Loading...
HomeMy WebLinkAbout08-53 - Resolutions RESOLUTION NO. 08-53 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DRC2008-00143, A REQUEST FOR ARCHITECTURAL REVIEW OF 50 SINGLE-FAMILY RESIDENTIAL HOMES ON 9.85 ACRES OF LAND IN THE LOW-MEDIUM RESIDENTIAL DISTRICT (4-8 DWELLING UNITS PER ACRE), LOCATED AT THE NORTHWEST CORNER OF MILLER AVENUE AND EAST AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 1100-081-03, 04 AND 06. A. Recitals. 1. Crestwood Communities filed an application for the approval of Development Review DRC2008-00143, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 24th day of September 2008, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing September 24, 2008, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to the property located at the northwest corner of Miller Avenue and East Avenue; and b. The 9.85-acre site is comprised of three parcels and slopes gently from north to south; and C. The subdivision of the site into 50 residential lots was approved on August 9, 2006, (SUBTT17919); and d. There is an existing house on the corner of Miller Avenue and East Avenue which is not part of this development and will remain in place but whose access will be moved from Miller Avenue to a new street within the proposed project; and e. The site will take access off of two existing streets, Firestone Drive and Morning Crest Place; and f. There is an existing residential development to the north, south, and west of the site and an existing church to the east across East Avenue in the City of Fontana; and PLANNING COMMISSION RESOLUTION NO. 08-53 DEVELOPMENT REVIEW DRC2008-00143 — CRESTWOOD COMMUNITIES September 24, 2008 Page 2 g. The project will consist of three floor plans ranging in size from 2,527 to 3,527 square feet; and h. The project will have 13 single-story units and 37 two-story units; and i. The project was designed to conform to all the development requirements outlined in the Etiwanda Specific Plan for the Low-Medium Residential District. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed project is consistent with the General Plan, Development Code, and any applicable specific plans; and b. The proposed design or improvements are consistent with the General Plan, Development Code, and any applicable specific plans; and C. The site is physically suitable for the type of development proposed; and d. The design of the project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The project is not likely to cause serious public health problems; and 4. Based upon the facts and information contained in the application, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that no subsequent or supplemental environmental document is required pursuant to the California Environmental Quality Act (CEQA) in connection with the review and approval of this application based upon the following findings and determinations: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, the City adopted a Mitigated Negative Declaration on August 9, 2006, in connection with the City's approval of Tentative Tract Map SUBTT17919. Pursuant to CEQA Guidelines Section 15162, no subsequent or supplemental EIR or Negative Declaration is required in connection with subsequent discretionary approvals of the same project unless: (i) substantial changes are proposed to the project that indicate new or more severe impacts on the environment; (ii) substantial changes have occurred in the circumstances under which the project was previously reviewed that indicates new or more severe environmental impacts; or (iii) new important information shows the project will have new or more severe impacts than previously considered; or (iv) additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. b. The Planning Commission finds, in connection with Tentative Tract Map SUBTT17919, that substantial changes to the project or the circumstances surrounding the project have not occurred which would create new or more severe impacts than those evaluated in the previous Mitigated Negative Declaration. In that the applicant proposes building 50 single-family residences on the previously approved 50-lot Tentative Tract Map and only proposes a minor Lot Line Adjustment to the previously approved map. Staff further finds that the project will not have one or PLANNING COMMISSION RESOLUTION NO. 08-53 DEVELOPMENT REVIEW DRC2008-00143 — CRESTWOOD COMMUNITIES September 24, 2008 Page 3 more significant effects not discussed in the previous Mitigated Negative Declaration, not have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less-than-significant. In that the previously approved lots are surrounded by existing single-family residential development and the proposed residences meet all development criteria outlined in the Etiwanda Specific Plan and the City's Development Code. C. Based on these findings and all evidence in the record, the Planning Commission concurs with the staff determination that no additional environmental review is required pursuant to CEQA in connection with the City's consideration of Development Review DRC2008-00143. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the design of the homes for a 50-lot subdivision located at the northwest corner of Miller Avenue and East Avenue - APN: 1100-081-03, 04 and 06. 2) All pertinent conditions of approval for Tentative Tract Map SUBTT17919 shall apply. 3) The installation of all stone veneers requires 1/2-inch mortared joints. 4) All perimeter walls and walls exposed to public view shall be decorative. The perimeter walls fronting Miller and East Avenues shall adhere to the approved wall design and materials palette approved by the City of Rancho Cucamonga. 5) A maximum 50 percent (9 houses) of Plan 3 may be constructed with the optional rooms over the garage (Plan 3X). Engineering Department 1) Local depression at catch basin(s) shall not interfere with residential drive approaches. 2) If Lot Line Adjustment 660 and related rights-of-way have not recorded at the time of this application approval, dedicate additional right-of-way on Miller Avenue to achieve a total of 44 feet measured from centerline of the street. This dedication is intended to extend across Not-A-Part (NAP) parcel. a) The existing driveway(s) on the NAP property on Miller Avenue need to be removed and new driveway access installed to the interior tract street. PLANNING COMMISSION RESOLUTION NO. 08-53 DEVELOPMENT REVIEW DRC2008-00143 — CRESTWOOD COMMUNITIES September 24, 2008 Page 4 3) Install all public improvements per Drawing Numbers 2200, 2200-D and 2200-L. 4) The site is located within Area 8 (modified) of the Etiwanda/San Sevaine Area Drainage Policy. Development within the Etiwanda/San Sevaine Drainage Area is responsible for the City's adopted drainage fee (master plan and regional) as well as reimbursement to other development, or the City, for over sizing of local drainage facilities as determined by the City Engineer. City fees shall be paid prior to final map approval. a) For the portion of Drainage Areas 8 and 9'south of Base Line Road, the Master Plan drainage fee is currently $28,800 per net acre, but subject to annual adjustment. b) For Drainage Area 8, the Regional Mainline drainage fee is $7,800 per net acre, and there are no Secondary Regional fees. c) Tract 15711 has provided land for an area wide detention basin. The owner of the land is eligible for reimbursement to recover the proportionate cost of the land and ultimate basin related facilities (outlet, etc.). The fair share amount has been determined to be $5,000 per acre, which shall be paid prior recordation of the final map. 5) Prior to any work being performed in the public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 24TH DAY OF SEPTEMBER 2008. PLANNING.COMMISSION OF THE CITY OF RANCHO CUCAMONGA Richard B. Fletcher, Chairman ATTEST: Ja R. Troyer, AICP, Se retary I, James R. Troyer, AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 24th day of September 2008, by the following vote-to-wit: PLANNING COMMISSION RESOLUTION NO. 08-53 DEVELOPMENT REVIEW DRC2008-00143 — CRESTWOOD COMMUNITIES September 24, 2008 Page 5 AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, STEWART, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT . DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2008-00143 SUBJECT: DEVELOPMENT REVIEW APPLICANT: CRESTWOOD COMMUNITIES LOCATION: NORTHWEST CORNER OF MILLER AVENUE AND EAST AVENUE—APN: 1100-081-30, 04 AND 06. ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 08-44 Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Notice of Exemption - $50 b) Notice of Determination -$50 X c) Mitigated Negative Declaration - $ 1,926.75 d) Environmental Impact Report- $2,656.75 SC-1-05 1 11PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00143Stdcond9-24.doc Project No.DRC2008-00143 Completion Date B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Department,the conditions contained herein, Development Code regulations, and the Etiwanda Specific Plan. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 8. Street names shall be submitted for Planning Director review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 9. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 10. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and City Engineer review and approved prior to the issuance of building permits. 11. Solar access easements shall be dedicated for the purpose of assuming that each lot or dwelling unit shall have the right to receive sunlight across adjacent lots or units for use of a solar energy system. The easements may be contained in a Declaration of Restrictions for the subdivision which shall be recorded concurrently with the recordation of the final map or issuance of permits, whichever comes first. The easements shall prohibit the casting of shadows by vegetation, structures, fixtures, or any other object, except for utility wires and similar objects, pursuant to Development Code Section 17.08.060-G-2. 2 I:\PLANNINGTINAL\PLNGCOMM72008 Res&StI rep\DRC2008-00143Stdcond9-24.doc Project No. DRC2008-00143 Completion Date 12. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail,all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. 13. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 14. Access gates to the rear yards shall be constructed from wrought iron. 15. For residential development, return walls and corner side walls shall be decorative masonry. 16. On corner side yards, provide minimum 5-foot setback between walls/fences and sidewalk. The 5-foot wall/fence setback and the parkway shall have landscape and irrigation in addition to the required street trees. Detailed landscape and irrigation plans shall be submitted for Planning Director review and approval prior to issuance of building permits. The parkway landscaping including trees, shrubs, ground covers and irrigation shall be maintained by the property owner. The developer shall provide each prospective buyer written notice of the parkway maintenance requirement, in a standard format as determined by the Planning Director, prior to accepting a cash deposit on any property. 17. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. D. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 3. For single-family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Department to determine that they are in satisfactory condition. 4. Front yard and corner side yard landscaping and irrigation shall be required perthe Development Code and/or Etiwanda Specific Plan. This requirement shall be in addition to the required street trees and slope planting. 5. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 6. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 7. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Department- 3 I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00143Stdcond9-24.doc Project No.DRC2008-00143 Completion Date 8. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. Prior to issuance of Building Permits,the project landscape architect shall certify on the submitted plans that the xeriscape requirements have been met. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) E. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,waterandwaste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., DRC2008-00143) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can contact the Building and Safety Department staff for information and submittal requirements. F. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2008-00143). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permit issuance. 4 I:\PLANNING\FINAL\PLNGC0MM\2008 Res&Stf rep\DRC2008-00143Stdcond9-24.doc Project No. DRC2008-00143 Completion Date 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. ' G. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. H. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: I. Street Improvements 1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances,all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 5 I:\PLANNING\FINAL\PLNGCOMM\2008 Res 8 Stf rep\DRC2008-00143Stdcond9-24.doc Project No. DRC2008-00143 Completion Date J. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. K. General Requirements and Approvals 1. Etiwanda/San Sevaine Area Regional Mainline,Secondary Regional,and Master Plan Drainage Fees shall be paid prior to final map approval or prior to building permit issuance if no map is involved. 2. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. 3. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 6 I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stl rep\DRC2008-00143Stdcond9-24.doc Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS February 20, 2008 Miller & East Avenue NWC Miller & East Single Family Tract SUBTT17919 & DRC2008-00143 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in single-family residential projects is 500-feet. No portion of the exterior wall facing the addressed street shall be more than 250-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 200-feet. b. Fire hydrants are to be located. The preferred locations for fire hydrants are: i. At the entrance(s) to a commercial, industrial or residential project from the public roadways. ii. At intersections. iii. On the right side of the street, whenever practical and possible. iv. As required by the Fire Safety Division to meet operational needs of the Fire District. V. A minimum of forty-feet (40') from any building. FSC-2 Fire Flow 1. The required fire flow for this project is 2000 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This requirement is made in accordance with Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Firewater plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until public fire protection water plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-9 Single-family Residential Sales Model homes require approved Fire District vehicle access and water supply from a public or private water main system before construction. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities District #85-1 or #88-1 is required prior to the issuance of grading or building permits. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard #9-8 2. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Public Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. 3. Address: Prior to the granting of occupancy, single-family dwellings shall post the address with minimum 4-inch numbers on a contrasting background. The numbers shall be internally or externally illuminated during periods of darkness. The numbers shall be visible from the street. When building setback from the public roadway exceeds 100-feet, additional 4-inch numbers shall be displayed at the property entry. 3