HomeMy WebLinkAbout07-05 - Resolutions RESOLUTION NO. 07-05
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE
PARCEL MAP SUBTPM17818, A REQUEST TO SUBDIVIDE 12.66 NET
ACRES OF LAND INTO 6 PARCELS FOR COMMERCIAL AND
PROFESSIONAL OFFICE PURPOSES DESIGNATED AS GENERAL
COMMERCIAL AND WITHIN THE DISTRICT OF INDUSTRIAL PARK
(SUBAREA 7), LOCATED AT THE SOUTHEAST CORNER OF FOOTHILL
BOULEVARD AND ROCHESTER AVENUE; AND MAKING FINDINGS IN
SUPPORT THEREOF - APN: 0229-021-31 AND 32.
A. Recitals.
1. Charles Joseph Associate, Inc. filed an application for the approval of Tentative Parcel
Map SUBTPM17818, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Tentative Parcel Map is referred to as "the application."
2. On the 24th day of January 2007, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on January 24, 2007, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the property located at the southeast of
Foothill Boulevard and Rochester Avenue and is presently vacant; and
b. The site is rectangular in shape and is comprised of two parcels. It is vacant with
sparse vegetation and weeds covering the majority of the site and has evidence of discing for weed
abatement purposes. To the north of Foothill Boulevard is the recently approved commercial center
(Conditional Use Permit DRC2005-00365);to the east is an Edison Power Line Corridor; and to the
south is vacant land with a professional office project that was approved by the Planning
Commission on December 13, 2006. To the west/north is the Aggazzotti home, formerly a winery
and designated Historic Point of Interest(not a part of the project), and the Masi Plaza commercial
center is across the street of Rochester Avenue; and
C. The applicant is proposing to subdivide the subject site into six parcels for an office
building and retail center within the Industrial Park District (Subarea 7); and
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 2
d. The map, together with the recommended conditions of approval, complies with
land division standards for the City of Rancho Cucamonga and the Subdivision Map Act; and
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above and as analyzed in the Initial Study Part II, this Commission hereby finds and
concludes as follows:
a. The design or improvements of the Tentative Parcel Map is consistent with the
General Plan, Development Code, and any applicable specific plans; and
b. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
C. The Tentative Parcel Map is not likely to cause serious public health problems;and
d. The design of the Tentative Parcel Map will not conflict with any easement acquired
by the public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act("CEQA")and the City's local
CEQA Guidelines, City staff prepared an Initial Study of the potential environmental effects of the
project. Based on the findings contained in that Initial Study, City staff determined that, with the
imposition of mitigation measures, there would be no substantial evidence that the project would
have a significant effect on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter, City staff provided public notice of the public comment period
and of the intent to adopt the Mitigated Negative Declaration.
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and,based on the whole record before
it,finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA;and (ii)that,
based on the imposition of mitigation measures,there is no substantial evidence that the project will have
a significant effect on the environment. The Planning Commission further finds that the Mitigated
Negative Declaration reflects the independent judgment and analysis of the Planning Commission.
Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration.
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission, therefore,
adopts the Mitigation Monitoring Program for the project.
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 3
d. Pursuant to the requirements of California Fish and Game Code Section 711.4 and
Title 14 of the California Code of Regulations, Section 753.5,the Planning Commission finds,based
on the Initial Study, the Mitigated Negative Declaration, and considering the record as a whole,that
there is no evidence before the City that the proposed project will have the potential for an adverse
effect on wildlife resources or the habitat upon which the wildlife depends. The project site is
surrounded by industrial and commercial development, and the site has not been identified as
potential location for habitat that is known to support sensitive biological species. Further, the site
contains no blue line streams. Based on substantial evidence, the Planning Commission hereby
makes a declaration rebutting the presumption of adverse effect as set forth in California
Department of Fish and Game Regulation 753.5 (Title 14 of the California Code of Regulations
Code, Section 753.5.)
e. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program, and all other materials which constitute the record of proceedings
upon which the Planning Commission's decision is based is the Planning Director of the City of
Rancho Cucamonga. Those documents are available for public review in the Planning Department
of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga,
California 91730, telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) The map will be subdivided in accordance with the map proposal
on-file in the Planning Department as approved by the Design Review
Committee on December 19, 2006.
2) All pertinent conditions from Development Review DRC2006-00127
shall apply.
3) A reciprocal maintenance agreement ensuring joint maintenance of all
landscape areas, common areas, drives, and parking areas shall be
recorded prior, or concurrent with, the final parcel map.
Engineering Department
1) Foothill Boulevard frontage improvements are to be in accordance with
City "Major Divided Arterial" standards as required and including
(12 feet left— 1/2, 4 feet median, 13 feet thru, 11 feet thru, 11 feet thru,
5 feet bike lane):
a) Provide ultimate curb, gutter, street trees, access ramps, and
sidewalk to provide for 300 feet dual westbound left-turn lanes.
b) Provide eastbound bus bay on the south side of
Foothill Boulevard, east of "Not-A-Part" parcel.
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 4
c) Protect and relocate street lights along the Foothill Boulevard
frontage.
d) Provide or protect R26(s) "No Stopping" signs along the
Foothill Boulevard frontage.
e) Provide new median openings in Foothill Boulevard at the
easterly project boundary, with 200 feet eastbound and
westbound left-turn lanes.
f) Provide traffic signal equipment with the Foothill Boulevard Visual
Improvement Plan at new median openings in Foothill Boulevard
at the easterly project boundary.
g) The Easterly driveway shall be 44 feet wide (20 feet southbound,
10 feet left, 14 feet thru and right) with a modified asphalt
transition as approved by the City Engineer. The westerly drive
approach shall be a minimum of 35 feet wide, per City
Standard 101, Type C.
h) The Foothill Boulevard frontage shall be designed in accordance
with the City adopted Foothill Boulevard Visual Improvement Plan
including street lights, traffic signal, street pavers, Route 66
signage, and activity centers. A portion of the Foothill Boulevard
median island, including landscaping and irrigation, shall be
reconstructed. Revise existing Landscape Maintenance District
plans accordingly to reflect the above improvements.
i) Pavement reconstruction and overlays will be determined during
plan check from Rochester Avenue to the Day Creek Channel
bridge.
j) For that portion of the pavement overlay easterly of the property
line of the project and for the reconstruction of the median
left-turn pocket at Rochester Avenue, this work is eligible for
transportation fee credit or reimbursement.
2) Rochester Avenue frontage improvements are to be in accordance with
City "Major Divided Arterial" standards as required and including
(10 feet left — 1/2, 11 feet thru, 11 feet thru, 4 feet bike lane, 11 feet
right):
a) Provide sidewalk, street lights, street trees, and drive
approaches, as required.
b) Driveways are to be in accordance with the City's Driveway
Policy. The drive approach shall be a minimum of 35 feet wide
and maximum of 50 feet wide per City Standard 101, Type C.
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES °
January 24, 2007
Page 5
c) Provide a right-of-way dedication for a future
deceleration/right-turn lane on Rochester Avenue to
Foothill Boulevard. Construct a portion of the right-turn lane as
determined by the City Engineer.
d) Protect or relocate street lights along Rochester Avenue frontage.
e) Protect R26(s) "No Stopping" signs along Rochester Avenue
frontage.
f) Protect or replace traffic striping and signage, as required.
3) Provide the following along the "Not-A-Part" (N.A.P.) frontage.
a) Provide ultimate traffic lanes for Foothill Boulevard including
300 feet dual westbound left-turn lanes. Measured from the
centerline, the width of the lanes shall be as follows: 12 feet left,
4 feet median, 13 feet thru, 11 feet thru, 11 feet thru, 5 feet bike
lane, in the event the City obtains the appropriate right-of-way
prior to completion of the project.
i) Provide interim plan in the even the City of Rancho
Cucamonga cannot obtain appropriate right-of-way from
"Not-A-Part"parcel. For the interim plan, the bike lane may
be omitted.
b) Provide ultimate traffic lanes for Rochester Avenue including
northbound right-turn/bike lane. The width of the lanes
measured from centerline shall be as follows: 10 feet left— 1/2,
11 feet thru, 11 feet thru, 4 feet bike lane, 11 feet right. Provide
an interim plan in the event the City of Rancho Cucamonga
cannot obtain appropriate right-of-way from "Not-A-Part" parcel.
c) Provide missing public improvements on both Foothill Boulevard
and Rochester Avenue as curb/gutter, street lights, street trees,
access ramps, drive approaches, signing, and striping.
d) Remove and replace traffic signal equipment to ultimate location.
e) For the installation of the above improvements, the developer
shall receive credit against, and reimbursement of costs in
excess of, the Transportation Development Fee in conformance
with City policy. If the developer fails to submit for said
reimbursement agreement within 6 months of the public
improvements being accepted by the City, all rights of the
developer to reimbursement shall terminate.
4) The existing median island on Foothill Boulevard shall be
reconstructed to its ultimate location. The adjustment shall be
determined during plan check.
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 6
5) The existing overhead utilities (telecommunications and electrical,
except of the 66 kV electrical)on the project side of Rochester Avenue
shall be undergrounded from the first pole off-site to the south project
boundary to the first pole off-site north of the property line, prior to
public improvement acceptance or occupancy,whichever occurs first.
The developer may request a reimbursement agreement to recover
one-half the City adopted cost for undergrounding from future
development as it occurs on the opposite side of the street. If the
developer fails to submit for said reimbursement agreement within
6 months of the public improvements being accepted by the City, all
rights of the developer to reimbursement shall terminate.
6) The developer shall construct electrical distribution facilities in
accordance with Rancho Cucamonga Municipal Utility requirements
and dedicate such facilities to the Rancho Cucamonga Municipal
Utility. The Rancho Cucamonga Municipal Utility shall be the electrical
service provider for all project related development.
7) This development shall pay the City of Rancho Cucamonga
Redevelopment Agency for Parcel No. 0229-021-32 in the amount of
$257,714.83 as part of the 2003-01 CFD fair share improvements. The
said amount will increase after March of 2007 as determined by the
Redevelopment Agency.
8) The Water Quality Management Plan (WQMP) submitted with the
tentative map application has been reviewed and found to be
substantially complete. Include the Best Management Practices
(BMPs) identified in the plan on grading plans when submitted for
technical plan check.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per man ufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits,the developer shall submit
construction plans to the City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD), as well as City Planning staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high volume, low-pressure spray.
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 7
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule, established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon time of year
of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and the Regional Water Quality Control Board
[RWQCBj)daily to reduce Fine Particulate Matter(PM10) emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of
10 minutes).
PLANNING COMMISSION RESOLUTION NO. 07-05.
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 8
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the archaeological heritage of
the area.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) A qualified paleontologist shall conduct a preconstruction field survey
of the project site. The paleontologist shall submit a report of findings
that will also provide specific recommendations regarding further
mitigation measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate, the program
must include, but not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 9
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the discovery,
the grading contractor should immediately divert construction and
notify the monitor of the find.
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to the
San Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may
be used to minimize runoff and to enhance infiltration include Dutch
drains, precast concrete lattice blocks and bricks,terraces, diversions,
runoff spreaders, seepage pits, and recharge basins.
2) Prior to issuance of grading permits, the applicant shall prepare a
Storm Water Prevention Pollution Plan (SWPPP) that identifies Best
Management Practices (BMPs) to be implemented during the period
the site is under construction. BMPs shall be identified on the grading
plans for review and approval by the City Engineer.
3) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying BMPs that will
be used on-site to reduce pollutants into the storm drain system to the
maximum extent practicable. The WQMP shall identify the structural
and non-structural measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of Rancho
Cucamonga in June 2004.
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818 — CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 10
4) Prior to issuance of grading or paving permits, the applicant shall
submit to the City Engineer a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollution Discharge Elimination
System (NPDES) General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Dischargers Identification Number)
shall be submitted to the City Engineer for coverage under the NPDES
General Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D,as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Planning Department. The said consultant shall report their findings to
the Planning Department within 24 hours; however, if noise levels
exceed the above standards, then the consultant shall immediately
notify the Planning Department. If noise levels exceed the above
standards,then construction activities shall be reduced in intensity to a
level of compliance with above noise standards or halted.
3) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or any time
on Sunday or a national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 24TH DAY OF JANUARY 2007.
PLANNIN COQ MISSION" THE CITY OF RANCHO CUCAMONGA
BY: (/ �"�
Pam S wart hairman
ATTEST:
Jam R. Troyer, AIC , Seci tary
PLANNING COMMISSION RESOLUTION NO. 07-05
SUBTPM17818— CHARLES JOSEPH ASSOCIATES
January 24, 2007
Page 11
1, James R.Troyer, AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 24th day of January 2007, by the following vote-to-wit:
AYES: COMMISSIONERS: MACIAS, McPHAIL, MUNOZ, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: FLETCHER
City of Rancho Cucamonga
MITIGATION MONITORING
-F PROGRAM
Project File No.: Development District Amendment 2005-01008, Tentative Parcel Map
SUBTT17818, and Development Review DRC2005-01084.
This Mitigation Monitoring Program (MMP) has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration forthe above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action
and the procedure necessary to ensure compliance. The mitigation measure conditions of
approval are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the Planning Director, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
MITIGATION MONITORING PROGRAM
DRC2005-01008, SUBTT17818, AND DRC2005-01084
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or
additions. An MMP Reporting Form will be completed by the project planner or responsible
City department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued. The project planner or responsible City department also
has the authority to hold certificates of occupancies.if compliance with a mitigation measure
attached hereto is not occurring. The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Department. The Department shall
require the applicant to post any necessary funds (or other forms of guarantee) with the City.
These funds shall be used by the City to retain consultants and/or pay for City staff time to
monitor and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or Planning Director prior to the issuance of building
permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2005-01008, SUBTT17818, and DRC2005-01084 Applicant: Charles Joseph Associate
Initial Study Prepared by: Douglas Fenn Date: December 14, 2006
Mitigation Measures No. Responsible Monitoring Timing . of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality. -:., ,.;r -! ' .c�.. .., ,,.F r�•.. F 'k rJ,, q., t
All construction equipment shall be maintained in good PD C Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any grading permits, the PD/BO C Review of Plans C 2
developer shall submit construction plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed PD C Review of Plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108..
All construction equipment shall comply with SCAQMD BO C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
Reestablish ground cover on the construction site BO C Review of Plans A/C 2/4
throw h seeding and watering.
1 of 7
Mitigation Measures No. Responsible Monitoring Timing of
Method of Verif ied Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Pave or apply gravel to any on-site haul roads. BO C Review of Plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of Plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of Plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds (i.e., BO C During A 4
wind speeds exceeding 25 mph) in accordance with construction
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C Review of Plans A 4
haul trucks or cover payloads using tarps or other
suitable means.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and the construction
Regional Water Quality Control Board [RWQCB]) daily
to reduce Fine Particulate Matter (PM,o) emissions, in
accordance with SCAQMD Rule 403.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
The construction contractor shall utilize electric or clean BO C Review of Plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of Plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of Plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
2 of 7
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All industrial and commercial facilities shall designate PD C Review of Plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or PD C Review of Plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or PD C Review of Plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
p.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
Enact interim measures to protect undesignated PD/BO C Review of A/D 3/4
sites from demolition or significant modification Report
without an opportunity for the City to establish its
archaeological value.
Consider establishing provisions to require PD/BO C Review of A/D 3/4
incorporation of archaeological sites within new Report
developments, using their special qualities as a
theme or focal point.
Pursue educating the public about the PD/BO C Review of A/D 3/4
archaeological heritage of the area. Report
Propose mitigation measures and recommend PD/BO C Review of A/D 3/4
conditions of approval to eliminate adverse project Report
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
3 of 7
Mitigation Measures No./ Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Prepare a technical resources management report, PD C Review of A/D 3/4
documenting the inventory, evaluation, and Report
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
A qualified paleontologist shall conduct a precohstruction PD B Review of A/D 4
field survey of the project site. The paleontologist shall Report
submit a report of findings that will also provide specific
recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be
appropriate.Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
Assign a paleontological monitor, trained and PD B Review of A/D 4
equipped to allow the rapid removal of fossils with Report
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
Should fossils be found within an area being cleared BO B/C Review of A/D 4
or graded, divert earth-disturbing activities Report
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
Submit a summary report to the City of Rancho PD D Review of D 3
Cucamonga. Transfer collected specimens with a Report
copy of the report to the San Bernardino County
Museum.
Geologic Proble
g ms
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and Construction
RW QCB)daily to reduce PM,o emissions, in accordance
with SCAQMD Rule 403.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,, Construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
4of7
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM, emissions Construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM,a emissions.
Hydrology and Water Quality �. z
Structures to retain precipitation and runoff on-site shall BO B/C/D Review of Plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions,runoff spreaders,seepage pits,and recharge
basins.
Prior to issuance of grading permits, the applicant shall BO B/C/D Review of Plans A/C 2/4
prepare a Storm Water Prevention Pollution Plan
(SWPPP) that identifies Best Management Practices
(BMPs) to be implemented during the period the site is
under construction. BMPs shall be identified.on the
grading plans for review and approval by the City
Engineer.
Prior to issuance of building permits,the applicant shall BO B/C/D Review of Plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying BMPs that will be used
on-site to reduce pollutants into the storm drain system
to the maximum extent practicable. The WQMP shall
identify the structural and non-structural measures
consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho
Cucamonga June 2004.
5 of 7
Mitigation Measures No.
Responsible . . of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Prior to issuance of grading or paving permits, the BO BUD Review of Plans A/C 2/4
applicant shall submit to the City Engineer a Notice of
Intent(NOI)to comply with obtaining coverage under the
National Pollutant Discharge Elimination System
(NPDES) General Construction Storm Water Permit
from the State Water Resources Control Board.
Evidence that this has been obtained (i.e., a copy of the
Waste Discharger's Identification Number) shall be
submitted to the City Engineer for coverage under the
NPDES General Construction Permit.
Noise
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code Section Construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Planning Department. The said
consultant shall report their findings to the Planning
Department within 24 hours; however, if noise levels
exceed the above standards, then the consultant shall
immediately notify the Planning Department. If noise
levels exceed the above standards, then construction
activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
6 of 7
Mitigation Measures No. Responsible Monitoring Timing of
Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verif!cation Verif!cation Date/initials Non-Compliance
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitorin fFrequency�; �. � *Method of Verification k �x ;Sanctions
9
CDD - Community Development Director A - With Each New A- On-site Inspection 1 - Withhold Recordation of Final
or designee Development Map
PD— Planning Director or designee B - Prior To Construction B - Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE - City Engineer or designee C -Throughout Construction C - Plan Check 3 - Withhold Certificate of
Occupancy
BO - Building Official or designee D - On Completion D-Separate Submittal(Reports/Studies/Plans) 4 - Stop Work Order
PO - Police Captain or designee E - Operating 5 - Retain Deposit or Bonds
FC - Fire Chief or designee 6 - Revoke CUP
7 - Citation
7 of 7
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE PARCEL MAP SUBTPM17818
SUBJECT: SUBDIVISION OF 12.66 ACRES LAND INTO 6 PARCELS
APPLICANT: CHARLES JOSEPH ASSOCIATES
LOCATION: SOUTHEAST CORNER OF FOOTHILL BOULEVARD AND ROCHESTER AVENUE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may, at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Approval of Tentative Tract No. SUBTPM17818 is granted subject to the approval of
DRC2005-01084.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
C. Site Development
1. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
SC-1-05 1
11PLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\SUBTPM17818 STD COND 1-24.doc
Project No.SUBTPM17818
Completion Date
2. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
3. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering
Departments and the City Attorney. They shall be recorded concurrently with the Final Map or
prior to the issuance of building permits, whichever occurs first. A recorded copy shall be
provided to the City Engineer. The Homeowners' Association shall submit to the Planning
Department a list of the name and address of their officers on or before January 1 of each and
every year and whenever said information changes.
D. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the
amount of$538 prior to the issuance of building permits, guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
SEE ATTACHED
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
E. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from
street centerline):
As Needed total feet on Foothill Boulevard
50 total feet on Rochester Avenue /
2. Corner property line cutoffs shall be dedicated per City Standards.
3. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint
maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or
deeds and shall be recorded prior to, or concurrent with, the final parcel map.
4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
5. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
6. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7
feet measured from the face of curbs.
7. The developer shall make a good faith effort to acquire the required off-site property interests
necessary to construct the required public improvements, and if he/she should fail to do so,the
developer shall, at least 120 days prior to submittal of the final map for approval, enter into an
2
Project No.SUBTPM17818
Completion Date
agreement to complete the improvements pursuant to Government Code Sections 66462 and
66462.5 at such time as the City decides to acquire the property interests required for the
improvements. Such agreement shall provide for payment by the developer of all costs incurred
by the City if the City decides to acquire the off-site property interests required in connection with
the subdivision. Security for a portion of these costs shall be in the form of a cash deposit in the
amount given in an appraisal report obtained by the City, at developer's cost. The appraiser shall
have been approved by the City prior to commencement of the appraisal. This condition applies
in particular, but not limited to: "Not a part" frontages at the Southeast Corner of Foothill
Boulevard and Rochester Avenue.
F. Street Improvements
1. Pursuant to City Council Resolution No.88-557, no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Foothill Boulevard X X C X X X X
Rochester Avenue X X C X X X X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,priorto
final map approval or the issuance of building permits, whichever occurs first.
to. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
3
Project No.SUBTPM17818
Completion Date
Notes:
1) Pull boxes shall be No. 6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first plan
check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
4
Project No.SUBTPM17818
Completion Date
5. Install street trees per City street tree design guidelines and standards as follows. The --i
completed legend (box below) and construction notes shall appear on the title page of
the street improvement plans. Street improvement plans shall include a line item within
the construction legend stating: "Street trees shall be installed per the notes and
legend on sheet—(typically sheet 1)." Where public landscape plans are required,
tree installation in those areas shall be per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions
and other variables. For additional information, contact the Project Engineer.
Street Name Botanical Name Common Name Grow Space Spacing Size
Foothill Boulevard and Rochester Lagerstroemia Crape Myrtle Hybrid- 3 feet 15 feet O.C. 24 feet
Avenue indica Lavender Triangular box
Activity Center "Muskogee" Spacing
Foothill Boulevard Washingtonia Mexican Fan Palm 3 feet 25 feet O.C. 15 feet
Non Activity Centers at Victoria robusta Minimum Double row minimum
Gardens(115 to Day Creek of 5 feet away across sidewalk B.T.H.or
Boulevard) from street light match est
Heights
15 gallon
20 feet O.C.
Non Activity Centers Accent Tree Prunus blireiana NCN informal
groupings not
3 feet more than 25
percent of total
frontage trees
Rochester Avenue
Foreground Rhus lancea African Sumac 5 feet 20 feet O.C. 15 gallon
formal
20 feet O.C.
Backround Brachychiton Bottle Tree 5 feet informal 15 gallon
populneus
Construction Notes for Street Trees,
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector.
Any unusual toxicities or nutrient deficiencies may require backfill soil amendments,as determined by the City
inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
G. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
2. Parkway landscaping on the following street(s) shall conform to the results of the respective _/_/_
Beautification Master Plan Foothill Boulevard Visual Improvement Plan, including Traffic Signal,
Median Island Street Lights, and Activity Centers.
5
Project No.SUBTPM17818
Completion Date
H. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits, whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
I. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
J. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
K. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-toot candle power.
These areas should be lighted from sunset to sunrise and on photo censored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
6
Project No.SUBTPM17818
Completion Date
L. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All roof openings giving access to the building shall be secured with either iron bars,metal gates,
or alarmed.
M. Security Fencing
1. All businesses or residential communities with security fencing and gates will provide the police
with a keypad access and a unique code.The initial code is to be submitted to the Police Crime
Prevention Unit along with plans. If this code is changed due to a change in personnel or for any
other reason, the new code must be supplied to the Police via the 24-hour dispatch center at
(909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or
extension 2475.
N. Windows
1. Storefront windows shall be visible to passing pedestrians and traffic.
2. Security glazing is recommended on storefront windows to resist window smashes and impede
entry to burglars.
O. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be
a minimum of three feet in length and two feet in width and of contrasting color to background.
The stencils for this purpose are on loan at the Rancho Cucamonga Police Department.
3. At the entrances of commercial or residential complexes, an illuminated map or directory of
project shall be erected with vandal-resistant cover. North shall be at the top and so indicated.
Sign shall be in compliance with Sign Ordinance, including an application for a Sign Permit and
approval by the Planning Department.
P. Alarm Systems
1. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909) 941-1488.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
7
Rancho Cucamonga Community
r Development
r Building & Safety
COMMERCIAL/INDUSTRIAL STANDARD
CONDITIONS
January 10, 2006
Foothill and Rochester Avenues
8171 Rochester Avenue (Sec Foothill Boulevard and Rochester Avenue)
Commercial Subdivision
SUBTPM17818 and DRC2005-01084
NOTE: Any revisions may void these requirements and necessitate additional review.
A. New Structures
1. Provide compliance with the California Building Code (CBC) for property line
clearances considering use, area, and fire-resistive construction.
2. The project shall be designed to comply with the 2001 California Building Codes
(CBC), the California Fire Code and with RCFPD Ordinances 15 & 39.
3. Provide compliance with the California Building Code for required occupancy
separations.
4. Provide draft stops in attic areas, not exceed 3,000 square feet, in accordance with
CBC Section 1505.
5. Exterior walls shall be constructed of the required fire rating in accordance with CBC
Table 5-A.
6. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
7. Provide the required restroom facilities per the CBC Appendix chapter 29.
8. All exit components must comply with the requirements of CBC Chapter 10
(adjoining rooms, rated corridors, door swings, separation of exits, etc.).
9. At the time of tenant improvement plan check submittal (for construction) additional
requirements may be required.
10. Clearly indicate on the plans compliance with ADA requirements for the disabled.
11. A registered architect must sign and stamp the plans.
Page 1 of 3
B. General Requirements
1. Submit five conceptual sets of plans including the following:
a. Site/Plot Plan
b. Floor Plan
C. Foundation Plan
d. Ceiling, Floor, and Roof Framing Plan
e. Electrical Plans (2 sets, detached) including the size of main switch, number
and size of service entrance conductors, panel schedules, and single line
diagrams.
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water
and waste diagram, sewer or septic system location, fixture units, gas piping,
and heating and air conditioning.
g. Planning Department Tracking Number (i.e., DRC, SUBTT, SUBTPM etc.)
must be clearly noted on the Title Sheet of the plans.
h. Separate permits are required for fencing and/or walls.
2. Submit two sets of structural calculations, energy conservation calculations, and a
soils report. Architect's/Engineer's stamp and "wet" signature are required prior to
plan check submittal.
3. Contractors must show proof of State and City licenses and Workers' Compensation
coverage to the City prior to permit issuance.
4. Business shall not open for operation prior to posting the Certificate of Occupancy
issued by the Building and Safety Department.
C. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans
shall be marked with the project file number (i.e., DRC, SUBTT, SUBTPM etc.). The
applicant shall comply with the latest adopted California Codes, and all other
applicable codes, ordinances, and regulations in effect at the time of permit
application. Contact the Building and Safety Department for availability of the Code
Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development
project or major addition, the applicant shall pay development fees at the established
rate. Such fees may include, but are not limited to: City Beautification Fee, Park
Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,
and School Fees. Applicant shall provide a copy of the school fees receipt to the
Building and Safety Department prior to permit issuance.
Page 2 of 3
3. The Building and Safety Official shall provide the street addresses after tract/parcel
map recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m.
Monday through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at .the Planning
Department's public counter).
D. Grading
1. Grading of the subject property shall be in accordance with California Building Code,
City Grading Standards, and accepted grading practices. The final Grading Plan
shall be in substantial conformance with the approved Grading Plan.
2. A soils report shall be prepared by a qualified Engineer licensed by the State of
California to perform such work.
3. A geological report shall be prepared by a qualified Engineer or Geologist and
submitted at the time of application for grading plan check.
4. At the time of tenant improvement plan check submittal (for construction) additional
requirements may be required.
5. The final Grading Plan, appropriate certifications and compaction reports shall be
completed, submitted, and approved by the Building and Safety Official prior to the
issuance of building permits.
6. A separate grading plan check submittal is required for all new construction projects
and for existing buildings where improvements being proposed will generate 50
cubic yards or more of combined cut and fill. The Grading Plan shall be prepared,
stamped, and signed by a California registered Civil Engineer.
Note on title sheet that tenant improvement plans must be submitted for plan check and be
approved prior to construction. The applicant shall comply with the latest adopted California
Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit
application. Contact the Building and Safety Department if you have any questions about the
procedure at 909-477-2710.
Page 3 of 3
Rancho Cucamonga Fire Protection
daee �
"®R
l District
Fire Construction Services
STANDARD CONDITIONS
September 6, 2006
Foothill & Rochester
8171 Rochester (SEC Foothill & Rochester)
Commercial Subdivision
SUBTPM17818 & DRC2005-01084
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
The RCFPD Procedures & Standards which are referenced in this document can be access on
the web at hftp://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Division
& Fire Construction Services section. Search by article; the preceding number of the standard
refers to the article. Chose the appropriate article number then.a drop down menu will appear,
select the corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the
spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet. No portion of the exterior wall shall be located more than 150-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire
District.
V. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a public fire
hydrant measured on an approved route around the exterior of the facility or building,
additional private or public fire hydrants and mains capable of supplying the required
fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed
is 2625 gallons per minute at a minimum residual pressure of 20-pounds per square inch.
This flow reflects a 50-percent reduction for the installation of an approved automatic fire
sprinkler system in accordance with NFPA 13 with central station monitoring. This
requirement is made in accordance with the California Fire Code Appendix III-A, as
adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used
to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
3. Firewater plans are required for all projects that must extend the existing water supply to
or onto the site. Building permits will not be issued until firewater plans are
approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet
of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant
shall submit plans, specifications and calculations for the fire sprinkler system
underground supply piping. Approval of the underground supply piping system must be
obtained prior to submitting the overhead fire sprinkler system plans.
FSC-4 Requirement for Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or.industrial structures greater than 7,500 square feet.
2. Assembly and Educational Occupancy Buildings.
3. "All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When buildings do not meet the requirements of the 2001 California Building Code and
the RCFPD Fire Department Access - Fire Lane Standard 9-7
6. When any applicable code or standard requires the structure to be sprinklered.
2
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or
standards) requires an automatic and/or manual fire alarm system. Refer to RCFPD
Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6
and/or the California Fire Code.
2. Prior to any removal, remodel, modification and/or additions to the building or suite's fire
alarm system, Fire Construction Services' approval and a building permit must be
obtained. Plans and specifications shall be submitted to Fire Construction Services in
accordance with RCFPD Fire Alarm Standard #10-6.
3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by
a listed central station fire alarm system.
FSC=6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private
roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire
Lanes Standard 9-7
1. Location of Access: All portions of the structures 1s` story exterior wall shall be located
within 150-feet of Fire District vehicle access, measure on an approved route around the
exterior of the building. Landscaped areas, unpaved changes in elevation, gates and
fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 20-feet.
C. The minimum outside turn radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on
each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a .
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to
obstruct Fire Department apparatus.
3
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with
the 2001 California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal
feet or major fraction thereof, of the exterior wall that faces the required access
roadways. When railways are installed provisions shall be made to maintain Fire
District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road
shall be in accordance with Fire District Standard #9-2. The following design requirements
apply:
a. Prior to the fabrication and installation of the gates, plans are required to be
submitted to Fire Construction Services (FCS) for approval. Upon the completion of
the installation and before placing the gates in service, inspection and final
acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety
Office for$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override
device and a fail-safe or battery backup feature to open the gate or release the
locking Mechanism in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must
be installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the
complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and
operation must be approved by the Fire Chief prior to installation. Bi-directional or
multiple sensors may be required due to complexity of the various entry
configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site
plan illustrating the proposed delineation that meets the minimum Fire District standards
shall be included in the architectural plans submitted to B&S for approval.
4
7. Approved Fire Department Access:. Any approved mitigation measures must be clearly
noted on the site plan. A copy of the approved Alternative Method application, if
applicable, must be reproduced on the architectural plans submitted to B&S for plan
review.
8. Roof Access: There shall be a means of fire department access from the exterior walls
of the buildings on to the roofs of all commercial, industrial and multi-family residential
structures with roofs less than 75' above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an
aerial ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with
construction features, or high parapets that inhibit roof access.
c. The number of ladder points may be required to be increased, depending on the
building size and configuration.
d. Regardless of the parapet height or construction features the approved ladder point
shall be identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions,
a permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard
9-9 Appendix A and drawings 9-9a and 9-91b.
h. A site plan showing the locations of the roof ladder shall be submitted during plan
check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or
building construction. Plan check submittal is required with the permit application for approval
of the permit; field inspection is required prior to permit issuance. General Use Permit shall be
required for any activity or operation not specifically described below, which in the judgment of
the Fire Chief is likely to produce conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies
• Compressed Gases
• Public Assembly
• Cryogenics
5
• Dry Cleaning Plants
• Refrigeration Systems
• Repair Garages
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-11 Hazardous Materials — Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the San
Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and
assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency
(CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety
will not be finalized until the San Bernardino County Fire Department reviews your
Business Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the applicant has
met or is meeting specific hazardous materials disclosure requirements. A Risk
Management Program (RMP) may also be required if regulation substances are to be
used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a
Plan, is also required to submit a notice to the owner of the property in writing stating that
the business is subject to the Business Emergency/Contingency Plan mandates and has
complied with the provisions. The tenant must provide a copy of the Plan to the property
owner within five (5) working days, if requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate
method, when submitted. The request must be submitted on the Fire District "Application for
Alternate Method" form along with supporting documents and payment of the $92 review fee.
6
FCS-14 Map Recordation
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply
are required on this project. The project appears to be located on a property that is being
subdivided. The reciprocal agreement is required to be recorded between property
owners and the Fire District. The recorded agreement shall include a copy of the site
plan. The Fire Construction Services shall approve the agreement, prior to recordation.
The agreement shall be recorded with the County of San Bernardino, Recorders Office.
Reciprocal access agreement — Please provide a permanent access agreement
between the owners granting irrevocable and a non-exclusive easement, favoring the Fire
District to gain access to the subject property. The agreement shall include a statement
that no obstruction, gate, fence, building or other structure shall be placed within the
dedicated access, without Fire Department approval. The agreement shall have provisions
for emergency situations and the assessing of cost recovery to the property by the fire
District.
Reciprocal water covenant — Please provide a permanent maintenance and service
covenant between the owners granting an irrevocable and non-exclusive easement,
favoring the Fire District for the purpose of accessing and maintaining the private water
mains, valves and fire hydrants (fire protection systems facilities in general). The covenant
shall have provisions for emergency situations and the assessing of cost recovery to the
property by the fire District.
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to
the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District
Standards. Approval of the on-site (private) fire underground and water plans is required
prior to any building permit issuance for any structure on the site. Private on-site
combination domestic and fire supply system must be designed in accordance with
RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire
Construction Services will perform plan checks and inspections.
2. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. Fire construction Services will inspect the
installation, witness hydrant flushing and grant a clearance before lumber is dropped.
3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the
Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot
radius of the project. Please reference the RCFPD Water Plan Submittal Procedure
Standard 9-8.
7
All required public fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. CCWD personnel shall inspect the
installation and witness the hydrant flushing. Fire Construction Services shall inspect the
site after acceptance of the public water system by CCWD. Fire Construction Services
must grant a clearance before lumber is dropped.
4. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access
roads must be installed at least 14' 6" above the finished surface of the road.
S. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the letter to
Fire Construction Services.
6. Easements and Reciprocal Agreements: All easements and agreements must be
recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' "Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the City of
Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant
Markers". On private property, the markers shall be installed at the centerline of the fire
access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the most
hydraulically remote on-site fire hydrants. The underground fire line contractor, developer
and/or owner are responsible for hiring the company to perform the test. A final test
report shall be submitted to Fire Construction Services verifying the fire flow available.
The fire flow available must meet or exceed the required fire flow in accordance with the
California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler monitoring system must be tested and accepted by Fire Construction Services.
The fire sprinkler monitoring system shall be installed, tested and operational immediately
following the completion of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be
inspected, tested and accepted by Fire Construction Services before occupancy is granted
and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm
system shall be installed, inspected, tested and accepted by Fire Construction Services.
8
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular
gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1
or #9-2 by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire
access roadways must be installed in accordance with the approved plans and acceptable
to Fire Construction Services.
9. The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the
required annual inspections and the maintenance of all required fire access roadways.
10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness.
When the building setback exceeds 200 feet from the public street, an additional non-
illuminated 6-inch minimum number address shall be provided at the property entrance.
Larger address numbers will be required on buildings located on wide streets or built with
large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
11. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant
must demonstrate (in writing from the County) that the facility has met or is meeting the
Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San
Bernardino County Fire Department, Hazardous Materials/Emergency Response and
Enforcement Division. The applicant must also obtain inspection and acceptance by Fire
Construction Services.
12. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form.
This form provides contact information for Fire District use in the event of an emergency at
the subject building or property. This form must be presented to the Fire Construction
Services Inspector.
13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Y2" x 11" or
11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised
by the applicant to reflect the actual location of all devices and building features as
required in the standard. The site plan must be reviewed and accepted by the Fire
Inspector.
9
141
- City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Development District Amendment DRC2005-01008, Tentative Parcel Map
SUBTPM17818, and Conditional Use Permit DRC2005-01084
Public Review Period Closes: January 24, 2007
Project Name: Project Applicant: Charles Joseph Associates
10681 Foothill Boulevard, Suite 395
Rancho Cucamonga, CA 91730
Project Location (also see attached map): Located at the southeast comer of Foothill Boulevard
and Rochester Avenue—APN: 0229-021-31 and 32.
Project Description: A request to change the Development District from Industrial Park(Subarea 7)
to General Commercial (to reflect the current General Plan Designation of General Commercial)and
a request to subdivide 12.66 net acres of land into 6 parcels for an office and commercial center
consisting of one bank with drive-thru at 4,500 square feet(Building A), one drive-thru restaurant at
2,430 square feet (Building B), two restaurant Buildings totaling 13,000 square feet (Buildings C
and E), one retail multi-tenant/restaurant building at 5,100 square feet (Building D), and a two-story
39,400 square foot medical office (Building F).
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive(909)477-2750 or Fax(909)477-2847.
NOTI E
The public is invited to comment on the propose Mit ated Negati a Declaration during the review
period.
January 24, 2007
Date of Determination A opted By I