RESOLUTION NO. 09-37
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE
PARCEL MAP SUBTPM18535, LOCATED ALONG THE WEST SIDE OF
ETIWANDA AVENUE, NORTH OF FOOTHILL BOULEVARD IN THE
COMMUNITY COMMERCIAL DISTRICT OF SUBAREA 4 OF THE
FOOTHILL BOULEVARD SPECIFIC PLAN; AND MAKING FINDINGS IN
SUPPORT THEREOF - APN: 0227-221-08.
A. Recitals.
1. Frank An fled an application for the approval of Tentative Parcel Map SUBTPM18535,
as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development
Review request is referred to as "the application."
2. On the 14th day of October 2009, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on October 14, 2009, including written and oral staff reports and
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the property' located along the west side of
Etiwanda Avenue north of Foothill Boulevard, with a street frontage of 369 feet and lot depth of
540 feet and is presently vacant; and
b. The property to the north of the subject site is a condominium complex, the
properties to the south consist of a mini-mart and vacant land; the property to the east is approved
for a commercial center, and the property to the west is an existing commercial center; and
C. The applicant has concurrently applied for Development Review DRC2007-00402
to construct a proposed retail commercial center consisting of 3 buildings totaling 51,940 square
feet; and
d. The use, together with the conditions applicable thereto, will not be detrimental to
the public health, safety,welfare, or materially injurious to properties or improvements in the vicinity;
and
e. The design and exterior materials of the proposed building will be consistent
with the surrounding area and the Foothill Boulevard Specific Plan.
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535 — FRANK AN
October 14, 2009
Page 2
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the objectives of the General Plan; and
b. The proposed use is in accord with the objectives of the Development Code and
the purposes of the district in which the site is located; and
C. The proposed use is in compliance with each of the applicable provisions of the
Development Code; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety or welfare, or materially injurious to properties or
improvements in the vicinity.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act("CEQA")and the City's local
CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of
the project. Based on the findings contained in that Initial Study, City staff determined that,with the
imposition of mitigation measures, there would be no substantial evidence that the project would
have a significant effect on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter, the City staff provided public notice of the public comment
period and of the intent to adopt the Mitigated Negative Declaration.
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and, based on the whole record
before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA;
and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that
the project will have a significant effect on the environment. The Planning Commission further finds .
that the Mitigated Negative Declaration reflects the independent judgment and analysis of the
Planning Commission. Based on these findings, the Planning Commission hereby adopts the
Mitigated Negative Declaration.
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission therefore
adopts the Mitigation Monitoring Program for the project.
d. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program and all other materials which constitute the record of proceedings
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535 — FRANK AN
October 14, 2009
Page 3
upon which the Planning Commission's decision is based is the Planning Director of the City of
Rancho Cucamonga. Those documents are available for public review in the Planning Department
of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga,
California 91730, telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) This approval is to subdivide 4.67 acres of land into 3 parcels for
commercial purposes. Plans submitted for plan check shall conform to
the plans approved by the Planning Commission approval on
October 14, 2009.
2) All applicable conditions of approval for DRC2007-00402 shall apply.
3) Adequate provision shall be made and continue in perpetuity to assure
that access and maintenance between all parcels established under
Parcel Map SUBTPM18535 and DRC2007-00402 will be provided.
4) Prior to the issuance of any grading or building permit, the applicant
shall establish to the satisfaction of the Planning Director that applicant
has sufficient clear title to the subject property to complete construction
of the project and to operate the project.
Engineering Department
1) Etiwanda Avenue to be improved in accordance with City
"Secondary Arterial" standards including dual southbound left turn
lanes (10 feet and 10 feet), 2 southbound thru lanes (11 feet and
11 feet), 1 bike lane (4 feet) and 1 southbound bus bay/right turn lane
(12 feet). Widen west half of Etiwanda Avenue from 32 feet at north
project boundary to 47 feet at south project boundary.
a) Provide cobble curb and gutter, sidewalk, drive approach, street
trees and street lights, as required, per Figure 5-23 of the
Etiwanda Specific Plan.
b) Provide a 10-foot southbound right turn lane for driveway that
extends, at 42 feet from centerline, to 60 feet north of the south
property line then transitions to 47 feet for the intersection right
turn lane.
c) Provide traffic striping and signage, including R26 signs, as
required.,
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535— FRANK AN
October 14, 2009
Page 4
2) Provide reciprocal access easements in favor of the commercial
property to the west and to the south.
a) Make a good faith effort to establish reciprocating vehicular
access with commercial property along the westerly boundary of
this project.
3) Pavement reconstruction and overlays will be determined during plan
check on Etiwanda Avenue.
4) Construct appropriate off-site street improvements from transition to
existing.
5) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical, except
for the 66 KV electrical)on the opposite side of Etiwanda Avenue shall
be paid to the City prior to map approval or issuance of building
permits, whichever comes first. The fee shall be one-half the City
adopted unit amount times the length of the project frontage on
Etiwanda Avenue.
6) Final Parcel Map 18535 shall be reviewed, approved and recorded,
prior to issuance of building permits.
7) Revise the City Drawing No. 1863-D to add private storm drain
connection.
Grading
1) The applicant shall provide a copy of EPA Form 7520-16 (Inventory of
Injection Wells) with the Facility ID Number assigned to the Building
and Safety Official prior to issuance of the grading permit.
2) Prior to removing fences or walls along common lot lines and prior to
constructing walls along common lot lines the applicant shall provide a
letter from the adjacent property owner(s) allowing work on the
adjacent property.
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535— FRANK AN
October 14, 2009
Page 5
ENVIRONMENTAL MITIGATION
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits,the developer shall submit
Construction Plans to the City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
a) Reestablish ground cover on the construction site through
seeding and watering.
b) Pave or apply gravel to any on-site haul roads.
c) Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
d) Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
e) Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
f) Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occur as a
result of hauling. Timing may vary depending upon the time of
year of construction.
i
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535 — FRANK AN
October 14, 2009
Page 6
g) Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
h) Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
3) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
5) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
6) The construction contractor shall ensure that Construction Grading
Plans include a statement that work crews will shut off equipment when
not in use.
7) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of
10 minutes).
8) Warehouse managers/building operators shall be required to post both
bus and Metrolink schedules in conspicuous areas.
9) Warehouse managers/building operators shall be required to configure
their operating schedules around the Metrolink schedule to the extent
reasonably feasible.
10) Warehouse managers/building operators shall be required to
incorporate high-efficiency/low-polluting heating, air conditioning,
appliances, and water heaters in the building.
11) Warehouse managers/building operators shall be required to
incorporate thermal pane windows and weather-stripping.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535— FRANK AN
October 14, 2009
Page 7
a) Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
b) Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
c) Pursue educating the public about the archaeological heritage of
the area.
d) Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources,following appropriate
CEQA guidelines.
e) Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resources (i.e., plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be appropriate. Where
mitigation monitoring is appropriate,the program must include, but not
be limited to, the following measures:
a) Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay,to the
site full-time during the interval of earth-disturbing activities.
b) Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
c) Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535 — FRANK AN
October 14, 2009
Page 8
d) Submit summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy to the report to
San Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon time
of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Prior to issuance of grading permits, the permit applicant shall submit
to the Building Official for approval, Storm Water Pollution Prevention
Plan (SWPPP) specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to the maximum
extent practical.
2) An Erosion Control Plan shall be prepared, included in the Grading
Plan, and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
Erosion Control Plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in Southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535 — FRANK AN
October 14, 2009
Page 9
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable.
4) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
5) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
6) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by Michael P. St. Jacques of
Madison-FCS, Inc., on June 19, 2008, to reduce pollutants after
construction entering the storm drain system to the maximum extent
practical.
7) Landscaping Plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
grading permits.
8) Prior to issuance of grading or paving permits, applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
PLANNING COMMISSION RESOLUTION NO. 09-37
SUBTPM 18535 — FRANK AN
October 14, 2009
Page 10
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
3) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips(counting both to and from the
construction site), then the developer shall prepare a Noise Mitigation
Plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 14TH DAY OF OCTOBER 2009.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
Richard B. Fletcher, Chairman
ATTEST: �/" )2 - J6a'/
Ja, es R. Troyer, AICP, Secr tary
I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 14th day of October 2009, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, STEWART, WIMBERLY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT M TENTATIVE PARCEL MAP SUBTPM18535
SUBJECT: TENTATIVE PARCEL MAP
APPLICANT: FRANK AN
LOCATION: ETIWANDA AVENUE NORTH OF FOOTHILL BLVD —APN: 0227-221-08
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may, at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 09-37 Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The _/_/
project planner will confirm which fees apply to this project. All checks are to be made payable to
the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to
the Planning Commission or Planning Director hearing:
a) Mitigated Negative Declaration -$ 2,043.00
B. Time Limits
1. This tentative tract map shall expire, unless extended by the Planning Commission, unless a
complete final map is filed with the City Engineer within 3 years from the date of the approval.
1
I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\SUBTPM18535StdCond10-14.d6c
• • Project No. SUBTPM18535
Comoletion Date
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department,the conditions contained herein, Development Code
regulations, and the Foothill Boulevard Specific Plan.
2. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of building permits.
3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced,whichever comes first.
4. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
5. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner,homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and City Engineer review and approved
prior to the issuance of building permits.
6. The developer shall submit a construction access plan and schedule for the development of all
lots for Planning Director and City Engineer approval; including, but not limited to, public notice
requirements,special street posting,phone listing for community concerns,hours of construction
activity, dust control measures, and security fencing.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
D. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
50 total feet on Etiwanda Avenue
2. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
3. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or
noted on the final map.
4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
5. Easements for public sidewalks placed outside the public right-of-way shall be dedicated to the
City.
6. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7
feet measured from the face of curbs.
2
Project No. SUBTPM18535
Completion Dale
E. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to,completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& AC. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Etiwanda Avenue (e) J J J J J
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item.
(e) cobble curb and gutter
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,streetlights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
3
• Project No. SUBTPM18535
Completion Date
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first plan
check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Qty.
Etiwanda Avenue Eucalyptus Silver Dollar Gum 5' 30'o.c. 15 Gal
polyanthemas
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineeringpepartment.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
F. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
4
• • Project No. SUBTPM18535
Completion Date
G. Drainage and Flood Control
1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the —/—/—
property from adjacent areas.
H. Improvement Completion
1. If the required public improvements are not completed prior to approval of the final parcel map, —/—/—
an improvement security accompanied by an agreement executed by the Developer and the City
will be required: All public improvements.
I. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, —/—I—
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the _/_/_
Cucamonga Valley Water District(CVWD), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved. —/—/—
Approval of the final parcel map will be subject to any requirements that may be received from
them.
J. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall —/—I—
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
5
Rancho Cucamonga Fire Protection District
Fire Construction Services
STANDARD CONDITIONS
September 11, 2008
International Restaurants Phase II
8036 Etiwanda
PM 18535
DRC2007-00402
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT
The RCFPD Procedures & Standards which are referenced in this document can be access on the web at
http://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Division & Fire Construction
Services section. Search by article; the preceding number of the standard refers to the article. Chose the
appropriate article number then a drop down menu will appear, select the corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location
of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion
of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-
sacs, the distance shall not exceed 100-feet.
b. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the public roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the Fire District.
5. A minimum of forty-feet (40')from any building.
c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured
on an approved route around the exterior of the facility or building, additional private or public fire
hydrants and mains capable of supplying the required fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 2,625gallons
per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent
reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13
with central station monitoring. This requirement is made in accordance with the California Fire Code
Appendix, as adopted by the Fire District Ordinances.
3. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the
required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property
shall not be used to provide required fire flow.
4. Fire protection water plans are required for all projects that must extend the existing water supply to or
onto the site. Building permits will not be issued until Fre protection water plans are approved.
5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed
project site.
FSC-3 Prerequisite for submittaloof Overhead Automatic Fire Sprinkler'Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans,
specifications and calculations for the fire sprinkler system underground supply piping. Approval of the
underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system
plans.
FSC-4 Requirements for Automatic Fire Sprinkler Systems
Automatic fire sprinklers shall be installed in buildings as required by the2007 California Fire Code and the
Rancho Cucamonga Fire Protection District Ordinance FD46 and/or any other applicable standards require an
approved automatic fire sprinkler system to be installed.
FSC-5 Fire Alarm System & Sprinkler Monitoring
s
1. The 2007 California Building Code, the RCFPD Fire Alarm Standard, Ordinance FD46 and/or the 2007
California Fire Code require most fire sprinkler systems to be monitoring by Central Station sprinkler
monitoring system. A manual and or automatic fire alarm system fire may also be required based on the
use and occupancy of the building. Plan check approval and a building permit are required prior to the
installation of a fire alarm or a sprinkler monitoring system. Plans and specifications shall be submitted to
Fire Construction Services in accordance with RCFPD Fire Alarm Standard.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive
aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access Roadways
Standard.
1. Location of Access: All portions of the structures 1" story exterior wall shall be located within 150-feet of
Fire District vehicle access, measure on an approved route around the exterior of the building.
Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 24-feet.
c. The minimum outside turn radius shall be 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
b. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 80,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-
inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as
follows:
a. In buildings without high-piled storage, access shall be provided in accordance with the 2001
California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major
fraction thereof, of the exterior wall that faces the required access roadways. When railways are
installed provisions shall be made to maintain Fire District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road
to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in
accordance with Fire District Standard. The following design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire
Construction Services (FCS) for approval. Upon the completion of the installation and before placing
the gates in service, inspection and final acceptance must be requested from FCS.
2
b. Gates must slide open h•ontally or swing inward. •
c. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-
safe or battery backup feature to open the gate or release the locking Mechanism in case of power
failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed
outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be
approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due
to complexity of the various entry configurations.
7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating
the proposed delineation that meets the minimum Fire District standards shall be included in the
architectural plans submitted to B&S for approval.
8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the
site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the
architectural plans submitted to B&S for plan review.
6. Roof Access: There shall be a means of fire department access from the exterior walls of the buildings
on to the roofs of all commercial, industrial and multi-family residential structures with roofs less than 75'
above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an aerial ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction
features, or high parapets that inhibit roof access.
c. The number of ladder points may be required to be increased, depending on the building size and
configuration.
d. Regardless of the parapet height or construction features the approved ladder point shall be identified
in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently
mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix A.
h. A site plan showing the locations of the roof ladder shall be submitted during plan check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit; field
inspection is required prior to permit issuance. General Use Permit shall be required for any activity or
operation not specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Candles and open flames in public assemblies
• Compressed Gases Public Assembly
• Dry Cleaning Plants Refrigeration Systems
• Explosive or Blasting Agents Repair Garages
• Tents, Canopies and/or Air Supported Structures LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment
designed to store, use or dispense hazardous materials in accordance with the 2007 California Building, Fire,
3
Mechanical, Plumbing, Electricallodes, RCFPD Ordinances FD46andter implemented and/or adopted
standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when
submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along
with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply are required
on this project. The project appears to be located on a property that is being subdivided. The reciprocal
agreement is required to be recorded between property owners and the Fire District. The recorded
agreement shall include a copy of the site plan. The Fire Construction Services shall approve the
agreement, prior to recordation. The agreement shall be recorded with the County of San Bernardino,
Recorders Office.
Reciprocal access agreement — Please provide a permanent access agreement between the owners
granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject
property. The agreement shall include a statement that no obstruction, gate, fence, building or other
structure shall be placed within the dedicated access, without Fire Department approval. The agreement
shall have provisions for emergency situations and the assessing of cost recovery to the property by the
fire District.
Reciprocal water covenant — Please provide a permanent maintenance and service covenant between
the owners granting an irrevocable and non-exclusive easement, favoring the Fire District for the purpose
of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems
facilities in general). The covenant shall have provisions for emergency situations and the assessing of
cost recovery to the property by the fire District.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities District
#85-1 or#88-1 is required prior to the issuance of grading or building permits.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of
any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow
test data and calculations for the private water main system for review and approval by the Fire District.
Plans and installation shall comply with Fire District.Standards. Approval of the on-site (private) fire
underground and water plans is required prior to any building permit issuance for any structure on the site.
Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD
-Standards. The Building & Safety Division and Fire Construction Services will perform plan checks and
inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible
framing materials to the site. Fire construction Services will inspect the installation, witness hydrant
flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations
of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan,
show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water
Plan Submittal Procedure Standard.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible
framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant
4
flushing. Fire Construction Rices shall inspect the site after acceptance of the public water system by
CCWD. Fire Construction Services must grant a clearance before lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the requirements of the
RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14' 6"
above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for
obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the
County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering
Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be
installed at the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire
hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the
company to perform the test. A final test report shall be submitted to Fire Construction Services verifying
the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance
with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s)
shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler
monitoring system shall be installed, tested and operational immediately following the completion of the
fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and
accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in
service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be
installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be
inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways
must be installed in accordance with the approved plans and acceptable to Fire Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain
an approved fire access roadway map with provisions that prohibit parking, specify the method of
enforcement and identifies who is responsible for the required annual inspections and the maintenance of
all required fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family
buildings shall post the address in accordance to the appropriate RCFPD addressing Standard.
10. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire Construction
Services.
11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga
Fire District "Confidential Business Occupancy Information" form. This form provides contact information
for Fire District use in the event of an emergency at the subject building or property. This form must be
presented to the Fire Construction Services Inspector.
5
. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, 8 %' x 11" or 11" x 17" site plan
of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual
location of all devices and building features as required in the standard. -The site plan must be reviewed
and accepted by the Fire Inspector.
6
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2007-00402 AND SUBTPM18535 Applicant: Frank An
Initial Study Prepared by: Adam Collier Date: August 3, 2009
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
_ , .
All construction equipment shall be maintained in good PD C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, the PD/BO C Review of plans C 2
developer shall submit Construction Plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed PD C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
1 of 8
Mitigation Measures No.
Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date finitials Non-Compliance
• Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds (i.e., BO C During A 4
wind speeds exceeding 25 mph)in accordance with construction
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
• Wash truck tires leaving the site to reduce the BO C During A 4
amount of particulate matter transferred to paved Construction
streets according to SCAQMD Rule 403.
• Limit traffic speeds on all unpaved road surfaces to BO C During A 4
15 miles per hour or less to reduce fugitive dust. Construction
The Applicant shall post signs on the Project site
limiting traffic speeds on unpaved road surfaces to a
maximum of 15 miles per hour.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
Regional Water Quality Control Board [RWQCBj) daily
to reduce Particulate Matter (PM1o) emissions, in
accordance with SCAQMD Rule 403.
2 of 8
Mitigation Measures No. Responsible Monitoring Timing of
Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
Warehouse managers/building operators shall be PD C Review of plans D 2/3
required to post both bus and Metrolink schedules in
conspicuous areas.
Warehouse managers/building operators shall be PD C Review of plans D 2/3
required to configure their operating schedules around
the Metrolink schedule to the extent reasonably feasible.
Warehouse managers/building operators shall be BO C/D Review of plans C 2/4
required to incorporate high-efficiency/low-polluting
heating,air conditioning,appliances,and water heaters
in the building.
Warehouse managers/building operators shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Cultural Resources.'
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
3 of 8
Mitigation Measures No. Responsible Monitoring Timing of
Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Enact interim measures to protect undesignated PD/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
Consider establishing provisions to require PD/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the PD/BO C Review of report A/D 3/4
archaeological heritage of the area.
• Propose mitigation measures and recommend PD/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
• Prepare a technical resources management report, PD C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
If any paleontological resource (i.e. plant or animal PD B Review of report A/D 4
fossils) are encountered before or during grading, the
developer will retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
4 of 8
Mitigation Measures No.
Responsible
Implementing Action for Monitoring Frequency Verif ication Verification Date/initials Non-Compliance
Assign a paleontological monitor, trained and PD B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
Should fossils be found within an area being cleared BO BSC Review of report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify,and curate all recovered fossils for PD D Review of report D 3
documentation in the summary report and transfer to
an appropriate depository (i.e., San Bernardino
County Museum).
Submit summary report to City of Rancho PD D Review of report D 3
Cucamonga. Transfer collected specimens with a
copy to the report to San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RW QCB)daily to reduce PM,o emissions,in accordance
with SCAQMD Rule 403.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PMIO construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon time of year
of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM10 emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
5of8
Mitigation Measures No./
Responsible . . of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Hydrology and Water Quality
Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4
shall submit to Building Official for approval, Storm
Water Pollution Prevention Plan (SWPPP) specifically
identifying Best Management Practices (BMPs) .that
shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to
the maximum extent practical.
An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
the Grading Plan, and implemented for the proposed
project that identifies specific measures to control on-
site and off-site erosion from the time ground disturbing
activities are initiated through completion of grading.
This Erosion Control Plan shall include the following
measures at a minimum: a) Specify the timing of
grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
Prior to issuance of building permits,the applicant shall BO B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent
practicable.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
6 of 8
i
Y
Mitigation • Responsible
Implementing for Monitoring Frequency Verification Verification .
ate/initials Non-Compliance
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
The developer shall implement the BMPs identified in BO B/C/D Review of plans A/C 2/4
the Water Quality Management Plan prepared by
Michael P. St. Jacques of Madison-FCS, Inc. on
June 19, 2008, to reduce pollutants after construction
entering the storm drain system to the maximum extent
practical.
Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years, shall be submitted to the City for
review and approval prior to the issuance of grading
permits.
Prior to issuance of grading or paving permits,applicant BO B/C/D Review of plans A/C 2/4
shall obtain a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction Permit.
Noise':
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
7of8
Mitigation Measures No.
Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code construction
Section 17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within
24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
iResponsibleePerson Monitoring Frequency Method of'Verification 'Sanctions'
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection -1 -Withhold Recordation of Final Map
PD-Planning Director or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation