Loading...
HomeMy WebLinkAbout10-16 - Resolutions RESOLUTION NO. 10-16 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA,APPROVING TENTATIVE TRACT MAP SUBTT18708,A REQUEST TO SUBDIVIDE 5.02 GROSS ACRES OF LAND INTO 7 LOTS IN THE VERY LOW RESIDENTIAL DISTRICT (.1-2 DWELLING UNITS PER ACRE) OF THE ETIWANDA SPECIFIC PLAN, LOCATED EAST OF EAST AVENUE AND ON THE SOUTH SIDE OF BANYAN STREET -APN: 0226-102-02. A. Recitals. 1. TAVA Development Company has filed an application for the approval of Tentative Tract Map SUBTT18708, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map request is referred to as "the application." 2. On the 14th day of April 2010, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on April 14, 2010, including written and oral staff reports,together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a property located east of East Avenue and on the south side of Banyan Street. The site generally slopes from north to south with alluvial fan sage brush as the predominant vegetation type; and b. The same applicant has an approved 56 lot subdivision(SUBTT17651)to the west with which the project will share a public street. There are vacant lots to the north and south and San Bernardino Flood Control property to the east. The properties to the north, south, and west are zoned Very Low Residential (VL) (.1-2 dwelling units per acre) and the property to the east is zoned Open Space (OP); and C. The project design meets all required Development Standards of the Etiwanda Specific Plan; and d. The site has been evaluated for the occurrence potential of sensitive habitat and protected species. The applicant's environmental consultant recommends that they perform a focused environmental survey prior to the approval of a rough grading permit; and e. The Trails Advisory Committee recommended that the applicant provide a Community Trail along the south and east property lines of the site. The applicant is required to provide 12 feet of the Community Trail running along the south property line with the property owner PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708— TAVA DEVELOPMENT COMPANY April 14, 2010 Page 2 to the south providing the remaining 8 feet. The applicant is required to provide the full width of the Community Trail proposed to run along the east property line of the site. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The Tentative Tract Map is consistent with the General Plan, Development Code, and any applicable specific plans; and b. The design or improvements of the Tentative Tract Map is consistent with the General Plan, Development Code, and any applicable specific plans; and C. The site is physically suitable for the type of development proposed; and d. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The Tentative Tract Map is not likely to cause serious public health problems; and f. The design of the Tentative Tract Map will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. Pursuant to the California Environmental Quality Act (CEQA) and the City's local CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that,with the imposition of mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 —TAVA DEVELOPMENT COMPANY April 14, 2010 Page 3 C. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. d. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) The subdivision will be developed in accordance with plans on file in the Planning Department, as approved by the Planning Commission. 2) The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers,or employees, for any court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action, but such participation shall not relieve applicant of his obligations under this condition. 3) Prior to issuance of clearing and grubbing, grading or building permits, the applicant shall perform focused surveys for the California Gnatcatcher and San Bernardino Kangaroo Rat. 4) In the instance that the focused survey finds either the California Gnatcatcher or San Bernardino Kangaroo Rat, the applicant shall be required to fulfill all mitigation measures recommended by their environmental consultant. 5) If mitigation measures are recommended by the environmental consultant, the applicant shall complete said mitigations to the satisfaction of the Planning Director prior to the issuance of clearing and grubbing, grading or building permits. 6) A perimeter wall shall be constructed around the subdivision in accordance with the recommendations and mitigation measures made PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 —TAVA DEVELOPMENT COMPANY April 14, 2010 Page 4 in the acoustical reports by Vista Environmental, on file with the Planning Department under SUBTT18708. 7) All perimeter walls shall be decorative and have a uniform design that is compatible with those in the area. 8) Perimeter walls shall be placed at the top-of-slope with a 2-foot bench. 9) All retaining walls visible to public view shall be decorative, such as split-face block or an alternative design, subject to Planning Director review and approval. 10) The project contractor shall place all stationary construction equipment so that emitted noise is directed away from sensitive receptors nearest the project site. 11) The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction related noise sources and noise sensitive receptors nearest the project site during all project construction. 12) Future house product for the subdivision shall adhere to the architectural guidelines of the Etiwanda Specific Plan. Engineerinq Department 1) Raindrop Place to be improved in accordance with City Local Street standards including: a) Provide curb and gutter, sidewalk, drive approaches, street pavement, catch basins, curbside drain outlets and street trees. b) Provide details for parkway bio-swales and reverse parkway drains, including their relationship to street trees and drive approaches. Locate all swales, drains, and splash pads in the plan view. c) If Raindrop Place has been constructed as a "half-street' by others, widen it by 8 feet, for a total of 18 feet from centerline. Developer is also responsible for reimbursing his fair share of the construction costs, east of centerline along the project frontage. d) If Raindrop Place is not constructed beforehand by Tract 17651, provide a 26-foot paved access road from the north property line to Banyan Street, within the existing street easement, with curb and gutter, street lights, and "no parking" signs on the west side. Provide full width improvements along the project frontage. e) The developer may request a reimbursement agreement to recover the cost for ultimate permanent off-site improvements PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 — TAVA DEVELOPMENT COMPANY April 14, 2010 Page 5 from future development. If the developer fails to submit for said reimbursement agreement within 6 months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. f) Dedicate 20 feet of right-of-way on final map. g) Provide 5800 Lumen HPSV streetlights. h) Provide traffic striping and signage. i) Street trees, a minimum of 15-gallon size, shall be of a species and spaced in accordance with the Standard Conditions, subject to the Fire Safety Department review if determined to be in the High Fire Hazard area. j) Frontage improvements on Lot 1 shall extend along the entire frontage. 2) Raindrop Place transition to a"half-street"and other improvements that will be affected when the property to the north develops include: a) Developer shall make a good faith effort to expand the existing, or obtain additional, grading easement sufficient to eliminate a retaining wall within the future Raindrop Place right-of-way north of Lot 1. b) If retaining wall along the north property line does extend into the future Raindrop Place right-of-way, this portion of the wall shall be removed when Raindrop Place is widened. Improvements at the north property line, such as the retaining wall, a transition asphalt curb, drive approach, etc., shall be designed so that the development of the property to the north will cause minimal disruption to the frontage of Lot 1. c) Funds shall be deposited for removing portions of the retaining wall and related drainage facilities within the right-of-way. d) Permanent perimeter wall shall not be constructed within the building setback area. Driveway on Lot 1 shall be located away from the north property line so that vehicles backing out can see over the retaining wall. 3) Individual homeowners shall be responsible for maintaining all facilities required by the Water Quality Management Plan (WQMP) within the public right-of-way, as provided for in CC&R's, or said WQMP, recorded prior to or concurrent with the final map. Costs of installing WQMP facilities shall be borne by development. PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708—TAVA DEVELOPMENT COMPANY April 14, 2010 Page 6 a) Any language referring to City participation in financing of private Water Quality Management Plan (WQMP) facilities shall be removed from the WQMP. 4) Construct an interior Community Trail, per Standard Drawing 1004, along the south and east tract boundaries. Install a drive approach for City maintenance vehicle access and a vehicle gate with side access, per Standard Drawing 1006-A, on the Gypsum/Raindrop knuckle. Provide corner cutoffs for interior trail intersections with dimensions subject to approval by the City Engineer. Install single private gates for each lot per Standard Drawing 1008, 1009-B or equivalent, acceptable to the Fire and Safety Department. Public street improvement plans shall include a separate Community Trail Plan, with the suffix "-L", subject to approval of the City Engineer. a) Dedicate a separate Lot "A" to the City on the final map for Community Trail purposes, including both the south and east trails. b) Trail along the south tract boundary shall be installed with a minimum 15-foot width, to be widened by future development to the south. If possible, the perimeter block wall on Lot 7 should start at the building setback line,with a concrete header and PVC rail fencing on the north side between the wall and back of sidewalk. c) Inlet to the public storm drain from the private cross lot drainage facility that ends on Lot 7 shall be oversized, designed to prevent trash and dirt from getting into the storm drain, and have an overflow path to the public street. Show this facility on the Storm Drain Plans, but label it "private." d) Design the sewer system to locate the sewer manhole outside the decomposed granite trail surface area, to the satisfaction of Cucamonga Valley Water District. If not successful, the sewer manhole cover at the Community Trail entrance shall be coated with a material acceptable to the Trails Advisory Committee and City Engineer. 5) If Tract 17651 storm drains do not precede the subject tract; this developer shall install local storm drains to convey all development drainage to the Victoria Basin Master Plan Storm Drain System. The cost of local storm drains shall be borne by development with no fee credit; however, you may request a reimbursement agreement to recover over-sizing costs from future development within the same tributary area. If you fail to submit for said reimbursement agreement within 6 months of the public improvements being accepted by the City, all your rights to reimbursement shall terminate. On the other hand, if the construction of local storm drains conveying Tract 17651 runoff to PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 —TAVA DEVELOPMENT COMPANY April 14, 2010 Page 7 the Victoria Basin Master Plan Storm Drain System precedes the subject tract,the developer is responsible for reimbursing his fair share of the construction costs. a) Extend the local storm drain system as far on site as needed to contain Q25 within tops of curbs, Q100 within rights-of-way and provide a 10-foot dry lane in Q10. b) Locate catch basins and local depressions clear of drive approaches or where they are likely to be located. c) Construct, if not done previously or concurrently, sufficient street improvements on Gypsum Drive to convey runoff to the Tentative Tract 17651 catch basins. 6) A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval. All drainage facilities shall be installed as required by the City Engineer. Because submitted plans show this project draining entirely into the storm drain system of Tentative Tract 17651, also designed by MDS Consulting, a single combined final drainage study is required. 7) Runoff shall not enter Community Trail and run across trail surface. 8) Site shall be rough graded to eliminate all cross-lot drainage (except in the drainage facilities adjacent to Community Trail). All slopes and retaining walls necessary to accomplish this shall be installed prior to final map approval. 9) Final map shall show an easement for private, cross-lot drainage. 10) Public improvement plans shall be 90 percent complete prior to the issuance of grading permits. Building and Safety— Grading 1) The site shall be rough graded to eliminate all cross-lot drainage, (except in approved facilities adjacent to private trails). All slopes and retaining walls necessary to accomplish this shall be installed prior to final map approval. 2) Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard-lined gutters and swales where concentrated flows exceed 3fps and anywhere that flow lines exceed 10 percent. 3) Prior to removing the fences or walls along the common lot lines and prior to constructing walls along common lot lines, the applicant shall provide a letter from the adjacent property owner(s) allowing work on the adjacent property. PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 —TAVA DEVELOPMENT COMPANY April 14, 2010 Page 8 4) Prior to issuance of a grading permit the Water Quality Management Plan shall be approved by the City of Rancho Cucamonga and the Memorandum of Agreement of Storm Water Quality Management Plan shall be recorded. Water Quality Management Plan (Building and Safety Department) 1) A Storm Water Quality Management Plan shall be approved by the Building and Safety Official and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits,the developer shall submit Construction Plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. PLANNING COMMISSION RESOLUTION NO, 10-16 SUBTT18708—TAVA DEVELOPMENT COMPANY April 14, 2010 Page 9 • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds (i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB])daily to reduce Fine Particulate Matter(PM10)emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that Construction-Grading Plans include a statement that work crews will shut off equipment when not in use. 10) All residential structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 11) All residential structures shall be required to incorporate thermal pane windows and weather-stripping. Biological Resources 1) Prior to issuance of clearing and grubbing, grading or building permits, the applicant shall perform focused surveys for the California Gnatcatcher and San Bernardino Kangaroo Rat. 2) In the instance that the focused survey finds either the California Gnatcatcher or San Bernardino Kangaroo Rat, the applicant shall be PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 —TAVA DEVELOPMENT COMPANY April 14, 2010 Page 10 required to fulfill all mitigation measures recommended by their environmental consultant. 3) If mitigation measures are recommended by the environmental consultant, the applicant shall complete said mitigations to the satisfaction of the Planning Director prior to the issuance of clearing and grubbing, grading or building permits Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Propose mitigation measures and recommend Conditions of Approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA Guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resources (i.e., plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708—TAVA DEVELOPMENT COMPANY April 14, 2010 Page 11 • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water 1) Prior to issuance of grading permits, the permit applicant shall submit to the Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in Grading Plan, and. implemented for the proposed project that identifies specific PLANNING COMMISSION RESOLUTION NO, 10-16 SUBTT18708—TAVA DEVELOPMENT COMPANY April 14, 2010 Page 12 measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. Post- Construction Operational: 5) The developer shall implement the BMPs identified in the Water Quality Management Plan prepared by MDS Consulting, October 27, 2009, to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 6) Landscaping Plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 7) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 8) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES)General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 —TAVA DEVELOPMENT COMPANY April 14, 2010 Page 13 the Waste Discharger's Identification Number)shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) The applicant shall provide a 6.0-foot high sound wall for the side and rear of Lot 7 facing the 210 Freeway and a 4.0-foot high sound wall for the sides and rear of Lots 1, 2, 3, 4, 5, and 6 facing the 210 Freeway. The side walls shall start 42 feet back from the curb and run to the rear property line. The sound barrier's weight shall be at least 3.5 pounds per square foot of face area, which is equivalent to % inch plywood, and have no decorative cutouts or line-of-site openings between shielded area and the roadway. 2) The applicant shall provide a window closed condition for all the proposed homes. A windows closed condition requires a means of mechanical ventilation per the Uniform Building Code Standards. This shall be achieved with standard air conditioning or a fresh air intake system. 3) The applicant shall ensure that all air intake ducts on Lot 7 will be oriented away from the 210 Freeway and shall incorporate at least 6 feet of flexible fiberglass ducting and at least one 90 degree bend. There shall be no other openings on Lot 7 (mails slots, vents, etc.) in the exterior wall facing the 210 Freeway. 4) The applicant shall provide exterior walls with a minimum Sound Transmission Class (STC) rating of 46. Typical walls with this rating will have 2 by 4 studs or greater, 16-inch on center with R-13 insulation, a minimum 7/8-inch exterior surface of '/2-inch gypsum board. 5) The applicant shall provide window and door assemblies used throughout the project that are free of cuts outs and openings, well fitted and well weather stripped. 6) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 7) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the PLANNING COMMISSION RESOLUTION NO. 10-16 SUBTT18708 —TAVA DEVELOPMENT COMPANY April 14, 2010 Page 14 Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 8) The perimeter block wall shall be constructed as early as possible in first phase. 9) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips(counting both to and from the construction site), then the developer shall prepare a Noise Mitigation Plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF APRIL 2010. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: � n �C Richard B. Fletcher, Chairman ATTEST: ^- Jame . Troyer, AICP, Secre ary I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of April 2010, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga MITIGATED NEGATIVE DECLARATION The following Mitigated Negative Declaration is being circulated for public review in accordance with the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code. Project File No.: TENTATIVE TRACT MAP SUBTT18708 Public Review Period Closes: April 14, 2010 Project Name: ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT MAP SUBTT18708 Project Applicant: Mr. Scott Allen (TAVA DEVELOPMENT COMPANY) Project Location (also see attached map): Located east of East Avenue and on the south side of Banyan Street, within the Etiwanda Specific Plan - APN: 0226-102-02. Project Description: A request to subdivide 5.02-gross acres of land into 7 lots in the Very Low Residential District (less than 2 dwelling units per acre). FINDING This is to advise thatthe City of Rancho Cucamonga,acting as the lead agency,has conducted an Initial Study to determine if the project may have a significant effect on the environment and is proposing this Mitigated Negative Declaration based upon the following finding: The Initial Study identified potentially significant effects but: (1) Revisions in the project plans or proposals made or agreed to by the applicant before this proposed Mitigated Negative Declaration was released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur, and (2) There is no substantial evidence before the agency that the project, as revised, may have a significant effect on the environment. If adopted,the Mitigated Negative Declaration means that an Environmental Impact Reportwill not be required. The factual and analytical basis for this finding is included in the attached Initial Study. The project file and all related documents are available for review at the City of Rancho Cucamonga Planning Department at 10500 Civic Center Drive(909)477-2750 or Fax(909)477-2847. NOTICE The public is invited to comment on the proposed Mitigated Negative Declaration during the review period. April 14, 2010 Date of Determination Adopted By a COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: SUBTT18708 SUBJECT: TENTATIVE TRACT MAP APPLICANT: TAVA DEVELOPMENT COMPANY LOCATION: EAST OF EAST AVENUE AND SOUTH OF BANYAN STREET—APN: 0226-102-02 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Approval of Tentative Tract No. SUBTT18708 is granted subject to the approval of DRC2009-00652. 3. Copies of the signed Planning Commission Resolution of Approval No. 10-16, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 4. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Mitigated Negative Declaration -$ 2,060.25 SC-12-08 1 I:\PLANNING\FINAL\PLNGCOMM\2010 Res 8 Stf Rpt\SUBTT18708StdCond 4-14.doc Project NO.SUS8TT18708 Completion Date B. Time Limits 1. This tentative tract map or shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations,exterior materials and colors, landscaping,sign program,and grading on file in the Planning Department, the conditions contained herein, Development Code regulations, and the Etiwanda Specific Plan. 2. Prior to any use of the project site, all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 5. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 6. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 7. Street names shall be submitted for Planning Director review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 8. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 9. A detailed plan indicating trail widths, maximum slopes, physical conditions, fencing, and weed control, in accordance with City Master Trail drawings, shall be submitted for Planning Director review and approval prior to approval and recordation of the Final Tract Map and prior to approval of street improvement and grading plans. Developer shall upgrade and construct all trails, including fencing and drainage devices, in conjunction with street improvements. a. Local Feeder Trails (i.e., private equestrian easements) shall, at a minimum, be fenced with two-rail, 4-inch lodgepole"peeler"logs to define both sides of the easement;however, developer may upgrade to an alternate fence material. b. Local Feeder Trail entrances shall also provide access for service vehicles, such as veterinarians or hay deliveries, including a 12-foot minimum drive approach. Entrance shall be gated provided that equestrian access is maintained through step-throughs. 2 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\SUBTT18708StdCond 4-14.doc Project No.SUSBTT18708 Completion Date C. Local Feeder Trail grades shall not exceed 0.5% at the downstream end of a trail for a distance of 25 feet behind the public right-of-way line to prohibit trail debris from reaching the street. Drainage devices may be required by the Building Official d. Provide a 24-foot by 24-foot corral area in the rear yard. Grade access from corral to trail with a maximum slope of 5:1 and a minimum width of 10 feet. e. For single family residential development within the Equestrian/Rural Overlay District, at least one model home shall be provided with a constructed 24-foot by 24-foot corral with appropriate fencing. 10. The Covenants, Conditions, and Restrictions (CC&Rs)shall not prohibit the keeping the equine animals where zoning requirements for the keeping of said animals have been met. Individual lot owners in subdivisions shall have the option of keeping said animals without the necessity of appealing to boards of directors of homeowners' associations for amendments to the CC&Rs. 11. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners'Association are subject to the approval of the Planning and Engineering Services Department and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Department a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 12. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and Engineering Services Department review and approved prior to the issuance of building permits. 13. Solar access easements shall be dedicated for the purpose of assuming that each lot or dwelling unit shall have the right to receive sunlight across adjacent lots or units for use of a solar energy system. The easements may be contained in a Declaration of Restrictions for the subdivision which shall be recorded concurrently with the recordation of the final map or issuance of permits, whichever comes first. The easements shall prohibit the casting of shadows by vegetation, structures, fixtures, or any other object, except for utility wires and similar objects, pursuant to Development Code Section 17.08.060-G-2. 14. The developer shall submit a construction access plan and schedule for the development of all lots for Planning Director and Engineering Services Department approval; including, but not limited to, public notice requirements, special street posting, phone listing for community concerns, hours of construction activity, dust control measures, and security fencing. 15. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. 16. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 17. Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and PVC. 18. For residential development, return walls and corner side walls shall be decorative masonry. 3 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\SUBTT18708StdCond 4-14.doc Project No.SUSBTT18708 Completion Date D. Environmental 1. Noise levels shall be monitored after construction to verify the adequacy of the mitigation measures. Noise levels shall be monitored by actual noise level readings taken on-and off-site. A final acoustical report shall be submitted for Planning Director review and approval prior to final occupancy release. The final report shall also make recommendations as to additional mitigation measures to reduce noise levels to below City standards, such as, residential exterior noise levels to below 60 dBA and interior noise attenuation to below 45 dBA. 2. A final acoustical report shall be submitted for Planning Director review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate, verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 3. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building & Safety Department prior to final occupancy release of the affected homes. 4. Mitigation measures are required for the project. The applicant is responsible for the cost of _/_/_ implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the amount of$557 prior to the issuance of building permits,guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. 5. In those instances requiring long term monitoring(i.e.)beyond final certificate of occupancy),the applicant shall provide a written monitoring and reporting program to the Planning Director prior to issuance of building permits. Said program shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) E. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets, detached)including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; 4 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\SUBTT18708StdCond 4-14.doc Project No.SUSBTT18708 Completion Date f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number(i.e.,SUBTT18708)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. F. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., SUBTT18708). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. G. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances _/_/_ considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. H. Grading 1. Grading of the subject property shall be in accordance with California Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 5 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\SUBTT18708StdCond 4-14.doc Project No.SUSBTT18708 Completion Date 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. I. Additional Requirements/Comments 1. SEE ATTACHED GRADING PROJECT REPORT AND RECOMMENDED CONDITIONS, DATED MARCH 16, 2010 APPLICANT SHALL CONTACT THE ENGINEERING SERVICES DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: J. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 30 total feet on Raindrop Place —/—/- 2. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or noted on the final map. 3. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. K. Street Improvements 1. All public improvements(interior streets,drainage facilities,community trails,paseos, landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to, curb and gutter,AC pavement, drive approaches, sidewalks, street lights, and street trees. 2. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy,fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except:that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. 3. A minimum of 26-foot wide pavement, within a 40-foot wide dedicated right-of-way shall be constructed for all half-section streets. 6 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\SUBTT18708StdCond 4-14.doc Project No.SUSBTT18708 Completion Date 4. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Istand Trail Other Raindrop Place X X X X X X 5. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the Planning Director prior to submittal for first plan check. 6. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 7 I:\PLANNING\FINAL\PLNGCOMM\2010 Res &Stf Rpt\SUBTT18708StdCond 4-14.doc Project No.SUSBTT18708 Completion Date 7. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The Engineering Services Department reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size Qty. Raindrop Place Geijera parviflora Australian willow 5' 25' o.c. 15 gal Fill In Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils reportshall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. 4) Street trees are to be planted per public improvement plans only. 8. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. L. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the Engineering Services Department prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. M. Drainage and Flood Control 1. It shall be the developer's responsibility to have the current FIRM Zone 17)— designation removed from the project area. The developer shall provide drainage and/or flood protection facilities sufficient to obtain a Zone"X"designation. The developer's engineer shall prepare all necessary reports, plans, and hydrologic/hydraulic calculations. A Conditional Letter of Map Revision (CLOMR) shall be obtained from FEMA prior to final map approval or issuance of building permits, whichever occurs first. A Letter of Map Revision (LOMR) shall be issued by FEMA prior to occupancy or improvement acceptance, whichever occurs first. 2. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 3. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 4. A permit from the San Bernardino County Flood Control District is required for work within its right-of-way. 8 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\SUBTT18708StdCond 4-14.doc Project No.SUSBTT18708 Completion Date 5. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. N. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. O. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. 2. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Services Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Services Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 9 l:\PLANNING\FINAL\PLNGC0MM\2010 Res & Stf Rpt\SUBTT18708StdCond 4-14.doc City of Rancho Cucamonga SUBTT18708 Aimarik Building & Safety Department zi10500 Civic Center Dr. Rancho Cucamonga, CA 91730 T: (909)477-2710 F: (909)477-2711 GRADING COMMITTEE PROJECT REPORT&RECOMMENDED CONDITIONS Project No.: SUBTT18708 Type: 7 Lot Residential Subdivision Location: Raindrop Place south of Banyan Street Planning Department: TARE VAN DER ZWAAG APN: 226-102-02-0000 Al Meeting Date: March 16, 2010 By: Matthew Addington Acceptable for Planning Commission: Yes: xxx No: If NO, see COMMENTS below: PRELIMINARY: GRC: March 16, 2010 By: Matthew Addington FINAL: PC Meeting: By: Note: Building and Safety—Grading will review and comment on future submittals for this project. A. STANDARD CONDITIONS - Standard Building and Safety - Grading and Planning Department standard conditions for Grading and Drainage Plans. 1. Grading of the subject property shall be in accordance with current adopted California Building Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plans) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 2. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 3. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and submitted at the time of application for Grading and Drainage Plan review. 4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will 1:\BUILDING\PERMITS\SUSTT78708\TT18708 Grading Committee Project Report,03-16-10.doc 1 of 6 City of Rancho Cucamonga SUBTT18708 Building & Safety Department 10500 Civic Center Dr. Rancho Cucamonga, CA 91730 T: (909)477-2710 F: (909)477-2711 generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer. 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. 7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Officiat for review, that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit. 8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a grading permit. All reports shall be wet signed and sealed by the Engineer of Record. 9. It shall be the responsibility of the applicant to acquire any required off-site grading or drainage easements prior to the issuance of a grading permit. 10. It shall be the responsibility of the applicant to acquire any required off-site drainage acceptance letter(s)from adjacent downstream property owner(s) or discharge flows in a natural condition (concentrated flows are not accepted) & shall provide the Building and Safety Official a drainage study showing the proposed flows do not exceed the existing flows prior to the issuance of a grading permit. 11. It shall be the responsibility of the applicant to obtain written permission from the adjacent property owner(s)to construct wall on property line or provide a detail(s) showing the perimeter wall(s)to be constructed offset from the property line. 12.The Grading and Drainage Plan shall Implement City Standards for on-site construction where possible, and provide details for all work not covered by City Standard Drawings. 13.All slopes shall be a minimum 2-foot offset from the public right of way or adjacent private property. 14. Private sewer, water and storm drain improvements will be designed per the, latest adopted California Plumbing Code. 15. The final grading and drainage plan shall show existing topography a minimum of 100- feet beyond project boundary. 16. The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Building and Safety Official. I:SUILDING\PERMITSISUBTT787081T718708 Grading Committee Project Report,03-16•10.doc 2of6 City of Rancho Cucamonga SUBTT18708 Building& Safety Department 10500 Civic Center Dr. Rancho Cucamonga,CA 91730 T: (909)477-2710 F: (909)477-2711 17. The precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit". 18. Grading Inspections: a. Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre- grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b. The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: 1) The bottom of the over-excavation 2) Completion of Rough Grading, prior to issuance of the building permit; 3) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; 4) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. 19. B. COMMENTS -The following items shall be corrected/completed, submitted to, reviewed and approved by staff prior to scheduling the project for a Planning Commission hearing. Copies of required easement/right-of-way documents, including legal descriptions, shall be submitted for review prior to obtaining final signatures. The review period for the above will generally be a minimum of two weeks or longer depending upon the adequacy and complexity of the submittal: 1. On Section H-H of the conceptual grading and drainage plan show the parkway swale with dimensions. Show the parkway swale and other BMP devices on the sections as appropriate. C. SPECIAL CONDITIONS 1. The site shall be rough graded to eliminate all cross-lot drainage, (except in approved facilities adjacent to private trails). All slopes and retaining walls necessary to accomplish this shall be installed prior to final map approval. I:\BUILDINGIPERMITS\SUBTT187081Tr18708 Grading Committee Project Report,03-1e-10.doc 3of6 City of Rancho Cucamonga SUBTT18708 97 Building &Safety Department 10500 Civic Center Dr. Rancho Cucamonga,CA 91730 T: (909)477-2710 F: (909)477-2711 2. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. 3. Prior to removing fences or walls along common lot lines and prior to constructing walls along common lot lines the applicant shall provide a letter from the adjacent property owner(s) allowing work on the adjacent property. 4. Prior to issuance of a grading permit the water quality management plan shall be approved by the City of Rancho Cucamonga and the Memorandum of Agreement of Storm Water Quality Management Plan shall be recorded. D. WATER QUALITY MANAGEMENT PLAN 1. A Storm Water Quality Management Plan shall be approved by the Building and Safety Official and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit. 2. The Water Quality Management Plan (WQMP) prepared by MDS Consulting , dated October 5, 2008 , is deemed "Substantially Complete". Other than two exhibits and the calculations to size the BMP's, this document has not been revised from the previous submittal. The following comments are continued from the previous submittal and are required to be completed prior to issuance of a grading permit: Section Page r, ," , i' .iCommenE61 �"-' - Please note that this WQMP has not been updated for over a year. There appears to be many conflicts between the recently submitted WQMP and the grading plans. Please coordinate the design of the conceptual grading and drainage plan with the BMP's referenced in the WQMP. Cover 1 Pae The engineer of record must wet sign and seal the document. 1.2 6 A WDID number will be required prior to issuance of a grading permit. 3.1.1 17 The response for the second item reads"Overall development will consist of approximately 35% pervious surface". Is this a limiting factor as the homeowners add a pool and landscaping improvements to their property? 3.1.1 18 In the second item, a reference reads "Parkway swales are not being proposed . . . ". Other sections of this document reference parkway swales. The BMP exhibit references parkway swales. Please show the location and a typical section of the parkway swales on the conceptual grading and drainage plan. 3.1.1 19 i In the first box a reference reads "Decorative concrete and hardsca e 1:1BUILDING\PERMITSISUBTT18708\TT18708 Grading Committee Project Report,03-18-10.doc 4of6 City of Rancho Cucamonga SUBTT18708 Building& Safety Department 10500 Civic Center Dr. Rancho Cucamonga,CA 91730 T: (909)477-2710 F: (909)477-2711 Section ` -Page rr' t:OrrltttB)1t$is Y s�y tax use within the public areas will be avoided". The grading plan shows sidewalk, and sidewalk is required for this project. Please correct your drawings accordingly, or revise this statement. 3.1.2 20 The last reference on this page reads"No curbs cuts are proposed for this Tract as there are no Street Improvements required . . .". The grading plan shows street improvements and street improvements are required. Please correct your drawings accordingly, or revise this statement. 3.1.2 20 The last reference on this page reads "The adjacent Tract 17651 has included these BMP's which will also serve this Tract. Please note that each project must clean it's own water before such water leaves the project site. If an adjacent property will be providing BMP's to clean this water, please describe all BMP's in WQMP document and show all such BMP's on the BMP exhibit with the exhibit showing Tract 17651. 3.3 28 In the "Treatment Control BMP Selection Matrix" please answer all questions with a yes or no. A check box is not acceptable. In addition, the check boxes indicate that you are not treating the expected pollutants of concern from Table 2-1 such as: pesticides; sediments;, trash and debris; oxygen demanding substances; and oil and grease. 3.4 29 1 Please complete this table. In addition this table must match Table 3.3. 3.4.1 30 Please provide a detail of the check dams within the public on the conceptual grading and drainage plan for review by the Engineering Department. 3.4.1 30 "Stringent non-structural practices" are proposed. Who will be enforcing these stringentpractices? 3.4.1 30 The last sentence of the 2" paragraph reads "Details of the proposed swale design are located in Attachment D of the WDMP". Details were not included. Please include the details in the next draft of this document. 4.1.3 32 A few items regarding the funding: a You must provide the City Department and title of the person providing the funding; a Please provide a written statement from the City Engineer providing funding for the operation and maintenance of the proposed BMP's; It is typically the responsibility of the homeowner to maintain the parkway(s) fronting their property; a In a discussion with the Engineering.Department at the Grading Review Committee meeting discussing this project, the Engineering Department noted that funding would not be provided by the City. 5.1 37 A few items regarding the funding: You must provide the City Department and title of the person providing the funding; a Please provide a written statement from the City Engineer providing funding for the operation and maintenance of the proposed BMP's; a It is typically the responsibility of the homeowner to maintain the parkway(s) fronting their property: 1:1BUILDINGIPERMITS\SUBTT18708\TT18708 Grading Committee Project Report,03.16-10.doc 5of6 City of Rancho Cucamonga SUBTT18708 Building & Safety Department 10600 Civic Center Dr. Rancho Cucamonga,CA 91730 T: (909)477-2710 F: (909)477-2711 Section Page Commenfsu * r 's r re—M".— Ina !• Ina discussion with the Engineering Department at the design review committee meeting discussing this project, the Engineering Department noted that funding would not be provided by the City. Tab A 43 Please remove "Attachment A-1" as the City of Rancho Cucamonga does not use this document. Tab A 44 Please remove "Attachment A-2" as the City of Rancho Cucamonga does not use this document. WQMP BMP Exhibit: As the City of Rancho Cucamonga is responsible per the current adopted MS4 Permit for future inspections of the BMP's, please include a full sized sheet (24" x 36") drawing of the exhibit. On this exhibit, clearly show ALL parkway swales and other proposed BMP's along with a maintenance schedule and details of the BMP's. Exhibit "B" 40 This exhibit is missing. Exhibit "C" 41 This exhibit is missing. Attachment 51 The site specific calculations reference areas 1, 2 and 3 on the BMP "D" exhibit. Please show these areas and the corresponding swales on the BMP exhibit. 1:1BUILDINGIPERMITSI.SUBTT787081TT18708 Grading Committee Project Report,03-16.10.doc 6of6 Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS October 28, 2008 TAVA Development (7) SFR Tract 13720 Highland SUBTT18708 As agreed by the developer and the RCFPD the tract can not be developed until (1 ) a second point of access is constructed on adjacent property per RCFPD Standards, (2) a Fire Protection plan is prepared plan checked and approved and the building permit issuance. Construction requirements of lots 1-7 must be mitigated in the Fire Protection Plan and may be delayed if defensible space is not available on adjacent property. THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. For single-family residential projects in the designated Hazardous Fire Area, the maximum distance between fire hydrants and the location of fire hydrants must be in accordance to the 2007 California Fire Code and the RCFPD Ordinance FD46. FSC-2 Fire Flow 1. The required fire flow for this project will be established in gallons per minute at a minimum residual pressure of 20-pounds per square inch. This requirement is made in accordance with Fire Code Appendix, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Fire service plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until fire service plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems I. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirement for Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance FD46, the 2007 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. Buildings constructed in the designed Hazardous Fire Areas which include: a. All structures that do not meet Fire District access requirements (see Fire Access). b. When required fire flow cannot be provided due to inadequate volume or pressure. c. Proposed as mitigation in the fire protection plan FSC-6 Fire District Site Access Fire District access roadways include public roads; streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access — Fire Lanes Standard 9-7. 1. Residential gates installed across Fire District access roads shall be installed in accordance with RCFPD Residential Gate Standard #9-1. The following design requirements apply: a. All automatic gates shall be provided with a Fire District approved, compatible traffic pre-emption device. The devices shall be digital. Analog devices are not acceptable. Devices shall be installed in accordance with the manufacturer's instructions and specifications. b. Vehicle access gates shall be provided with an approved Fire District Knox Key Switch. c. The key switch shall be located outside and immediately adjacent to the gate for use in the event that the traffic pre-emption device fails to operate. d. A traffic loop device must be installed to allow exiting from the complex. e. The gate shall remain in the open position for not less than 20-minutes and shall automatically reset. 2. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 3. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. FSC-7 Hazardous Fire Area This project is located within the "State Responsibility Area" (SRA), the "Very High Fire Hazard Severity Zone" (VHFHSZ), City of Rancho Cucamonga "Hillside District", and/or within the area identified on the Rancho Cucamonga General Plan, Exhibit V-7 as High Probability-High Consequence for Fire Risk. These locations have been determined to be within the "Hazardous Fire Area" as defined by the Fire District. The Hazardous Fire Area is based on maps produced by the California Department of Forestry and Fire Protection and the City of Rancho Cucamonga. 2 1. Hazard Reduction Plans: The applicant shall prepare the architectural plans for the construction of the buildings in accordance with the County of San Bernardino's Development Code as amended by RCFPD Ordinance FD46. Fire Area FS-3 and the 2007 CBC Chapter 7A requirements apply to the construction of the buildings based on the slope of the terrain and/or mitigation of the fuel modification plans. The development code provides standards regulating and requiring: a. Fire resistive roof assemblies b. Fuel Modification and hazard reduction plans c. Fire District access roadways d. Fire resistive construction and protection of openings. e. Fire sprinkler systems f. Fire flow criteria Fire Protection Plans Submit four (4) sets of plans. Approved plan and documentation must be recorded with San Bernardino County prior to release of occupancy. Proof of the recording must be provided to FCS.NOTE: Fuel Modification Plans must be submitted to Fire Construction Services for review and approval prior to the submittal of architectural drawings. Mobile, stationary or portable power-operated equipment in the Hazardous Fire Area shall not be used without the Fire Safety Division's written approval. Specific fire protection measures that may be required to mitigate the hazard include, but are not limited to: a. A stand-by water tender, equipped with a pump, fire hose and nozzle. b. Pre-wetting of the site to avoid the production of sparks between blades or tracks and rocks. c. Conducting a fire watch for a minimum of one-hour following the cessation of operations each day. d. For welding, cutting or grinding work, clear away all combustible material from the area around such operation for a minimum distance of 10-feet. A "hot-work" permit must be obtained from Fire Construction Services prior to cutting, welding or grinding work. e. Maintain one serviceable round point shovel with an overall length of not less than forty-six (46) inches and one five (5) gallon backpack water pump-type fire extinguisher fully equipped and ready for use at the immediate area during the operation. FSC-8 Chronological summary of RCFPD Hazardous Fire Area requirements Prior to the issuance of a rough grading permit, the applicant shall obtain the Fire District approval of a preliminary fuel modification/hazard reduction plan and program. The plan(s) shall be prepared by an individual or firm qualified and experienced in wildfire hazard mitigation planning. Prior to the issuance of a building permit, the developer shall have submitted and obtain approval of a final fuel modification plan. Further, the builder shall have completed that portion of the approved fuel modification/hazard reduction plan determined to be necessary by the Fire District before the introduction of any combustible materials into the project area. Approval is subject to an on-site inspection. 3 Prior to the issuance of any Certificate of Occupancy, the remainder of the fuel modification/hazard reduction plan requirements shall be installed, inspected and accepted by the Fire District staff. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the review fee. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Fuel Modification Plans: Please refer to RCFPD Summary of Fire Hazardous Area requirements. 4. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 5. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services requirements. 4 PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or#9-2 by Fire Construction Services. 5. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 6. Address: Prior to the granting of occupancy, single-family dwellings shall post the address on a contrasting background. The numbers shall be internally or externally illuminated during periods of darkness. The numbers shall be visible from the street. The address signs shall be in accordance with RCFPD Standards. 7. Fuel Modification: Please refer to RCFPD Summary of Fire Hazardous Area requirements. 5