HomeMy WebLinkAbout10-21 - Resolutions RESOLUTION NO. 10-21
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA,APPROVING CONDITIONAL USE
PERMIT NO. DRC2006-00397, A REQUEST TO OPERATE A 7,442
SQUARE FOOT CHURCH ON 1.04-ACRES OF LAND IN THE MEDIUM
RESIDENTIAL DISTRICT (8-14 DWELLING UNITS PER ACRE) OF THE
ETIWANDA SPECIFIC PLAN, LOCATED ON THE WEST SIDE OF
EAST AVENUE, SOUTH OF THE 1-15 FREEWAY AT 7384 EAST AVENUE
- APN: 1100-051-03; AND MAKING FINDINGS IN SUPPORT THEREOF.
A. Recitals.
1. John Kim for Norwalk Avenue Baptist Church filed an application for the issuance of
Conditional Use Permit No. DRC2006-00397,as described in the title of this Resolution. Hereinafter
in this Resolution, the subject Conditional Use Permit request is referred to as "the application."
2. On the 9th day of June 2010, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on June 9, 2010, including written and oral staff reports, together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to property located at 7384 East Avenue with a street
frontage of 244 feet and lot depth of 377 feet and which is presently vacant land; and
b. The property is bordered to the north by the 1-15 Freeway,the properlyto the south
consists of a Cucamonga Valley Water District facility, the property to the east is an existing
single-family subdivision within the City of Fontana; and
C. The site is of the appropriate size to accommodate the proposed improvements,
including the provision of required on-site parking and internal vehicular circulation; and
d. Churches are permitted in the Medium Residential District of the Etiwanda Specific
Plan, subject to the approval of a Conditional Use Permit; and
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
PLANNING COMMISSION RESOLUTION NO. 10-21
DRC2006-00397 — NORWALK AVENUE BAPTIST CHURCH
June 9, 2010
Page 2
a. The proposed use is in accord with the General Plan, the objectives of the
Development Code, and the purposes of the district in which the site is located.
b. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety or welfare, or materially injurious to properties or
improvements in the vicinity.
C. The proposed use complies with each of the applicable provisions of the
Development Code.
4. The Planning Department staff has determined that the project is categorically exempt
from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA
Guidelines. The project qualifies as a Class 32 exemption under State CEQA Guidelines
Section 15332, Infill Development Projects, because the project is consistent with the General Plan;
is within the City limits, is on a project site of less than five acres, is surrounded by urban uses, the
site has no value as habitat for endangered, rare, or threatened species, the projectwould not result
in any significant effects relating to traffic, noise, air quality, or water quality, the site can be
adequately served by all required utilities and public services, and there is no substantial evidence
that the project may have a significant effect on the environment. The Planning Commission has
reviewed the Planning Department's determination of exemption, and based on its own independent
judgment, concurs in the staff's determination of exemption.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) Approval is hereby granted to operate a 7,442 square foot church on
1.04-acres of land in the Medium Residential District (8-14 dwelling
units per acre)of the Etiwanda Specific Plan, located on the west side
of East Avenue, south of the 1-15 Freeway at 7384 East Avenue -
APN: 1100-051-03.
2) There shall be no concurrent services or bible studies in the classroom
space during the use of the sanctuary for church services that would
cause the on-site parking to be insufficient and generating off-site
parking impacts and thereby cause a nuisance to the neighborhood.
3) All site improvements, including, but not limited to, landscaping,
parking, lighting, etc., shall be installed prior to the occupancy of
Phase 1.
4) Prior to the submission of building permits, the applicant shall make a
good faith effort to coordinate the design of the proposed southerly
property line wall with the Cucamonga Valley Water District.
5) Prior to the submission of building permits, the applicant shall revise
the plans to include an impervious driveway paving material such as,
but not limited to, concrete, asphalt, etc.
PLANNING COMMISSION RESOLUTION NO. 10-21
DRC2006-00397 — NORWALK AVENUE BAPTIST CHURCH
June 9, 2010
Page 3
6) Proposed trash enclosure shall be built per City Standard.
7) Any proposed river rock or fieldstone shall be natural stone.
Manufactured fieldstone or river rock is not permitted.
8) Freestanding parking lot lighting shall not exceed a maximum height of
15 feet as measured from finished grade to the highest point of the
light fixture.
9) If the operation of the facility causes adverse effects upon adjacent
residences or operations, the Conditional Use Permit shall be brought
before the Planning Commission for consideration and possible
revocation of the Conditional Use Permit.
10) Any intensification of the use beyond what is specifically approved by
this Conditional Use Permit shall require review and approval by the
Planning Director.
11) All signs require the submittal of a Sign Permit application for review
and approval by the Planning Director prior to installation. All signs
shall comply with the signage standards for residential zones as set
forth in Section 14.20.110, Permitted Signs— Residential Zones.
12) Approval of this request shall not waive compliance with any sections
of the Development Code, State Fire Marshal's regulations, Uniform
Building Code, or any other City Ordinances.
13) Any revision to the approved plans shall require review and approval by
the Planning Director.
Engineering Department
1) Provide a Final Drainage Study to determine how Q100 flows will split
between East Avenue and the trapezoidal channel along the project
frontage. You may use the same flow rates as the City's consultant for
the East Avenue Master Plan Storm Drain.
a) Calculate existing flows in the 60-inch RCP, 48-inch RCP and
surface flows in East Avenue north of the project driveway.
b) Indicate the water surface elevation and depth of flow on full
width street sections, extended to include the channel, both north
and south of the project driveway.
c) Driveway high point shall be above the Q100 water surface for
East Avenue.
d) Design driveway culvert(s) for current capacity of the existing
trapezoidal channel.
PLANNING COMMISSION RESOLUTION NO. 10-21
DRC2006-00397 — NORWALK AVENUE BAPTIST CHURCH
June 9, 2010
Page 4
e) If building permits are issued after the East Avenue Master Plan
Storm Drain is functionally complete, this condition can be
waived by the City Engineer.
2) Design East Avenue frontage improvements in accordance with
"Secondary Arterial" standards and Figure 5-28 of the Etiwanda
Specific Plan, including, but not limited to, curb and gutter, sidewalk,
street trees, streetlights, and asphalt pavement.
a) Project driveway to be aligned with the "flag"driveway of the self
storage business on APN: 1100-771-10, across the street. The
drive approach shall conform to Standard Drawing 101, Type C,
and be at least 35 feet wide, measured at the back of sidewalk.
b) Ultimate curb face will be 32 feet from the street centerline and
back of sidewalk will be at 44 feet. The parkway shall slope at
2 percent from the top of curb to one foot beyond the sidewalk.
c) If building permits are issued before the East Avenue Master
Plan Storm Drain is functionally complete, install only the project
drive approach and an interim driveway with culvert(s) to
accommodate the existing open channel. The driveway culverts
shall outlet below the proposed pedestrian access and join the
existing surface drainage facility to the satisfaction of the City
Engineer.
d) Pay a contribution in lieu of construction for future street
improvements, including any reconstruction of the project
driveway.
e) Provide a low rock theme wall along the property line, consistent
with Figure 5-28A of the Etiwanda Specific Plan, to screen the
parking lot and offer additional protection in the event of street
flooding. The wall is private, but can be shown and labeled as
such on the street improvement plans.
f) Provide all traffic striping and signage, as required, including a
northbound left turn lane in East Avenue for the project driveway.
Begin said turn lane from the south project boundary and align
with the existing southbound left turn lane for the existing
driveway on the east side of East Avenue.
3) The City is currently designing the East Avenue Master Plan Storm
Drain; however, there is no guarantee as to when actual construction
will occur. Installation of that storm drain will include laterals for both
the 60-inch and 48-inch RCP. If the site is developed before the storm
drain is installed, the site will need to be protected from Q100 surface
flows on East Avenue, without increasing impacts to downstream
properties.
PLANNING COMMISSION RESOLUTION NO. 10-21
DRC2006-00397— NORWALK AVENUE BAPTIST CHURCH
June 9, 2010
Page 5
4) Provide a copy of the Sanitary Sewer Plans for the Engineering
Department to review for consistency with the Storm Drain Plans.
These Conditions of Approval shall be reprinted on the Sewer Plans
prior to submitting for Building and Safety review.
5) Prior to issuance of a grading permit, correct the following on the
Grading Plan:
a) Ultimate back of sidewalk elevations shall reflect an 8-inch curb
on East Avenue and a 2 percent parkway grade.
b) Driveway slope shall conform to Fire District standards
(12 percent maximum)with a 14 percent maximum grade break.
If back of the drive approach is the high point, the first 6 feet of
the driveway should slope away from the right-of-way at no more
than 6 percent.
c) Construction notes within the public right-of-way shall read:
"Construct... per public improvement plans." Remove all
references to specific Standard Drawing numbers (these will be
on the plans approved by the City Engineer).
d) Frontage improvements other than the drive approach and
pedestrian access should be labeled "future" since the
trapezoidal channel cannot be removed until the East Avenue
Master Plan Storm Drain is constructed.
e) Show the existing inlet to the low flow drainage facility (12-inch
PVC) installed by the City across this property frontage that
extends south along the CVWD frontage.
Building and Safety Department
1) Prior to the issuance of a grading permit, the applicant shall obtain a
drainage easement or letter from the downstream property owners
accepting concentrated drainage flows.
2) Prior to the issuance of a grading permit, the City of Rancho
Cucamonga's "Memorandum of Agreement of Storm Water Quality
Management Plan" shall be submitted for review and approval by the
Building Official and recorded with the County Recorder's Office.
3) Prior to issuance of a building permit, the applicant shall obtain a
Waste Discharge Identification Number(WDIN).
4) A grading bond will be required to be submitted to the Building and
Safety Official for review and approval prior to issuance of a grading
permit.
PLANNING COMMISSION RESOLUTION NO. 10-21
DRC2006-00397 — NORWALK AVENUE BAPTIST CHURCH
June 9, 2010
Page 6
5) All roof drainage flowing to the public right-of-way(East Avenue)must
drain under the sidewalk through a parkway culvert approved by the
Engineering Department.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 9TH DAY OF JUNE 2010.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Richard B. Fletcher, Chairman
ATTEST: Y--
JA�
J fes R. Troyer, AICP, Secr,tary
I, James R. Troyer, AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 9th day of June 2010, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, OAXACA, WIMBERLY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MUNOZ
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2006-00397
SUBJECT: CONDITIONAL USE PERMIT
APPLICANT: JOHN KIM FOR NORWALK AVENUE BAPTIST CHURCH
LOCATION: 7384 EAST AVENUE —APN: 1100-051-03
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers, or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may, at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 10-21, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The
project planner will confirm which fees apply to this project. All checks are to be made payable to
the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to
the Planning Commission or Planning Director hearing:
a) Notice of Exemption - $50 X
B. Time Limits
1. Conditional Use Permit approval shall expire if building permits are not issued or approved use
has not commenced within 5 years from the date of approval. No extensions are allowed.
SC-12-08 1
l:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans, architectural elevations,exterior materials and colors, landscaping,sign program,and
grading on file in the Planning Department,the conditions contained herein, Development Code
regulations, and the Etiwanda Specific Plan.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved
by the Planning Director and Police Department (477-2800) prior to the issuance of building
permits. Such plan shall indicate style, illumination, location, height, and method of shielding so
as not to adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design, locations, and
the number of trash receptacles shall be subject to Planning Director review and approval prior to
the issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For
single-family residential developments, transformers shall be placed in underground vaults.
10. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners'association, or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and Engineering Services Department
review and approved prior to the issuance of building permits.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections shall be screened from all sides and the sound shall be buffered from adjacent
properties and streets as required by the Planning Department. Such screening shall be
architecturally integrated with the building design and constructed to the satisfaction of the
Planning Director. Any roof-mounted mechanical equipment and/or ductwork, that projects
vertically more than 18 inches above the roof or roof parapet, shall be screened by an
architecturally designed enclosure which exhibits a permanent nature with the building design
and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or
2
I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be
painted consistent with the color scheme of the building. Details shall be included in building
plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more
parking stalls. Designate two percent or one stall; whichever is greater, of the total number of
stalls for use by the handicapped.
F. Landscaping
1. A detailed landscape and irrigation plan, including slope planting, shall be prepared by a licensed
landscape architect and submitted for Planning Director review and approval prior to the issuance
of building permits or prior final map approval in the case of a custom lot subdivision.
2. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
3. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1
slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
4. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area, and appropriate ground cover. In addition, slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
5. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to Planning Director review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Services Department.
3
I:\PLANNING\FINAL\PLNGCOMM\2010 Res & SH Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
6. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
7. All walls shall be provided with decorative treatment. If located in public maintenance areas, the _/_/_
design shall be coordinated with the Engineering Services Department.
8. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the
freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash
deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans and
City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and approved
by the Planning Director and Engineering Services Department. Landscape and irrigation shall
be installed prior to the release of occupancy of the project. If final approvals and/or installation
are not complete at that time, the City will accept a cash deposit for future landscaping of the
Caltrans right-of-way.
G. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. _/_/_
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
H. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (i.e., DRC2006-00397) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
4
I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
6. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can
contact the Building and Safety Department staff for information and submittal requirements.
I. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i,e., DRC2006-00397). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tracUparcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
J. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Roofing material shall be installed per the manufacturer's "high wind" instructions.
4. Plans for food preparation areas shall be approved by County of San Bernardino Environmental
Health Services prior to issuance of building permits.
5. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
6. Provide draft stops in attics in line with common walls.
7. Roofing materials shall be Class "A."
8. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
9. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
10. If the area of habitable space above the first floor exceeds 3,000 square feet, then the
construction type shall be V-1 Hour minimum.
11. Provide smoke and heat venting in accordance with CBC Section 906.
5
I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
12. Upon tenant improvement plan check submittal, additional requirements may be needed.
K. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading plan, appropriate certifications and compaction reports shall be completed, _/_/_
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California
registered Civil Engineer.
6. If human remains are discovered on-site before or during grading, no further disturbance shall
occur until the County Coroner has made a determination of origin and disposition pursuant to
Public Resources Code Section 5097.98 and California Health and Safety Code Section 7050.5.
APPLICANT SHALL CONTACT THE ENGINEERING SERVICES DEPARTMENT,(909)477-2740,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
L. Street Improvements
1. All public improvements(interior streets,drainage facilities,community trails,paseos, landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to, curb and gutter,AC pavement,
drive approaches, sidewalks, street lights, and street trees.
2. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source
of energy,fuel or power to any building or structure which is regulated by technical codes and for
which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building, structure or unit, the development may have energy connections made in equal
proportion to the percentage of completion of all improvements required by these conditions of
development approval, as determined by the City Engineer, provided that reasonable, safe and
maintainable access to the property exists. In no case shall more than 95 percent of the
buildings,structures or units be connected to energy sources prior to completion and acceptance
of all improvements required by these conditions of development approval.
3. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side. Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
East Avenue J J J J J J
6
I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
4. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements, prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the Engineering Services Department in
addition to any other permits required.
C. Pavement striping, marking, traffic signing, street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first plan
check.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
6. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The Engineering Services Department reserves the right to adjust tree species based upon field
conditions and other variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Qty.
East Avenue Magnolia NCN 6 35 15 gal
"Foreground" grandiflora 'D.D.
Blanchard'
East Avenue Geijera parviflora Australian Willow 5 20 15 gal
"Background"
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Services
Department.
4) Street trees are to be planted per public improvement plans only.
7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
8. A permit shall be obtained from Caltrans for any work within the following right of-way: _/_/_
East Avenue,
M. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the Engineering Services Department prior to final map approval or
issuance of building permits whichever occurs first. Formation costs shall be borne by the
developer.
N. Drainage and Flood Control
1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
2. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured
from the outer edge of a mature tree trunk.
O. Utilities
1. The developer shall be responsible for the relocation of existing utilities as necessary.
8
I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
2. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
P. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Services Department when the first building permit application is submitted to
Building and Safety. Form CD-2 shall be submitted to the Engineering Services Department
within 60 days following the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
Q. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
R. Security Hardware
1. All roof openings giving access to the building shall be secured with either iron bars, metal gates,
or alarmed.
S. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
T. Alarm Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in
turn save dollars and lives.
2. Alarm companies shall be provided with the 24-hour Sheriffs dispatch number: (909)941-1488.
9
I:\PLANNING\FINAL\PLNGC0MM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Project No.DRC2006-00397
Completion Date
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
10
I:\PLANNING\FINAL\PLNGC0MM\2010 Res & Stf Rpt\DRC2006-00397StdCond 6-9 .doc
Rancho Cucamonga Fire Protection District
Fire Construction Services
STANDARD CONDITIONS
June 10, 2009
Norwalk Blvd. Baptist Church
7384 East Ave.
New Church Building
DRC2006-00397D
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT
The RCFPD Procedures & Standards which are referenced in this document can be access on the
web at htto://www,ci.rancho-cucamonga.ca.us/fire/index,htm, under the Fire Safety Division & Fire
Construction Services section. Search by article; the preceding number of the standard refers to the
article. Chose the appropriate article number then a drop down menu will appear, select the
corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and
location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet.
No portion of the exterior wall shall be located more than 150-feet from an approved fire
hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the Fire District.
5. A minimum of forty-feet (40') from any building.
c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant
measured on an approved route around the exterior of the facility or building, additional
private or public fire hydrants and mains capable of supplying the required fire flow shall be
provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is
1500-gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow
reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system
in accordance with NFPA 13 with central station monitoring. This requirement is made in
accordance with the California Fire Code Appendix, as adopted by the Fire District Ordinances.
3. Public fire hydrants located within a 500-foot radius of the proposed project may be used to
provide the required fire flow subject to Fire District review and approval. Private fire hydrants on
adjacent property shall not be used to provide required fire flow.
4. Fire protection water plans are required for all projects that must extend the existing water supply
to or onto the site. Building permits will not be issued until fire protection water plans are
approved.
5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the
proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall
submit plans, specifications and calculations for the fire sprinkler system underground supply
piping. Approval of the underground supply piping system must be obtained prior to submitting
the overhead fire sprinkler system plans.
FSC-4 Requirements for Automatic Fire Sprinkler Systems
Automatic fire sprinklers shall be installed in buildings as required by the2007 California Fire Code
and the Rancho Cucamonga Fire Protection District Ordinance FD46 and/or any other applicable
standards require an approved automatic fire sprinkler system to be installed.
FSC-5 Fire Alarm System & Sprinkler Monitoring
t. The 2007 California Building Code, the RCFPD Fire Alarm Standard, Ordinance FD46 and/or the
2007 California Fire Code require most fire sprinkler systems to be monitoring by Central Station
sprinkler monitoring system. A manual and or automatic fire alarm system fire may also be
required based on the use and occupancy of the building. Plan check approval and a building
permit are required prior to the installation of a fire alarm or a sprinkler monitoring system. Plans
and specifications shall be submitted to Fire Construction Services in accordance with RCFPD
Fire Alarm Standard.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads,
streets, drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department
Access Roadways Standard.
1. Location of Access: All portions of the structures first-story exterior wall shall be located within
150-feet of Fire District vehicle access, measure on an approved route around the exterior of the
building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed
obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 24-feet.
c. The minimum outside turn radius shall be 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
E At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-
feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire
Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with the 2001
California Building Code, Fire and/or any other applicable standards.
2
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or
major fraction thereof, of the exterior wall that faces the required access roadways. When
railways are installed provisions shall be made to maintain Fire District access to all required
openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus
access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall
be in accordance with Fire District Standard. The following design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire
Construction Services (FCS) for approval. Upon the completion of the installation and before
placing the gates in service, inspection and final acceptance must be requested from FCS.,
b. Gates must slide open horizontally or swing inward.
c. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock. The lock must be purchased at the Fire
Administration Office.
f. .Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual overridedevice
and a fail-safe or battery backup feature to open the gate or release the locking Mechanism
in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must be
installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation
must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors
may be required due to complexity of the various entry configurations.
7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan
illustrating the proposed delineation that meets the minimum Fire District standards shall be
included in the architectural plans submitted to B&S for approval.
8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted
on the site plan. A copy of the approved Alternative Method application, if applicable, must be
reproduced on the architectural plans submitted to B&S for plan review.
6. Roof Access: There shall be a means of fire department access from the exterior walls of the
buildings on to the roofs of all commercial, industrial and multi-family residential structures with
roofs less than 75' above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an aerial
ladder.
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with
construction features, or high parapets that inhibit roof access.
c. The number of ladder points may be required to be increased, depending on the building size
and configuration.
d. Regardless of the parapet height or construction features the approved ladder point shall be
identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions, a
permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix
A.
h. A site plan showing the locations of the roof ladder shall be submitted during plan check.
i. Ladder points shall face a fire access roadway(s).
3
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit;
field inspection is required prior to permit issuance. General Use Permit shall be required for any
activity or operation not specifically described below, which in the judgment of the Fire Chief is likely
to produce conditions that may be hazardous to life or property.
• Candles and open flames in public assemblies
• Public Assembly
Tents, Canopies and/or Air Supported Structures
LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2007
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD46and other
implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method,
when submitted. The request must be submitted on the Fire District "Application for Alternate
Method" form along with supporting documents and payment of the $92 review fee.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities
District #85-1 or#88-1 is required prior to the issuance of grading or building permits.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the
issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review and
approval by the Fire District. Plans and installation shall comply with Fire District Standards.
Approval of the on-site (private) fire underground and water plans is required prior to any building
permit issuance for any structure on the site. Private on-site combination domestic and fire
supply system must be designed in accordance with RCFPD Standards. The Building & Safety
Department and Fire Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. Fire construction Services will inspect the installation,
witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and
CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project.
Please reference the RCFPD Water Plan Submittal Procedure Standard.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. CCWD personnel shall inspect the installation and
witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of
the public water system by CCWD. Fire Construction Services must grant a clearance before
lumber is dropped.
4
3. Construction Access: The access roads must be paved in accordance with all the requirements
of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at
least 14' 6" above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible
for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction
Services.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' 'Temporary Power Release Checklist and Procedures."
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the
fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga
Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property,
the markers shall be installed at the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-
site fire hydrants. The underground fire line contractor, developer and/or owner are responsible
for hiring the company to perform the test. A final test report shall be submitted to Fire
Construction Services verifying the fire flow available. The fire flow available must meet or
exceed the required fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler
monitoring system shall be installed, tested and operational immediately following the completion
of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems: and/or other special hazard protection systems shall be inspected,
tested and accepted by Fire Construction Services before occupancy is granted and/or
equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system
shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must
be inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction
Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access
roadways must be installed in accordance with the approved plans and acceptable to Fire
Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and
contain an approved fire access roadway map with provisions that prohibit parking, specify the
method of enforcement and identifies who is responsible for the required annual inspections and
the maintenance of all required fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-
family buildings shall post the address in accordance to the appropriate RCFPD addressing
Standard.
10. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire
Construction Services.
11. Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides
5
contact information for Fire District use in the event of an emergency at the subject building or
property. This form must be presented to the Fire Construction Services Inspector.
12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 8 '/z' by 11" or 11" by
17" Site Plan of the site in accordance with RCFPD Standard shall be revised by the applicant to
reflect the actual location of all devices and building features as required in the standard. The
site plan must be reviewed and accepted by the Fire Inspector.
6