HomeMy WebLinkAbout08-31 - Resolutions RESOLUTION NO. 08-31
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2007-00497, A PROPOSAL TO CONSTRUCT A
DEMONSTRATION BUILDING COMPRISED OF OFFICES AND
DISPLAY/EXHIBITION AREAS AT THE CUCAMONGA VALLEY WATER
DISTRICT FACILITIES, LOCATED IN THE INDUSTRIAL PARK (IP)
DISTRICT, SUBAREA 17, AT 10440 ASHFORD STREET; AND MAKING
FINDINGS IN SUPPORT THEREOF—APN: 1077-401-47.
A. Recitals.
1. HMC Architects, on behalf of the Cucamonga Valley Water District, filed an application
for the issuance of Development Review DRC2007-00497, as described in the title of this
Resolution. Hereinafter in this Resolution,the subject Development Review request is referred to as
"the application.".
2. On the 11th day of June 2008, the Planning Commission of the City of
Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded
said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the
Planning Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on June 11, 2008, including written and oral staff reports,together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to a rectangular parcel of about 240 feet(north to south)by
150 feet (east to west) with an area of about 36,015 square feet (0.83 acre), located at the
southeast corner of the Ashford Street and Cartilla Avenue; and
b. The property is bound on the east and north by the parking lot, administrative
offices,and operations facilities of the Cucamonga Valley Water District(CVW D). To the south and
west are office warehouse buildings of about 40,000 and 16,000 square feet, respectively; and
C. The applicant proposes to construct a two-story building of 14,411 square feet;and
d. The application contemplates a demonstration building comprised of offices and
display/exhibition areas to educate visitors on the latest methods and technologies in sustainable
building practices, land management, and resource conservation; and
e. The building will be part of the Cucamonga Valley Water District's'campus'and will
therefore use the existing parking on-site. The combined parking requirement for the existing
PLANNING COMMISSION RESOLUTION NO. 08-31
DRC2007-00497 — HMC ARCHITECTS
June 11, 2008
Page 2
buildings is 150 stalls and 256 parking stalls on-site. Following completion of the new building the
parking requirement will be 208 stalls and 238 parking stalls on-site following completion; and
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs
1 and 2 above, this Commission hereby finds and concludes as follows:
a. The proposed development is in accord with the General Plan,the objectives of the
Development Code and the purposes of the district in which the site is located. The proposed
project is to construct a demonstration building comprised of offices and display/exhibition areas and
is consistent with the development in the vicinity.
b. The proposed development,together with the conditions applicable thereto,will not
be detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity. The surrounding properties are zoned industrial park and the
surrounding uses are industrial and office oriented.
C. The proposed development complies with each of the applicable provisions of the
Development Code. The proposed development meets all standards outlined in the Development
Code and the design and development standards and policies of the Planning Commission and the
City.
4. The Planning Department Staff has determined that the project is categorically exempt
from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA
Guidelines. The project qualifies as a Class 32 exemption under State CEQA Guidelines
Section 15332 In-Fill Development Project as the project site is surrounded on all sides by existing
industrial development. In addition, there is no substantial evidence that the project may have a
significant effect on the environment. The Planning Commission has reviewed the Planning
Department's determination of exemption, and based on its own independent judgment,concurs in
the staff's determination of exemption.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) Approval is for the construction of a 14,411 square foot demonstration
building comprised of offices and display/exhibition areas at the
Cucamonga Valley Water District facilities located in the Industrial Park
(IP) District, Subarea 17,at 10440 Ashford Street-APN: 1077-401-47.
2) All walls including retaining walls exposed to public shall be decorative
masonry. Decorative means slump stone, split-face, or stucco.
3) All trash enclosures shall incorporate an overhead trellis and roll-up
doors per City standard.
PLANNING COMMISSION RESOLUTION NO. 08-31
DRC2007-00497 — HMC ARCHITECTS
June 11, 2008
Page 3
4) All groundmounted equipment, utility boxes including transformers, and
back-flow devices shall be surrounded by a minimum of two rows of
shrubs spaced a minimum of 18 inches on-center.
5) Light standards shall not exceed 25 feet or the height of the shortest
on-site building. The height includes the base and is measured from
finished grade to the top of the lamp head.
6) The landscaping shall be installed prior to release for occupancy.
7) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume low-pressure spray.
Engineering Department
1) The following impact fees shall be paid upon issuance of building
permit (fees subject to change annually):
a) Diversion Deposit $10,000.00 (14,394 square feet)
b) Administrative Fee $ 750.00 (14,394 square feet)
2) Prior to the issuance of building permits, a Diversion Deposit and
related administrative fees shall be paid for the Construction and
Demolition Diversion Program. The deposit is fully refundable if at
least 50 percent of all wastes generated during construction and
demolition are diverted from landfills and appropriate documentation is
provided to the City. Form CD-1 shall be submitted to the Engineering
Department when the first building permit application is submitted to
Building and Safety. Form CD-2 shall be submitted to the Engineering
Department within 60 days following the completion of the construction
and/or demolition project.
Building and Safety Department
1) An HCOC exists for the downstream receiving water. The downstream
receiving water (Mill Creek, Prado Area) is experiencing significant
degradation of its banks. The project must implement a volume-based
treatment control Best Management Practices (retention/detention
facility) on each lot.
2) Flow lines steeper than 6 percent could be erosive. Provide hard lined
gutters and swales where concentrated flows exceed 3fps and
anywhere that flow lines exceed 10 percent.
3) A Water Quality Management Plan shall be completed, notarized, and
recorded prior to the issuance of a grading permit.
PLANNING COMMISSION RESOLUTION NO. 08-31
DRC2007-00497 — HMC ARCHITECTS
June 11, 2008
Page 4
4) A freestanding wall exists along the south property line. The
Conceptual Grading and Drainage Plan proposes to retain soil against
the wall. A Structural Engineer shall provide calculations showing that
the freestanding wall can work as a retaining wall and support the soils
placed against it.
6. The Secretary to this Commission shall certify the adoption of this Resolution.
APPROVED AND ADOPTED THIS 11TH DAY OF JUNE 2008.
PLANNI G COMMISSION OF THE CITY OF RANCHO CUCAMONGA
/;��
Pam S , Chairman
ATTEST:
Jam s R. Troyer, AICP, Secretary
I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 11th day of June 2008, by the following vote-to-wit:
AYES: COMMISSIONERS: MUNOZ, STEWART, WIMBERLY
NOES: COMMISSIONERS: NOME
ABSENT: COMMISSIONERS: FLETCHER, HOWDYSHELL
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2007-00497
SUBJECT: DEVELOPMENT REVIEW
APPLICANT: HMC ARCHITECTS (FOR CUCAMONGA VALLEY WATER DISTRICT)
LOCATION: SOUTHEAST CORNER OF ASHFORD STREET AND CARTILLA AVENUE-APN: 1077-401-15
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of.any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 08-31, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The
project planner will confirm which fees apply to this project. All checks are to be made payable to
the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to
the Planning Commission or Planning Director hearing:
a) Notice of Exemption - $50 x
b) Notice of Determination - $50
c) Mitigated Negative Declaration - $ 1,926.75
d) Environmental Impact Report -$2,656.75
SC-1-05 1
I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2007.00497StdCond 6-11.doc
Project No. DRC2007-00497
Completion Date
B. Time Limits
1. Development/Design Review approval shall expire if building permits are not issued or approved _/_/_
use has not commenced within 5 years from the date of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department, and the conditions contained herein, Development
Code regulations.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first. I
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved
by the Planning Director and Police Department (477-2800) prior to the issuance of building
permits. Such plan shall indicate style, illumination,location, height,and method of shielding so
as not to adversely affect adjacent properties.
8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For
single-family residential developments, transformers shall be placed in underground vaults.
9. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
10. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and City Engineer review and approved
prior to the issuance of building permits.
11. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured
products.
2
I:\PLANNING\FINAL\PLNGCOMM\2008 Res 8 Stf rep\DRC2007-00497StdCond 6-11.doc
Project No. DRC2007-00497
Completion Date
D. Office Projects
1. Provide for the following design features in each trash enclosure, to the satisfaction of the
Planning Director:
a. Architecturally integrated into the design of (the shopping center/the project).
b. Separate pedestrian access that does not require the opening of the main doors and to
include self-closing pedestrian doors.
C. Large enough to accommodate two trash bins.
d. Roll-up doors.
e. Trash bins with counter-weighted lids.
f. Architecturally treated overhead shade trellis.
g. Chain link screen on top to prevent trash from blowing out of the enclosure and designed
to be hidden from view.
2. Graffiti shall be removed within 72 hours.
3. The entire site shall be kept free from trash and debris at all times and in no event shall trash and
debris remain for more than 24 hours.
4. Signs shall be conveniently posted for "no overnight parking" and for "employee parking only."
5. All operations and businesses shall be conducted to comply with the following standards which
shall be incorporated into the lease agreements for all tenants:
a. Noise Level - All commercial activities shall not create any noise that would exceed an
exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m. and 65 dB during the
hours of 7 a.m. until 10 p.m.
b. Loading and Unloading-No person shall cause the loading,unloading,opening,closing,or
other handling of boxes, crates, containers, building materials, garbage cans, or other
similar objects between the hours of 10 p.m. and 7 a.m. unless otherwise specified herein,
in a manner which would cause a noise disturbance to a residential area.
6. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and plaza.
They shall be of brick/tile pavers,exposed aggregate,integral color concrete,or any combination
thereof. Full samples shall be submitted for Planning Director review and approval prior to the
issuance of building permits.
E. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the Planning Director.
Details shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
3
I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2007-00497StdCond 6-11.doc
Project No. DRC2007-00497
Completion Date
F. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
4. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the
rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet.
G. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
2. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If
covered, the vertical clearance shall be no less than 9 feet.
H. Landscaping
1. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Department.
2. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. Prior to
issuance of Building Permits,the project landscape architect shall certify on the submitted plans
that the xeriscape requirements have been met.
I. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to Planning Director review and approval prior to the issuance
of building permits.
4
I:\PLANNING\FINAL\PLNGCOMM\2008 Res&St!rep\DRC2007-00497StdCond 6-11.doc
Project No.DRC2007-00497
Completion Date
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
J. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
I. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (i.e., DRC2007-00497) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
K. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2007-00497). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5
I:\PLANNING\FINAL\PLNGC0MM\2008 Res&Stf rep\DRC2007-00497StdCond 6-11.doc
Project No.DRC2007-00497
Completion Date
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
L. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC _/_/_
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
6. Upon tenant improvement plan check submittal, additional requirements may be needed.
M. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. The precise grading and drainage plan shall follow the format provided in the City of Rancho
Cucamonga handout "Information for Grading Plans and Permit."
3. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work. Two copies will be provided at plan submittal for review. Plans shall
implement design recommendations per said report.
4. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading and drainage plan review.
5. The final grading plan, appropriate certifications and compaction reports shall be completed, _
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
6. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California
registered Civil Engineer.
7. Comply with the City of Rancho Cucamonga Dust Control Measures.
8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be
prepared and submitted to the Building Official for review and approval for on-site storm water
drainage. All reports shall be wet signed and sealed by the Engineer of Record.
9. Acquire off-site drainage easements.
10. Acquire off-site drainage acceptance letter from adjacent downstream property owner or
discharge flows in a natural condition (concentrated flows are not accepted) and provide a
drainage study showing the proposed flows so not exceed the existing flows.
11. Obtain written permission to construct wall on property line or provide detail(s)showing the wall
offset from the property line.
6
I:\PLANNING\FINAL\PLNGCOMM\2008 Res&Stf rep\DRC2007-00497StdCond 6-11.doc
Project No. DRC2007-00497
Completion Date
12. Implement City Standards for on-site construction where possible,provide details for all work not
covered by City Standard Drawings.
13. All slopes shall be a minimum 2 feet offset from the public right-of-way.
14. Private sewer, water, and storm drain improvements will be designed per the latest adopted
California Plumbing Code.
15. Roof storm water is not permitted to flow over the public parkway.
16. Show existing topography 100 feet beyond the project boundary.
17. Provide a grading agreement for cut and fill combined exceeding 5,000 cubic yards.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
N. None. '
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
O. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
P. Security Hardware
1. A secondary locking device shall be installed on all sliding glass doors.
2. All roof openings giving access to the building shall be secured with either iron bars,metal gates,
or alarmed.
Q. Windows
1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted
from frame or track in any manner.
2. Storefront windows shall be visible to passing pedestrians and traffic.
3. Security glazing is recommended on storefront windows to resist window smashes and impede
entry to burglars.
R. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
7
I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2007-00497StdCond 6-11.doc
Project No.DRC2007-00497
Completion Date
S. Alarm Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in
turn save dollars and lives.
2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909) 941-1488.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
8
I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stt rep\DRC2007-00497StdCond 6-11.doc
Rancho Cucamonga Fire Protection
District
- — Fire Construction Services
STANDARD CONDITIONS
July 30, 2007
CVWD Office & Exhibition Building
SEC Ashford & Cartilla
DRC2007-00497
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
The RCFPD Procedures & Standards which are referenced in this document can be access on
the web at http://www.ei.rancho-cucamon aca.us/fire/index.htm under the Fire Safety Division
& Fire Construction Services section. Search by article; the preceding number of the standard
refers to the article. Chose the appropriate article number then a drop down menu will appear,
select the corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the
spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet. No portion of the exterior wall shall be located more than 150-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the Fire
District.
5. A minimum of forty-feet(40') from any building.
c. If any portion of a facility or building is located more than 150-feet from a public fire
hydrant measured on an approved route around the exterior of the facility or building,
additional private or public fire hydrants and mains capable of supplying the required
fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed
is 1500 gallons per minute at a minimum residual pressure of 20-pounds per square inch.
This flow reflects a 50-percent reduction for the installation of an approved automatic fire
sprinkler system in accordance with NFPA 13 with central station monitoring. This
requirement is made in accordance with the California Fire Code Appendix III-A, as adopted
by the Fire District Ordinances.
3. Public fire hydrants located within a 500-foot radius of the proposed project may be used to
provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
4. Firewater plans are required for all projects that must extend the existing water supply to or
onto the site. Building permits will not be issued until fire protection water plans are
approved.
5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of
the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall
submit plans, specifications and calculations for the fire sprinkler system underground
supply piping. Approval of the underground supply piping system must be obtained prior to
submitting the overhead fire sprinkler system plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Assembly and Educational Occupancy Buildings.
3. "All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When buildings do not meet the requirements of the 2001 California Building Code and the
RCFPD Fire Department Access - Fire Lane Standard 9-7
6. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or standards)
requires an automatic and/or manual fire alarm system. Refer to RCFPD Ordinances 15
and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6 and/or the
California Fire Code.
2. Prior to the installation of the building fire alarm system, Fire Construction Services'
approval and a building permit must be obtained. Plans and specifications shall be
submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard
#10-6.
3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by a
listed central station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private
roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire
Lanes Standard 9-7
1. Location of Access: All portions of the structures 15' story exterior wall shall be located
within 150-feet of Fire District vehicle access, measure on an approved route around the
exterior of the building. Landscaped areas, unpaved changes in elevation, gates and
fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside tum radius shall be 20-feet.
c. The minimum outside tum radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each
side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum
of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct
Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with the
2001 California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal
feet or major fraction thereof, of the exterior wall that faces the required access
roadways. When railways are installed provisions shall be made to maintain Fire
District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Commercial Gates: Any gate installed across a Fire Department access road shall be in
accordance with Fire District Standard#9-2. The following design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be submitted
to Fire Construction Services (FCS) for approval. Upon the completion of the
installation and before placing the gates in service, inspection and final acceptance
must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
c. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office
for$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override
device and a fail-safe or battery backup feature to open the gate or release the locking
Mechanism in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must
be installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the
complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and
operation must be approved by the Fire Chief prior to installation. Bi-directional or
multiple sensors may be required due to complexity of the various entry configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site
plan illustrating the proposed delineation that meets the minimum Fire District standards
shall be included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly
noted on the site plan. A copy of the approved Alternative Method application, if applicable,
must be reproduced on the architectural plans submitted to B&S for plan review.
8. Roof Access: There shall be a means of fire department access from the exterior walls of
the buildings on to the roofs of all commercial, industrial and multi-family residential
structures with roofs less than 75' above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an aerial
ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with
construction features, or high parapets that inhibit roof access.
c. The number of ladder points may be required to be increased, depending on the
building size and configuration.
d. Regardless of the parapet height or construction features the approved ladder point
shall be identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions, a
permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard 9-9
Appendix A and drawings 9-9a and 9-9b.
h. A site plan showing the locations of the roof ladder shall be submitted during plan
check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or
building construction. Plan check submittal is required with the permit application for approval
of the permit; field inspection is required prior to permit issuance. General Use Permit shall be
required for any activity or operation not specifically described below, which in the judgment of
the Fire Chief is likely to produce conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies
• Compressed Gases
• Public Assembly
• Cryogenics
• Dry Cleaning Plants
• Refrigeration Systems
• Repair Garages
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-11 Hazardous Materials— Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the San
Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and
assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency
(CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will
not be finalized until the San Bernardino County Fire Department reviews your Business
Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the
City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting
specific hazardous materials disclosure requirements. A Risk Management Program
(RMP) may also be required if regulation substances are to be used or stored at the new
facility.
2. Any business that operates on rented or leased property which is required to submit a Plan,
is also required to submit a notice to the owner of the property in writing stating that the
business is subject to the Business Emergency/Contingency Plan mandates and has
complied with the provisions. The tenant must provide a copy of the Plan to the property
owner within five (5) working days, if requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate
method, when submitted. The request must be submitted on the Fire District "Application for
Alternate Method"form along with supporting documents and payment of the $92 review fee.
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to
the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District
Standards. Approval of the on-site (private) fire underground and water plans is required
prior to any building permit issuance for any structure on the site. Private on-site
combination domestic and fire supply system must be designed in accordance with RCFPD
Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction
Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. Fire construction Services will inspect the
installation, witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the Fire
District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of
the project. Please reference the RCFPD Water Plan Submittal Procedure Standard 9-8.
All required public fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. CCWD personnel shall inspect the
installation and witness the hydrant flushing. Fire Construction Services shall inspect the
site after acceptance of the public water system by CCWD. Fire Construction Services
must grant a clearance before lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access
roads must be installed at least 14' 6" above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the letter to
Fire Construction Services.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' 'Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION —Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating
the fire hydrant location on the street or driveway in accordance with the City of Rancho
Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers".
On private property, the markers shall be installed at the centerline of the fire access road,
at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor,
in the presence of Fire Construction Services, shall conduct a test of the most hydraulically
remote on-site fire hydrants. The underground fire line contractor, developer and/or owner
are responsible for hiring the company to perform the test. A final test report shall be
submitted to Fire Construction Services verifying the fire flow available. The fire flow
available must meet or exceed the required fire flow in accordance with the California Fire
Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler monitoring system must be tested and accepted by Fire Construction Services.
The fire sprinkler monitoring system shall be installed, tested and operational immediately
following the completion of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be
inspected, tested and accepted by Fire Construction Services before occupancy is granted
and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm
system shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular
gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1
or#9-2 by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire
access roadways must be installed in accordance with the approved plans and acceptable
to Fire Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the
required annual inspections and the maintenance of all required fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness.
When the building setback exceeds 200 feet from the public street, an additional non-
illuminated 6-inch minimum number address shall be provided at the property entrance.
Larger address numbers will be required on buildings located on wide streets or built with
large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant
must demonstrate (in writing from the County) that the facility has met or is meeting the
Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San
Bernardino County Fire Department, Hazardous Materials/Emergency Response and
Enforcement Division. The applicant must also obtain inspection and acceptance by Fire
Construction Services.
11. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This
form provides contact information for Fire District use in the event of an emergency at the
subject building or property. This form must be presented to the Fire Construction Services
Inspector.
12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 8Y2" x 11" or
11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised
by the applicant to reflect the actual location of all devices and building features as required
in the standard. The site plan must be reviewed and accepted by the Fire Inspector.