HomeMy WebLinkAbout12-27 - Resolutions RESOLUTION NO. 12-27
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA,CALIFORNIA,APPROVING TENTATIVE TRACT
MAP SUBTT18747 A REQUEST TO SUBDIVIDE A VACANT PARCEL OF
APPROXIMATELY 146,000 SQUARE FEET (3.4 ACRES) INTO FIVE (5)
LOTS IN THE VERY LOW (VL) RESIDENTIAL DISTRICT, WITHIN THE
ETIWANDA SPECIFIC PLAN, LOCATED AT THE EAST TERMINUS OF
ARAPAHO ROAD BETWEEN EAST AVENUE AND CHOCTAW PLACE;
AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0225-181-73.
A. Recitals.
1. K.U. & Associates filed an application for the issuance of Tentative Tract Map
SUBTT18747, as described in the title of this Resolution. Hereinafter in this Resolution,the subject
Tentative Tract Map request is referred to as "the application."
2. On the 13th day of June 2012, the Planning Commission of the City of
Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded
said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the
Planning Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting on June 13, 2012, including written and oral staff reports, together with
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to a vacant parcel of land located at the east terminus of
Arapaho Road between East Avenue and Choctaw Place; and
b. The project site is a vacant parcel with an area of approximately 146,000 square
feet (3.4 acres). The overall dimensions of the site are approximately 442 feet (east to west) by
approximately 331 feet(north to south); and
C. To the north, south, and west,and of the project site are single-family residences.
To the east are a single-family residence and a telephone company facility; and
d. The zoning of the property and all surrounding properties is Very Low (VL)
Residential District, Etiwanda Specific Plan; and
e. The proposal is to subdivide the property into five (5) lots for single-family
residential development; and
f. All lots will comply with the development standards applicable to this zoning district
as described in Figure 5-2 of the Etiwanda Specific Plan, except for lot depth. The lot depth of
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES
June 13, 2012
Page 2
Lots 1 and 5,which will be approximately 135 feet in depth and will not comply with the minimum lot
depth of 200 feet as required per the Etiwanda Specific Plan. The lot depths of Lots 2 through 4 will
be at least 200 feet. The width of each lot will meet the required 90-foot dimension. Individual lot
areas will range between 20,494 square feet to 30,051 square feet, which are in excess of the
minimum of 20,000 square feet that is required. The minimum average lot area is 25,835 square
feet, which is in excess of the minimum 25,000 that is required; and
g. This application is in conjunction with Development Review DRC2009-00010,
Variance DRC2011-00963, and Tree Removal Permit DRC2011-00964.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed development is in accord with the General Plan,the objectives of the
Development Code and the Etiwanda Specific Plan, and the purposes of the district in which the site
is located. The proposal is to subdivide a property with an area of approximately 146,000 square
feet(3.4 acres) into five (5) lots for single-family residential development. The underlying General
Plan designation is Very Low Residential.
b. The proposed development,together with the conditions applicable thereto,will not
be detrimental to the public health, safety or welfare, or materially injurious to properties or
improvements in the vicinity. The project site is vacant;the proposed land use is consistentwith the
land uses within the vicinity where it is located and the expectations of the community. The zoning
of the property and all surrounding properties is Very Low (VL) Residential District,
Etiwanda Specific Plan.
C. The proposed development complies with each of the applicable provisions of the
Development Code and the Etiwanda Specific Plan except for the proposed lot depth of Lots 1 and
5 that will be approximately 135 feet in depth and will not comply with the minimum lot depth of
200 feet as required per the Etiwanda Specific Plan. The applicant has submitted a Variance
request for consideration by the Planning Commission. The proposed development, otherwise,
meets all standards outlined in the Development Code and the Etiwanda Specific Plan and the
design and development standards and policies of the Planning Commission and the City.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration,together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act("CEQA")and the City's local
CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of
the project. Based on the findings contained in that Initial Study, City staff determined that,with the
imposition of mitigation measures, there would be no substantial evidence that the project would
have a significant effect on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter, the City staff provided public notice of the public comment
period and of the intent to adopt the Mitigated Negative Declaration.
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES
June 13, 2012
Page 3
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and, based on the whole record
before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA;
and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that
the project will have a significant effect on the environment. The Planning Commission further finds
that the Mitigated Negative Declaration reflects the independent judgment and analysis of the
Planning Commission. Based on these findings, the Planning Commission hereby adopts the
Mitigated Negative Declaration.
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission therefore
adopts the Mitigation Monitoring Program for the project.
d. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program and all other materials which constitute the record of proceedings
upon which the Planning Commission's decision is based is the Planning Director of the City of
Rancho Cucamonga. Those documents are available for public review in the Planning Department
of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga,
California 91730, telephone (909)477-2750.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planninq Department
1) Approval is for the subdivision of a parcel of approximately
146,000 square feet (3.4 acres) with overall dimensions of
approximately 442 feet(east to west)by approximately 331 feet(north
to south) located at the east terminus of Arapaho Road between
East Avenue and Choctaw Place -APN: 0225-181-73.
2) Development of all lots shall be in accordance with the standards and
requirements applicable to the Very Low (VL) Residential District as
described in Figure 5-2 of the Etiwanda Specific Plan.
3) Approval of this request shall not waive compliance with any sections
of the Development Code, Etiwanda Specific Plan,State Fire Marshal's
regulations, Uniform Building Code, or any other City Ordinances.
4) Prior to recordation of the Final Map, all lots shall be rough graded to
include building pads and interim improvements (for example,
drainage)as deemed necessary by the City.
5) Prior to construction, all future homes and associated improvements
shall require the review and approval by the City and the issuance of
applicable Building Permits by the Building and Safety Department.
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES
June 13, 2012
Page 4
6) All setback lines shall be shown on the Final Map.
7) Equestrian uses and improvements shall be in accordance with the
standards and requirements applicable to the properties within the
Equestrian Overlay as described in Development Code Section 17.08
and the Trail Implementation Master Plan.
8) Drainage concrete V ditches shall be no more than 6 inches deep and
a minimum of 5 feet wide with a medium broom finish.
9) A culvert shall be provided where water must be conveyed from one
side of the trail to the other side, i.e. at the concrete swale/trail
intersections located at the southwest and southeast corners of Lot 4.
10) The slope along the west side of the trail on the west side of Lot 4 shall
be landscaped with ground cover for erosion control; the use of
decomposed granite on the slope is not permitted.
11) Provide trail signage for the Community Trail at all trail intersections per
City standards.
12) All trail surfacing shall be of decomposed granite with 4-inch minimum
base. Remove rocks and debris and grade surface smooth. The
decomposed granite shall be the complete width of the trail up to the
property boundary.
13) Provide City Standard "Unauthorized Vehicles Prohibited" signs at
each street trail connection. The minimum dimension between the
wood posts for a step-through detail is 18 inches clear minimum
between posts and maximum 14 inches above grade.
14) A detailed plan indicating trail widths, maximum slopes, physical
conditions, fencing, and weed control in accordance with City Master
Trail drawings shall be submitted for City Trails Coordinator review and
approval prior to approval and recordation of the Final Tract Map and
prior to approval of street improvement and Grading Plans. The
developer shall upgrade and construct all trails, including fencing and
drainage devices in conjunction with street improvements.
15) All Conditions of Approval for Development Review DRC2009-00010,
Variance DRC2011-00963,and Tree Removal Permit DRC2011-00964
shall apply.
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES
June 13, 2012
Page 5
Building and Safety
1) Prior to issuance of a Grading Permit the applicant shall provide a letter
from the property owner to the east (Verizon) accepting the proposed
drainage structure on their property.
2) Prior to removing fences or walls along common lot lines, and prior to
constructing walls along common lot lines,the applicant shall provide a
letter from the adjacent property owner(s) allowing work on the
adjacent property.
3) Prior to the issuance of a grading permit a Water Quality Management
Plan shall be submitted for review and approval by the Building and
Safety Services Director or his designee.
4) Prior to the issuance of a Grading Permit,the applicant shall provide to
the Building and Safety Services Director a copy of the City of
Rancho Cucamonga's Memorandum of Agreement for Storm Water
Quality Management Plan for review prior to recordation of the
document. The Memorandum of Agreement for Storm Water Quality
Management Plan shall be recorded prior to issuance of a
Grading Permit.
5) Prior to the issuance of a Grading Permit, the applicant shall obtain a
drainage easement or letter from the downstream property owner
accepting the concentrated drainage flows in excess of the
pre-developed storm water drainage flows.
6) In the equestrian trails, water bars shall be spaced accordingly:
Equestrian Trail Slope Water Bar Interval Spacing
4% to 5.99% 50 feet
6% to 8.99% 40 feet
9% to 11.99% 30 feet
12% and greater 20 feet
7) Prior to issuance of a Grading Permit the applicant shall obtain a
Waste Discharge Identification Number (WDID).
8) A Grading Bond will be required to be submitted to the Building and
Safety Services Director or his designee for review and approval prior
to the issuance of a grading permit.
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747— K.U. & ASSOCIATES
June 13, 2012
Page 6
Engineering Department
1) Acknowledgement of Development Impact Fee Form must be signed
and notarized prior to Building Permit issuance (fees subject to
change/periodic increases).
2) Development Impact Fees are due prior to Occupancy Release
(subject to change/periodic increases).
a) Drainage impact fees were collected under PM 16969.
3) For pads below streets, the first 6 feet of the driveway should slope
away from the right-of-way(back of sidewalk)elevation at no more than
6 percent.
4) Drive approaches must comply with City Standard 101.
5) Final Map shall label proposed trail easement as "15-foot Private
Equestrian Trail Easement."
6) Provide written approval from the property owner to the east to
construct a 5-foot wide concrete swale on their property prior to
issuance of Grading Permit.
7) Remove the existing parkway drain along East Avenue and replace
with City Standard #107-B Medium Capacity Drain Outlet.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any Grading Permits, the developer shall
submit construction plans to the City denoting the proposed schedule
and projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD)as well as City Planning staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747 — K.U. & ASSOCIATES
June 13, 2012
Page 7
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with SCAQMD Rule 403
requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB])daily to reduce Fine Particulate Matter(PM1o)emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipmentwhen
not in use.
10) Landscape with native and/or drought-resistant species to reduce
water consumption and to provide passive solar benefits.
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES
June 13, 2012
Page 8
11) Provide lighter color roofing and road materials and tree planning
programs to comply with the AQMP Miscellaneous Sources MSC-01
measure.
12) All residential structures shall be required to incorporate high-
efficiency/low-polluting heating, air conditioning,appliances,and water
heaters.
13) All residential structures shall be required to incorporate thermal pane
windows and weather-stripping.
14) All new development in the City of Rancho Cucamonga shall comply
with South Coast Air Quality Management District's Rule 445, Wood
Burning Devices. Rule 445 was adopted in March 2008 to reduce
emissions of PM2.5and precludes the installation of indoor or outdoor
wood burning devices (i.e. fireplaces/hearths)in new development on
or after March 9, 2009.
Biological Resources
1) Prior to grading or other ground disturbance of the site, the applicant
shall conduct a final focused survey to determine the
presence/absence of this species following protocols established by
the United States Fish and Wild Life Services(USFWS). In the event
that CAGN is detected or observed within the area of disturbance,
avoidance, minimization, and/or mitigation measures shall be
developed and implemented.
2) The removed Blue Gum Eucalyptus tree shall be replaced with a
matching species (or equivalent)of a minimum 24-inch box size.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the archaeological heritage of
the area.
• Prepare a mitigation plan consistent with Section 21083.2
Archaeological resources of CEQA to eliminate adverse project
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES
June 13, 2012
Page 9
effects on significant, important, and unique prehistoric
resources, including but not limited to, avoiding archaeological
sites, capping or covering sites with soil, planning the site as a
park or green space or paying an in-kind mitigation fee.
• Prepare a technical resources management report,documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures(i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate,the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository(i.e., San Bernardino County Museum).
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES
June 13, 2012
Page 10
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Greenhouse Gases
1) The project must comply with all rules that assist in reducing short-term
air pollutant emission in compliance with SCAW MD Rule 403 regarding
fugitive dust including treating the site with water or other
soil-stabilizing agent twice daily or replanting disturbed areas as quickly
as possible.
2) The construction contactor shall select construction equipment based
on low-emission factors and high energy efficiency and submit a
statement on the grading plan that ensures all construction equipment
will be tuned and maintained in accordance with the manufactures
specification.
3) Trucks shall not idle continuously for more than 5 minutes.
4) Alternative fuel powered equipment shall be utilized in lieu of
gasoline- or diesel-powered engines where feasible.
5) Construction should be timed so as not to interfere with peak-hour
traffic.
6) Ridesharing and transit incentives shall be supported and encouraged
for construction crew.
7) Construction and Building materials shall be produced and/or
manufactured locally. Use "Green Building Materials' such as
materials that are resource efficient, recycled and manufactured in an
environmentally friendly way including low-volatile-organic-compound
(VOC) materials.
8) Design all buildings to exceed California Building Code Title 24 energy
standard including but not limited to any combination of:
• Increased insulation,
• Limit air leakage through the structure,
• Incorporate Energy Star or better rated windows, space heating
and cooling equipment, light fixtures, and appliances,
• Landscape and developed site utilizing shade, prevailing winds
and landscaping,
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES
June 13, 2012
Page 11
• Install efficient lighting and lighting control systems,
• Install light colored "cool" roofs and cool pavements,
• Install solar or light emitting diodes (LED's)for outdoor lighting.
9) Prepare a comprehensive water conservation strategy appropriate for
the project and include the following:
• Install water efficient landscapes and irrigation systems and
devices in compliance with the City of Rancho Cucamonga
Water Efficient Landscape Ordinance.
• Use reclaimed water for landscaping within the project if available
and/or install the infrastructure to deliver and use reclaimed
water.
• Design building to be water efficient by installing water efficient
fixtures and appliances including low flow faucets, dual flush
toilets, and waterless urinals/water heaters.
• Design irrigation to control runoff and to remove water to non-
vegetated surfaces.
10) Reuse and recycle construction and demolition waste. Provide interior
and exterior storage areas for recyclables and green waste in public
areas. Educate employees about reducing waste and about recycling.
Hazards and Waste Materials
1) The project shall comply with Chapter 7A of the California Building
Code(CBC),which includes building standards forthe Wildland-Urban
Interface Fire Area. The standards call for the use of ignition-resistant
materials and design to inhibit the intrusion of flame or burning embers
projected by a vegetation fire and help reduce losses resulting from
repeated cycles of interface fire disasters.
Hydrology and Water Quality
1) Prior to issuance of grading permits, the permit applicant shall submit
to the Building Official for approval a Storm Water Pollution Prevention
Plan (SWPPP) specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to the maximum
extent practical.
2) An Erosion Control Plan shall be prepared, included in the Grading
Plan, and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES
June 13, 2012
Page 12
Erosion Control Plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan (WQMP), prepared on August 24, 2011, by
W&W Technologies to reduce pollutants during construction entering
the storm drain system to the maximum extent practical.
6) The developer shall implement the BMPs identified in the Water
Quality Management Plan (WQMP), prepared by W&W Technologies
on August 24, 2011,to reduce pollutants after construction entering the
storm drain system to the maximum extent practical.
7) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
grading permits.
8) Prior to issuance of Building Permits, the applicant shall submit to the
Building Official for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying BMPs that will
be used on-site to reduce pollutants into the storm drain system to the
maximum extent practicable. The WQMP shall identify the structural
and non-structural measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of Rancho
Cucamonga in June 2004.
9) Prior to issuance of grading or paving permits, the applicant shall
obtain a Notice of Intent(NOI)to comply with obtaining coverage under
the National Pollutant Discharge Elimination System(NPDES)General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747 — K.U. & ASSOCIATES
June 13, 2012
Page 13
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
3) The perimeter block wall shall be constructed as early as possible in
the first phase.
4) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify the adoption of this Resolution.
APPROVED AND ADOPTED THIS 13TH DAY OF JUNE 2012.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Luis Munoz, Jr., Chairman
ATTEST:
Candy a Burnett, Senior Planner
I, Candyce Burnett, Senior Planner of the City of Rancho Cucamonga, do hereby certify that the
foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning
PLANNING COMMISSION RESOLUTION NO. 12-27
TENTATIVE TRACT MAP SUBTT18747— K.U. & ASSOCIATES
June 13, 2012
Page 14
Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission
held on the 13th day of June 2012, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, OAXACA, MONOZ, WIMBERLY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: HOWDYSHELL
ABSTAIN: COMMISSIONERS: NONE
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: SUBTT18747
SUBJECT: TENTATIVE TRACT MAP
APPLICANT: K.U. & ASSOCIATES
LOCATION: EASTTERMINUS OFARAPAHO ROAD BETWEEN EASTAVENUEAND CHOCTAW PLACE-
APN: 0225-181-73.
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Dace
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 12-27 Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s)are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The
project planner will confirm which fees apply to this project. All checks are to be made payable to
the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to
the Planning Commission or Planning Director hearing:
a) Mitigated Negative Declaration -$ 2,151.50 X
B. Time Limits
1. This tentative tract map shall expire, unless extended by the Planning Commission, unless a
complete final map is filed with the Engineering Services Department within 3 years from the date
of the approval.
1
Project No.SUBTT18747
Completion Date
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department,the conditions contained herein, Development Code
regulations, and the Etiwanda Specific Plan.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed plan indicating trail widths, maximum slopes, physical conditions, fencing, and weed
control, in accordance with City Master Trail drawings, shall be submitted for Planning Director
review and approval prior to approval and recordation of the Final Tract Map and prior to
approval of street improvement and grading plans. Developer shall upgrade and construct all
trails, including fencing and drainage devices, in conjunction with street improvements.
8. Local Feeder Trail entrances shall also provide access for service vehicles,such as veterinarians
or hay deliveries,including a 12-foot minimum drive approach. Entrance shall be gated provided
that equestrian access is maintained through step-throughs in accordance with Engineering
Department Standard Drawing 1006-B and 1007-B.
9. Local Feeder Trail grades shall not exceed 0.5%at the downstream end of a trail for a distance
of 25 feet behind the public right-of-way line to prohibit trail debris from reaching the street.
Drainage devices may be required by the Building Official
10. Provide a 24-foot by 24-foot or 12-foot by 48-foot corral area in the rear yard adjacent to the Local
Feeder Trail. Grade access from corral to trail with a maximum slope of 5:1 and a minimum
width of 10 feet.
11. For single-family residential development within the Equestrian/Rural Overlay District,at least one
model home shall be provided with a constructed 24-foot by 24-foot corral with appropriate
fencing.
12. Where corner side,interior side or rear yard property lines are adjacent to local equestrian trails,
construct minimum 6 foot high decorative masonry walls. Decorative masonry shall mean split-
face double sided block,'slump stone'or an alternative material that is acceptable to the Design
Review Committee.
2
Project No.SUBM 8747
Completion Date
13. The Covenants, Conditions, and Restrictions(CC&Rs)shall not prohibit the keeping the equine _/_/_
animals where zoning requirements for the keeping of said animals have been met. Individual lot
owners in subdivisions shall have the option of keeping said animals without the necessity of
appealing to boards of directors of homeowners'associations for amendments to the CC&Rs.
14. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and Engineering Services Department
review and approved prior to the issuance of building permits.
15. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall
condition would result, the developer shall make a good faith effort to work with the adjoining
property owners to provide a single wall. Developer shall notify, by mail, all contiguous property
owner at least 30 days prior to the removal of any existing walls/ fences along the project's
perimeter.
16. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than
wood fencing for permanence, durability, and design consistency.
17. Access gates to the rear yards shall be constructed from a material more durable than wood
gates. Acceptable materials include, but are not limited to, wrought iron and PVC.
18. For residential development, return walls and corner side walls shall be decorative masonry.
19. Where rock cobble is used,it shall be real river rock. Other stone veneers may be manufactured
products.
D. Building Design
1. For all residential development,provide conduit from each unit/lot and a pull box to connect to the
street. Provide interior structured wiring for each house/building with minimum Category 5
copper wire, Radio Grade 6 coaxial cable, and a central distribution panel, prior to release of
occupancy (fiber-to-the building, FTTB). Plans shall be submitted for Planning Director and
Building Official review and approval prior to issuance of building permits.
E. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for Planning Director review and approval prior to the issuance of building permits or
prior final map approval in the case of a custom lot subdivision.
2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1
slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
3
Project No.SUBTT18747
Completion Date
3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area, and appropriate ground cover. In addition, slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
4. For single-family residential development, all slope planting and irrigation shall be continuously
maintained in a healthy and thriving condition by the developer until each individual unit is sold
and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be
conducted by the Planning Department to determine that they are in satisfactory condition.
5. Front yard and corner side yard landscaping and irrigation shall be required per the Development
Code and/or the Etiwanda Specific Plan. This requirement shall be in addition to the required
street trees and slope planting.
6. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to Planning Director review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Services Department.
7. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
8. All walls shall be provided with decorative treatment. If located in public maintenance areas,the /_/_
design shall be coordinated with the Engineering Services Department.
9. Landscaping and irrigation shall be designed to conserve water through the principles of water
efficient landscaping as defined in Ordinance 823 of the Rancho Cucamonga Municipal Code
F. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the
amount of$557 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
G. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to Planning Director review and approval prior to the issuance
of building permits.
4
Project No.SUBTT18747
Completion Date
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
H. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans(2 sets, detached)including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number(i.e., SUBTT18747)clearly identified on the outside
of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can
contact the Building and Safety Department staff for information and submittal requirements.
I. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number (i.e., SUBTT18747). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition, the applicant
shall pay development fees at the established rate. Such fees may include,but are not limited to:
Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees
and School Fees. The applicant shall provide a copy of the School Fees receipt to the Building
and Safety Department prior to permit issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5
Project No.SUBTT18747
completion Date
J. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Roofing material shall be installed per the manufacturer's "high wind"instructions.
4. All structures are required to be equipped with automatic fire sprinklers
5. All structures must be constructed in accordance with Chapter 7A of the California Building Code.
K. Grading
1. Grading of the subject property shall be in accordance with current adopted California Building
Code, City Grading Standards, and accepted grading practices. The Grading and Drainage
Plan(s)shall be in substantial conformance with the approved conceptual Grading and Drainage
Plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work. Two copies will be provided at grading and drainage plan submittal for
review. Plans shall implement design recommendations per said report.
3. A geological report shall be prepared by a qualified engineer or engineering geologist and
submitted at the time of application for Grading and Drainage Plan review.
4. The final Grading and Drainage Plan,appropriate certifications and compaction reports shall be
completed, submitted, and approved by the Building and Safety Official prior to the issuance of
building permits.
5. A separate Grading and Plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet
signed by a California licensed Civil Engineer.
6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place _/_/_
a dust control sign on the project site prior to the issuance of a Grading Permit.
7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for
review,that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit.
8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be
prepared and submitted to the Building and Safety Official for review and approval for on-site
storm water drainage prior to issuance of a Grading Permit. All reports shall be wet signed and
sealed by the Engineer of Record.
9. It shall be the responsibility of the applicant to acquire any required off-site drainage easements
prior to the issuance of a Grading Permit.
10. It shall be the responsibility of the applicant to acquire any required off-site drainage acceptance
letter(s)from adjacent downstream property owner(s) or discharge flows in a natural condition
(concentrated flows are not accepted) and shall provide the Building and Safety Official a
drainage study showing the proposed flows do not exceed the existing flows prior to the issuance
of a Grading Permit.
11. It shall be the responsibility of the applicant to obtain written permission from the adjacent
property owners to construct walls on property lines or provide a detail(s)showing the perimeter
wall(s)to be constructed offset from the property line.
6
Project No.SUBTT18747
Completion Date
12. The Grading and Drainage Plan shall implement City Standards for on-site construction where
possible, and provide details for all work not covered by City Standard Drawings.
13. All slopes shall be a minimum 2-foot offset from the public right of way or adjacent private
property.
14. Private sewer, water, and storm drain improvements will be designed per the latest adopted
California Plumbing Code.
15. The maximum parking stall gradient is 5 percent. Accessibility parking stall grades shall be
constructed per the current adopted California Building Code.
16. The final Grading and Drainage Plan shall show existing topography a minimum of 100-feet
beyond the project boundary.
a) The applicant shall provide a grading agreement and grading bond
for all cut and fill combined exceeding 5,000 cubic yards prior to
issuance of a Grading Permit. The grading agreement and bond
shall be approved by the Building and Safety Official.
b) Provide documentation for CVWD sewer offset program to the
Building and Safety Official for review prior to issuance of a Grading
Permit.
17. This project shall comply with the accessibility requirements of the current adopted California
Building Code.
18. The precise Grading and Drainage Plan shall follow the format provided in the City of Rancho
Cucamonga handout"Information for Grading Plans and Permit."
7
Project No.SUBTT18747
Completion Date
19. Grading Inspections:
a) Prior to the start of grading operations the owner and grading
contractor shall request a pre-grading meeting. The meeting shall
be attended by the project owner/representative, the grading
contractor and the Building Inspector to discuss about grading
requirements and preventive measures, etc. If a pre-grading
meeting is not held within 24 hours from the start of grading
operations,the Grading Permit may be subject to suspension by the
Building Inspector;
b) The grading contractor shall call into the City of Rancho Cucamonga
Building and Safety Department at least 1 working day in advance to
request the following inspections prior to continuing grading
operations:
i. The bottom of the over-excavation
ii. Completion of rough grading,the grading contractor or owner
shall submit to the Permit Technicians (Building and Safety
front counter)an original and a copy of the Pad Certifications
to be prepared by and properly wet signed and sealed by the
Civil Engineer and Soils Engineer of Record;
iv. The rough grading certificates and the compaction reports will
be reviewed by the Associate Engineer or a designated person
and approved prior to the issuance of a Building Permit.
c) Prior to the issuance of the Certificate of Occupancy the engineer of
record shall certify the functionality of the storm water quality
management plan (WQMP) best management practices (BMP)
devices.
L. WATER QUALITY MANAGEMENT PLAN
1. A Storm Water Quality Management Plan shall be approved by the Building and Safety Official
and the City of Rancho Cucamonga's"Memorandum of Storm Water Quality Management Plan"
shall be recorded prior to the issuance of a Grading Permit.
APPLICANT SHALL CONTACT THE ENGINEERING SERVICES DEPARTMENT,(909)477-2740,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
M. Dedication and Vehicular Access
1. Rights-of-way and easements shall be dedicated to the City for all interior public streets,
community trails,public paseos, public landscape areas,street trees,traffic signal encroachment
and maintenance, and public drainage facilities as shown on the plans and/or tentative map.
Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be
reserved as shown on the plans and/or tentative map.
2. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or
noted on the final map.
8
Project No.SUBTT18747
Completion Date
N. Street Improvements
1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement,
drive approaches, sidewalks, street lights, and street trees.
2. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source
of energy,fuel or power to any building or structure which is regulated by technical codes and for
which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building, structure or unit, the development may have energy connections made in equal
proportion to the percentage of completion of all improvements required by these conditions of
development approval, as determined by the City Engineer, provided that reasonable, safe and
maintainable access to the property exists. In no case shall more than 95 percent of the
buildings,structures or units be connected to energy sources prior to completion and acceptance
of all improvements required by these conditions of development approval.
3. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Arapaho Road X X X X X X (a) (b)
East Avenue (C)
Notes: (a) protect/replace as necessary existing community trail adjacent to Lots 2 and 5(b)
provide traffic signing and striping as required where directed by Traffic Engineer(c) upgrade
existing curbside drain to City Standard 107-B Medium Capacity Drain Outlet.
4. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required
e. Street names shall be approved by the Planning Director prior to submittal for first plan
check.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
9
Project No.SUBTT18747
Completion Date
6. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet---(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The Engineering Services Department reserves the right to adjust tree species based upon field
conditions and other variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Qty.
Arapaho Road Lagerstroemia Crape Myrtle 2' 20' 15 Gal Fill
tuscarora Pink/Red O.C. In
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils reportshall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Services
Department.
4) Any private landscape plans that show street trees: "All improvements within the public
right-of-way, including street trees, shall be installed per the public improvement plans." If
there is a discrepancy between the public and private plans,the street improvement plans
will govern.
O. Drainage and Flood Control
1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
P. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
10
Project No.SUBTT18747
Completion Date
Q. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Services Department when the first building permit application is submitted to
Building and Safety. Form CD-2 shall be submitted to the Engineering Services Department
within 60 days following the completion of the construction and/or demolition project.
3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the Engineering Services prior to final map approval or issuance of
Building Permits whichever occurs first. Formation costs shall be borne by the developer.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
None.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
11
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
{t.l.
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Tentative Tract Map SUBTT18747,Variance DRC2010-00963 and Tree Removal
Permit DRC2010-00964
Public Review Period Closes: June 13, 2012
Project Name: Project Applicant:
Philip Chung
K.U. & Associates, Inc.650
Camino De Gloria
Walnut, CA 91789
Project Location (also see attached map): Located at the east terminus of Arapaho Road
between East Avenue and Choctaw Place - APN: 0225-818-73
Project Description: A proposal to subdivide a vacant parcel of about 3.4 acres into 5 lots in the
Very Low Residential District within the Etiwanda Specific Plan. The application includes a
requested Variance to allow a reduction in lot depth and the removal of 4 trees.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax
(909) 477-2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
June 13 2012
Date of Determination Adopted By