HomeMy WebLinkAbout08-45 - Resolutions RESOLUTION NO. 08-45
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2008-00083, A PROPOSAL TO CONSTRUCT TWO (2)
INDUSTRIAL WAREHOUSE/MANUFACTURE/OFFICE BUILDINGS WITH A
COMBINED FLOOR AREA OF APPROXIMATELY 88,200 SQUARE FEET ON
A PARCEL OF APPROXIMATELY 5.46 ACRES OF LAND IN THE GENERAL
INDUSTRIAL (GI) DISTRICT, SUBAREA 3, LOCATED AT 8575 HELMS
AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0209-
021-42.
A. Recitals.
1. Pneudraulics, Inc. filed an application for the issuance of Development Review DRC2008-
00083, as described in the title of this Resolution. Hereinafter in this Resolution, the subject request is
referred to as "the application."
2. On the 27th day of August 2008, the Planning Commission of the City of
Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said
hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is herebyfound,determined, and resolved by the Planning Commission of
the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part
A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on August 27, 2008, including written and oral staff reports, together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to a parcel of land located at 8575 Helms Avenue with an
overall area of approximately 237,838 square feet (5.46 acres), and a street frontage along
Arrow Route of approximately 586.7 feet and a street frontage along Helms Avenue of approximately
374.4 feet; and
b. To the north, across Arrow Route are single-family residences; to the east, is a
business center; to the south, is the applicant's existing industrial facility; and to the west, across Helms
Avenue, is an industrial facility; and
C. The proposed development is in conjunction with Tentative Parcel Map
SUBTPM18994 to subdivide the property into two (2) parcels of 2.67acres and 2.79 acres (Parcels 1
and 2, respectively).
d. The applicant proposes to construct two (2) buildings totaling 41,160 square feet on
Parcel 1 (Building 1) and 47,040 square feet on Parcel 2 (Building 2); and
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083 — PNEUDRAULICS, INC.
August 27, 2008
Page 2
e. The application contemplates warehouse tenants. Warehouse intensive uses are
permitted in this development district. Additional potential tenants include manufacturing uses which
are permitted subject to the availability of parking on-site; and
f. The applicant is required to provide 67 parking stalls for Building A and 48 parking
stalls for Building B, respectively. They have provided 68 parking stalls for Building A and 58 parking
stalls for Building B; and
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed development is in accord with the General Plan, the objectives of the
Development Code, and the purposes of the district in which the site is located. The proposed project
is to construct two (2) industrial buildings and is consistent with the development in the vicinity.
b. The proposed development,togetherwith the conditions applicable thereto,will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or improvements
in the vicinity. The surrounding properties to the west, south, and east are zoned industrial and the
surrounding uses are industrial-oriented.
C. The proposed development complies with each of the applicable provisions of the
Development Code. The proposed development meets all standards outlined in the Development
Code and the design and development standards and policies of the Planning Commission and the
City.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for the
application, the Planning Commission finds that there is no substantial evidence that the project will
have any significant impacts upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local
CEQA Guidelines, City staff prepared an Initial Study of the potential environmental impacts of the
project. Based on the findings contained in that Initial Study, City staff determined that, with the
implementation of mitigation measures, there would be no substantial evidence that the project would
have any significant impacts on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter, City staff provided public notice of the public comment period
and of the intent to adopt the Mitigated Negative Declaration; and
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and, based on the whole record
before it,finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and
(ii)that, based on the implementation of mitigation measures, there is no substantial evidence that the
project will have any significant impacts on the environment. The Planning Commission further finds
that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning
Commission. Based on these findings,the Planning Commission hereby adopts the Mitigated Negative
Declaration; and
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083 — PNEUDRAULICS, INC.
August 27, 2008
Page 3
C. The Planning Commission has also reviewed and considered the Mitigation Monitoring
Program for the project that has been prepared pursuant to the requirements of Public Resources
Code Section 21081.6 and finds that such Program is designed to ensure compliance with the
mitigation measures during project implementation. The Planning Commission therefore adopts the
Mitigation Monitoring Program for the project; and
d. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program, and all other materials which constitute the record of proceedings upon
which the Planning Commission's decision is based is the Planning Director of the City of Rancho
Cucamonga. Those documents are available for public.review in the Planning Department of the City
of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730,
telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this
Commission hereby approves the application subject to each and every condition set forth below and in
the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) Approval is for the construction of two warehouse buildings with a
combined floor area of 88,200 square feet in the General Industrial
District, Subarea 3, located at the southeast corner of Arrow Route and
Helms Avenue -APN: 0209-021-42.
2) Approval also includes Master Sign Program DRC2008-00360 and Tree
Removal Permit DRC2008-00359.
3) Proposed land uses requiring a Conditional Use Permit, as identified in
Table 17.30.030 of the Development Code, shall require a separate
review and approval by the Planning Director prior to submittal of
documents for plan check and occupancy.
4) Downspouts shall not be visible from the exterior on any elevations of the
buildings. All downspouts shall be routed through the interior of the
building walls.
5) The screen wall, parallel to Arrow Route and exposed to the public, shall
be decorative masonry. Decorative means slump stone, split-face, or
stucco to match the buildings.
6) All trash enclosures shall be surrounded with dense shrub plantings.
7) Provide an overhead trellis at the employee lunch area. The overhead
trellis shall have cross members spaced no more than 18 inches on center
with minimum dimensions of 4 inches by 12 inches. Also, each support
column shall have a decorative base that incorporates the architectural
finishes/trim used on the building. The trellis shall be painted to match the
building. Also, provide durable street furniture in the outdoor employee
eating area such as tables, chairs, waste receptacles.
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083— PNEUDRAULICS, INC.
August 27, 2008
Page 4
8) All ground-mounted equipment, utility boxes including transformers, and
back-flow devices shall be surrounded by a minimum of two rows of
shrubs spaced a minimum of 18 inches on-center.
9) Landscaping shall be installed prior to release for occupancy.
10) All paints and coatings shall meet or exceed performance standards noted
in SCAQMD Rule 1113. Paints and coatings shall be applied either by
hand or high-volume, low pressure spray.
11) The parking lot light fixtures shall be located outside of the parking spaces
and shall not disrupt parking capacity.
Design Review Committee
1) Designate all parking stalls, located along the eastern wall of Building, as
"Employee Parking Only." Illustrate on the plans to be reviewed during
Plan Check.
2) Reduce the proposed number of future truck loading knockout doors from
8 to 4 for Building 1 (east elevation) and from 7 to 2 for Building 2 (west
elevation). Illustrate on the plans to be reviewed during Plan Check.
3) All wall signs shall not exceed 70 percent of the building fascia area and
shall not extend onto or beyond building reveals.
Engineering Department
1) Arrow Route public frontage improvements shall be improved in
accordance with City"Major Arterial' Standards, including but not limited
to:
a) Protect existing curb and gutter at 36 feet south from the street
centerline. ,
b) Provide new street pavement section as prescribed by the City
Engineer to centerline of street, curvilinear sidewalk, three (3) 9500
lumen HPSV streetlights, traffic signing and striping, and street
trees.
c) Provide drive approaches in accordance with the City "Driveway
Policy."
d) Install street trees per the Street Tree Requirement Form.
2) Helms Avenue public frontage improvements shall be improved in
accordance with City"Local Industrial'Standards including, but not limited
to:
a) Protect the existing curb and gutter at 22 feet west from street
centerline.
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083— PNEUDRAULICS, INC.
August 27, 2008
Page 5
b) Provide new street pavement section as prescribed by the City
Engineer to centerline of the street, property line adjacent sidewalk,
two (2) 8500 lumen HPSV streetlights, drainage facilities as
determined necessary, traffic signing and striping, and street trees.
c) Provide drive approaches in accordance with City"Driveway Policy."
d) Install street trees per the Street Tree Requirement Form.
3) An in-lieu fee as contribution to the future undergrounding of the existing
overhead utilities(telecommunications and electrical, except for the 66 kV
electrical) on the opposite side of Arrow Route shall be paid to the City
prior to the issuance of building permits. The fee shall be one-half of the
City adopted unit amount times the length of the project frontage.
4) A signed consent waiver form to join and/or form the appropriate
landscape and lighting districts shall be filed with the City Engineer prior to
final map approval or issuance of building permits whichever occurs first.
The proposed project shall be annexed into Landscaping Maintenance
District No. 3B and Street Lighting District Nos. 1 and 6.
Building and Safety Department (Grading)
1) The applicant shall provide a copy of EPA Form 7520-16 (Inventory of
Injection Wells) with the Facility ID Number assigned prior to issuance of
the grading permit.
2) A HCOC exists for the downstream receiving water. The downstream
receiving water (Mill Creek, Prado Area) is experiencing significant
degradation of its banks. The project must implement a volume-based
treatment control Best Management Practices(retention/detention facility).
3) Obtain written permission to construct wall on the property line or provide
detail(s) showing the wall offset from the property line.
4) A drainage study showing a 100-year, AMC 3 design storm event for on-
site drainage shall be prepared and submitted to the Building Official for
review and approval for on-site storm water drainage. All reports shall be
wet signed and sealed by the Engineer of Record.
5) Prior to issuance of a grading permit a Water Quality Management Plan
(WQMP) must be completed, approved, notarized, and recorded.
Police Department
1) Provide lighting for outdoor eating areas.
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083 — PNEUDRAULICS, INC.
August 27, 2008
Page 6
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating condition
so as to reduce operational emissions. The contractor shall ensure that
all construction equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records shall be available
at the construction site for City verification.
2) Prior to the issuance of any Grading Permits, the developer shall submit
construction plans to City denoting the proposed schedule and projected
equipment use. Construction contractors shall provide evidence that low
emission mobile construction equipment will be utilized, or that their use
was investigated and found to be infeasible for the project. Contractors
shall also conform to any construction measures imposed by the South
Coast Air Quality Management District (SCAQMD) as well as City
Planning Staff.
3) All paints and coatings shall meet or exceed performance standards noted
in SCAQMD Rule 1113. Paints and coatings shall be applied either by
hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment and activities shall comply with SCAQMD
Rules 402 and 403. Additionally, contractors shall include the following
provisions:
• Reestablish ground cover on the construction site through seeding
and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to erosion
over extended periods of time.
• Schedule activities to minimize the amounts of exposed excavated
soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if silt
is carried over to adjacent public thoroughfares or occurs as a result
of hauling. Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds (i.e., wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083 — PNEUDRAULICS, INC.
August 27, 2008
Page 7
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks or
cover payloads using tarps or other suitable means.
• Wash truck tires leaving the site to reduce the amount of particulate
matter transferred to paved streets as required by SCAQMD Rule
403.
• Limit traffic speeds on all unpaved road surfaces to 15 miles per
hour or less to reduce fugitive dust. The Applicant shall post signs
on the Project site limiting traffic speeds on unpaved road surfaces
to a maximum of 15 miles per hour.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB])daily to reduce PM10 emissions, in accordance with SCAQMD
Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be
applied to all inactive construction areas that remain inactive for 96 hours
or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading plans
include a statement that work crews will shut off equipment when not in
use.
10) The project shall designate a minimum of 10 percent of the total parking
spaces as preferential parking for vanpool/carpool.
11) The project shall post signs requiring that trucks shall not be left idling for
prolonged periods (i.e. in excess of 10 minutes).
12) Warehouse managers/building operators shall post both bus and
Metrolink schedules in conspicuous areas.
13) Warehouse managers/building operators shall configure operating
schedules around the Metrolink schedule to the extent reasonably
feasible.
14) Warehouse managers/building operators shall use high efficiency/low
polluting heating, air conditioning, appliances and water heaters that
conform to energy use guidelines in Title 24 of the California
Administrative Code.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect or
PLANNING COMMISSION RESOLUTION NO, 08-45
DRC2008-00083 — PNEUDRAULICS, INC.
August 27, 2008
Page 8
preserve them for study. With the assistance of the archaeologist, the
City of Rancho Cucamonga would:
Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for the
City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following appropriate
CEQA guidelines.
• Prepare a technical resources management report,documenting the
inventory, evaluation, and proposed mitigation of resources within
the project area. Submit one copy of the completed report with
original illustrations, to the San Bernardino County Archaeological
Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a qualified
paleontologist to monitor construction activities, to take appropriate
measures to protect or preserve them for study. The paleontologist shall
submit a report of findings that will also provide specific recommendations
regarding further mitigation measures (i.e., paleontological monitoring)
that may be appropriate. Where mitigation monitoring is appropriate, the
program must include, but not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow the
rapid removal of fossils with minimal construction delay, to the site
full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the discovery,
the grading contractor should immediately divert construction and
notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for documentation
in the summary report and transfer to an appropriate depository(i.e.,
San Bernardino County Museum).
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy to the report to San Bernardino
County Museum.
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083 — PNEUDRAULICS, INC.
August 27, 2008
Page 9
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in
accordance with SCAQMD Rule 403 or re-planted with drought resistant
landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with vehicle
tracking of soil off-site. Timing may vary depending upon the time of year
of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM,o emissions from the site during such episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be
applied to all inactive construction areas that remain inactive for 96 hours
or more to reduce PM,o emissions.
Hydrology and Water Quality
Construction Activities:
1) Prior to issuance of Grading Permits, the permit applicant shall submit to
Building Official for approval, Storm Water Pollution Prevention Plan
(SWPPP) specifically identifying Best Management Practices(BMPs)that
shall be used on-site to reduce pollutants during construction activities
entering the storm drain system to the maximum extent practical.
2) An Erosion Control Plan shall be prepared, included in grading plan, and
implemented for the proposed project that identifies specific measures to
control on-site and off-site erosion from the time ground disturbing
activities are initiated through completion of grading. This Erosion Control
Plan shall include the following measures at a minimum: a) Specify the
timing of grading and construction to minimize soil exposure to rainy
periods experienced in southern California, and b) An inspection and
maintenance program shall be included to ensure that any erosion which
does occur either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program within a specified
time frame.
3) Prior to issuance of building permits, the applicant shall complete the
Water Quality Management Plan (WQMP) review and receive approval
from the Building Official. WQMP shall include a project description and
identifying Best Management Practices(BMPs)that would be used on-site
to reduce pollutants into the storm drain system to the maximum extent
practicable.
4) During construction, temporary berms such as sandbags or gravel dikes
must be used to prevent discharge of debris or sediment from the site
when there is rainfall or other runoff.
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083— PNEUDRAULICS, INC.
August 27, 2008
Page 10
5) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to control
dust in order to prevent discharge of debris or sediment from the site.
6) The developer shall implement the BMPs identified in the WQMP
prepared by Kevin J. Richer, RCE of the Land Development Design
Corporation (LDDC), submitted on May 18, 2008, to reduce pollutants
after construction entering the storm drain system to the maximum extent
practical.
7) Landscaping plans shall include provisions for controlling and minimizing
the use of fertilizers/pesticides/herbicides. Landscaped areas shall be
monitored and maintained for at least two years to ensure adequate
coverage and stable growth. Plans for these areas, including monitoring
provisions for a minimum of two years, shall be submitted to the City for
review and approval prior to the issuance of grading permits.
8) Prior to issuance of building permits, the applicant shall complete the
Water Quality Management Plan (WQMP) review and receive approval
from the Building Official. WQMP shall include a project description and
identifying Best Management Practices(BMPs)that would be used on-site
to reduce pollutants into the storm drain system to the maximum extent
practicable.
9) Prior to issuance of Grading or Paving Permits, applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources Control
Board. Evidence that this has been obtained (i.e., a copy of the Waste
Discharger's Identification Number)shall be submitted to the City Building
Official for coverage under the NPDES General Construction Permit.
Noise
1) Prior to final development plan approval and during plan check, the
Planning Department shall verify that the Landscape Plan and site
development plans illustrates a permanent buffer for screening the
outdoor loading/unloading activities along Arrow Route and the residences
to the north. Screening features shall include a screening wall in between
Buildings 1 and 2, parallel to Arrow Route. The wall shall be flushed with
both buildings and be painted and treated to match the building exterior
colors and shall use the same materials
2) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time
on Sunday or a national holiday.
3) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at the
property line. Developer shall hire a consultant to perform weekly noise
level monitoring as specified in Development Code Section 17.02.120.
Monitoring at other times may be required by the Building Official. Said
PLANNING COMMISSION RESOLUTION NO. 08-45
DRC2008-00083— PNEUDRAULICS, INC.
August 27, 2008
Page 11
consultant shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above standards, then the
consultant shall immediately notify the Building Official. If noise levels
exceed the above standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise standards or halted.
4) Haul truck deliveries shall not take place between the hours of 8:00 p.m.
and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday
or a national holiday. Additionally, if heavy trucks used for hauling would
exceed 100 daily trips (counting both to and from the construction site),
then the developer shall prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible, the plan shall
denote haul routes that do not pass sensitive land uses or residential
dwellings.
6. The Secretary to this Commission shall certify the adoption of this Resolution.
APPROVED AND ADOPTED THIS 27TH DAY OF AUGUST 2008,
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Richard B. Fletcher, Chairman
ATTEST: R'
Ja s R. Troyer, AICP, Secr tary
I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 27th day of August 2008, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, STEWART, WIMBERLY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: SUBTPM18994 and DRC2008-00083
This Mitigation Monitoring Program (MMP) has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration)for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance. The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the Planning Director, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1 . A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga — Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
MITIGATION MONITORING PROGRAM
SUBTPM18994 AND DRC2008-00083
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring afterwritten
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring. The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Department. The Department shall
require the applicant to post any necessary funds (or other forms of guarantee) with the City.
These funds shall be used by the City to retain consultants and/or pay for City staff time to
monitor and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
Planning Director prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2008-00083 & SUBTPM18994 Applicant: Mike Saville, Pneudraulics, Inc.
Initial Study Prepared by: Waen Messner Date: July 28. 2008
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
u
All construction equipment shall be maintained in good PD C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, the PD/BO C Review of plans C 2
developer shall submit Construction Plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed PD C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
o Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
1 of 9
Mitigation Measures No.I
Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification
. . Date/initials Non-Compliance
o Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
o Phase grading to prevent the susceptibility of BO C Review of plans A/C 2/4
large areas to erosion over extended periods of
time.
o Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end
of work periods.
o Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use
sound engineering practices.
• Sweep streets according to a schedule BO C During A 4
established by the City if silt is carried over to construction
adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending
upon the time of year of construction.
o Suspend grading operations during high winds BO C During A 4
(i.e., wind speeds exceeding 25 mph) in construction
accordance with SCAQMD Rule 403
requirements.
o Maintain a minimum 24-inch freeboard ratio on BO C During A 4
soils haul trucks or cover payloads using tarps Construction
or other suitable means.
o Limit traffic speeds on all unpaved road BO C During A 4
surfaces to 15 miles per hour or less to reduce Construction
fugitive dust. The Applicant shall post signs on
the Project site limiting traffic speeds on
unpaved road surfaces to a maximum of 15
miles per hour.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and Construction
Regional Water Quality Control Board [RWQCB]) daily
to reduce Particulate Matter (PMS,) emissions, in
accordance with SCAQMD Rule 403.
2of9
Mitigation Measures No. Responsible . . of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Chemical soil stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
The project shall designate a minimum of 10% of the PD C Review of plans A/C 2/3
total parking spaces as preferential parking for
vanpool/carpool.
The project shall post signs requiring that trucks shall BO C Review of plans A 4
not be left idling for prolonged periods (i.e. in excess of
10 minutes).
Warehouse managers/building operators shall be PD C Review of plans D 2/3
required to post both bus and Metrolink schedules in
conspicuous areas.
Warehouse managers/building operators shall be PD C Review of plans D 2/3
required to configure their operating schedules around
the Metrolink schedule to the extent reasonably feasible.
Warehouse managers/building operators shall use high PD C Review of plans D 2/3
efficiency/low polluting heating, air conditioning,
appliances and water heaters that conform to energy
use guidelines in Title 24 of the California Administrative
Code.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
3of9
Mitigation Measures No./ Responsible Monitoring Timing of of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
o Enact interim measures to protect undesignated PD/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
o Consider establishing provisions to require PD/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
o Pursue educating the public about the area's PD/BO C Review of report A/D 3/4
archaeological heritage.
o Propose mitigation measures and recommend PD/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse
project effects on significant, important, and
unique prehistoric resources, following
appropriate CEQA guidelines.
o Prepare a technical resources management PD C Review of report A/D 3/4
report, documenting the inventory, evaluation,
and proposed mitigation of resources within the
project area. Submit one copy of the completed
report, with original illustrations, to the San
Bernardino County Archaeological Information
Center for permanent archiving.
If any paleontological resource (i.e. plant or animal PD B Review of report A/D 4
fossils) are encountered before or during grading, the
developer will retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures(i.e., paleontological monitoring)that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
4of9
Mitigation Measures No. Responsible Monitoring Timing of of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
o Assign a paleontological monitor, trained and PD B Review of report AID 4
equipped to allow the rapid removal of fossils
with minimal construction delay, to the site full-
time during the interval of earth-disturbing
activities.
o Should fossils be found within an area being BO B/C Review of report AID 4
cleared or graded, divert earth-disturbing
activities elsewhere until the monitor has
completed salvage. If construction personnel
make the discovery, the grading contractor
should immediately divert construction and
notify the monitor of the find.
o Prepare, identify, and curate all recovered PD D Review of report D 3
fossils for documentation in the summary report
and transfer to an appropriate depository (i.e.,
San Bernardino County Museum).
o Submit summary report to City of Rancho PD D Review of report D 3
Cucamonga. Transfer collected specimens with
a copy to the report to San Bernardino County
Museum.
5 of 9
Mitigation Measures No. Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date linitials Non-Compliance
Geology and Soils
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RWQCB)daily to reduce PM,o emissions, in accordance
with SCAQMD Rule 403 or replanted with drought
resistant landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon time of year
of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM10 emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
Hydrology and Water Quality
Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4
shall submit to Building Official for approval, Storm
Water Pollution Prevention Plan (SWPPP) specifically
identifying Best Management Practices (BMPs) that
shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to
the maximum extent practical.
6 of 9
Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing
Action Date/initials Non-Compliance
An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
the Grading Plan, and implemented for the proposed
project that identifies specific measures to control on-
site and off-site erosion from the time ground disturbing
activities are initiated through completion of grading.
This Erosion Control Plan shall include the following
measures at a minimum: a) Specify the timing of
grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
Prior to issuance of building permits, the applicant shall BO B/C/D Review of plans A/C 2/4
complete the Water Quality Management Plan(WQMP)
review and receive approval from the Building Official.
WQMP shall include a project description and identifying
Best Management Practices(BMPs)that would be used
on-site to reduce pollutants into the storm drain system
to the maximum extent practicable.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan prepared by Kevin
J. Richer of Land Development Design Corporation
(LDDC), submitted on May 18,2008 to reduce pollutants
after construction entering the storm drain system to the
maximum extent practical.
7 of 9
Mitigation Measures No.
Responsible
Implementing Action for Monitoring Frequency Verification Verification Date linitials Non-Compliance
Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years, shall be submitted to the City for
review and approval prior to the issuance of grading
permits.
Prior to issuance of grading or paving permits, applicant BO B/C/D Review of plans A/C 2/4
shall obtain a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage underthe NPDES General
Construction Permit.
Noise
Prior to final development plan approval and during plan PD B/C/D Review of plans A/C 2/3/4
check, the Planning Department shall verify that the
Landscape Plan and site development plans illustrates a
permanent buffer for screening the outdoor
loading/unloading activities along Arrow Route and the
residences to the north. Screening features shall
include a screening/sound wall in between Buildings 1
and 2. The wall shall be flushed with both buildings and
be painted and treated to match the building exterior
colors and shall use the same materials.
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
8of9
Mitigation Measures No.
Responsible . . of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code Section construction
17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
PD-Planning Director or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
9 of 9
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2008-00083
SUBJECT: DEVELOPMENT REVIEW
APPLICANT: PNEUDRAULICS, INC.
LOCATION: 8575 HELMS AVENUE (SOUTHEAST CORNER OF ARROW ROUTE AND HELMS AVENUE
APN: 0209-021-42
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 08-45 Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The
project planner will confirm which fees apply to this project. All checks are to be made payable to
the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to
the Planning Commission or Planning Director hearing:
a) Notice of Exemption - $50
b) Notice of Determination - $50
c) Mitigated Negative Declaration - $ 1,926.75 X
d) Environmental Impact Report-$2,656.75
SC-1-05 1
hPLANNINGTINAL\PLNGCOMNIQ008 Res&Stf repORC2008-00083SWCond 8-27.doc
Project No. DRC2008-00083
Completion Date
B. Time Limits
1. Development/Design Review approval shall expire if building permits are not issued or approved
use has not commenced within 5 years from the date of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans, architectural elevations, exterior materials and colors, landscaping,sign program,and
grading on file in the Planning Department, the conditions contained herein, and the
Development Code regulations.
2. Prior to any use of the project site or business activity being commenced thereon, all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved
by the Planning Director and Police Department (477-2800) prior to the issuance of building
permits. Such plan shall indicate style, illumination, location, height, and method of shielding so
as not to adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design, locations, and
the number of trash receptacles shall be subject to Planning Director review and approval prior to
the issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For
single-family residential developments, transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and City Engineer review and approved
prior to the issuance of building permits.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
2
1:\PLANNING\FINAL\PLNGC0MW2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No. DRC2008-00083
Completion Date
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the Planning Director.
Details shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. All parking spaces shall be double striped per City standards and all driveway aisles, entrances,
and exits shall be striped per City standards.
4. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and
Rancho Cucamonga Fire Protection District review and approval prior to issuance of building
permits. For residential development, private gated entrances shall provide adequate turn-
around space in front of the gate and a separate visitor lane with call box to avoid cars stacking
into the public right-of-way.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more
parking stalls. Designate two percent or one stall; whichever is greater, of the total number of
stalls for use by the handicapped.
F. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
2. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If
covered, the vertical clearance shall be no less than 9 feet.
3. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be _/_/_
provided to encourage bicycle commuting per the City of Rancho Cucamonga Bicycle
Transportation Plan adopted by City Council Resolution No. 02-237. Accessible restrooms with
storage lockers for clothing and equipment shall be sufficient.
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for Planning Director review and approval prior to the issuance of building permits or
prior final map approval in the case of a custom lot subdivision.
3
I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No. DRC2008-00083
Completion Date
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees -24-inch box or larger.
3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
5. The final design of the perimeter parkways,walls, landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to Planning Director review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Department.
6. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering
sidewalks (with horizontal change), and intensified landscaping, is required along Arrow Route
and Helms Avenue.
7. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
8. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Department.
9. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. Prior to
issuance of Building Permits, the project landscape architect shall certify on the submitted plans
that the xeriscape requirements have been met.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
2. A Uniform Sign Program for this development shall be submitted for Planning Director review and
approval prior to issuance of building permits.
I. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the
amount of$538 prior to the issuance of building permits, guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
2. In those instances requiring long term monitoring (i.e.)beyond final certificate of occupancy),the
applicant shall provide a written monitoring and reporting program to the Planning Director prior
to issuance of building permits. Said program shall identify the reporter as an individual qualified
to know whether the particular mitigation measure has been implemented.
4
hPLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No. DRC2008-00083
Completion Date
J. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. The final location of the mailboxes and the design of the overhead structure shall
be subject to Planning Director review and approval prior to the issuance of building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
K. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (i.e., DRC2008-00083) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
6. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can _/_/_
contact the Building and Safety Department staff for information and submittal requirements.
L. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2008-00083 and SUBTPM18994). The applicant
shall comply with the latest adopted California Codes,and all other applicable codes,ordinances,
and regulations in effect at the time of permit application. Contact the Building and Safety
Department for availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
5
I:\PLANNING\FINAL\PLNGC0MM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No.DRC2008-00083
Completion Date
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
M. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
6. Upon tenant improvement plan check submittal, additional requirements may be needed.
N. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading plan, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California
registered Civil Engineer.
6. If human remains are discovered on-site before or during grading, no further disturbance shall
occur until the County Coroner has made a determination of origin and disposition pursuant to
Public Resources Code Section 5097.98 and California Health and Safety Code Section 7050.5.
6
I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No. DRC2008-00083
Completion Date
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
O. Dedication and Vehicular Access
1. Rights-of-way and easements shall be dedicated to the City for all interior public streets,
community trails, public paseos, public landscape areas, street trees,traffic signal encroachment
and maintenance, and public drainage facilities as shown on the plans and/or tentative map.
Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be
reserved as shown on the plans and/or tentative map.
2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
50 total feet on Arrow Route
33 total feet on Helms Avenue
3. Corner property line cutoffs shall be dedicated per City Standards.
4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
P. Street Improvements
1. Pursuant to City Council Resolution No. 88-557, no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council, except: that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Arrow Route b C X X X
Helms Avenue b X X X X (e)
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Curbside drainage outlets
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements, prior to
final map approval or the issuance of building permits, whichever occurs first.
7
I:\PLANNING\FINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No.ORC2008-00083
Completion Date
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing, street name signing,traffic signal conduit, and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No. 5 along streets, a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first plan
check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
8
I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No. DRC2008-00083
Completion Date
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size cty.
ARROW ROUTE Gingko biloba Maidenhair Tree 5' 25'O.C. 15 Gal Fill
'Fairmount' In
HELMS AVE Tristaniopsis laurina Water Gum 3' 20'O.C. 15 Gal Fill
In
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
Q. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
2. Parkway landscaping on the following street(s) shall conform to the results of the respective
Beautification Master Plan Arrow Route.
R. General Requirements and Approvals
1. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
S. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
9
I:\PLANNING\FINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Project No. DRC2008-00083
Completion Date
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
T. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within _/_/_
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
3. All roof openings giving access to the building shall be secured with either iron bars, metal gates,
or alarmed.
U. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be _/_/_
a minimum of three feet in length and two feet in width and of contrasting color to background.
The stencils for this purpose are on loan at the Rancho Cucamonga Police Department.
3. At the entrances of commercial or residential complexes, an illuminated map or directory of _/_/_
project shall be erected with vandal-resistant cover. North shall be at the top and so indicated.
Sign shall be in compliance with Sign Ordinance, including an application for a Sign Permit and
approval by the Planning Department.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
10
(:\PLANNING\FINAL\PLNGC0MM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc
Rancho Cucamonga Fire Protection
OF District
Fire Construction Services
STANDARD CONDITIONS
May 21, 2008
Pneudraulics, Inc
(2) Industrial Buildings
8575 Helms
SUBTPM18894 & DRC2008-00083
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT
The RCFPD Procedures & Standards which are referenced in this document can be
access on the web at hftp:/Avww.ci.rancho-cucamonga.r-a.ustfirefindex.htm under the Fire
Safety Division & Fire Construction Services section. Search by article; the preceding
number of the standard refers to the article. Chose the appropriate article number then
a drop down menu will appear, select the corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for
the spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial
projects is 300-feet. No portion of the exterior wall shall be located more than
150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall
not exceed 100-feet.
b. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from
the public roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the
Fire District.
V. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a
public fire hydrant measured on an approved route around the exterior of the
facility or building, additional private or public fire hydrants and mains capable
of supplying the required fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction
thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are
installed is 2750 gallons per minute at a minimum residual pressure of 20-pounds
per square inch. This flow reflects a 50-percent reduction for the installation of an
approved automatic fire sprinkler system in accordance with NFPA 13 with central
station monitoring. This requirement is made in accordance with the California
Fire Code Appendix, as adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be
used to provide the required fire flow subject to Fire District review and approval.
Private fire hydrants on adjacent property shall not be used to provide required fire
flow.
3. Fire protection water plans are required for all projects that must extend the
existing water supply to or onto the site. Building permits will not be issued
until public fire protection water plans are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within
600-feet of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the
applicant shall submit plans, specifications and calculations for the fire sprinkler
system underground supply piping. Approval of the underground supply piping
system must be obtained prior to submitting the overhead fire sprinkler system
plans.
FSC-4 Requirements for Automatic Fire Sprinkler Systems
Automatic fire sprinklers shall be installed in buildings as required by the 2007 California
Fire Code and the Rancho Cucamonga Fire Protection District Ordinance FD46 and/or
any other applicable standards require an approved automatic fire sprinkler system to
be installed.
FSC-5 Fire Alarm System & Sprinkler Monitoring
1. The 2007 California Building Code, the RCFPD Fire Alarm Standard, Ordinance
FD46 and/or the 2007 California Fire Code require most fire sprinkler systems to
be monitoring by Central Station sprinkler monitoring system. A manual and or
automatic fire alarm system fire may also be required based on the use and
occupancy of the building. Plan check approval and a building permit are required
prior to the installation of a fire alarm or a sprinkler monitoring system. Plans and
specifications shall be submitted to Fire Construction Services in accordance with
RCFPD Fire Alarm Standard.
2
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as
private roads, streets drive aisles and/or designated fire lanes. Please reference the,
RCFPD Fire Department Access Roadways Standard.
1. Location of Access: All portions of the structures 1st story exterior wall shall be
located within 150-feet of Fire District vehicle access, measure on an approved
route around the exterior of the building. Landscaped areas, unpaved changes in
elevation, gates and fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD
Standards are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 24-feet.
C. The minimum outside turn radius shall be 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-
feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20
percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be
allowed to obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder,
shall be provided as follows:
a. In buildings without high-piled storage, access shall be provided in
accordance with the 2001 California Building Code, Fire and/or any other
applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each
100 lineal feet or major fraction thereof, of the exterior wall that faces the
required access roadways. When railways are installed provisions shall be
made to maintain Fire District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
3
5. Commercial/Industrial Gates: Any gate installed across a Fire Department
access road shall be in. accordance with Fire District Standard. The following
design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be
submitted to Fire Construction Services (FCS) for approval. Upon the
completion of the installation and before placing the gates in service,
inspection and final acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be
20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire
Safety Office for $20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual
override device and a fail-safe or battery backup feature to open the gate or
release the locking Mechanism in case of power failure or mechanical
malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The
switch must be installed outside the gate in a visible and unobstructed
location.
i. For motorized gates, a traffic loop device must be installed to allow exiting
from the complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location
and operation must be approved by the Fire Chief prior to installation. Bi-
directional or multiple sensors may be required due to complexity of the
various entry configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes.
A site plan illustrating the proposed delineation that meets the minimum Fire
District standards shall be included in the architectural plans submitted to B&S for
approval.
7. Approved Fire Department Access: Any approved mitigation measures must be
clearly noted on the site plan. A copy of the approved Alternative Method
application, if applicable, must be reproduced on the architectural plans submitted
to B&S for plan review.
8. Roof Access: There shall be a means of fire department access from the exterior
walls of the buildings on to the roofs of all commercial, industrial and multi-family
4
residential structures with roofs less than 75' above the level of the fire access
road.
a. This access must be reachable by either fire department ground ladders or by
an aerial ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in
buildings with construction features, or high parapets that inhibit roof access.
C. The number of ladder points may be required to be increased, depending on
the building size and configuration.
d. Regardless of the parapet height or construction features the approved ladder
point shall be identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other
obstructions, a permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access
Standard Appendix A.
h. A site plan showing the locations of the roof ladder shall be submitted during
plan check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations
and/or building construction. Plan check submittal is required with the permit
application for approval of the permit; field inspection is required prior to permit
issuance. General Use Permit shall be required for any activity or operation not
specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Aerosol Products Magnesium Working
• Application of Flammable Finishes Motor Vehicle Fuel-Dispensing
Operation
• Automobile Wrecking Yards Open Burning
• Battery Systems Organic Coating
• Candles and open flames in public assemblies Ovens
• Cellulose Nitrate Powder Coating
• Compressed Gases Public Assembly
• Cryogenics Pyrotechnical Special Effects
• Dry Cleaning Plants Radioactive Materials
5
• Dust-Producing Processes and Operations Refrigeration Systems
• Explosive or Blasting Agents Repair Garages
• Flammable and Combustible Liquids Rubbish Handling
Operations
• Fruit Ripening Plants Spraying or Dipping Operations
• Hazardous Materials Tents, Canopies and/or Air
Supported Structures
• High-Pile Combustible Storage (HIPS) Tire Storage
• Liquefied Petroleum Gases Welding and Cutting Operations
• LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards
FSC-11 Hazardous Materials — Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the
San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms
and assistance. The County Fire Department is the Cal/EPA Certified Unified Program
Agency (CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building &
Safety will not be finalized until the San Bernardino County Fire Department
reviews your Business Emergency/Contingency Plan. California Government
Code, Section 65850.2 prohibits the City from issuing a final Certificate of
Occupancy unless the applicant has met or is meeting specific hazardous
materials disclosure requirements. A Risk Management Program (RMP) may also
be required if regulation substances are to be used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to
submit a Plan, is also required to submit a notice to the owner of the property in
writing stating that the business is subject to the Business Emergency/Contingency
Plan mandates and has complied with the provisions. The tenant must provide a
copy of the Plan to the property owner within five (5) working days, if requested by
the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the
installation of equipment designed to store, use or dispense hazardous materials in
accordance with the 2007California Building, Fire, Mechanical, Plumbing, Electrical
Codes, RCFPD Ordinances FD46 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for
alternate method, when submitted. The request must be submitted on the Fire District
"Application for Alternate Method" form along with supporting documents and payment
of the $92 review fee.
FCS-14 Map Recordation
6
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water
Supply are required on this project. The project appears to be located on a
property that is being subdivided. The reciprocal 'agreement is required to be
recorded between property owners and the Fire District. The recorded agreement
shall include a copy of the site plan. The Fire Construction Services shall approve
the agreement, prior to recordation. The agreement shall be recorded with the
County of San Bernardino, Recorders Office.
Reciprocal access agreement — Please provide a permanent access agreement
between the owners granting irrevocable and a non-exclusive easement, favoring
the Fire District to gain access to the subject property. The agreement shall
include a statement that no obstruction, gate, fence, building or other structure
shall be placed within the dedicated access, without Fire Department approval. The
agreement shall have provisions for emergency situations and the assessing of
cost recovery to the property by the fire District.
Reciprocal water covenant — Please provide a permanent maintenance and
service covenant between the owners granting an irrevocable and non-exclusive
easement, favoring the Fire District for the purpose of accessing and maintaining
the private water mains, valves and fire hydrants (fire protection systems facilities
in general). The covenant shall have provisions for emergency situations and the
assessing of cost recovery to the property by the fire District.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the
Community Facilities District #85-1 or #88-1 is required prior to the issuance of grading
or building permits.
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following
prior to the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction
plans, specifications, flow test data and calculations for the private water main
system for review and approval by the Fire District. Plans and installation shall
comply with Fire District Standards. Approval of the on-site (private) fire
underground and water plans is required prior to any building permit issuance for
any structure on the site. Private on-site combination domestic and fire supply
system must be designed in accordance with RCFPD Standards. The Building &
Safety Division and Fire Construction Services will perform plan checks and
inspections.
2. All private on-site fire hydrants shall be installed, flushed and operable prior to
delivering any combustible framing materials to the site. Fire construction Services
will inspect the installation, witness hydrant flushing and grant a clearance before
lumber is dropped.
3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a
plan showing the locations of all new public fire hydrants for the review and
7
approval by the Fire District and CCWD. On the plan, show all existing fire
hydrants within a 600-foot radius of the project. Please reference the RCFPD
Water Plan Submittal Procedure Standard.
4. All required public fire hydrants shall be installed, flushed and operable prior to
delivering any combustible framing materials to the site. CCWD personnel shall
inspect the installation and witness the hydrant flushing. Fire Construction
Services shall inspect the site after acceptance of the public water system by
CCWD. Fire Construction Services must grant a clearance before lumber is
dropped.
5. Construction Access: The access roads must be paved in accordance with all
the requirements of the RCFPD Fire Lane Standard. All temporary utilities over
access roads must be installed at least 14' 6" above the finished surface of the
road.
6. Fire Flow: A current fire flow letter from CCWD must be received. The applicant
is responsible for obtaining the fire flow information from CCWD and submitting the
letter to Fire Construction Services.
7. Easements and Reciprocal Agreements: All easements and agreements must
be recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire
Construction Services' "Temporary Power Release Checklist and Procedures".
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire
Construction Services' "Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the
City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of
Reflective Hydrant Markers". On private property, the markers shall be installed at
the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of
the most hydraulically remote on-site fire hydrants. The underground fire line
contractor, developer and/or owner are responsible for hiring the company to
perform the test. A final test report shall be submitted to Fire Construction
Services verifying the fire flow available. The fire flow available must meet or
exceed the required fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the
fire sprinkler system(s) shall be tested and accepted by Fire Construction Services.
8
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy,
the fire sprinkler monitoring system must be tested and accepted by Fire
Construction Services. The fire sprinkler monitoring system shall be installed,
tested and operational immediately following the completion of the fire sprinkler
system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall
be inspected, tested and accepted by Fire Construction Services before
occupancy is granted and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire
alarm system shall be installed, inspected, tested and accepted by Fire
Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy,
vehicular gates must be inspected, tested and accepted in accordance with
RCFPD Standards by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy,
the fire access roadways must be installed in accordance with the approved plans
and acceptable to Fire Construction Services.
9. The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that
prohibit parking, specify the method of enforcement and identifies who is
responsible for the required annual inspections and the maintenance of all required
fire access roadways.
10. Address: Prior to the issuance of a Certificate of Occupancy,
commercial/industrial and multi-family buildings shall post the address in
accordance to the appropriate RCFPD addressing Standard.
it. Hazardous Materials: The applicant must obtain inspection and acceptance by
Fire Construction Services..
12. Confidential Business Occupancy Information: The applicant shall complete
the Rancho Cucamonga Fire District "Confidential Business Occupancy
Information" form. This form provides contact information for Fire District use in the
event of an emergency at the subject building or property. This form must be
presented to the Fire Construction Services Inspector.
13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 8 1/2" x
11" or 11" x 17" site plan of the site in accordance with RCFPD Standard shall be
revised by the applicant to reflect the actual location of all devices and building
features as required in the standard. The site plan must be reviewed and
accepted by the Fire Inspector.
9
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: TENTATIVE PARCEL MAP SUBTPM18994 AND DEVELOPMENT REVIEW
DRC2008-00083
Public Review Period Closes: August 27, 2008
Project Name: Project Applicant: Pneudraulics, Inc
Project Location(also see attached map): Located within the General Industrial District, Subarea
3, at the southeast corner of Arrow Route and Helms Avenue—APN: 0209-021-43.
Project Description: A request to subdivide 5.46 acres of land into 2 separate parcels and a request to
develop 2 industrial buildings (with office, manufacturing and warehousing)totaling 88,200 square feet
(41,160 square feet and 47,040 square feet)in the General Industrial District(Subarea 3). Related Files:
Sign Permit Application DRC2008-00360 and Tree Removal Permit DRC2008-0359
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Reportwill not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax
(909)477-2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
August 27, 2008
Date of Determination Adopted By