HomeMy WebLinkAbout07-56 - Resolutions RESOLUTION NO. 07-56
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE
PARCEL MAP SUBTPM18680, A REVIEW OF A PROPOSED 3-UNIT
SUBDIVISION FOR CONDOMINIUM PURPOSES OF A BUILDING TO BE
CONSTRUCTED ON A VACANT PARCEL OF 1.23 ACRE IN THE
GENERAL INDUSTRIAL (GI) DISTRICT, SUBAREA 13, LOCATED AT
9275 CHARLES SMITH AVENUE;AND MAKING FINDINGS IN SUPPORT
THEREOF - APN: 0229-283-02.
A. Recitals.
1. William Fox Group filed an application for the issuance of Tentative Parcel Map
SUBTPM18680, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 26th day of September 2007, the Planning Commission of the City of
Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded
said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the
Planning Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on September 26, 2007, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies a parcel of land located at 9275 Charles Smith Avenue with
an overall area of about 53,580 square feet (1.23 acres) and a street frontage along
Charles Smith Avenue of about 330 feet and a depth of about 167 feet; and
b. To the north of the subject site is a small office/warehouse complex consisting of
two buildings; to the south is a refueling station; and to the east is the 1-15 Freeway(with additional
industrial buildings beyond the freeway); and to the west is a warehouse building; and
C. The applicant proposes to subdivide the property into three (3) units for
condominium purposes;
d. The proposed tentative parcel map is in conjunction with a development review
(related file: Development Review DRC2007-00253) to construct an office/warehouse building of
22,498 square feet; and
e. The proposed tentative parcel map, together with the recommended Conditions of
Approval, meets the development standards for the City of Rancho Cucamonga.
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680 —WILLIAM FOX GROUP
September 26, 2007
Page 2
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs
1 and 2 above, this Commission hereby finds and concludes as follows:
a. The proposed tentative parcel map is in accord with the General Plan, the
objectives of the Development Code, and the purposes of the district in which the site is located.
The proposed project is to subdivide a proposed industrial building for condominium purposes and
is consistent with similar subdivisions of this nature.
b. The proposed tentative parcel map,together with the conditions applicable thereto,
will not be detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity. The surrounding properties are zoned industrial and the surrounding
uses are industrial-oriented.
C. The proposed tentative parcel map complies with each of the applicable provisions
of the Development Code. The proposed parcel map meets all standards outlined in the
Development Code and the design and development standards and policies of the Planning
Commission and the City.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act("CEQA")and the City's local
CEQA Guidelines, City staff prepared an Initial Study of the potential environmental effects of the
project. Based on the findings contained in that Initial Study, City staff determined that, with the
imposition of mitigation measures, there would be no substantial evidence that the project would
have a significant effect on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter,City staff provided public notice of the public comment period
and of the intent to adopt the Mitigated Negative Declaration.
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and, based on the whole record
before it,finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA;
and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that
the project will have a significant effect on the environment. The Planning Commission furtherfinds
that the Mitigated Negative Declaration reflects the independent judgment and analysis of the
Planning Commission. Based on these findings, the Planning Commission hereby adopts the
Mitigated Negative Declaration.
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission therefore
adopts the Mitigation Monitoring Program for the project.
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680 —WILLIAM FOX GROUP
September 26, 2007
Page 3
d. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program, and all other materials which constitute the record of proceedings
upon which the Planning Commission's decision is based is the Planning Director of the City of
Rancho Cucamonga. Those documents are available for public review in the Planning Department
of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga,
California 91730, telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) Approval is for the subdivision of one (1) parcel into three (3) units for
condominium purposes.
2) Shared access, parking, and maintenance shall be incorporated in the
project Covenants, Conditions, and Restrictions (CC&Rs).
3) All pertinent conditions of approval for Development Review
DRC2007-00253 shall apply as adopted by the Planning Commission.
Engineering Department
1) Full frontage improvements shall be completed in accordance with City
"Local Industrial" standards as required, included but not necessarily
limited to the following:
a) Provide curb and gutter, property line adjacent sidewalk, drive
approaches (W = 35 feet minimum, R = 11 feet).
b) Provide curbside drain outlets in sufficient number to convey
concentrated flows under sidewalks.
c) Provide one (1) 5800 Lumen HPSV street light.
d) Provide R26 "NO PARKING" signs.
e) Provide traffic striping and signage.
Note: Street trees will not be required due to the existence of a
15-inch sewer line and a GTE fiber optic line, both located in the
parkway behind the curb. Engineering will be working with the
Planning Department to place trees behind the right-of-way in an effort
to achieve the effect of having street trees.
f) Update City Drawing Number 2095 to show all revisions needed
to accommodate this development.
g) Grading within the north/east area of the site will be done in such
a manner as to allow for site surface drainage to reach the street
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680—WILLIAM FOX GROUP
September 26, 2007
Page 4
through a curbside drain outlet located immediately to the south
of the north drive approach. Concentrated drainage flows
conveyed in swales and similar devices shall be PCC with a
minimum grade of 0.5 percent. Site grading shall conform to
UBC and City Building and Safety Division Standards.
h) Contact Caltrans and determine if drainage easement across
your site is needed to drain portion of freeway right-of-way.
Provide written determination from Caltrans of same.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. Contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any Grading Permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
PLANNING COMMISSION RESOLUTION NO. 07-56 .
SUBTPM18680—WILLIAM FOX GROUP
September 26, 2007
Page 5
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB])daily to reduce Fine Particulate Matter(PM,())emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of
10 minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
14) All residential and commercial structures shall be required to
incorporate high-efficiency/low-polluting heating, air conditioning,
appliances, and water heaters.
15) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680 —WILLIAM FOX GROUP
September 26, 2007
Page 6
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEOA guidelines.
• Prepare a technical resources management report,documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures (i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate, the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680 —WILLIAM FOX GROUP
September 26, 2007
Page 7
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10,emissions.
Hydrology and Water Quality
1) Prior to issuance of Grading Permits, the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SW PPP) specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An Erosion Control Plan shall be prepared, included in grading plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
Erosion Control Plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680 —WILLIAM FOX GROUP
September 26, 2007
Page 8
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
5) Applicant shall implement additional Best Management Practices as
outlined in the Water Quality Management Plan prepared by
Kevin J. Richer, March 2007.
Post-Construction Operational:
6) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by Kevin J. Richer on
March 30, 2007 to reduce pollutants after construction entering the
storm drain system to the maximum extent practical.
7) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
Grading Permits.
8) Prior to issuance of Building Permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in
June 2004.
9) Prior to issuance of Grading or Paving Permits,applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680 —WILLIAM FOX GROUP
September 26, 2007
Page 9
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
3) The perimeter clock wall shall be constructed as early as possible in
first phase.
4) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips(counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify the adoption of this Resolution.
APPROVED AND ADOPTED THIS 26TH DAY OF SEPTEMBER 2007.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: pe��7
Pa tewart, Chairman
ATTEST: ' R
Jam V
R. Troyer, AICP, Secreta
1,James R.Troyer, AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga,at a regular meeting of the
Planning Commission held on the 26th day of September 2007, by the following vote-to-wit:
PLANNING COMMISSION RESOLUTION NO. 07-56
SUBTPM18680—WILLIAM FOX GROUP
September 26, 2007
Page 10
AYES: FLETCHER, HODYSHELL, MUNOZ, STEWART, WIMBERLY
NOES: NONE
ABSENT: NONE
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: SUBTPM18680 AND DRC2007-00253
Public Review Period Closes: September 26, 2007
Project Name: Project Applicant: William Fox Group
Project Location (also see attached map): Located at the east side of Charles Smith Avenue,
about 1000 feet south of 6th Street - APN: 0229-283-02.
Project Description: A proposal to construct a building of about 22,680 square feet and a review
of a proposed 3-unit subdivision for condominium purposes to be constructed on a vacant parcel of
1.23 acre in the General Industrial (GI) District,Subarea 13, located at 9275 Charles Smith Avenue-
APN: 0229-283-02.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax
(909) 477-2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
September 26, 2007
Date of Determination Adopted
" City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Tentative Parcel Map SUBTPM18680 and Development Review DRC2007-00253
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
Tentative Parcel Map SUBTPM18680 and Development Review DRC2007-00253
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department, to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed bythe project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring. The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division. The Division shall require
the applicant to post any necessary funds (or other forms of guarantee) with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and
report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2007-00253 and SUBTPM18680 Applicant: William Fox Group
Initial Study Prepared by: Mike Smith, Associate Planner Date: August 22, 2007
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
:-o
All construction equipment shall be maintained in good PD C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any Grading Permits, the PD/BO C Review of.plans C 2
developer shall submit Construction Plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed PD C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
1 of 9
Mitigation Measures No.I
Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds(i.e., BO C During A 4
wind speeds exceeding 25 mph) in accordance with construction
SCAQMD Rule 403 requirements.
Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAOMD and construction
Regional Water Quality Control Board [RWQCB]) daily
to reduce Particulate Matter (PM10) emissions, in
accordance with SCAQMD Rule 403.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PMIO emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
2of9
Mitigation Measures No.I
Responsible
Implementing Action for Monitoring Frequency Verif!cation Verification Date/initials Non-Compliance
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate PD C Review of plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate high-efficiency/low-polluting
heating, air conditioning, appliances, and water heaters.
All .residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
_
Cultural Resources'•
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist,.the City of Rancho Cucamonga will:
Enact interim measures to protect undesignated PD/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
3of9
Mitigation Measures No.I
Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Consider establishing provisions to require PD/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's PD/BO C Review of report A/D 3/4
archaeological heritage.
Propose mitigation measures and recommend PD/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
Prepare a technical resources management report, PD C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernaraino County
Archaeological Information Center for permanent
archiving.
If ,any paleontological resource (i.e. plant or animal PD B Review of report A/D 4
fossils) are encountered before or during grading, the
developer will retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
Assign a paleontological monitor, trained and PD B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
4 of 9
Mitigation Measures No.
Responsible
ActionImplementing Date/Initials Non-Compliance
Should
. -
Should fossils be found within an area being cleared BO B/C Review of report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
Prepare, identify,and curate all recovered fossils for PD D Review of report D 3
documentation in the summary report and transfer to
an appropriate depository (i.e., San Bernardino
County Museum).
Submit summary report to City of Rancho PD D Review of report D 3
Cucamonga. Transfer collected specimens with a
copy to the report to San Bernardino County
Museum.
Geologyand SOIIS4 :; a ',:, ,;,• :,:: L � -t?; MI �' r
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RW QCB)daily to reduce PM,o emissions, in accordance
with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM,o emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
5 of 9
Mitigation Measures No./ Responsible Monitoring Timing of
Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Hydrology and Water Quality
Prior to issuance of Grading Permits, the permit BO B/C/D Review of plans A/C 2/4
applicant shall submit to Building Official for approval,
Storm Water Pollution Prevention Plan (SWPPP)
specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants
during construction activities entering the storm drain
system to the maximum extent practical.
An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
the Grading Plan, and implemented for the proposed
project that identifies specific measures to control
on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of
grading. This Erosion Control Plan shall include the
following measures at a minimum: a)Specify the timing
of grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
Applicant shall implement additional Best Management CE B/C/D Review of plans A/C 2/4
Practices as outlined in the Water Quality Management
Plan prepared by Kevin J. Richer, March 2007.
6 of 9
Mitigation Measures No.
Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan prepared by
(name/date) to reduce pollutants after construction
entering the storm drain system to the maximum extent
practical.
Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years, shall be submitted to the City for
review and approval prior to the issuance of Grading
Permits.
Prior to issuance of Building Permits,the applicant shall CE B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent
practicable. The W QMP shall identify the structural and
non-structural measures consistent with the Guidelines
for New Development and Redevelopment adopted by
the City of Rancho Cucamonga in June 2004.
Prior to issuance of grading or paving permits,applicant BO B/C/D Review of plans A/C 2/4
shall obtain a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage underthe NPDES General
Construction Permit.
7of9
Mitigation Measures No.
Responsible
ImplementingDate/initials Non-Compliance
Noise
Construction or grading shall not take place between the BO C During A4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code construction
Section 17.02.120-D, as measured at the property line.
The developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within
24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
The perimeter block wall shall be constructed as early PD C During A A
as possible in the first phase. construction
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
8 of 9
Key to Checklist Abbreviations
Responsible Person Monitoring frequency Metfiod of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
PD- Planning Director or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal (Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
i:\planningVinal\ceqa\mmchklst-revl2-4-06final.doc
9 of 9
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2007-00253 AND SUBTPM18680
DEVELOPMENT REVIEW OF A 22,498 SQUARE FOOT BUILDING AND A 3 UNIT CONDO
SUBJECT: MAP
APPLICANT: WILLIAM FOX GROUP
LOCATION: 9275 CHARLES SMITH AVENUE — APN: 0229-283-02
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers, or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Approval of Tentative Parcel No. is granted subject to the approval of DRC2007-00253.
3. Copies of the signed Planning Commission Resolution of Approval No. 07-56, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
4. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The
project planner will confirm which fees apply to this project. All checks are to be made payable to
the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to
the Planning Commission or Planning Director hearing:
a) Notice of Exemption - $50
b) Notice of Determination - $50
c) Negative Declaration -$ 1,850 X
d) Environmental Impact Report - $2,550
SC-1-05 1
IAPLANNINGTINALTLNGCOM2007 Res&Stf RptORC2007-00253SWCond 9-26.doc
Project No. DRC2007-00253 AND SUBTPM18680
Completion Date
B. Time Limits
1. This tentative parcel map shall expire, unless extended by the Planning Commission, unless a
complete final map is filed with the City Engineer within 3 years from the date of the approval.
2. Development/Design Review approval shall expire if building permits are not issued or approved
use has not commenced within 5 years from the date of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department, the conditions contained herein, and the
Development Code regulations.
2. Prior to any use of the project site or business activity being commenced thereon, all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved
by the Planning Director and Police Department (477-2800) prior to the issuance of building
permits. Such plan shall indicate style, illumination, location, height,and method of shielding so
as not to adversely affect adjacent properties.
8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For
single-family residential developments, transformers shall be placed in underground vaults.
9. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
D. Industrial Buildings
1. Graffiti shall be removed within 72 hours.
2. The entire site shall be kept free from trash and debris at all times and in no event shall trash and
debris remain for more than 24 hours.
3. Signs shall be conveniently posted for"no overnight parking" and for "employee parking only."
2 .
1APLANNING\FINAL\PLNGC0MM\2007 Res& Stf Rpt\DRC2007-00253StdCond 9-26.doc
Project No.DRC2007-00253 AND SUBTPM18680
Completion Date
4. All operations and businesses shall be conducted to comply with the following standards which
shall be incorporated into the lease agreements for all tenants:
a. Noise Level - All commercial activities shall not create any noise that would exceed an
exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m. and 65 dB during the
hours of 7 a.m. until 10 p.m.
b. Loading and Unloading.-No person shall cause the loading, unloading,opening,closing,or
other handling of boxes, crates, containers, building materials, garbage cans, or other
similar objects between the hours of 10 p.m,and 7 a.m. unless otherwise specified herein,
in a manner which would cause a noise disturbance to a residential area.
5. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and plaza.
They shall be of brick/tile pavers,exposed aggregate,integral color concrete,or any combination
thereof. Full samples shall be submitted for Planning Director review and approval prior to the
issuance of building permits.
6. The lighting fixture design shall compliment the architectural program. It shall include the plaza
area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting fixtures.
E. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the Planning Director.
Details shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
F. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 0 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, --L—/--
and
/_/_and exits shall be striped per City standards.
4. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more
parking stalls. Designate two percent or one stall; whichever is greater, of the total number of
stalls for use by the handicapped.
5. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the
rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet.
3
1:\PLANNING\FINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00253StdCond 9-26.doc
Project No,DRC2007-00253 AND SUBTPM18680
Completion Date
G. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
2. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If
covered, the vertical clearance shall be no less than 9 feet.
3. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other
non-residential development.
4. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be
provided to encourage bicycle commuting per the City of Rancho Cucamonga Bicycle
Transportation Plan adopted by City Council Resolution No.02-237. Accessible restrooms with
storage lockers for clothing and equipment shall be sufficient.
H. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for Planning Director review and approval prior to the issuance of building permits or
prior final map approval in the case of a custom lot subdivision.
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees - 24-inch box or larger.
3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1
slope,shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required bythis section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
7. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Department.
4
I:\PLANNINGTINAL\PLNGCOMM\2007 Res& Sd Rpt\DRC2007-00253StdCond 9-26.doc
Project No. DRC2007-00253 AND SUBTPM18680
Completion Date
8. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the _/_/_
freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash
deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans and
City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and approved
by the Planning Director and City Engineer. Landscape and irrigation shall be installed prior to
the release of occupancy of the project. If final approvals and/or installation are not complete at
that time, the City will accept a cash deposit for future landscaping of the Caltrans right-of-way.
I. Signs
1. A Uniform Sign Program for this development shall be submitted for Planning Director review and
approval prior to issuance of building permits.
J. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit,or other forms of guarantee acceptable to the Planning Director in the
amount of$538 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
K. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to Planning Director review and approval prior to the issuance
of building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
L. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
I. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number(i.e., DRC2007-00253 and SUPTPM18680)clearly
identified on the outside of all plans.
5
(:\PLANNING\FINAL\PLNGCOMMt2007 Res&Stf RpADRC2007-00253SWCond 9-26.doc
Project No. DRC2007-00253 AND SUBTPM18680
Completion Date
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
M. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2007.00253 and SUBTPM18680). The applicant
shall comply with the latest adopted California Codes, and all other applicable codes,ordinances,
and regulations in effect at the time of permit application. Contact the Building and Safety
Department for availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or _/_/_
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
N. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attics in-line with common walls.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
5. Upon tenant improvement plan check submittal, additional requirements may be needed.
O. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work. --—
6
I:\PLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00253StdCond 9-26.doc
Project No.DRC2007-00253 AND SUBTPM18580
Completion Date
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading plan, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
P. Dedication and Vehicular Access
1. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
2. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint
maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or
deeds and shall be recorded prior to, or concurrent with, the final parcel map:
Q. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Charles Smith Avenue X X X X X (e)
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) curbside drain outlets
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
7
I:\PLANNING\FINAL\PLNGC0MM\2007 Res& Sri Rpt\DRC2007-00253StdCond 9-26.doc
Project No. DRC2007-00253 AND SUBTPM18680
Completion Date
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No. 5 along streets,,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first plan
check.
R. General Requirements and Approvals
1. A signed consent and waiver form to join and/or form the Law Enforcement Community Facilities
District shall be filed with the City Engineer prior to final map approval or the issuance of building
permits, whichever occurs first. Formation costs shall be borne by the Developer.
2. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or prior to building
permit issuance if no map is involved.
3. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
4. Prior to approval of the final map, or prior to improvement agreement approval if no map is
involved, all Tract Maps, Parcel Maps and public improvement plans shall be submitted to the
Engineering Division on a compact disc (CD) in Auto CAD (computer aided design) format. If
public improvement plans are completed after map approval, the CD shall be submitted prior to
issuance of a construction permit for frontage improvements or a building permit, whichever
occurs first.
8
I:\PLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00253StdCond 9-26.doc
Project No. DRC2007-00253 AND SUBTPM1868o
Completion Date
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
9
hPLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00253StdCond 9-26.doc
Rancho Cucamonga Fire Protection
District
Fire Construction Services
STANDARD CONDITIONS
William Fox Group
Eagle Family Limited
9275 Charles Smith
22k Industrial Condominium Building
SUBTPM18680 and DRC2007-00253
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT
The RCFPD Procedures & Standards which are referenced in this document can be access on
the web at http://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Division
& Fire Construction Services section. Search by article; the preceding number of the standard
refers to the article. Chose the appropriate article number then a drop down menu will appear,
select the corresponding standard.
FSC-1 Public and Private Water Supply
1 . Design guidelines for Fire Hydrants: The following provides design guidelines for the
spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet. No portion of the exterior wall shall be located more than 150-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
ii. At intersections.
On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire
District.
V. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a public fire
hydrant measured on an approved route around the exterior of the facility or building,
additional private or public fire hydrants and mains capable of supplying the required
fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed
is 2000 gallons per minute at a minimum residual pressure of 20-pounds per square inch.
This flow reflects a 50-percent reduction for the installation of an approved automatic fire
sprinkler system in accordance with NFPA 13 with central station monitoring. This
requirement is made in accordance with the California Fire Code Appendix III-A, as
adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used
to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
3. Fire protection water plans are required for all projects that must extend the existing water
supply to or onto the site. Building permits will not be issued until fire protection
water plans are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet
of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant
shall submit plans, specifications and calculations for the fire sprinkler system
underground supply piping. Approval of the underground supply piping system must be
obtained prior to submitting the overhead fire sprinkler system plans.
FSC-4 Requirements for Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Group "A" Occupancies.
3. "E" Occupancies with an occupant load of 50 or more persons.
4. All structures that do not meet Fire District access requirements (see Fire Access).
S. When required fire flow cannot be provided due to inadequate volume or pressure.
6. When the building access does not meet the requirements of the 2001 California Building
Code and the RCFPD Fire Department Access - Fire Lane Standard #9-7
7. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. The California Building Code, the RCFPD Fire Alarm Standard #10-6 and/or the California
Fire Code require a listed fire sprinkler monitoring Central Station Fire Alarm system. Plan
2
check approval and a building permit are required Prior to the installation of the fire alarm
system. Plans and specifications shall be submitted to Fire Construction Services in
accordance with RCFPD Fire Alarm Standard #10-6.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private
roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire
Department Access Roadways Std #9-7.
1. Location of Access: All portions of the structures 1s` story exterior wall shall be located
within 150-feet of Fire District vehicle access, measure on an approved route around the
exterior of the building. Landscaped areas, unpaved changes in elevation, gates and
fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 24-feet.
C. The minimum outside turn radius shall be 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on
each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to
obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with
the 2001 California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal
feet or major fraction thereof, of the exterior wall that faces the required access
roadways. When railways are installed provisions shall be made to maintain Fire
District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
3
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road
shall be in accordance with Fire District Standard #9-2. The following design requirements
apply:
a. Prior to the fabrication and installation of the gates, plans are required to.be
submitted to Fire Construction Services (FCS) for approval. Upon the completion of
the installation and before placing the gates in service, inspection and final
acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety
Office for$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override
device and a fail-safe or battery backup feature to open the gate or release the
locking Mechanism in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must
be installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the
complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and
operation, must be approved by the Fire Chief prior to installation. Bi-directional or
multiple sensors may be required due to complexity of the various entry
configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site
plan illustrating the proposed delineation that meets the minimum Fire District standards
shall be included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly
noted on the site plan. A copy of the approved Alternative Method application, if
applicable, must be reproduced on the architectural plans submitted to B&S for plan
review.
8. Roof Access: There shall be a means of fire department access from the exterior walls
of the buildings on to the roofs of all commercial, industrial and multi-family residential
structures with roofs less than 75' above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an
aerial ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with
construction features, or high parapets that inhibit roof access.
4
C. The number of ladder points may be required to be increased, depending on the
building size and configuration.
d. Regardless of the parapet height or construction features the approved ladder point
shall be identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions,
a permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard
9-9 Appendix A and drawings 9-9a and 9-9b.
h. A site plan showing the locations of the roof ladder shall be submitted during plan
check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or
building construction. Plan check submittal is required with the permit application for approval
of the permit; field inspection is required prior to permit issuance.' General Use Permit shall be
required for any activity or operation not specifically described below, which in the judgment of
the Fire Chief is likely to produce conditions that may be hazardous to life or property.
• Aerosol Products Magnesium Working
• Application of Flammable Finishes Motor Vehicle Fuel-Dispensing
Operation
• Automobile Wrecking Yards Open Burning
• Battery Systems Organic Coating
• Candles and open flames in public assemblies Ovens
• Cellulose Nitrate Powder Coating
• Compressed Gases Public Assembly
• Cryogenics Pyrotechnical Special Effects
• Dry Cleaning Plants Radioactive Materials
• Dust-Producing Processes and Operations Refrigeration Systems
• Explosive.or Blasting Agents Repair Garages
• Flammable and Combustible Liquids Rubbish Handling Operations
• Fruit Ripening Plants Spraying or Dipping Operations
• Hazardous Materials Tents, Canopies and/or Air
Supported Structures
• High-Pile Combustible Storage (HPS) Tire Storage
• Liquefied Petroleum Gases Welding and Cutting Operations
5
• LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards
FSC-11 Hazardous Materials — Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the San
Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and
assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency
(CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety
will not be finalized until the San Bernardino County Fire Department reviews your
Business Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the applicant has
met or is meeting specific hazardous materials disclosure requirements. A Risk
Management Program (RMP) may also be required if regulation substances are to be
used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a
Plan, is also required to submit a notice to the owner of the property in writing stating that
the business is subject to the Business Emergency/Contingency Plan mandates and has
complied with the provisions. The tenant must provide a copy of the Plan to the property
owner within five (5) working days, if requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate
method, when submitted. The request must be submitted on the Fire District "Application for
Alternate Method" form along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply
are required on this project. The project appears to be located on a property that is being
subdivided. The reciprocal agreement is required to be recorded between property
owners and the Fire District. The recorded agreement shall include a copy of the site
plan. The Fire Construction Services shall approve the agreement, prior to recordation.
The agreement shall be recorded with the County of San Bernardino, Recorders Office.
Reciprocal access agreement — Please provide a permanent access agreement between
the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to
gain access to the subject property. The agreement shall include a statement that no
obstruction, gate, fence, building or other structure shall be placed within the dedicated
access, without Fire Department approval. The agreement shall have provisions for
emergency situations and the assessing of cost recovery to the property by the fire District.
6
Reciprocal water covenant — Please provide a permanent maintenance and service
covenant between the owners granting an irrevocable and non-exclusive easement,
favoring the Fire District for the purpose of accessing and maintaining the private water
mains, valves and fire hydrants (fire protection systems facilities in general). The covenant
shall have provisions for emergency situations and the assessing of cost recovery to the
property by the fire District.
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to
the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District
Standards. Approval of the on-site (private) fire underground and water plans is required
prior to any building permit issuance for any structure on the site. Private on-site
combination domestic and fire supply system must be designed in accordance with
RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire
Construction Services will perform plan checks and inspections.
2. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. Fire construction Services will inspect the
installation, witness hydrant flushing and grant a clearance before lumber is dropped.
3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the
Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot
radius of the project. Please reference the RCFPD Water Plan Submittal Procedure
Standard.
4. All required public fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. CCWD personnel shall inspect the
installation and witness the hydrant flushing. Fire Construction Services shall inspect the
site after acceptance of the public water system by CCWD. Fire Construction Services
must grant a clearance before lumber is dropped.
5. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access
roads must be installed at least 14' 6" above the finished surface of the road.
6. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the letter to
Fire Construction Services.
7. Easements and Reciprocal Agreements: All easements and agreements must be
recorded with the County of San Bernardino.
7
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' "Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the City of
Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant
Markers". On private property, the markers shall be installed at the centerline of the fire
access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the most
hydraulically remote on-site fire hydrants. The underground fire line contractor, developer
and/or owner are responsible for hiring the company to perform the test. A final test
report shall be submitted to Fire Construction Services verifying the fire flow available.
The fire flow available must meet or exceed the required fire flow in accordance with the
California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler monitoring system must be tested and accepted by Fire Construction Services.
The fire sprinkler monitoring system shall be installed, tested and operational immediately
following the completion of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shallbe
inspected, tested and accepted by Fire Construction Services before occupancy is granted
and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm
system shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular
gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1
or #9-2 by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire
access roadways must be installed in accordance with the approved plans and acceptable
to Fire Construction Services.
9. The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the
required annual inspections and the maintenance of all required fire access roadways.
10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness.
When the building setback exceeds 200 feet from the public street, an additional non-
illuminated 6-inch minimum number address shall be provided at the property entrance.
8
Larger address numbers will be required on buildings located on wide streets or built with
large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
11. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant
must demonstrate (in writing from the County) that the facility has met or is meeting the
Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San
Bernardino County Fire Department, Hazardous Materials/Emergency Response and
Enforcement Division. The applicant must also obtain inspection and acceptance by Fire
Construction Services.
12. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form.
This form provides contact information for Fire District use in the event of an emergency at
the subject building or property. This form must be presented to the Fire Construction
Services Inspector.
-13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 8 1/2" x 11" or
11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised
by the applicant to reflect the actual location of all devices and building features as
required in the standard. The site plan must be reviewed and accepted by the Fire
Inspector.
9