HomeMy WebLinkAbout07-63 - Resolutions RESOLUTION NO.07-63
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA,APPROVING CONDITIONAL USE
PERMIT DRC2007-00244,AN APPLICATION FOR THE OFFICE PROJECT
COMPRISED OF A ONE 4-STORY, 140,138 SQUARE FOOT BUILDING
WITH INCIDENTAL RETAIL(UP TO 20 PERCENT)AND A SINGLE-STORY
RETAIL BUILDING OF 16,000 SQUARE FEET, INCLUDING A SHARED
PARKING ANALYSIS TO ALLOW UP TO 9,600 SQUARE FEET AS
RESTAURANT USE, AND A BANK WITH A DRIVE THRU OF
5,000 SQUARE FEET ON A 9.87 ACRE PROPERTY, LOCATED ON THE
WEST SIDE OF HAVEN AVENUE BETWEEN CIVIC CENTER DRIVE AND
ARROW ROUTE; AND MAKING FINDINGS IN, SUPPORT THEREOF
-APN: 0208-341-15
A. Recitals.
1. Opus West filed an application for the issuance of Conditional Use Permit
No. DRC2007-00244, as described in the title of this Resolution. Hereinafter in this Resolution,the
subject Conditional Use Permit request is referred to as "the application."
2. On the 10th day of October 2007, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on October 10, 2007, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the property located on the west side of Haven Avenue
between Arrow Route and Civic Center Drive with a street frontage of 1,248.29 feet and lot depth of
326.24 feet and which is presently unimproved with remnant vineyard; and
b. The property to the north of the subject site is partially developed mixed use
commercial and 3-story apartments; the property to the south consists of graded land with pending
office development; the property to the east is developed mixed use retail and office; and the
property to the west is 2- and 3-story apartments.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
a. The proposed use is in accord with the General Plan, the objectives of the
Development Code, and the purposes of the district in which the site is located.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244— OPUS WEST
October 10, 2007
Page 2
b. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
C. The proposed use complies with each of the applicable provisions of the
Development Code.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration,together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act("CEQA") and the City's local
CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of
the project. Based on the findings contained in that Initial Study, City staff determined that,with the
imposition of mitigation measures, there would be no substantial evidence that the project would
have a significant effect on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter, the City staff provided public notice of the public comment
period and of the intent to adopt the Mitigated Negative Declaration.
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and, based on the whole record
before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA;
and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that
the project will have a significant effect on the environment. The Planning Commission further finds
that the Mitigated Negative Declaration reflects the independent judgment and analysis of the
Planning Commission. Based on these findings, the Planning Commission hereby adopts the
Mitigated Negative Declaration.
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission therefore
adopts the Mitigation Monitoring Program for the project.
d. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program and all other materials which constitute the record of proceedings
upon which the Planning Commission's decision is based is the Planning Director of the City of
Rancho Cucamonga. Those documents are available for public review in the Planning Department
of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga,
California 91730, telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) The approval of this Conditional Use Permit (CUP) is for incidental
retail (up to 20 percent) within a single-story retail building of
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244—OPUS WEST
October 10, 2007
Page 3
16,000 square feet including up to for 9,600 for food establishments.
No additional non-construction CUPs will be required to establish a
retail sales, office, or food establishment unless it is a type of use that
would require a CUP within commercial or office zones of the City
Development Code; for example, but not limited to, live entertainment,
or a bar.
Engineering Department
1) Haven Avenue frontage improvements to be in accordance with City
"Major Divided Highway" standards, as required and including;
(7 1/2 foot median, 12 foot, 11 foot, 11 foot thru lanes, 5 foot bike lane
and 11 foot bus bay at south of Civic Center Drive or 7 1/2 foot median,
13 foot, 11 foot, 11 foot thru lanes and 5 foot bike lane mid block)
a) Provide curb and gutter, curvilinear sidewalk, 9500 lumens street
lights, street trees and asphalt pavement, as required.
b) Provide a bus bay at the southwest corner of Haven Avenue and
Civic Center Drive for southbound Haven Avenue.
c) Provide a deceleration/right-turn lane on all Haven Avenue
driveways and at Arrow Route.
d) Revise traffic signing and striping and protect R26(s) "No
Stopping" signs along Haven Avenue, as required.
e) Protect or replace Haven Avenue/Arrow Route traffic signal
equipment, as required.
f) Proposed entrances to be in accordance with the City Driveway
Policy, 35 foot minimum and 50 foot maximum width measured
along the right-of-way line. Also, driveway policy calls for a
minimum of 75 feet for stacking measured from the face of curb
to the near edge of the first parking stall.
g) Access points to Haven Avenue shall be per City Std. 101,
Type C.
2) Arrow Route frontage improvements to be in accordance with City
"Major Arterial" standards, as required and including:
a) Provide curb and gutter, curvilinear sidewalk, access ramps,
9500 Lumens street light and street trees.
b) Protect existing westbound bus bay at Arrow Route (northeast
corner of Arrow Route and Haven Avenue).
c) Provide a deceleration/right-turn lane for westbound driveway in
accordance with City Driveway Policy.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244— OPUS WEST
October 10, 2007
Page 4
d) Revise traffic signing and striping and protect R26(s) "No
Stopping" signs along Arrow Route, as required.
e) Re-stripe Arrow Route to provide a left turn pocket at westerly
project entrance.
f) Proposed entrances to be in accordance with the City Driveway
Policy, 35 feet minimum and 50 feet maximum width measured
along the right-of-way line. Also, driveway policy calls for a
minimum of 75 feet for stacking measured from the face of curb
to the near edge of the first parking stall.
g) Reconstruct existing curvilinear sidewalk as it transition to the
proposed drive approach.
h) Access point to Arrow Route shall be per City Std. 101, Type C.
3) Civic Center Drive frontage improvements to be in accordance with City
"Secondary" standards, as required and including:
a) Provide curb and gutter, sidewalk, 5800 Lumens street lights and
street trees.
b) Proposed entrance to be in accordance with the City Driveway
Policy, 35 foot minimum width measured along the right-of-way
line.
c) Reconstruct existing curb adjacent sidewalk as it transition at the
proposed sidewalk.
d) Protect R26 "No Parking" signs along Civic Center Drive, as
required.
e) Revise traffic signing and striping, as required.
f) Protect or replace Civic Center Drive/Haven Avenue traffic signal
equipment, as required.
g) Access point to Civic Center Drive shall be per City Std. 101,
Type C.
4) The development requires installation of fiber optics conduits, vaults
and manholes on Haven Avenue per City Standard Plans 135-137.
Also, the improvement plans need to show the location and limits of the
conduits, vaults and manholes with construction notes using Standard
Plans 135-137.
5) Dedication on Haven Avenue shall be 64 feet measured from the
centerline of the street. Additional dedication shall be made at the
project entry(s) to encompass the sidewalk crossing the drive
approaches.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244 — OPUS WEST
October 10, 2007
Page 5
6) The existing overhead utilities (telecommunications and electrical) on
the project side of Haven Avenue shall be undergrounded along the
entire project frontage, extending to the first pole off-site (across the
street where applicable on corner sites), prior to public improvement
acceptance or occupancy,whichever occurs first. All services crossing
Haven Avenue shall be undergrounded at the same time. The
developer may request a reimbursement agreement to recover
one-half the City adopted cost for undergrounding from future
development (redevelopment) as it occurs on the opposite side of the
street. If the developer fails to submit for said reimbursement
agreement within 6 months of the public improvements being accepted
by the City, all rights of the developer to reimbursement shall terminate.
7) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical, except
for the 66 KV electrical) on the opposite side of Haven Avenue shall be
paid to the City prior to map approval or issuance of building permits,
whichever comes first. The fee shall be one-half the City adopted unit
amount times the distance on Haven Avenue from the existing
overhead utilities south of Civic Center Drive to the intersection of
Haven Avenue and Arrow Route.
8) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical, except
for the 66 KV electrical) on the opposite side of Arrow Route shall be
paid to the City prior to map approval or issuance of building permits,
whichever comes first. The fee shall be one-half the City adopted unit
amount times the length of the project frontage on Arrow Route to the
intersection of Haven Avenue and Arrow Route.
9) The developer shall execute a line extension agreement for electrical
service and shall construct electrical distribution facilities in accordance
with such agreement and Rancho Cucamonga Municipal Utility
requirements and dedicate such facilities to the Rancho Cucamonga
Municipal Utility. The Rancho Cucamonga Municipal Utility shall be the
electrical service provider for all project related development.
10) Provide a 5-foot wide public utility easement for Rancho Cucamonga
Municipal Utility on Haven Avenue.
11) All parkways shall slope at 2 percent from the top-of-curb to 1 foot
behind the sidewalk along all street frontages.
12) The citywide Transportation Development Fee, covering the
City-adopted estimated costs to mitigate the traffic impacts of new
development, shall be paid upon issuance of building permits.
13) Identify all applicable Best Management Practices (BMPs) of the
project WQMP, show and label them on the grading plan.
Maintenance of BMPs identified in the WQMP shall be addressed in
the project CC&Rs.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244—OPUS WEST
October 10, 2007
Page 6
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. Contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occur as a
result of hauling. Timing may vary depending upon time of year
of construction.
• Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244 — OPUS WEST
October 10, 2007
Page 7
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of
10 minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
14) All residential and commercial structures shall be required to
incorporate high efficiency/low polluting heating, air conditioning,
appliances, and water heaters.
15) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244— OPUS WEST
October 10, 2007
Page 8
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures (i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate, the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244— OPUS WEST
October 10, 2007
Page 9
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon time
of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
Hydrology and Water Quality
Construction Activities:
1) Prior to issuance of grading permits, the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SWPPP) specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An erosion control plan shall be prepared, included in grading plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
erosion control plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244 — OPUS WEST
October 10, 2007
Page 10
Post- Construction Operational:
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared on March 27, 2007, to reduce
pollutants after construction entering the storm drain system to the
maximum extent practical.
6) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
grading permits.
7) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in
June 2004.
8) Prior to issuance of grading or paving permits, applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
PLANNING COMMISSION RESOLUTION NO.07-63
CONDITIONAL USE PERMIT DRC2007-00244 — OPUS WEST
October 10, 2007
Page 11
3) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips(counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 10TH DAY OF OCTOBER 2007.
PLANNING C MISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Pa St a& Chairman
ATTEST: / � •
Jam R. Troyer, AICP, Secretdiy
I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 10th day of October 2007, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, STEWART, WIMBERLY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: TENATIVE PARCEL MAP SUBTPM18544 AND DEVELOPMENT REVIEW AND
CONDITIONAL USE PERMIT DRC2007-00244.
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the (Mitigated Negative Declaration/Environmental Impact Report) for the
above-listed project. This program has been prepared in compliance with State law to ensure that
adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance. The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when, and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
TENATIVE PARCEL MAP SUBTPM18544 AND DEVELOPMENT REVIEW AND CONDITIONAL
USE PERMIT DRC2007-00244.
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring. The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division. The Division shall require
the applicant to post any necessary funds (or other forms of guarantee) with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and
report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2007-00244 and SUBTPM18544 Applicant: OPUS WEST
Initial Study Prepared by: L. J. Henderson AICP Date: September 10, 2007
ResponsibleMitigation Measures No. of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
,AirQuality:,_
All construction equipment shall be maintained in good PD C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per man ufactu rers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, the PD/BO C Review of plans C 2
developer shall submit Construction Plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed PD C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
• through seeding and watering.
I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc1 of 8 0
Mitigation . . of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds(i.e., BO C During A 4
wind speeds exceeding 25 mph)in accordance with construction
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
Regional Water Quality Control Board [RWQCB]) daily
to reduce Particulate Matter (PM,o) emissions, in
accordance with SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc2 of 8
Mitigation Measures No.I Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate PD C Review of plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate high efficiency/low polluting
heating,air conditioning, appliances, and water heaters.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
x.t . ' .'a ;w" -. -.('.',..n ;rP,+4ra .k. 4:a:x: 3:i -fig='b 'k., •;,.;-h..
raRsource . .c: '..i.: ``�Pi:z'.t�'�F T;c.:..".`+,.,"; .,.� •!'_. :,ry' 'i.`..Y �.y-
UItUl' e5
e' �:,t •+.iFY 7- `-'n.iA. 3Y RFv.F- i .may. i t `i i =S
Lc .va.r ,.JL.� -,
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
Enact interim measures to protect undesignated PD/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
Consider establishing provisions to require PD/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
Pursue educating the public about the area's PD/BO C Review of report A/D 3/4
archaeological heritage.
I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc3 of 8
Mitigation Measures No.
Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Propose mitigation measures and recommend PD/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines
• Prepare a technical resources management report, PD C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
If any paleontological resource (i.e. plant or animal PD B Review of report A/D 4
fossils) are encountered before or during grading, the
developerwill retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
Assign a paleontological monitor, trained and PD B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared BO B/C Review of report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify,and curate all recovered fossils for PD D Review of report D 3
documentation in the summary report and transfer to
an appropriate depository (i.e., San Bernardino
County Museum).
I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc4 of 8
Mitigation .. of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance
Submit summary report to City of Rancho PD D Review of report D 3
Cucamonga. Transfer collected specimens with a
copy to the report to San Bernardino County
Museum
tr' - µKy: - =.=+cyrT mal.• t_. ,�,?. l'k.e:..J's'3' 'T..>'_ _ _ _ a�5y .'ae'i v•.�.`_ rtiL. - _ -;J ..`Y.�, n.l:^' - -„ _a"
r :'e,.•atr �Cx.",,�N ""' '<„ � ' ',n• f'.-.., .,
Geology and'Soils s , d
.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RWQCB)daily to reduce PM10 emissions,in accordance
with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon time of year
of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM10 emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
{SYY kiy'•Cv-.Yj x` us-/. "tii-ae uR.+ -..F. k��':.��... 'Y2lxi? -9.✓ it.
H
H' i's' ` .'=
drolo '9Y�andxWate
r. ualiy a a k
, Y . -_:�., SvQ ==" s.'{. ' „R. ':Rs'.�^ws+�R: '3'•'M'"�Y'; su'P",; ,,_ ?,""c�a;m �,� ,3�.2�z *.,-=!�,.- Apy $ " '+c''-v.' Y1.i,:%. 4C$ ,
--'
THP
Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4
shall submit to Building Official for approval, Storm
Water Pollution Prevention Plan (SWPPP) specifically
identifying Best Management Practices (BMPs) that
shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to
the maximum extent practical.
I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc5 of 8
Mitigation Measures No.I
Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
the Grading Plan, and implemented for the proposed
project that identifies specific measures to control on-
site and off-site erosion from the time ground disturbing
activities are initiated through completion of grading.
This Erosion Control Plan shall include the following
measures at a minimum: a) Specify the timing of
grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the sitewhen there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan prepared by
(name/date) to reduce pollutants after construction
entering the storm drain system to the maximum extent
practical.
Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years, shall be submitted to the City for
review and approval prior to the issuance of grading
permits.
I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc6 of 8
Mitigation • ResponsibleMonitoring
ImplementingAction
Prior to issuance of building permits, the applicant shall CE B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and
non-structural measures consistent with the Guidelines
for New Development and Redevelopment adopted by
the City of Rancho Cucamonga in June 2004.
Prior to issuance of grading or paving permits, applicant BO B/C/D Review of plans A/C 2/4
shall obtain a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction Permit.
'..f<L...'. -- {<;ixk - "•;,.t.' - 'f-,r_''„`,;.>2•.`.'�- d'�n.;." ' xsTn,L.,, s'z;'G_St,�:a+�.,e �_., .: c,_o' _':rtd;'::;.c-='>cr`a'g. ' C:: .ii-:' '" <
�� :u''.}�"r s" ;�4{`' n�g:." - �+r.-;5�3;� :� F. ..k ..�e'.f;• ,.L,,. °,�'', L r--�i.='..; a -- ..?''�:'.,u ...� : "°-us;'?.;=`�. ;r.,.-:'yf , hgf. :..<.`x
.Nose-_-'�.•_�'t"-.1.;:7. ;',-�-•"�-�.. ,• ?£.?;''`. 'i'z.. .,�a�'� .w��� :: :i.-•-1.' -s-::..:{'.,.,, _ ..,.f�_r`�.,'i �:-�.. -- "`r � _ ::.-� _ ;.{.
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
]:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCH KLST-rev3-13-07final.doc7 of 8
Mitigation Measures No.
Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code Section construction
17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. It noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
PD-Planning Director or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C- Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal (Reports/Studies/Plans) 4-Stop Work Order
PO- Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee6- Revoke CUP
7-Citation
I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc8 of 8
COMMUNITY DEVELOPMENT
in DEPARTMENT
STANDARD CONDITIONS
PROJECT #: DRC2007-00244
SUBJECT: CONDITIONAL USE PERMIT
APPLICANT: OPUS WEST
LOCATION: SOUTHWEST CORNER OF HAVEN AVENUE AND CIVIC CENTER DRIVE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion
Date
1. The applicant shall agree to defend at his sole expense any action brought against the
City, its agents, officers, or employees, because of the issuance of such approval, or in
the alternative, to relinquish such approval. The applicant shall reimburse the City, its
agents, officers, or employees, for any Court costs and attorney's fees which the City,
its agents, officers, or employees may be required by a court to pay as a result of such
action. The City may, at its sole discretion, participate at its own expense in the
defense of any such action but such participation shall not relieve applicant of his
obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 07-63, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size).
The sheet(s) are for information only to all parties involved in the construction/grading
activities and are not required to be wet sealed/stamped by a licensed
Engineer/Architect.
3. The applicant shall be required to pay any applicable Fish and Game fees as shown
below. The project planner will confirm which fees apply to this project. All checks are
to be made payable to the Clerk of the Board Supervisors and submitted to the _
Planning Commission Secretary prior to the Planning Commission or Planning Director
hearing:
a) Negative Declaration - $ 1,850 X
SC-1-05 1
IAPLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No.DRC2007-00244
Completion Date
B. Time Limits
1. Conditional Use Permit .approval shall expire if building permits are not issued or
approved use has not commenced within 5 years from the date of approval. No
extensions are allowed..
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans
which include site plans, architectural elevations, exterior materials and colors,
landscaping, sign program, and grading on file in the Planning Department, the
conditions contained herein, Development Code regulations, and the.Haven Avenue
Overlay.
2. Prior to any use of the project site or business activity being commenced thereon, all
Conditions of Approval shall be completed to the satisfaction of the Planning Director.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building
Code and State Fire Marshal regulations have been complied with. Prior to occupancy,
plans shall be submitted to the Rancho Cucamonga Fire Protection District and the
Building and Safety Department to show compliance. The buildings shall be inspected
for compliance prior to occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall
be submitted for Planning Director review and approval prior to the issuance of building
permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be
coordinated for consistency prior to issuance of any permits (such as grading, tree
removal, encroachment, building, etc.) or prior to final map approval in the case of a
custom lot subdivision, or approved use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development
Code, all other applicable City Ordinances, and applicable Community or Specific Plans
in effect at the time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and
approved by the Planning Director and Police Department (477-2800) prior to the
issuance of building permits. Such plan shall indicate style, illumination, location,
height, and method of shielding so as not to adversely affect adjacent properties.
8. Trash receptacle(s) are required and shall meet City standards. The final design,
locations, and the number of trash receptacles shall be subject to Planning Director
review and approval prior to the issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc.,
shall be located out of public view and adequately screened through the use of a
combination of concrete or masonry walls, berming, and/or landscaping to the
satisfaction of the Planning Director. For single-family residential developments,
transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified,in a clear and concise
manner, including proper illumination.
2
1:\PLANNING\FINAL\PLNGC0MM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No. DRC2007-00244
Completion Date
11. All parkways, open areas, and landscaping shall be permanently maintained by the
property owner, homeowners' association, or other means acceptable to the City.
Proof of this landscape maintenance shall be submitted for Planning Director and City
Engineer review and approved prior to the issuance of building permits.
12. The developer shall submit a construction access plan and schedule for the _/_/_
development of all lots for Planning Director and City Engineer approval; including, but
not limited to, public notice requirements, special street posting, phone listing for
community concerns, hours of construction activity, dust control measures, and security
fencing.
D. Shopping Centers
1. A uniform hardscape and street furniture design including seating benches, trash
receptacles, free-standing potted plants, bike racks, light bollards, etc., shall be utilized
and be compatible with the architectural style. Detailed designs shall be submitted for
Planning Department review and approval prior to the issuance of building permits.
2. Provide for the following design features in each trash enclosure, to the satisfaction of
the Planning Director:
a. Architecturally integrated into the design of (the shopping center/the project).
b. Separate pedestrian access that does not require the opening of the main doors
and to include self-closing pedestrian doors.
C. Large enough to accommodate two trash bins.
d. Roll-up doors.
e. Trash bins with counter-weighted lids.
f. Architecturally treated overhead shade trellis.
g. Chain link screen on top to prevent trash from blowing out of the enclosure and
designed to be hidden from view.
3. Graffiti shall be removed within 72 hours.
4. The entire site shall be kept free from trash and debris at all times and in no event shall
trash and debris remain for more than 24 hours.
5. Signs shall be conveniently posted for"no overnight parking"and for"employee parking
only."
6. All operations and businesses shall be conducted to comply with the following
standards which shall be incorporated into the lease agreements for all tenants:
a. Noise Level - All commercial activities shall not create any noise that would
exceed an exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m.
and 65 dB during the hours of 7 a.m. until 10 p.m.
3
I:\PLANNING\FINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No. DRC2007-00244
Completion Date
b. Loading and Unloading - No person shall cause the loading, unloading, opening,
closing, or other handling of boxes, crates, containers, building materials, garbage
cans, or other similar objects between the hours of 10 p.m. and 7 a.m. unless
otherwise specified herein, in a manner which would cause a noise disturbance to
a residential area.
7. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and
plaza. They shall be of brick/tile pavers, exposed aggregate, integral color concrete, or
any combination thereof. Full samples shall be submitted for Planning Director review
and approval prior to the issuance of building permits.
8. All future building pads shall be seeded and irrigated for erosion control. Detailed plans
shall be included in the landscape and irrigation plans to be submitted for Planning
Department approval prior to the issuance of building permits.
E. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment
and/or projections, shall be shielded from view and the sound buffered from adjacent
properties and streets as required by the Planning Department. Such screening shall
be architecturally integrated with the building design and constructed to the satisfaction
of the Planning Director. Details shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match
main building colors
F. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall. be 9 feet wide by 18 feet long. When a side of any parking
space abuts a building, wall, support column, or other obstruction, the space shall be a
minimum of 11 feet wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and
shall contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be
provided throughout the development to connect buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,
entrances, and exits shall be striped per City standards.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25
or more parking stalls. Designate two percent or one stall; whichever is greater, of the
total number of stalls for use by the handicapped.
6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or
more parking stalls. Developments with over 100 parking stalls shall provide motorcycle
parking at the rate of one percent. The area for motorcycle parking shall be a minimum
of 56 square feet.
4
IAPLANNING\FINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No. DRC2007-00244
Completion Date
G. Trip Reduction
1. Carpool and vanpool designated off-street parking close to the building shall be
provided for commercial, office, and industrial facilities at the rate of 10 percent of the
total parking area. If covered, the vertical clearance shall.be no less than 9 feet.
2. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and
other non-residential development.
3. Transit improvements such as bus shelters, bus pullouts, and bus pads shall be _/_
provided. Bus shelters shall also include a bench, a trash receptacle, and an adjoining
bike rack(minimum 3 capacity)on a concrete pad. Bus shelter shall be located outside
public right-of-way and shall be privately maintained.
4. Shower facilities accessible to both men and women shall be provided per Municipal _/_/_
Code Section 17.30.070.A. for persons walking or bicycling to work for each project
which meets the following thresholds:
Commercial: 250,000 square feet
Industrial: 325,000 square feet
Office: 125,000 square feet
Hotels and Motels: 250 rooms
H. Landscaping
1. A minimum of 20% of trees planted within industrial projects, and a minimum of 30%
within commercial and office projects, shall be specimen size trees - 24-inch box or
larger.
2. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three
parking stalls.
3. Trees shall be planted in areas of public view adjacent to and along structures at a rate
of one tree per 30 linear feet of building.
4. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be
included in the required landscape plans and shall be subject to Planning Director
review and approval and coordinated for consistency with any parkway landscaping
plan which may be required by the Engineering Department.
5. Special landscape features such as mounding, alluvial rock, specimen size trees,
meandering sidewalks (with horizontal change), and intensified landscaping, is required
along driveway aisles from Haven Avenue.
6. Landscaping and irrigation systems required to be installed within the public right-of-
way on the perimeter of this project area shall be continuously maintained by the
developer.
7. Tree maintenance criteria shall be developed and submitted for Planning Director
review and approval prior to issuance of building permits. These criteria shall
encourage the natural growth characteristics of the selected tree species.
5
1APLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No.DRC2007-00244
Completion Date
8. Landscaping and irrigation shall be designed to conserve water through the principles
of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
I. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this
approval. Any signs proposed for this development shall comply with the Sign
Ordinance and shall require separate application and approval by the Planning
Department prior to installation of any signs.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE:ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE
ADDITIONAL REVIEW(S)
J. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number
and size of service entrance conductors, panel schedules, .and single line
diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water
and waste diagram, sewer or septic system location, fixture units, gas piping, and
heating and air conditioning; and
g. Planning Department Project Number(i.e., DRC2007-00244)clearly identified on
the outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils
report. Architect's/Engineer's stamp and "wet" signature are required prior to plan
check submittal.
3. Contractors must show proof of State and City licenses and Workers' Compensation
coverage to the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy
issued by the Building and Safety Department.
K. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans
shall be marked with the project file number (i.e., DRC2007-00244). The applicant
6
I:\PLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No.ORC2007-00244
Completion Date
shall comply with the latest adopted California Codes, and all other applicable codes,
ordinances, and regulations in effect at the time of permit application. Contact the
Building and Safety Department for availability of the Code Adoption Ordinance and
applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development
project or major addition, the applicant shall pay development fees at the established
rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee,
Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,
Construction and Demolition Diversion Program deposit and fees and School Fees.
Applicant shall provide a copy of the school fees receipt to the Building and Safety
Department prior to permits issuance.
3. The building and Safety Official shall provide the street addresses after tract/parcel map
recordation and prior to issuance of building and safety.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m.
Monday through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's
public counter).
L. New Structures
1. Provide compliance with the California Building Code(CBC)for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy
separations.
3. Provide draft stops in attic areas, not exceed 3,000 square feet, in accordance with
CBC Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC
Table 5-A
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
6. Upon tenant improvement plan check submittal, additional requirements may be
needed.
M. Grading
1. Grading of the subject property shall be in accordance with California Building Code,
City Grading Standards, and accepted grading practices. The final grading plan shall
be in substantial conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of
California to perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted
at the time of application for grading plan check.
1APLANNINGTINALTLNGCOMM0007 Res&Stf RpMRC2007-00244Std Cond (CUP)10-10.doc
Project No. DRC2007-00244
Completion Date
4. The final grading plan, appropriate certifications and compaction reports shall be
completed, submitted, and approved by the Building and Safety Official prior to the
issuance of building permits.
5. A separate grading plan check submittal is required for all new construction projects
and for existing buildings where improvements being proposed will generate 50 cubic
yards or more of combined cut and fill. The grading plan shall be prepared, stamped,
and signed by a California registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
N. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets
(measured from street centerline):
As needed total feet on Haven Avenue
50 total feet on Arrow Route
44 total feet on Civic Center Drive
2. Corner property line cutoffs shall be dedicated per City Standards.
3. Reciprocal parking agreements for all parcels and maintenance agreements ensuring
joint maintenance of all common roads, drives, or parking areas shall be provided by
CC & R's or deeds and shall be recorded prior to, or concurrent with, the final parcel
map.
4. All existing easements lying within future rights-of-way shall be quit-claimed or
delineated on the final map.
5. Easements for public sidewalks and/or street trees placed outside the public right-of-
way shall be dedicated to the City.
6. Additional street right-of-way shall be dedicated along right turn lanes, to provide a
minimum of 7 feet measured from the face of curbs.
O. Street Improvements —/—/-
1. Pursuant to City Council Resolution No. 88-557, no person shall make connections
from a source of energy, fuel or power to any building service equipment which is
regulated by technical codes and for which a permit is required unless, in addition to
any and all other codes, regulations and ordinances, all improvements required by
these conditions of development approval have been completed and accepted by the
City Council, except: that in developments containing more than one building or unit,
the development may have energy connections made to a percentage of those
buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the
buildings or units be connected to energy prior to completion and acceptance of all
improvements required by these conditions of approval of development.
8
I:\PLANNINGTINAL\PLNGCOMMt2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No.DRC2007-00244
Completion Data
2, Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. 1 Lights Trees Trail Island Trail Other
Haven Avenue X X (c) X X X X (b)
Arrow Route X (c) X X X (b)
Civic Center Drive X X X X X X
Notes: (a) Median island includes landscaping and irrigation on meter. (b)
Pavement reconstruction and overlays will be determined during plan check. (c) If
so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-
lieu of construction fee shall be provided for this item.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, and intersection
safety lights on future signal poles, and traffic signal plans shall be prepared by a
registered Civil Engineer and shall be submitted to and approved by the City
Engineer. Security shall be posted and an agreement executed to the satisfaction
of the City Engineer and the City Attorney guaranteeing completion of the public
and/or private street improvements, prior to final map approval or the issuance of
building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to
any other permits required.
C. Pavement striping, marking, traffic signing, street name signing, traffic signal _
conduit, and interconnect conduit shall be installed to the satisfaction of the City
Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or _/_/_
reconstruction project along major or secondary streets and at intersections for
future traffic signals and interconnect wiring. Pull boxes shall be placed on both
sides of the street at 3 feet outside of BCR, ECR, or any other locations approved
by the City Engineer
Notes:
1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a
maximum of 200 feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per
City Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times
with adequate detours during construction. Street or lane closure permits are
required. A cash deposit shall be provided to cover the cost of grading and
paving, which shall be refunded upon completion of the construction to the
satisfaction of the City Engineer.
9
I:\PLANNING\FINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No. DRC2007-00244
Completion Date
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains
shall be installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first
plan check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards
in accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The
completed legend (box below) and construction notes shall appear on the title page of
the street improvement plans. Street improvement plans shall include a line item within
the construction legend stating: "Street trees shall be installed per the notes and
legend on sheet_(typically sheet 1)." Where public landscape plans are required,
tree installation in those areas shall be per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions
and other variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Qty.
Haven Avenue Magnolia grandiflora NCN 8' 60'0.C. 15 Gal Fill In
Foreground 'Mageslic Beauty' Intentionally
P.A. 8'or greater, spaced this
Generally in front of far apart
sidewalk
P.A. Less than 8' Magnolia grandiflora NCN 3' 20'O.C. 15 Gal Fill In
'St.Mary'
Primary tree in Brachychiton populneus - Bottle Tree 8' 25-0'C. 15 Gal Fill In
masses, mainly Forml on
behind sidewalk alternating
side of
meandering
walk
Arrow Route Lagerstroemia indica Crape Myrtle Hybrid— 3' 20 O.C. 24"Box
Replacement for 'Tuscarora' Pink Informal—if
Liguidambar 8-1-05 maintained
DER by City
Civic Center Drive Platanus acerifolia London Plane Tree 8' 30'O.C. 15 Gal Fill In
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be
furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may
require backfill soil amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering
Department.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for
conformance with adopted policy. On collector or larger streets, lines of sight shall be
plotted for all project intersections, including driveways. Local residential street
intersections and commercial or industrial driveways may have lines of sight plotted as
required.
10
I:\PLANNING\FINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No. DRC2007-00244
Completion Date
P. Public Maintenance Areas —/—/-
1. A signed consent and waiver form to join and/or form the appropriate Landscape and
Lighting Districts shall be filed with the City Engineer prior to final map approval or
issuance of building permits whichever occurs first. Formation costs shall be borne by
the developer.
Q. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to
final map approval or the issuance of building permits, whichever occurs first. All
drainage facilities shall be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage
entering the property from adjacent areas.
R. Utilities —/—/-
1. Provide separate utility services to each parcel including sanitary sewerage system,
water, gas, electric power, telephone, and cable TV (all underground) in accordance
with the Utility Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of _/—/—
the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection
District, and the Environmental Health Department of the County of San Bernardino. A
letter of compliance from the CVWD is required prior to final map approval or issuance
of permits, whichever occurs first. Such letter must have been issued by the water
district within 90 days prior to final map approval in the case of subdivision or prior to
the issuance of permits in the case of all other residential projects.
4. Approvals have not been secured from all utilities and other interested agencies _/—/—
involved. Approval of the final parcel map will be subject to any requirements that may
be received from them.
S. General Requirements and Approvals —/—/-
1. A non-refundable deposit shall be paid to the City, covering the estimated operating _/—/—
costs for all new streetlights for the first six months of operation, prior to final map
approval or prior to building permit issuance if no map is involved.
2. Prior to the issuance of building permits, a Diversion Deposit and related administrative _/—/—
fees shall be paid for the Construction and Demolition Diversion Program. The deposit
is fully refundable if at least 50% of all wastes generated during construction and
demolition are diverted from landfills, and appropriate documentation is provided to the
City. Form CD-1 shall be submitted to the Engineering Department when the first
building permit application is submitted to Building and Safety. Form CD-2 shall be
submitted to the Engineering Department within 60 days following the completion of the
construction and/or demolition project.
11
I:\PLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
Project No. DRC2007-00244
Completion Date
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
T. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle
power. These areas should be lighted from sunset to sunrise and on photo sensored
cell.
2. . All buildings shall have minimal security lighting to eliminate dark areas around the
buildings, with direct lighting to be provided by all entryways. Lighting shall be
consistent around the entire development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
12
11PLANNINGTINAL\PLNGCOMM\2007 Res&Stf Rpt\DRC2007-00244Std Cond (CUP)10-10.doc
o Rancho Cucamonga Fire Protection
District
Fire Construction Services
STANDARD CONDITIONS
May 24, 2007
Opus West Corporation
SWC Haven & Arrow
Commercial Subdivision
SUBTPM18544 & DRC2007-00244
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
The 4-Story building must comply with the Low Rise requirements of RCFPD Ordinance
39
The RCFPD Procedures & Standards which are referenced in this document can be
access on the web at http://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire
Safety Division & Fire Construction Services section. Search by article; the preceding
number of the standard refers to the article. Chose the appropriate article number then
a drop down menu will appear, select the corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for
the spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects
is 300-feet. No portion of the exterior wall shall be located more than 150-feet
from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed
100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the
Fire District.
5. A minimum of forty-feet (40') from any building.
c. If any portion of a facility or building is located more than 150-feet from a public
fire hydrant measured on an approved route around the exterior of the facility or
building, additional private or public fire hydrants and mains capable of
supplying the required fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction
thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are
installed may be reduced by 50-percent for the installation of an approved
automatic fire sprinkler system in accordance with NFPA 13 with central station
monitoring . This requirement is made in accordance with the California Fire Code
Appendix III-A, as adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be
used to provide the required fire flow subject to Fire District review and approval.
Private fire hydrants on adjacent property shall not be used to provide required fire
flow.
3. Firewater plans are required for all projects that must extend the existing water
supply to or onto the site. Building permits will not be issued until firewater
plans are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within
600-feet of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the
applicant shall submit plans, specifications and calculations for the fire sprinkler
system underground supply piping. Approval of the underground supply piping
system must be obtained prior to submitting the overhead fire sprinkler system
plans.
FSC-4 Requirement for Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or
any other applicable standards require an approved automatic fire sprinkler system to
be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Assembly and Educational Occupancy Buildings.
3. "All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When buildings do not meet the requirements of the 2001 California Building Code
and the RCFPD Fire Department Access - Fire Lane Standard 9-7
6. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or
standards) requires an automatic and/or manual fire alarm system. Refer to
RCFPD Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm
Standard #10-6 and/or the California Fire Code.
2. Prior to any removal, remodel, modification and/or additions to the building or suite's
fire alarm system, Fire Construction Services' approval and a building permit must
be obtained. Plans and specifications shall be submitted to Fire Construction
Services in accordance with RCFPD Fire Alarm Standard #10-6.
3. Based on the number of sprinkler heads; the sprinkler system is required to
monitored by a listed central station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as
private roads, streets drive aisles and/or designated fire lanes. Please reference the
RCFPD Fire Lanes Standard 9-7
t. Location of Access: All portions of the structures 1s' story exterior wall shall be
located within 150-feet of Fire District vehicle access, measure on an approved
route around the exterior of the building. Landscaped areas, unpaved changes in
elevation, gates and fences are deemed obstructions.
2. Specifications .for private Fire District access roadways per the RCFPD
Standards are:
a. The minimum unobstructed width is 26-feet.
b. The fire department access must comply to the 5-50' rule in Appendix I-B of
RCFPD Ordinance 39.
c. The maximum inside turn radius shall be 20-feet.
d. The minimum outside turn radius shall be 46-feet.
e. The minimum radius for cul-de-sacs is 45-feet.
f. The minimum vertical clearance is 14-feet, 6-inches.
g. At any private entry median, the minimum width of traffic lanes shall be 20-feet
on each side.
h. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
i. The maximum grade of the driving surface shall not exceed 12%.
j. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
k. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be
allowed to obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder,
shall be provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance
with the 2001 California Building Code, Fire and/or any other applicable
standards.
b. In buildings with high-piled storage access doors shall be provided in each 100
lineal feet or major fraction thereof, of the exterior wall that faces the required
access roadways. When railways are installed provisions shall be made to
maintain Fire District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department
access road shall be in accordance with Fire District Standard #9-2. The following
design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be
submitted to Fire Construction Services (FCS) for approval. Upon the
completion of the installation and before placing the gates in service, inspection
and final acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
c. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20
feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety
Office for $20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual
override device and a fail-safe or battery backup feature to open the gate or
release the locking Mechanism in case of power failure or mechanical
malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch
must be installed outside the gate in a visible and unobstructed location.
3
i. For motorized gates, a traffic loop device must be installed to allow exiting from
the complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and
operation must be approved by the Fire Chief prior to installation. Bi-directional
or multiple sensors may be required due to complexity of the various entry
configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes.
A site plan illustrating the proposed delineation that meets the minimum Fire District
standards shall be included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be
clearly noted on the site plan. A copy of the approved Alternative Method
application, if applicable, must be reproduced on the architectural plans submitted
to B&S for plan review.
8. Roof Access: There shall be a means of fire department access from the exterior
walls of the buildings on to the roofs of all commercial, industrial and multi-family
residential structures with roofs less than 75' above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by
an aerial ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings
with construction features, or high parapets that inhibit roof access.
c. The number of ladder points may be required to be increased, depending on
the building size and configuration.
d. Regardless of the parapet height or construction features the approved ladder
point shall be identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other
obstructions, a permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access
Standard 9-9 Appendix A and drawings 9-9a and 9-9b.
h. A site plan showing the locations of the roof ladder shall be submitted during
plan check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations
and/or building construction. Plan check submittal is required with the permit
application for approval of the permit; field inspection is required prior to permit
issuance. General Use Permit shall be required for any activity or operation not
specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies
• Compressed Gases
• Public Assembly
• Cryogenics
• Dry Cleaning Plants
• Refrigeration Systems
• Repair Garages
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
4
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-11 Hazardous Materials — Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the
San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms
and assistance. The County Fire Department is the Cal/EPA Certified Unified Program
Agency (CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building &
Safety will not be finalized until the San Bernardino County Fire Department reviews
your Business Emergency/Contingency Plan. California Government Code, Section
65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the
applicant has met or is meeting specific hazardous materials disclosure
requirements. A Risk Management Program (RMP) may also be required if
regulation substances are to be used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit
a Plan, is also required to submit a notice to the owner of the property in writing
stating that the business is subject to the Business Emergency/Contingency Plan
mandates and has complied with the provisions. The tenant must provide a copy of
the Plan to the property owner within five (5) working days, if requested by the
owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the
installation of equipment designed to store, use or dispense hazardous materials in
accordance with the 2001 California Building, Fire, Mechanical, Plumbing, Electrical
Codes, RCFPD Ordinances FD15 and FD39 and other implemented and/or adopted
standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for
alternate method, when submitted. The request must be submitted on the Fire District
"Application for Alternate Method" form along with supporting documents and payment
of the $92 review fee.
FCS-14 Map Recordation
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water
Supply are required on this project. The project appears to be located on a
property that is being subdivided. The reciprocal agreement is required to be
recorded between property owners and the Fire District. The recorded agreement
shall include a copy of the site plan. The Fire Construction Services shall approve
the agreement, prior to recordation. The agreement shall be recorded with the
County of San Bernardino, Recorders Office.
Reciprocal access agreement — Please provide a permanent access agreement
between the owners granting irrevocable and a non-exclusive easement, favoring
the Fire District to gain access to the subject property. The agreement shall
include a statement that no obstruction, gate, fence, building or other structure
shall be placed within the dedicated access, without Fire Department approval. The
agreement shall have provisions for emergency situations and the assessing of
cost recovery to the property by the fire District.
5
Reciprocal water covenant — Please provide a permanent maintenance and
service covenant between the owners granting an irrevocable and non-exclusive
easement, favoring the Fire District for the purpose of accessing and maintaining
the private water mains, valves and fire hydrants (fire protection systems facilities
in general). The covenant shall have provisions for emergency situations and the
assessing of cost recovery to the property by the fire District.
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following
prior to the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction
plans, specifications, flow test data and calculations for the private water main
system for review and approval by the Fire District. Plans and installation shall
comply with Fire District Standards. Approval of the on-site (private) fire
underground and water plans is required prior to any building permit issuance for
any structure on the site. Private on-site combination domestic and fire supply
system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and
#10-4. The Building & Safety Division and Fire Construction Services will perform
plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to
delivering any combustible framing materials to the site. Fire construction Services
will inspect the installation, witness hydrant flushing and grant a clearance before
lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by
the Fire District and CCWD. On the plan, show all existing fire hydrants within a
600-foot radius of the project. Please reference the RCFPD Water Plan Submittal
Procedure Standard 9-8.
All required public fire hydrants shall be installed, flushed and operable prior to
delivering any combustible framing materials to the site. CCWD personnel shall
inspect the installation and witness the hydrant flushing. Fire Construction Services
shall inspect the site after acceptance of the public water system by CCWD. Fire
Construction Services must grant a clearance before lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over
access roads must be installed at least 14' 6" above the finished surface of the
road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the
letter to Fire Construction Services.
5. Easements and Reciprocal Agreements: All easements and agreements must
be recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire
Construction Services' "Temporary Power Release Checklist and Procedures".
6
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the
City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of
Reflective Hydrant Markers". On private property, the markers shall be installed at
the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the
most hydraulically remote on-site fire hydrants. The underground fire line
contractor, developer and/or owner are responsible for hiring the company to
perform the test. A final test report shall be submitted to Fire Construction Services
verifying the fire flow available. The fire flow available must meet or exceed the
required fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the
fire sprinkler monitoring system must be tested and accepted by Fire Construction
Services. The fire sprinkler monitoring system shall be installed, tested and
operational immediately following the completion of the .fire sprinkler system
(subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall
be inspected, tested and accepted by Fire Construction Services before occupancy
is granted and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire
alarm system shall be installed, inspected, tested and accepted by Fire
Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy,
vehicular gates must be inspected, tested and accepted in accordance with RCFPD
Standards #9-1 or #9-2 by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the
fire access roadways must be installed in accordance with the approved plans and
acceptable to Fire Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that
prohibit parking, specify the method of enforcement and identifies who is
responsible for the required annual inspections and the maintenance of all required
fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial
and multi-family buildings shall post the address with minimum 8-inch numbers on
contrasting background, visible from the street and electrically illuminated during
periods of darkness. When the building setback exceeds 200 feet from the public
street, an additional non-illuminated 6-inch minimum number address shall be
provided at the property entrance. Larger address numbers will be required on
buildings located on wide streets or built with large setbacks in multi-tenant
commercial and industrial buildings. The suite designation numbers and/or letters
shall be provided on the front and back of all suites.
10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the
applicant must demonstrate (in writing from the County) that the facility has met or
is meeting the Risk Management Plan (RMP) or Business Emergency/Contingency
Plan with the San Bernardino County Fire Department, Hazardous
7
Materials/Emergency Response and Enforcement Division. The applicant must
also obtain inspection and acceptance by Fire Construction Services.
11. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information"
form. This form provides contact information for Fire District use in the event of an
emergency at the subject building or property. This form must be presented to the
Fire Construction Services Inspector.
12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 1/z" x
11" or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1
shall be revised by the applicant to reflect the actual location of all devices and
building features as required in the standard. The site plan must be reviewed and
accepted by the Fire Inspector.
8