Loading...
HomeMy WebLinkAbout10-03 - Resolutions RESOLUTION NO. 10-03 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA,APPROVING CONDITIONAL USE PERMIT DRC2009-00308 - INO CRUZ (FOR ARCO), A PROPOSAL TO CONSTRUCT AN AUTOMATIC CAR WASH, RELOCATE AN EXISTING TRASH ENCLOSURE, AND RELOCATE A PREVIOUSLY APPROVED HEALY TANK AT AN EXISTING ARCO GAS SERVICE STATION AND CONVENIENCE STORE IN THE COMMUNITY COMMERCIAL (CC) DISTRICT,TERRA VISTA PLANNED COMMUNITY(TVPC), LOCATED AT 11768 FOOTHILL BOULEVARD AND MAKING FINDINGS IN SUPPORT THEREOF — APN: 0227-151-41. RELATED FILE: CONDITIONAL USE PERMIT 96-14. A. Recitals. 1. Ino Cruz, on behalf of Atlantic Richfield Corporation (ARCO), filed an application for the issuance of Conditional Use Permit DRC2009-00308, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional Use Permit request is referred to as "the application." 2. On the 10th day of February 2010, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on February 10, 2010, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a developed parcel of land located at the northeast corner of Foothill Boulevard and Masi Drive—APN: 0227-151-41. The parcel has an overall area of approximately 49,110 square feet(1.13 acre);and b. The street frontage (east-to-west) of the parcel along Foothill Boulevard is approximately 200 feet and the depth (north-to-south)of the parcel is approximately 217 feet; and C. To the west of the site is a fast food restaurant and to the east are two (2) retail buildings. To the south is the 26-acre Masi commercial center. To the north it is vacant; and d. The applicant proposes to construct an automated car wash with a floor area of approximately 1,000 square feet at the northeast corner of the project site; and PLANNING COMMISSION RESOLUTION NO. 10-03 DRC2009-00308— ]NO CRUZ (for ARCO) February 10, 2010 Page 2 e. The construction of the new car wash will require the relocation of the trash enclosure elsewhere on the site and the relocation of the outdoor Healy Tank Enhanced Vapor Recovery(EVR) system to the interior of the new building; and f. The proposed car wash will be an added service to an existing service station that is operated by ARCO and was previously reviewed and approved by the Planning Commission on August 14, 1996, (Related File: Conditional Use Permit 96-14). Per the Terra Vista Community Plan, Page V-21, car washes are permitted in the Community Commercial District within the Terra Vista Plan; and g. The hours of operations for this carwash will be the same as the gas station/convenience store which operates 24 hours a day, 7 days a week; and h. The car wash will not require any new employees as the facility is fully automated; and i. The applicant is required to provide thirteen (13) parking stalls for the gas station/convenience store. There are currently fourteen (14) on the site. The new carwash will require the removal of five(5)parking stalls. The applicant will construct four(4)new parking stalls elsewhere on the site resulting in a net loss of one (1) parking stall. Additional parking is not required for the new car wash. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed car wash is in accord with the General Plan, the objectives of the Development Code,Terra Vista Community Plan, and the purposes of the district in which the site is located. The proposed project is to construct an automated car wash and is consistent with development in the vicinity. b. The proposed car wash, together with the conditions applicable thereto,will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The surrounding properties are zoned commercial and the surrounding uses are commercial-oriented. C. The proposed development complies with each of the applicable provisions of the Development Code. The proposed car wash meets all standards outlined in the Development Code, Terra Vista Community Plan, and the design and development standards and policies of the Planning Commission and the City. 4. The Planning Department staff has determined that the project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA Guidelines. The project qualifies as a Class 3 exemption under State CEQA Guidelines Section 15303- New Construction or Conversion of Small Structures-as the proposed structure is less than 2,500 square feet in floor area. In addition, there is no substantial evidence that the project may have a significant effect on the environment. The Planning Commission has reviewed the Planning Department's determination of exemption, and based on its own independent judgment, concurs in the staffs determination of exemption. PLANNING COMMISSION RESOLUTION NO. 10-03 DRC2009-00308 — INO CRUZ (for ARCO) February 10, 2010 Page 3 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the construction of an automatic car wash with a floor area of 1,000 square feet at an existing ARCO gas station/convenience store in the Community Commercial(CC)District,Terra Vista Planned Community (TVPC) located at 11768 Foothill Boulevard; APN: 0227-151-41. 2) Approval of this request shall not waive compliance with any sections of the Development Code, State Fire Marshal's regulations, Uniform Building Code, or any other City Ordinances. 3) The car wash shall be operated in conformance with the performance standards as defined in the Development Code, including, but not limited to, noise levels. If operation of the car wash causes adverse effects upon the gas station/convenience store, and/or adjacent businesses or operations, then the Conditional Use Permit shall be brought before the Planning Commission for consideration and possible revocation of the Conditional Use Permit. 4) Any modification or intensification of the existing uses; any improvements including new building construction; and/or other modifications/intensification beyond what is specifically approved by this Conditional Use Permit shall require the review and approval by the Planning Director or Planning Commission prior to submittal of documents for plan check/occupancy,construction,commencement of the activity, and/or issuance of a business license. 5) Outdoor storage of sales products, supplies, materials,and equipment is prohibited. 6) The windows on the west elevation of the car wash building shall be one-way vision glass that restricts visibility of the interior of the car wash from the outside. 7) The overhead trellis at the south and north sides of the building shall be constructed of polyvinyl chloride (PVC). 8) Downspouts shall not be visible from the exterior on any elevations of the building. All downspouts shall be routed through the interior of the building walls. 9) Signs identifying products, advertising services, or identifying the car wash building as "car wash" are not permitted. Signs required by Federal, State, or local agencies are exempt. PLANNING COMMISSION RESOLUTION NO. 10-03 DRC2009-00308 — [NO CRUZ (for ARCO) February 10, 2010 Page 4 10) All walls, including retaining walls, exposed to public view shall be constructed of decorative masonry block such as slump-stone or stack-stone, or have a decorative finish such as stucco. 11) A 3-foot high planter wall shall be constructed and landscaping installed along the south side of the drive aisle that leads to the entrance of the car wash. The walls of the planter shall be constructed of decorative block or finished to match the existing building. 12) Landscaping shall be installed prior to release for occupancy. Building and Safety 1) The installation of the EVR and the foundation surcharge design of the carwash building must be approved by the county of San Bernardino Fire Department before obtaining Building & Safety plan check approval. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 10TH DAY OF FEBRUARY 2010. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: _ Richard B. Fletcher, Chairman ATTEST: It R. JU,.VA/ ja . Troyer, AICP, Secre ary I, James AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga,at a regular meeting of the Planning Commission held on the 10th day of February 2010, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: DRC2009-00308 SUBJECT: CONDITIONAL USE PERMIT APPLICANT: INO CRUZ (FOR ARCO) LOCATION: 11768 FOOTHILL BOULEVARD -APN: 0227-151-41 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 10-03, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Notice of Exemption -$50 X SC-12-08 1 I:\PLANNING\FINAL\PLNGC0MM\2010 Res & Stf Rpt\DRC2009-00308 StdCond 2-10.doc Project No. DRC2009-00308 Completion Date B. Time Limits 1. Conditional Use Permit approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors,landscaping,sign program,and grading on file in the Planning Department, the conditions contained herein, Development Code regulations, and the Terra Vista Community Plan. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. D. Shopping Centers 1. Graffiti shall be removed within 72 hours. 2. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 3. Signs shall be conveniently posted for"no overnight parking"and for"employee parking only." 4. All operations and businesses shall be conducted to comply with the following standards which shall be incorporated into the lease agreements for all tenants: a. Noise Level - All commercial activities shall not create any noise that would exceed an exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m. and 65 dB during the hours of 7 a.m. until 10 p.m. 2 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00308 StdCond 2-10.doc Project No. DRC2009-00308 Completion Date b. Loading and Unloading-No person shall cause the loading, unloading,opening,closing,or other handling of boxes, crates, containers, building materials, garbage cans, or other similar objects between the hours of 10 p.m.and 7 a.m. unless otherwise specified herein, in a manner which would cause a noise disturbance to a residential area. E. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall / ! contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. G. Landscaping 1. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) H. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; 3 l:\PLANNING\FINAL\PLNGC0MM\2010 Res & Stf Rpt\DRC2009-00308 StdCond 2-10.doc Project No. DRC2009-00308 Completion Date e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., DRC2009-00308) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. I. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2009-00308). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). J. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC. 5. Openings in exterior walls shall be protected in accordance with CBC. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. 4 I:\PLANNING\FINAL\PLNGCOMM\2010 Res &Stf Rpt\DRC2009-00308 StdCond 2-10.doc Project No. DRC2009-00308 Completion Date K. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: L. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with _/_/_ direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. M. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 5 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00308 StdCond 2-10.doc ,o.„`-° Rancho Cucamonga Fire Protection District - Fire Construction Services STANDARD CONDITIONS October 15, 2009 Arco New Car Wash Building 11768 Foothill Blvd. DRC2009-00308 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT The installation of the EVR and the foundation surcharge design of the car-wash building must be approved by the county of San Bernardino Fire Department before obtaining RCFPD plan check approval. The RCFPD Procedures & Standards which are referenced in this document can be access on the web at http://www.ci.rancho-cucamonoa.ca.us/fire/index.htm under the Fire Safety Division & Fire Construction Services section. Search by article; the preceding number of the standard refers to the article. Chose the appropriate article number then a drop down menu will appear, select the corresponding standard. FSC-1 Public and Private Water Supply is existing 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300- feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. The preferred locations for fire hydrants are: 1. At the entrance(s) to a commercial, industrial or residential project from the public roadways. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs of the Fire District. 5. A minimum of forty-feet (40') from any building. c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access Roadways Standard. I. Location of Access: All portions of the structures Is` story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 24-feet. c. The minimum outside turn radius shall be 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. 6. Roof Access: There shall be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family residential structures with roofs less than 75' above the level of the fire access road. a. This access must be reachable by either fire department ground ladders or by an aerial ladder. b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction features, or high parapets that inhibit roof access. c. The number of ladder points may be required to be increased, depending on the building size and configuration. d. Regardless of the parapet height or construction features the approved ladder point shall be identified in accordance to the roof access standard. e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently mounted access ladder is required. f Multiple access ladders may be required for larger buildings. g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix A. h. A site plan showing the locations of the roof ladder shall be submitted during plan check. i. Ladder points shall face a fire access roadway(s). FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. 2 • Compressed Gases • Repair Garages Tents, Canopies and/or Air Supported Structures FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2007 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD46and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION— Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 3 4. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address in accordance to the appropriate RCFPD addressing Standard. 5. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire Construction Services. 6. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 7. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Yz" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 4