HomeMy WebLinkAbout06-110 - Resolutions RESOLUTION NO. 06-110
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE
PARCEL MAP SUBTPM18209,A SUBDIVISION OF 7.36 ACRES OF LAND
INTO 5 PARCELS IN THE INDUSTRIAL PARK DISTRICT (SUBAREA 6)
WITHIN THE HAVEN AVENUE OVERLAY DISTRICT, LOCATED AT THE
SOUTHEAST CORNER OF HAVEN AVENUE AND JERSEY BOULEVARD;
AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 0209-143-02.
A. Recitals.
1. Rock-Jersey, LLC filed an application for the approval of Tentative Parcel Map
SUBTPM18209, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Tentative Parcel Map request is referred to as "the application."
2. On the 13th day of December 2006, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during, the
above-referenced public hearing on December 13, 2006, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to one vacant parcel of land located at the southeast corner
of Haven Avenue and Jersey Boulevard, totaling 7.36 acres; and
b. The property to the north of the subject site is developed with a gas station and a
car wash, and is zoned Industrial Park (Subarea 6) within the Haven Avenue Overlay District; the
property to the south consists of office and industrial buildings and is zoned Industrial Park
(Subarea 6) within the Haven Avenue Overlay District; the property to the east is developed with
mini-storage buildings and is zoned Industrial Park(Subarea 6);and the property to the west, across
Haven Avenue, contains industrial buildings, vacant land and the Cucamonga Pioneer Winery is
zoned Industrial Park (Subarea 6) within the Haven Avenue Overlay District; and
C. The application proposes the subdivision of a 7.36-acre site into 5 parcels ranging
in size from .28 acre to 5.56 acres. All parcel sizes are permitted since the project site is part of a
master plan development that is consistent with the goals and objectives of the Haven Overlay
District by providing an office park development that promotes a high employment density with
shared points of access; and
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 2
d. The application, in conjunction with Development Review DRC2006-00513,
proposes the development of a master plan consisting of 4 office buildings; and
e. The subdivision,together with the recommended conditions of approval, complies
with all minimum development standards for the City of Rancho Cucamonga.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
a. That Tentative Parcel Map SUBTPM18209 is consistent with the General Plan,
Development Code, and any applicable specific plans; and
b. The design or improvements of Tentative Parcel Map SUBTPM18209 is consistent
with the General Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. Tentative Parcel Map SUBTPM18209 is not likely to cause serious public health
problems; and
f. The design of Tentative Parcel Map SUBTPM18209 will not conflict with any
easement acquired by the public at large, now of record, for access through or use of the property
within the proposed subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, togetherwith all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act("CEQX)and the City's local
CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of
the project. Based on the findings contained in that Initial Study, City staff determined that, with the
imposition of mitigation measures, there would be no substantial evidence that the project would
have a significant effect on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter, the City staff provided public notice of the public comment
period and of the intent to adopt the Mitigated Negative Declaration.
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and, based on the whole record before
it,finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii)that,
based on the imposition of mitigation measures,there is no substantial evidence that the projectwill have
a significant effect on the environment. The Planning Commission further finds that the Mitigated
Negative Declaration reflects the independent judgment and analysis of the Planning Commission.
Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration.
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 3
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission therefore
adopts the Mitigation Monitoring Program for the project.
d. Pursuant to the requirements of California Fish and Game Code Section 711.4 and
Title 14 of the California Code of Regulations, Section 753.5,the Planning Commission finds, based
on the Initial Study, the Mitigated Negative Declaration, and considering the record as a whole, that
there is no evidence before the City that the proposed project will have the potential for an adverse
effect on wildlife resources or the habitat upon which the wildlife depends. The project site is
surrounded by industrial and commercial development, and the site has not been identified as
potential location for habitat that is known to support sensitive biological species. Further, the site
contains no blue line streams. Based on substantial evidence, the Planning Commission hereby
makes a declaration rebutting the presumption of adverse effect as set forth in California
Department of Fish and Game Regulation 753.5 (Title 14 of the California Code of Regulations
Code, Section 753.5.)
e. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program and all other materials which constitute the record of proceedings
upon which the Planning Commission's decision is based is the Planning Director of the City of
Rancho Cucamonga. Those documents are available for public review in the Planning Department
of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga,
California 91730, telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) All conditions of approval for Development Review DRC2006-00513
shall apply.
2) Approval is for a 5 parcel subdivision of 7.36 acres of land. Parcel A
shall be common area for parcels 1-4.
3) Covenants, Conditions, and Restrictions (CC&Rs) shall be prepared
(or amended)to address such issues as reciprocal ingress and egress,
reciprocal parking, property maintenance standards and landscaping
standards, and adherence to the Uniform Sign Program in order to
ensure coordinated long term maintenance of the project. The CC&Rs
shall be reviewed and approved by the City Attorney prior to map
recordation.
Engineering Department
1) The Capital Improvement Section of the City's Engineering Department
is preparing plans for the construction of a grade separation (railway
over-crossing Haven Avenue) along Haven Avenue adjacent to this
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 4
site. This development shall be constructed considering the ultimate
configuration of the proposed Haven Avenue Grade Separation
improvements including, but not limited to, Haven Avenue street
widening, revised curb alignment and grade, slopes, setbacks and all
other items related to the Haven Avenue Grade Separation Project.
Reference City drawing number 1986 sheets 1 thru 123 inclusive, for
the Haven Grade Separation project from south of 7th Street to 26th
Street.
a) This project (SUBTPM18209 and DRC2006-00513) will be
required to dedicate additional right-of-way to the City along both
Haven Avenue and Jersey Boulevard for street and/or sidewalk
related purposes per City Standards.
b) Haven Avenue dedication shall facilitate all needs for the City's
Grade Separation Project including, but not limited to, slopes,
curvilinear sidewalk, turn lanes, utilities, etc.
c) Project conditions shall be modified upon approval of an
agreement between the City and developer relative to the
Haven Grade Separation Project right-of-way acquisition,
hereinafter referred to as "settlement agreement."
2) Haven Avenue is a Major Divided Arterial, with a 94-foot mid-block
pavement width and 120-foot rights-of-way. This development is
responsible for the installation of all frontage Public Improvements,
which are also included in the City of Rancho Cucamonga's Capital
Improvement Project Section's "Haven Avenue Grade Separation
Project." Frontage improvements include, but are not limited to,
commercial drive approach, streetlights, landscaped median, street
trees, curvilinear sidewalk, turn lanes, and other potential
improvements.
a) Extend the intersection right-turn-lane south of drive approach
consistent with Standard Drawing No. 119.
b) No new median openings on Haven Avenue.
c) If this site develops before Haven Avenue Grade Separation, a
fee contribution in lieu of construction shall be made for frontage
improvements to be deferred.
d) Sidewalks shall cross commercial drive approaches at the zero
curb face per City Standard Drawing No. 101, Type C.
e) Access and parkway landscaping shall conform to Consolidated
Development Code Section 17.30.080-A for the Haven Avenue
Overlay District.
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 5
3) Upon approval of a "settlement agreement" by City Council, all
Haven Avenue improvements shall be waived, including any payment
of a contribution in lieu of construction.
4) Provide commercial drive approaches per City Standard 101, Type C
for the Haven Avenue and the Jersey Boulevard driveways (not a cross
gutter and access ramps). The Haven Avenue drive approach shall be
constructed by the City per the approved "settlement agreement."
a) Installation of the Haven Avenue drive access shall be
coordinated with the City's Haven Grade Separation Project.
5) City owned and maintained landscaping within the Haven Grade
Separation Project right-of-way acquisition area shall be credited in the
amount of 25,571 square feet towards the developer's required on-site
landscaping until approval of a "settlement agreement"that allows the
credit to the developer.
6) The private walkways on the west sides of the buildings (specifically
Building 4)shall not encroach into the dedication for the Haven Avenue
grade separation. However, the developer may provide a legal
description for the encroachment area(s),to the City's satisfaction, and
the area shall be abandoned for right of way purposes,while reserving
utility easements per the approved "settlement agreement."
7) All match-up grading shall be maintained on-site out of the City right-of-
way. The developer may provide a legal description for the
encroachment area, to the City's satisfaction, and the area shall be
abandoned for right of way purposes,while reserving utility easements,
per the approved "settlement agreement."
8) The frontage improvements on Jersey Boulevard shall include curb
and gutter, 1-foot wide AC back patch, 9500 Lumen HPSV streetlights,
however AC overlay will not be required, property line adjacent
sidewalk, commercial drive approach, and street trees as required.
Provide traffic striping and protect existing traffic signs, including R-
26(S), or replace as required. 72.4+/- Linear feet of curb and gutter
matching up to Haven Boulevard and related 1 foot wide AC back
patch shall be waived with an approved settlement agreement.
a) The driveway on Jersey Boulevard shall align (centerline to
centerline)with existing Monroe Avenue on the north side of the
street. The sidewalks shall cross commercial drive approaches
at the zero curb face per City Standard Drawing No. 101,Type C.
b) Protect all traffic signal equipment and/or relocate, adjust to
grade or replace as required. This shall be waived with an
approved "settlement agreement."
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 6
9) The street trees on Jersey Boulevard and Haven Avenue shall be per
the previously provided Street Tree Requirements Form developed for
this project. The sidewalk on Jersey Boulevard shall be property line
adjacent with street trees placed between the back of the curb and the
sidewalk. Haven Avenue street trees in the grade separation area
shall be waived in accordance with the approved "settlement
agreement."
10) Provide sidewalk easements on Tentative Parcel Map SUBTPM18209
whenever sidewalks cross drive approaches outside the street
right-of-way.
11) An in-lieu fee as contribution to the future under-grounding of any and
all existing overhead utilities such as CATV, electrical and telephone,
except for the 66 kV electrical on Haven Avenue, and except for the
existing underground telephone on Jersey Boulevard, shall be
collected for the Developer's sides, (east side) of Haven Avenue and
(south side) of Jersey Boulevard. Said fees shall be paid to the City,
as calculated and shown on exhibit "G", prior to the issuance of
building permits or the award of the City's Haven Avenue Grade
Separation Improvement Project,whichever comes first. However,the
first 10% (or documented actual design costs) of the fee shall be paid
within 30 days of Planning Commission approval of these conditions.
Note: Telephone will be undergrounded along Haven Avenue by the
utility at their cost with the Haven Grade Separation Project. No other
undergrounding fees or costs shall be required on Jersey Boulevard.
12) The developer shall execute a line extension agreement for the
electrical service and shall construct electrical distribution facilities in
accordance with such agreement and Rancho Cucamonga Municipal
Utility requirements and dedicate such facilities to the Rancho
Cucamonga Municipal Utility. The Rancho Cucamonga Municipal
Utility shall be the electrical service provider and will provide a service
connection to the site no later than June 1, 2007.
13) The corner property line cutoff shall be dedicated per the City
Standards.
14) The Jersey Boulevard street parkway shall slope at 2 percent from the
top of the curb to 1 foot beyond the property line adjacent to the
sidewalk along all street frontages. Join the on-site grading with a
maximum 2:1 slope.
15) Provide a Water Quality Management Plan(WQMP),to the satisfaction
of the City Engineer, and identify applicable Best Management
Practices (BMPs) on the grading plan.
a) Maintenance of BMP's identified in the WQMP shall be
addressed in the project CC&R's.
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 7
16) Process a revision to add a private storm drain connection to the
existing public storm drain in Utica Avenue. Suggested plans to
consider revising include Drawing No. 1143 or sheet 30 of
Drawing No. 1049. Private storm drain plans and studies will be
reviewed by Building and Safety. Provide a reference copy to the
Engineering Department.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any Grading Permits, the developer shall
submit construction plans to the City denoting the proposed schedule
and projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD), as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule, established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 8
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and the Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
9) The construction contractor shall ensure that construction Grading
Plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of
10 minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
Biological Resources
1) The four Eucalyptus Red Gum shall be replaced at a 1:1 ratio,with the
largest nursery grown specimens available. Final design, species, and
placement of the replacement trees shall be subject to Planning
Director review and approval during plan check.
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 9
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources,following appropriate
CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be appropriate. Where
mitigation monitoring is appropriate, the program must include, but not
be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the discovery,
the grading contractor should immediately divert construction and
notify the monitor of the find.
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 10
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to the
San Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Prior to issuance of Grading Permits,the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SWPPP) specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An Erosion Control Plan shall be prepared, included in Grading Plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time of ground
disturbing activities are initiated through completion of grading. This
Erosion Control plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to minimize
soil exposure to rainy periods experienced in southern California, and
b)An inspection and maintenance program shall be included to ensure
that any erosion which does occur either on-site or off-site as a result
of this project will be corrected through a remediation or restoration
program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 11
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks, to
control dust in order to prevent discharge of debris or sediment from
the site.
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by Goodman and Associates, June
13, 2006, to reduce pollutants after construction entering the storm
drain system to the maximum extent practical.
6) Roof outlet drains directly to landscape areas.
7) Parking lot drains to a vegetated swale before entering the public
street.
8) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
Grading Permits.
9) Prior to issuance of Building Permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in
June 2004.
10) Prior to issuance of Grading or Paving Permits, applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Interior: A final acoustical report shall be submitted for Planning
Director review and approval prior to the issuance of building permits.
The final report shall discuss the level of interior noise attenuation to
below 60 dBA, the building materials, and construction techniques
required. The building plans will be checked for conformance with the
mitigation measures contained in the final report.
PLANNING COMMISSION RESOLUTION NO. 06-110
SUBTPM18209 - ROCK-JERSEY, LLC
December 13, 2006
Page 12
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 13TH DAY OF DECEMBER 2006.
PLANNING C ISSION F THE CITY OF RANCHO CUCAMONGA
BY:
am St rt, Chairman
ATTEST:
Ja s R. Troyer, AICP, S retary
I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 13th Day of December 2006, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, MACIAS , McPHAIL, MUNOZ, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
in MITIGATION MONITORING
PROGRAM
Project File No.: Tentative Parcel Map SUBTPM18209 and Development Review DRC2006-00513
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration forthe above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
Conditions of approval that act as impact mitigation measures are recorded with the action and the
procedure necessary to ensure compliance. The mitigation measure conditions of approval are
contained in the adopted Resolution of Approval for the project.
1. A procedure of compliance and verification has been outlined for each action necessary.This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
2. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
1. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
MITIGATION MONITORING PROGRAM
SUBTPM18209 AND DRC2006-00513— ROCK-JERSEY, LLC
Page 2
2. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
3. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
4. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
5. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City
department and a copy provided to the appropriate design, construction, or operational
personnel.
6. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued.The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto is not occurring.The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
7. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require
the applicant to post any necessary funds (or other forms of guarantee)with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor
and report on the mitigation measure for the required period of time.
8. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: Tentative Parcel Map SUBTPM18209 and Development Review DRC2006-00513 Applicant: Rock-Jersey, LLC
Initial Study Prepared by: Donald Granger Date: October 5, 2006
Mitigation Measures No. Responsible Monitoring Timing of of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any grading permits, the CP/BO C Review of plans C 2
developer shall submit construction plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
1 of 8
Mitigation Measures No./ Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds(i.e., BO C During A 4
wind speeds exceeding 25 mph) in accordance with construction
SCAOMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
Regional Water Quality Control Board [RWQCB]) daily
to reduce Fine Particulate Matter (PMIO) emissions, in
accordance with SCAQMD Rule 403.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
2 of 8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate CP C Review of plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
Biological Resources
The four Eucalyptus Red Gum shall be replaced at a 1:1 CP B Review of plans A/C 2/3
ratio, with the largest nursery grown specimens
available. Final design, species, and placement of the
replacement trees shall be subject to Planning Director
review and approval during plan check.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
3 of 8
Mitigation Measures No./ Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Enact interim measures to protect undesignated CP/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the CP/BO C Review of report A/D 3/4
archaeological heritage of the area.
Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate
California Environmental Quality Act (CEQA)
guidelines.
• Prepare a technical resources management report, CP C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
If any paleontological resource (i.e. plant or animal CP B Review of report A/D 4
fossils) are encountered before or during grading, the
developer will retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring)that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
4 of 8
Mitigation Measures No. Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Assign a paleontological monitor, trained and CP B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
Should fossils be found within an area being cleared BO B/C Review of report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for CP D Review of report D 3
documentation in the summary report and transfer to
an appropriate depository (i.e., San Bernardino
County Museum).
Submit a summary report to the City of Rancho CP D Review of report D 3
Cucamonga. Transfer collected specimens with a
copy of the report to the San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RWQCB)dailyto reduce PM,oemissions,in accordance
with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,p construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM,o emissions construction
from the site during such episodes.
5 of 8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,a emissions.
Hydrology and Water Quality
Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans. A/C 2/4
shall submit to the Building Official for approval of a
Storm Water Pollution Prevention Plan (SWPPP)
specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants
during construction activities entering the storm drain
system to the maximum extent practical.
An erosion control plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
the grading plan, and implemented for the proposed
project that identifies specific measures to control
on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of
grading. This erosion control plan shall include the
following measures ata minimum: a)Specify the timing
of grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
6 of 8
Mitigation Measures No. Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan(WQMP),prepared
by Goodman and Associates on June 13, 2006, to
reduce pollutants after construction entering the storm
drain system to the maximum extent practical.
Roof outlet drains directly to landscape areas. CE B/C/D Review of plans A/C 2/4
Parking lot drains to a vegetated swale before entering CE B/C/D Review of plans A/C 2/4
the public street.
Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years,shall be submitted to the City for
review and approval prior to the issuance of grading
permits.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a WQMP,
including a project description and identifying BMPs that
will be used on-site to reduce pollutants into the storm
drain system to the maximum extent practicable. The
WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New
Development and Redevelopment adopted bythe City of
Rancho Cucamonga in June 2004.
7 of 8
Mitigation Measures No. Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Prior to issuance of grading or paving permits, the BO B/C/D Review of plans A/C 2/4
applicant shall obtain a Notice of Intent(NOI)to comply
with obtaining coverage under the NPDES General
Construction Storm Water permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction permit.
Noise
Interior: A final acoustical report shall be submitted for CP C Plan Check C 2
Planning Director review and approval prior to the
issuance of building permits. The final report shall
discuss the level of interior noise attenuation to below 60
dBA,the building materials,and construction techniques
required. The building plans will be checked for
conformance with the mitigation measures contained in
the final report.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6- Revoke CUP
7-Citation
i:\planning\final\ceqa\mmchklst-rev1-05f inal.doc
8 of 8
Project No.SUBTPM18209
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
4. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
5. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering
Departments and the City Attorney. They shall be recorded concurrently with the Final Map or
prior to the issuance of building permits, whichever occurs first. A recorded copy shall be
provided to the City Engineer. The Homeowners' Association shall submit to the Planning
Department a list of the name and address of their officers on or before January 1 of each and
every year and whenever said information changes.
6. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and City Engineer review and approved
prior to the issuance of building permits.
D. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the
amount of$517 prior to the issuance of building permits, guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
E. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
2
I:\PLANNING\FINAL\PLNGCOMM\2006 Res&Stl Rpt\SUBTPM18209S1d Cond 12-13.doc
Project No.SUBTPM18209
completion Date
g. Planning Department Project Number (i.e., SUBTPM18209) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
F. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., SUBTPM18209). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
G. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
6. Upon tenant improvement plan check submittal, additional requirements may be needed.
3
I:\PLANNINGTINAL\PLNGCOMM\2006 Res&Stf Rpt\SUBTPM18209Std Cond 12-13.doc
Project No.SUBTPM18209
Completion Date
H. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading plan, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California
registered Civil Engineer.
6. If human remains are discovered on-site before or during grading, no further disturbance shall
occur until the County Coroner has made a determination of origin and disposition pursuant to
Public Resources Code Section 5097.98 and California Health and Safety Code Section 7050.5.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
I. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
101 total feet on Haven Avenue
44 total feet on Jersey Boulevard
2. Corner property line cutoffs shall be dedicated per City Standards.
3. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
4. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint
maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or
deeds and shall be recorded prior to, or concurrent with, the final parcel map.
5. Easements for public sidewalks, Haven Avenue grade separation slope,and bench and/or trees
shall be placed outside the public right-of-way shall be dedicated to the City.
6. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7
feet measured from the face of curbs.
4
(:\PLANNING\FINAL\PLNGC0MM\2006 Res&Stf Rpt\SUBTPM18209Std Cond 12-13.doc
Project No.SUBTPM18209
Completion Date
J. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council, except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Haven Avenue X X X X X X (e)
Jersey Boulevard X X X X X X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) If so marked,
sidewalk shall be curvilinear per Standard 114. (c) If so marked, an in-lieu of construction fee
shall be provided for this item. (e) Right-turn lane for Haven Avenue entry and Jersey
Boulevard.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
5
I:\PLANNING\FINAL\PLNGC0MM\2006 Res&Stf Rpt\SUBTPM18209Std Cond 12-13.doc
Project No.SUBTPM18209
Completion Date
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first plan _/_/_
check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in _/_/_
accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Jersey Boulevard Platanus acerifolia London Plan Tree 8' 30'0.C. 15 Gal Fill
In
Haven Avenue 'Fill
Foreground In
P.A. 8'or Greater, Magnolia grandiflora NCN 8' 60'0.C. 15 Gal
Generally in front of 'Majestic Beauty' Intentionally
sidewalk spaced this
far apart
P.A. Less Than 8' Magnolia grandiflora NCN 3' 20'0.C. 15 Gal 'Fill
"St. Mary" I I n
Primary Tree in Brachychiton populneus Bottle Tree 8' 25'0.C. 15 Gal 'Fill
Masses mainly Informal if In
behind sidewalk maintained
by City
Construction Notes for Street Trees: 'Fill in number of street trees on the public improvement
plan.
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
6
I:\PLANNING\FINAL\PLNGCOMM\2006 Res&Stf Rpt\SUBTPM18209Std Cond 12-13.doc
Project No.SUBTPM18209
Completion Date
K. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
L. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits, whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
M. Improvement Completion
1. If the required public improvements are not completed prior to approval of the final parcel map,
an improvement security accompanied by an agreement executed by the Developer and the City
will be required for: All public improvements.
N. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
O. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
7
I:\PLANNINGWINAL\PLNGCOMM\2006 Res&Stf Rpt\SUBTPM18209Std Cond 12-13.doc
Project No.SUBTPM18209
Completion Date
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
P. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
Q. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
R. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
S. Alarm Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in
turn save dollars and lives.
2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909)941-1488.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
8
I:\PLANNINGTINAL\PLNGCOM2006 Res&Stf Rpt\SUBTPM18209Std Cond 12-13.doc
„u Rancho Cucamonga Fire Protection
1 District
Fire Construction Services
STANDARD CONDITIONS
June 15, 2006
Haven & Jersey Office Park
10539 Jersey (existing address)
SUBTPM18209 & DRC2006-00513
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS
PROJECT.
The RCFPD Procedures & Standards which are referenced in this document can be access on
the web at httg://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Division
& Fire Construction Services section. Search by article; the preceding number of the standard
refers to the article. Chose the appropriate article number then a drop down menu will appear,
select the corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the
spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet. No portion of the exterior wall shall be located more than 150-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire
District.
V. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a public fire
hydrant measured on an approved route around the exterior of the facility or building,
additional private or public fire hydrants and mains capable of supplying the required
fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required fire flow for this project will be determined in accordance with Fire Code
Appendix III-A, as adopted by the Fire District Ordinances. The fire flow may be reduced
by 50-percent for the installation of an approved automatic fire sprinkler system in
accordance with NFPA 13 with central station monitoring. This requirement is made in
accordance with the California Fire Code Appendix III-A, as adopted by the Fire District
Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used
to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
3. Firewater plans are required for all projects that must extend the existing water supply to
or onto the site. Building permits will not be issued until firewater plans are
approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet
of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant
shall submit plans, specifications and calculations for the fire sprinkler system
underground supply piping. Approval of the underground supply piping system must be
obtained prior to submitting the overhead fire sprinkler system plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Assembly and Educational Occupancy Buildings.
3. "All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When buildings do not meet the requirements of the 2001 California Building Code and
the RCFPD Fire Department Access - Fire Lane Standard 9-7
6. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or
standards) requires an automatic and/or manual fire alarm system. Refer to RCFPD
Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6
and/or the California Fire Code.
2. Prior to any removal, remodel, modification and/or additions to the building or suite's fire
alarm system, Fire Construction Services' approval and a building permit must be
obtained. Plans and specifications shall be submitted to Fire Construction Services in
accordance with RCFPD Fire Alarm Standard #10-6.
3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by
a listed central station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private
roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire
Lanes Standard 9-7
1. Location of Access: All portions of the structures 1" story exterior wall shall be located
within 150-feet of Fire District vehicle access, measure on an approved route around the
exterior of the building. Landscaped areas, unpaved changes in elevation, gates and
fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 20-feet.
C. The minimum outside turn radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on
each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to
obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided as follows:
3
a. In buildings without high-piled storage, access shall be provided in accordance with
the 2001 California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal
feet or major fraction thereof, of the exterior wall that faces the required access
roadways. When railways are installed provisions shall be made to maintain Fire
District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road
shall be in accordance with Fire District Standard #9-2. The following design requirements
apply:
a. Prior to the fabrication and installation of the gates, plans are required to be
submitted to Fire Construction Services (FCS) for approval. Upon the completion of
the installation and before placing the gates in service, inspection and final
acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety
Office for $20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override
device and a fail-safe or battery backup feature to open the gate or release the
locking Mechanism in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must
be installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the
complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and
operation must be approved by the Fire Chief prior to installation. Bi-directional or
multiple sensors may be required due to complexity of the various entry
configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site
plan illustrating the proposed delineation that meets the minimum Fire District standards
shall be included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly
noted on the site plan. A copy of the approved Alternative Method application, if
4
applicable, must be reproduced on the architectural plans submitted to B&S for plan
review.
8. Roof Access: There shall be a means of fire department access from the exterior walls
of the buildings on to the roofs of all commercial, industrial and multi-family residential
structures with roofs less than 75' above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an
aerial ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with
construction features, or high parapets that inhibit roof access.
C. The number of ladder points may be required to be increased, depending on the
building size and configuration.
d. Regardless of the parapet height or construction features the approved ladder point
shall be identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions,
a permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard
9-9 Appendix A and drawings 9-9a and 9-9b.
h. A site plan showing the locations of the roof ladder shall be submitted during plan
check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or
building construction. Plan check submittal is required with the permit application for approval
of the permit; field inspection is required prior to permit issuance. General Use Permit shall be
required for any activity or operation not specifically described below, which in the judgment of
the Fire Chief is likely to produce conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies
• Compressed Gases
• Public Assembly
• Cryogenics
• Dry Cleaning Plants
• Refrigeration Systems
• Repair Garages
5
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-11 Hazardous Materials — Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the San
Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and
assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency
(CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety
will not be finalized until the San Bernardino County Fire Department reviews your
Business Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the applicant has
met or is meeting specific hazardous materials disclosure requirements. A Risk
Management Program (RMP) may also be required if regulation substances are to be
used-or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a
Plan, is also required to submit a notice to the owner of the property in writing stating that
the business is subject to the Business Emergency/Contingency Plan mandates and has
complied with the provisions. The tenant must provide a copy of the Plan to the property
owner within five (5) working days, if requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate
method, when submitted. The request must be submitted on the Fire District "Application for
Alternate Method" form along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply
are required on this project. The project appears to be located on a property that is being
subdivided. The reciprocal agreement is required to be recorded between property
owners and the Fire District. The recorded agreement shall include a copy of the site
6
plan. The Fire Construction Services shall approve the agreement, prior to recordation.
The agreement shall be recorded with the County of San Bernardino, Recorders Office.
Reciprocal access agreement— Please provide a permanent access agreement between
the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to
gain access to the subject property. The agreement shall include a statement that no
obstruction, gate, fence, building or other structure shall be placed within the dedicated
access, without Fire Department approval. The agreement shall have provisions for
emergency situations and the assessing of cost recovery to the property by the fire District.
Reciprocal water covenant — Please provide a permanent maintenance and service
covenant between the owners granting an irrevocable and non-exclusive easement,
favoring the Fire District for the purpose of accessing and maintaining the private water
mains, valves and fire hydrants (fire protection systems facilities in general). The covenant
shall have provisions for emergency situations and the assessing of cost recovery to the
property by the fire District.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community
Facilities District #85-1 or #88-1 is required prior to the issuance of grading or building permits.
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to
the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District
Standards. Approval of the on-site (private) fire underground and water plans is required
prior to any building permit issuance for any structure on the site. Private on-site
combination domestic and fire supply system must be designed in accordance with
RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire
Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. Fire construction Services will inspect the
installation, witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the
Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot
radius of the project. Please reference the RCFPD Water Plan Submittal Procedure
Standard 9-8.
All required public fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. CCWD personnel shall inspect the
installation and witness the hydrant flushing. Fire Construction Services shall inspect the
site after acceptance of the public water system by CCWD. Fire Construction Services
must grant a clearance before lumber is dropped.
7
3. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access
roads must be installed at least 14' 6" above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the letter to
Fire Construction Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be
recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' "Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the City of
Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant
Markers". On private property, the markers shall be installed at the centerline of the fire
access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the most
hydraulically remote on-site fire hydrants. The underground fire line contractor, developer
and/or owner are responsible for hiring the company to perform the test. A final test
report shall be submitted to Fire Construction Services verifying the fire flow available.
The fire flow available must meet or exceed the required fire flow in accordance with the
California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler monitoring system must be tested and accepted by Fire Construction Services.
The fire sprinkler monitoring system shall be installed, tested and operational immediately
following the completion of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be
inspected, tested and accepted by Fire Construction Services before occupancy is granted
and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm
system shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular
gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1
or #9-2 by Fire Construction Services.
8
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire
access roadways must be installed in accordance with the approved plans and acceptable
to Fire Construction Services.
9. The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the
required annual inspections and the maintenance of all required fire access roadways.
10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness.
When the building setback exceeds 200 feet from the public street, an additional non-
illuminated 6-inch minimum number address shall be provided at the property entrance.
Larger address numbers will be required on buildings located on wide streets or built with
large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
11. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant
must demonstrate (in writing from the County) that the facility has met or is meeting the
Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San
Bernardino County Fire Department, Hazardous Materials/Emergency Response and
Enforcement Division. The applicant must also obtain inspection and acceptance by Fire
Construction Services.
12. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form.
This form provides contact information for Fire District use in the event of an emergency at
the subject building or property. This form must be presented to the Fire Construction
Services Inspector.
1. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Yz" x 11" or 11"
x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the
applicant to reflect the actual location of all devices and building features as required in the
standard. The site plan must be reviewed and accepted by the Fire Inspector.
9
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Tentative Parcel Map SUBTPM18209 and Development Review DRC2006-00513
Public Review Period Closes: December 13, 2006
Project Name: Project Applicant: Rock-Jersey, LLC
Project Location (also see attached map): Located at the southeast corner of Haven Avenue and
Jersey Boulevard —APN: 0209-143-02.
Project Description: A request to subdivide 7.36 acres of land into 5 parcels for the purpose of
developing a master plan for an office park consisting of 4 buildings totaling 97,300 square feet in
the Industrial Park District (Subarea 6) within the Haven Avenue Overlay District.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax
(909)477-2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
December 13, 2006
Date of Determination Ad6pted By