HomeMy WebLinkAbout10-31 - Resolutions RESOLUTION NO. 10-31 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2009-00882, A REQUEST TO CONSTRUCT A 27,879 SQUARE FOOT PUBLIC WORKS ADMINISTRATION BUILDING AND A 2,736 SQUARE FOOT HOUSEHOLD HAZARDOUS WASTE FACILITY ON A 6.65-ACRE LOT LOCATED IN THE GENERAL INDUSTRIAL DISTRICT (SUBAREA 2); AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0209-013-23. A. Recitals. 1. The applicant, Pitassi Architects, Inc., on behalf of the City of Rancho Cucamonga, filed an application for Development Review DRC2009-00882, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 28th day of July 2010, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on July 28, 2010, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to the property located at the northwest corner of Hellman Avenue and 8th Street with a street frontage on Hellman Avenue of 584 feet and a depth of 1,295 feet; and b. The properties on all sides of the subject site are industrial buildings, and there is a rail line and rail spur along the south and west property lines; and C. The project consists of the development of a 27,897 square foot Public Works Administration building and a 2,736 square foot Household Hazardous Waste Facility with a 400 square foot shed on approximately 6.65 acres of land; and d. The project consists of increasing the size of the existing City Yard which is an allowed use within the General Industrial District (Subarea 2) where this site is located; and e. The architectural design of the facility is consistent with the General Plan, and meets the objectives of the General Plan by using Green Building Practices such as solar panels and pervious surfaces in the parking areas to make City facilities more energy efficient and environmentally sustainable. PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 2 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed use is in accord with the General Plan, the objectives of the Development Code, and the purposes of the district in which the site is located. The proposed development meets the quality that is required for public facilities and the low maintenance features that are in accord with General Plan objectives. The Development Review is required to ensure that the objectives of the Development Code and General Plan are met. b. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The Household Hazardous Waste Facility will allow citizens to dispose of these wastes in a safe controlled manner. The facility will be continually inspected and operate under all State, County and local laws that govern this type of facility. C. The proposed use complies with each of the applicable provisions of the Development Code by complying with all setback, land use, and parking requirements. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. Pursuant to the California Environmental Quality Act ("CEQX) and the City's local CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that,with the imposition of mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i) that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning,Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. c. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 3 d. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program, and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the construction of a 27,897 square foot Public Works Administration building and a 2,736 square foot Household Hazardous Waste Facility, with a 400 square foot shed on approximately 6.65 acres of land, located at the northwest corner of Hellman Avenue and 8th Street. APN: 0209-013-23. 2) No exterior changes to the design of the project, including exterior materials, shall be permitted without prior City review and approval. Engineering Department 1) Hellman Avenue frontage improvements to be in accordance with City "Secondary Arterial" street standards as required and including curb and gutter, sidewalk, asphalt pavement and street trees. a) The proposed driveway approach shall be a minimum width of 35 feet and maximum of 50 feet and to be in accordance with the City "Driveway Policy." b) Provide 9500 Lumens HPSV street lights in accordance with the City street lighting standards. c) Protect the existing R26(s) signs, or replace as required. d) The sidewalk shall cross the drive approach at the zero curb face. Provide additional public right-of-way as needed. e) Hellman Avenue improvements shall be designed prior to the issuance of building permits, but installation will be deferred until completion of the Master Plan Storm Drain as a separate City project. 2) Lion Street frontage improvements to be in accordance with the City "Industrial Local" standards as required and including curb and gutter, sidewalk, asphalt, pavement and street trees. a) Construct offset cul-de-sac per City Stdandard 112. PLANNING COMMISSION RESOLUTION NO, 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 4 b) The proposed driveway approach shall be a minimum width of 35 feet and maximum of 50 feet per City Standard 101, Type C and to be in accordance with the City "Driveway Policy." c) Provide 5800 Lumens HPSV street lights in accordance with the City street lighting standards. d) Provide R26(s) signs along Lion Street, as required. e) Reconstruct the existing catch basins, to the satisfaction of the City Engineer. f) Repair the damaged sidewalk on the east side of Lion Street, south of the existing drive approach (damaged by tree roots). 3) Rights-of-way for Lion Street, on APN: 0209-013-23 and -49, shall be recorded prior the issuance of construction permits for public improvements or building permits, whichever occurs first. 4) An in-lieu fee as contribution to the future undergrounding of the existing overhead utilities (telecommunications and electrical, except for the 66 KV electrical) on the opposite side of Hellman Avenue shall be paid to the City prior to issuance of building permits. The fee shall be one-half the City adopted unit amount times the length of project frontage on Hellman Avenue to the intersection of Hellman Avenue and 8th Street. 5) An in-lieu fee as contribution to the future undergrounding of the existing overhead utilities on the project side of 8th Street (telecommunications) shall be paid to the City prior to issuance of building permits. The fee shall be one-half the City adopted unit amount times the length of project frontage on 8th Street to the intersection of Hellman Avenue and 8th Street. 6) Upon construction of the Master Plan Storm Drain in Hellman Avenue, the City will be responsible for removing the current Flood Insurance Rate Map (FIRM) Zone A designation from the project area. a) A Letter of Map Revision (LOMR) shall be issued by Federal Emergency Management Agency (FEMA) prior to occupancy of the Household Hazardous Waste Facility, or Hellman Avenue improvement acceptance, whichever occurs first. b) If the existing Zone A along the west property line,which includes existing buildings south of 9th Street, is no longer appropriate because of the surrounding development, include this area in the LOMR submittal. PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 5 c) Driveway to Hellman Avenue shall be installed, consistent with the approved drive approach per Condition No. 1, with the understanding the City will repair any flood damage incurred prior to construction of the Master Plan Storm Drain. 7) All improvements within the public right-of-way, including street trees, shall be installed per the approved public improvement plans. If there is a discrepancy between the public and private plans, the public improvement plans will govern. 8) Revise Drawing 1378-D or provide a new drawing to show the extension of the existing local storm drain under proposed parking lot. Provide calculations as needed to demonstrate facilities that have been sized for the additional development. a) Since Lion Street is being converted to a sump condition, two Q100 catch basins and laterals, or an overflow route through the project site, shall be provided. b) It is our understanding that the lateral pipe to Hellman Avenue, shown on the Conceptual Grading Plan, will only be installed when the Master Plan Storm Drain is already built. Grading 1) The applicant shall provide a copy of EPA Form 7520-16 (Inventory of Injection Wells) with the Facility ID Number assigned to the Building and Safety Official prior to issuance of the grading permit. 2) An HCOC exists for the downstream receiving water. The downstream receiving water (Mill Creek, Prado Area) is experiencing significant degradation of its banks. The project must implement a volume-based treatment control Best Management Practices (BMP) (retention/detention facility) on each lot. The Storm Water Quality Management Plan and the grading plan must contain an appropriate volume based BMP prior to the issuance of a grading permit. 3) Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard-lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. 4) If more than 5,000 square feet of combined asphalt concrete and PCC parking and driveway surface area are removed, a Water Quality Management Plan (WQMP)will be required for this project. Contact the Building and Safety Department for additional direction/information. 5) Prior to removing fences or walls along common lot lines and prior to constructing walls along common lot lines, the applicant shall provide a letter from the adjacent property owner(s) allowing work on the adjacent property. PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 6 6) Prior to the issuance of a grading permit for each phase 1. The Administrative Center; and 2. Household Hazardous Waste Facility;the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 7) Prior to issuance of a grading permit, the applicant shall obtain a Waste Discharge Identification Number (WDID) for each of the 2 phases/projects. 8) All roof drainage flowing to the public right-of-way (Hellman Avenue and Lion Street) must drain under the sidewalk through a parkway culvert approved by the Engineering Department. 9) The final grading and drainage plan shall show the grading construction phasing for the project. A site demolition plan shall be submitted as part of the precise grading and drainage plan set of drawings and shall be a separate sheet from the grading plan. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits,the developer shall submit Construction Plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 7 • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occur as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds (i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter (PM10) emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., less than 5 minutes). 11) All industrial and commercial facilities shall designate preferential parking for vanpools. PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 8 12) All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. 13) All industrial and commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. 14) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 15) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities,to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions.of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 9 paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit a summary report to the City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hazards and Waste Materials 1) Household Hazardous Waste Facility shall be inspected annually by CUPA (Certified Unified Program Agencies) for compliance with all regulations concerning the storage and operation of the facility. 2) City/County shall obtain a permit from CUPA(Certified Unified Program Agencies) prior to the opening of the Household Hazardous Waste Facility. PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 10 Hydrology and Water Quality 1) Prior to issuance of grading permits, the permit applicant shall submit to Building Official for approval a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in the Grading Plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time of ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified.time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) The developer shall implement the BMPs identified in the Water Quality Management Plan prepared by Dan Guerra&Associates dated January 19, 2010 to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 6) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 7) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 11 8) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number)shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading on weekdays shall not take place between the hours of 8:00 p.m. and 6:30 a.m., including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards,then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) The perimeter block wall shall be constructed as early as possible in first phase. 4) Haul truck deliveries on weekdays shall not take place between the hours of 8:00 p.m. and 6:30 a.m. including Saturday,or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a Noise Mitigation Plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 28TH DAY OF JULY 2010. PLAN7SION OF THE CITY OF RANCHO( CUCAMONGA . BY: { Luis Munoz, Jr., Chairrpa ATTEST: )z- J4*W,0L) Ja tt R. Troyer, AICP, Secreta PLANNING COMMISSION RESOLUTION NO. 10-31 DRC2009-00882 — PITASSI ARCHITECTS, INC. July 28, 2010 Page 12 I, James R. Troyer, AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 28th day of July 2010, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: DRC2009-00882 SUBJECT: DEVELOPMENT REVIEW APPLICANT: PITASSI ARCHITECTS LOCATION: 8825 HELLMAN AVENUE -APN: 0209-013-23 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 10-31, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Mitigated Negative Declaration - $ 2,060.25 X B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. SC-12-08 1 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping,sign program,and grading on file in the Planning Department, the conditions contained herein, and the Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. Trash receptacle(s)are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of building permits. 8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 9. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 10. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or _/_/_ projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be 2 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date painted consistent with the color scheme of the building. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 4. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 5. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be provided to encourage bicycle commuting per the City of Rancho Cucamonga Bicycle Transportation Plan adopted by City Council Resolution No. 02-237. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. G. Landscaping 1. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees -24-inch box or larger. 2. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 3. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 3 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date 4. The final design of the perimeter parkways,walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department. 5. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 6. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Services Department. 7. Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of building permits. These criteria shall encourage the natural growth characteristics of the selected tree species. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) H. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan, c. Floor Plan, d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number(i.e.,dre2009-00882)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. 4 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date I. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2009-00882). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition, the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). J. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. K. Grading 1. Grading of the subject property shall be in accordance with California Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the _/_/_ time of application for grading plan check. 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5 1:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING SERVICES DEPARTMENT,(909)477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: L. Street Improvements 1. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy,fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. 2. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Lion Street X X X X X X Hellman Avenue X X X X X X (b) 3. Improvement Plans and Construction: a. Street improvement plans, including street trees,streetlights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer 6 I:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date Notes: 1) Pull boxes shall be No.6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the Planning Director prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size Qty. Hellman Avenue Eucalyptus Silver Dollar Gum 5' 30' 5 Gal polyanthemos 0.C. Lion Street Brachychiton Bottle Tree 6' 35' 15 Gal populneus 0.C. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. 4) Street trees are to be planted per public improvement plans only. M. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 7 l:\PLANNING\FINAL\PLNGCOMM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date 2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 3. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. N. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVWD), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. O. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: P. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. Q. Security Hardware 1. All roof openings giving access to the building shall be secured with either iron bars, metal gates, or alarmed. R. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code. The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at 8 I:\PLANNING\FINAL\PLNGCCMM\2010 Res'& Stf Rpt\DRC2009-00882StdCond 7-28.doc Project No. DRC2009-00882 Completion Date (909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or extension 2475. S. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 9 I:\PLANNING\FINAL\PLNGC0MM\2010 Res & Stf Rpt\DRC2009-00882StdCond 7-28.doc �., Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS December 17, 2009 RC Public Works Service Center End of Lion St. South side of 9th. DRC2009-00882 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT The RCFPD Procedures & Standards which are referenced in this document can be access on the web at http://www.ci.rancho-cucamonga.ca.us/fire/index.httn under the Fire Safety Division & Fire Construction Services section. Search by article; the preceding number of the standard refers to the article. Chose the appropriate article number then a drop down menu will appear, select the corresponding standard. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. The preferred locations for fire hydrants are: 1. At the entrance(s) to a commercial, industrial or residential project from the public roadways. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs of the Fire District. 5. A minimum of forty-feet (40')from any building. c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow 1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 2375 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire Code Appendix, as adopted by the Fire District Ordinances. 3. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 4. Fire protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until public fire protection water plans are approved. 5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirements for Automatic Fire Sprinkler Systems Automatic fire sprinklers shall be installed in buildings as required by the2007 California Fire Code and the Rancho Cucamonga Fire Protection District Ordinance FD46 and/or any other applicable standards require an approved automatic fire sprinkler system to be installed. FSC-5 Fire Alarm System & Sprinkler Monitoring 1. The 2007 California Building Code, the RCFPD Fire Alarm Standard, Ordinance FD46 and/or the 2007 California Fire Code require most fire sprinkler systems to be monitoring by Central Station sprinkler monitoring system. A manual and or automatic fire alarm system fire may also be required based on the use and occupancy of the building. Plan check approval and a building permit are required prior to the installation of a fire alarm or a sprinkler monitoring system. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access Roadways Standard. 1. Location of Access: All portions of the structures 15` story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 24-feet. c. The minimum outside turn radius shall be 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).' j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14- feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in accordance with Fire District Standard. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. c. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. 3 e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office. f Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due to complexity of the various entry configurations. 7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. 6. Roof Access: There shall be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family residential structures with roofs less than 75' above the level of the fire access road. a. This access must be reachable by either fire department ground ladders or by an aerial ladder. b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction features, or high parapets that inhibit roof access. c. The number of ladder points may be required to be increased, depending on the building size and configuration. d. Regardless of the parapet height or construction features the approved ladder point shall be identified in accordance to the roof access standard. e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently mounted access ladder is required. f. Multiple access ladders may be required for larger buildings. 4 g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix A. h. A site plan showing the locations of the roof ladder shall be submitted during plan check. i. Ladder points shall face a fire access roadway(s). FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Aerosol Products Magnesium Working • Application of Flammable Finishes Motor Vehicle Fuel-Dispensing Operation • Automobile Wrecking Yards Open Burning • Battery Systems Organic Coating • Candles and open flames in public assemblies Ovens • Cellulose Nitrate Powder Coating • Compressed Gases Public Assembly • Cryogenics Pyrotechnical Special Effects • Dry Cleaning Plants Radioactive Materials • Dust-Producing Processes and Operations Refrigeration Systems • Explosive or Blasting Agents Repair Garages • Flammable and Combustible Liquids Rubbish Handling Operations • Fruit Ripening Plants Spraying or Dipping Operations • Hazardous Materials Tents, Canopies and/or Air Supported Structures • High-Pile Combustible Storage (HPS) Tire Storage • Liquefied Petroleum Gases Welding and Cutting Operations • LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards FSC-11 Hazardous Materials— Submittal to the County of San Bernardino The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA)for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be finalized until the San Bernardino County Fire Department reviews your Business 5 Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a Plan, is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of , buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2007California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD46 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard. 6 All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 7 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address in accordance to the appropriate RCFPD addressing Standard. 10. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire Construction Services. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 8 '/2' x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 8 City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: DRC2009-00882 This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration forthe above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management - The MMP will be in place through all phases of the project. The project planner, assigned by the Planning Director, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will betaken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Department 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program DRC2009-00882 — PITASSI ARCHITECTS, INC. Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the . responsibility of the City of Rancho Cucamonga Planning Department. The Department shall require the applicant to post any necessary funds (or other forms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the Citys MMP and shall be approved by the Community Development Director or Planning Director prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2009-00882 Applicant: Pitassi Architects, Inc Initial Study Prepared by: Steve Fowler Date: June 30, 2010 Mitigation . . of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date Anitials Non-Compliance Air Quality All construction equipment shall be maintained in good PD C Review of plans A/C 2/4 operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, the PD/BO C Review of plans C 2 developer shall submit Construction Plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. All paints and coatings shall meet or exceed PD C Review of plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: 1 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance • Reestablish ground cover on the construction site BO C Review of plans A/C 2/4 through seeding and watering. • Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4 • Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in BO C Review of plans A 4 accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established BO C During A 4 by the City if silt is carried over to adjacent public construction thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e., BO C During A 4 wind speeds exceeding 25 mph)in accordance with construction SCAQMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4 haul trucks or cover payloads using tarps or other Construction suitable means. The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and construction Regional Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter (PM,p) emissions, in accordance with SCAQMD Rule 403. Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM,a emissions. The construction contractor shall utilize electric or clean BO C Review of plans A/C 4 alternative fuel-powered equipment where feasible. 2 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance The construction contractor shall ensure that BO C Review of plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. All industrial and commercial facilities shall post signs BO C Review of plans A 4 requiring that trucks shall not be left idling for prolonged periods (i.e., less than 5 minutes). All industrial and commercial facilities shall designate PD C Review of plans A/C 2/3 preferential parking for vanpools. All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3 more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3 more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning,appliances, and water heaters. All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources If any prehistoric archaeological resources are encountered before or during grading,the developerwill retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: Enact interim measures to protect undesignated PD/BO C Review of report A/D 3/4 sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. 3of9 Mitigation Measures No. Responsible of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance Consider establishing provisions to require PD/BO C Review of report A/D 3/4 incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. Pursue educating the public about the PD/BO C Review of report A/D 3/4 archaeological heritage of the area. Propose mitigation measures and recommend PD/BO C Review of report A/D 3/4 conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. Prepare a technical resources management report, PD C Review of report A/D 3/4 documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. If any paleontological resource (i.e. plant or animal PD B Review of report A/D 4 fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: Assign a paleontological monitor, trained and PD B Review of report A/D 4 equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. 4of9 Mitigation Measures No. Responsible of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Should fossils be found within an area being cleared BO B/C Review of report A/D 4 or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for PD D Review of report D 3 documentation in the summaryreport and transfer to an appropriate depository (i.e., San Bernardino County Museum). Submit summary report to City of Rancho PD D Review of report D 3 Cucamonga. Transfer collected specimens with a copy to the report to San Bernardino County Museum. Geology and Soils The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and construction RWQCB)daily to reduce PMIO emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. Frontage public streets shall be swept according to a BO C During A 4 schedule established by the City to reduce PMIO construction emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. Grading operations shall be suspended when wind BO C During A 4 speeds exceed 25 mph to minimize PM10 emissions construction from the site during such episodes. Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PMio emissions. 5 of 9 Mitigation . . . g of Method . . . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Hazards and Waste Materials Household Hazardous Waste Facility shall be inspected CE D/E Upon A 4 annually by CUPA(Certified Unified Program Agencies) completion for compliance with all regulations concerning the storage and operation of the facility. City/County shall obtain a permit from CUPA(Certified CE D Prior to B 3 Unified Program Agencies) prior to the opening of the occupancy Household Hazardous Waste Facility. Hydrology and Water Quality Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4 shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4 the Grading Plan, and implemented for the proposed project that identifies specific measures to control on- site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in Southern California,and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4 sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 6of9 f Verified Sanctions for Mitigation . . of . . . VerificationImplementing Action for Monitoring Frequency Date/Initials Non-Compliance During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4 cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. The developer shall implement the BMPs identified in BO B/C/D Review of plans A/C 2/4 the Water Quality Management Plan prepared by Dan Guerra&Associates dated January 19, 2010 to reduce pollutants after construction entering the storm drain system to the maximum extent practical. Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4 controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. Prior to issuance of building permits, the applicant shall BO B/C/D Review of plans A/C 2/4 submit to the City Engineer for approval of a Water Quality Management Plan(WQMP), including a project description and identifying Best Management Practices (BMPs)that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 7of9 Mitigation . . .le Monitoring Timing . . . of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Prior to issuance of grading or paving permits, the BO B/C/D Review of plans A/C 2/4 applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the BO C During A 4 standards specified in Development Code Section construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. The perimeter block wall shall be constructed as early PD C During A A as possible in the first phase. construction 8of9 Mitigation Measures No. Responsible g of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Haul truck deliveries shall not take place between the PO/BO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Person Monitoring Frequency Method of Verification Sanctions CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map PD-Planning Director or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation is\planning\fi nal\cega\m m chklst-rev12-4-06fi nal.doc 9of9 City of Rancho Cucamonga MITIGATED NEGATIVE DECLARATION The following Mitigated Negative Declaration is being circulated for public review in accordance with the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code. Project File No.: DRC2009-00882 Public Review Period Closes: July 28, 2010 Project Name: Project Applicant: Curtis Dahle, Pitassi Architects Project Location (also see attached map): Located in Subarea 2 of the General Industrial District at 8825 Hellman Avenue -APN: 0209-013-23. Project Description: ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2009-00882-PITASSI ARCHITECTS, INC-A request to construct a 27,879 square foot Public Works Administration building and a 2,736 square foot Household Hazardous Waste Facility on.a 6.65-acre lot. FINDING This is to advise that the City of Rancho.Cucamonga,acting as the lead agency,has conducted an Initial Study to determine if the project may have a significant effect on the environment and is proposing this Mitigated Negative Declaration based upon the following finding: The Initial Study identified potentially significant effects but: (1) Revisions in the project plans or proposals made or agreed to by the applicant before this proposed Mitigated Negative Declaration was released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur, and (2) There is no substantial evidence before the agency that the project, as revised, may have a significant effect on the environment. If adopted,the Mitigated Negative Declaration means that an Environmental Impact Reportwill not be required. The factual and analytical basis for this finding is included in the attached Initial Study. The project file and all related documents are available for review at the City of Rancho Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909) 477-2847. NOTICE The public is invited to comment on the proposed Mitigated Negative Declaration during the review period. July 28, 2010 Date of Determination Adopted By