HomeMy WebLinkAbout12-27 - Resolutions RESOLUTION NO. 12-27 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA,CALIFORNIA,APPROVING TENTATIVE TRACT MAP SUBTT18747 A REQUEST TO SUBDIVIDE A VACANT PARCEL OF APPROXIMATELY 146,000 SQUARE FEET (3.4 ACRES) INTO FIVE (5) LOTS IN THE VERY LOW (VL) RESIDENTIAL DISTRICT, WITHIN THE ETIWANDA SPECIFIC PLAN, LOCATED AT THE EAST TERMINUS OF ARAPAHO ROAD BETWEEN EAST AVENUE AND CHOCTAW PLACE; AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0225-181-73. A. Recitals. 1. K.U. & Associates filed an application for the issuance of Tentative Tract Map SUBTT18747, as described in the title of this Resolution. Hereinafter in this Resolution,the subject Tentative Tract Map request is referred to as "the application." 2. On the 13th day of June 2012, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced meeting on June 13, 2012, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a vacant parcel of land located at the east terminus of Arapaho Road between East Avenue and Choctaw Place; and b. The project site is a vacant parcel with an area of approximately 146,000 square feet (3.4 acres). The overall dimensions of the site are approximately 442 feet (east to west) by approximately 331 feet(north to south); and C. To the north, south, and west,and of the project site are single-family residences. To the east are a single-family residence and a telephone company facility; and d. The zoning of the property and all surrounding properties is Very Low (VL) Residential District, Etiwanda Specific Plan; and e. The proposal is to subdivide the property into five (5) lots for single-family residential development; and f. All lots will comply with the development standards applicable to this zoning district as described in Figure 5-2 of the Etiwanda Specific Plan, except for lot depth. The lot depth of PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES June 13, 2012 Page 2 Lots 1 and 5,which will be approximately 135 feet in depth and will not comply with the minimum lot depth of 200 feet as required per the Etiwanda Specific Plan. The lot depths of Lots 2 through 4 will be at least 200 feet. The width of each lot will meet the required 90-foot dimension. Individual lot areas will range between 20,494 square feet to 30,051 square feet, which are in excess of the minimum of 20,000 square feet that is required. The minimum average lot area is 25,835 square feet, which is in excess of the minimum 25,000 that is required; and g. This application is in conjunction with Development Review DRC2009-00010, Variance DRC2011-00963, and Tree Removal Permit DRC2011-00964. 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed development is in accord with the General Plan,the objectives of the Development Code and the Etiwanda Specific Plan, and the purposes of the district in which the site is located. The proposal is to subdivide a property with an area of approximately 146,000 square feet(3.4 acres) into five (5) lots for single-family residential development. The underlying General Plan designation is Very Low Residential. b. The proposed development,together with the conditions applicable thereto,will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The project site is vacant;the proposed land use is consistentwith the land uses within the vicinity where it is located and the expectations of the community. The zoning of the property and all surrounding properties is Very Low (VL) Residential District, Etiwanda Specific Plan. C. The proposed development complies with each of the applicable provisions of the Development Code and the Etiwanda Specific Plan except for the proposed lot depth of Lots 1 and 5 that will be approximately 135 feet in depth and will not comply with the minimum lot depth of 200 feet as required per the Etiwanda Specific Plan. The applicant has submitted a Variance request for consideration by the Planning Commission. The proposed development, otherwise, meets all standards outlined in the Development Code and the Etiwanda Specific Plan and the design and development standards and policies of the Planning Commission and the City. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,together with all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. Pursuant to the California Environmental Quality Act("CEQA")and the City's local CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that,with the imposition of mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES June 13, 2012 Page 3 b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. C. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. d. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909)477-2750. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planninq Department 1) Approval is for the subdivision of a parcel of approximately 146,000 square feet (3.4 acres) with overall dimensions of approximately 442 feet(east to west)by approximately 331 feet(north to south) located at the east terminus of Arapaho Road between East Avenue and Choctaw Place -APN: 0225-181-73. 2) Development of all lots shall be in accordance with the standards and requirements applicable to the Very Low (VL) Residential District as described in Figure 5-2 of the Etiwanda Specific Plan. 3) Approval of this request shall not waive compliance with any sections of the Development Code, Etiwanda Specific Plan,State Fire Marshal's regulations, Uniform Building Code, or any other City Ordinances. 4) Prior to recordation of the Final Map, all lots shall be rough graded to include building pads and interim improvements (for example, drainage)as deemed necessary by the City. 5) Prior to construction, all future homes and associated improvements shall require the review and approval by the City and the issuance of applicable Building Permits by the Building and Safety Department. PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES June 13, 2012 Page 4 6) All setback lines shall be shown on the Final Map. 7) Equestrian uses and improvements shall be in accordance with the standards and requirements applicable to the properties within the Equestrian Overlay as described in Development Code Section 17.08 and the Trail Implementation Master Plan. 8) Drainage concrete V ditches shall be no more than 6 inches deep and a minimum of 5 feet wide with a medium broom finish. 9) A culvert shall be provided where water must be conveyed from one side of the trail to the other side, i.e. at the concrete swale/trail intersections located at the southwest and southeast corners of Lot 4. 10) The slope along the west side of the trail on the west side of Lot 4 shall be landscaped with ground cover for erosion control; the use of decomposed granite on the slope is not permitted. 11) Provide trail signage for the Community Trail at all trail intersections per City standards. 12) All trail surfacing shall be of decomposed granite with 4-inch minimum base. Remove rocks and debris and grade surface smooth. The decomposed granite shall be the complete width of the trail up to the property boundary. 13) Provide City Standard "Unauthorized Vehicles Prohibited" signs at each street trail connection. The minimum dimension between the wood posts for a step-through detail is 18 inches clear minimum between posts and maximum 14 inches above grade. 14) A detailed plan indicating trail widths, maximum slopes, physical conditions, fencing, and weed control in accordance with City Master Trail drawings shall be submitted for City Trails Coordinator review and approval prior to approval and recordation of the Final Tract Map and prior to approval of street improvement and Grading Plans. The developer shall upgrade and construct all trails, including fencing and drainage devices in conjunction with street improvements. 15) All Conditions of Approval for Development Review DRC2009-00010, Variance DRC2011-00963,and Tree Removal Permit DRC2011-00964 shall apply. PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES June 13, 2012 Page 5 Building and Safety 1) Prior to issuance of a Grading Permit the applicant shall provide a letter from the property owner to the east (Verizon) accepting the proposed drainage structure on their property. 2) Prior to removing fences or walls along common lot lines, and prior to constructing walls along common lot lines,the applicant shall provide a letter from the adjacent property owner(s) allowing work on the adjacent property. 3) Prior to the issuance of a grading permit a Water Quality Management Plan shall be submitted for review and approval by the Building and Safety Services Director or his designee. 4) Prior to the issuance of a Grading Permit,the applicant shall provide to the Building and Safety Services Director a copy of the City of Rancho Cucamonga's Memorandum of Agreement for Storm Water Quality Management Plan for review prior to recordation of the document. The Memorandum of Agreement for Storm Water Quality Management Plan shall be recorded prior to issuance of a Grading Permit. 5) Prior to the issuance of a Grading Permit, the applicant shall obtain a drainage easement or letter from the downstream property owner accepting the concentrated drainage flows in excess of the pre-developed storm water drainage flows. 6) In the equestrian trails, water bars shall be spaced accordingly: Equestrian Trail Slope Water Bar Interval Spacing 4% to 5.99% 50 feet 6% to 8.99% 40 feet 9% to 11.99% 30 feet 12% and greater 20 feet 7) Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). 8) A Grading Bond will be required to be submitted to the Building and Safety Services Director or his designee for review and approval prior to the issuance of a grading permit. PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747— K.U. & ASSOCIATES June 13, 2012 Page 6 Engineering Department 1) Acknowledgement of Development Impact Fee Form must be signed and notarized prior to Building Permit issuance (fees subject to change/periodic increases). 2) Development Impact Fees are due prior to Occupancy Release (subject to change/periodic increases). a) Drainage impact fees were collected under PM 16969. 3) For pads below streets, the first 6 feet of the driveway should slope away from the right-of-way(back of sidewalk)elevation at no more than 6 percent. 4) Drive approaches must comply with City Standard 101. 5) Final Map shall label proposed trail easement as "15-foot Private Equestrian Trail Easement." 6) Provide written approval from the property owner to the east to construct a 5-foot wide concrete swale on their property prior to issuance of Grading Permit. 7) Remove the existing parkway drain along East Avenue and replace with City Standard #107-B Medium Capacity Drain Outlet. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any Grading Permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD)as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747 — K.U. & ASSOCIATES June 13, 2012 Page 7 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with SCAQMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB])daily to reduce Fine Particulate Matter(PM1o)emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipmentwhen not in use. 10) Landscape with native and/or drought-resistant species to reduce water consumption and to provide passive solar benefits. PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES June 13, 2012 Page 8 11) Provide lighter color roofing and road materials and tree planning programs to comply with the AQMP Miscellaneous Sources MSC-01 measure. 12) All residential structures shall be required to incorporate high- efficiency/low-polluting heating, air conditioning,appliances,and water heaters. 13) All residential structures shall be required to incorporate thermal pane windows and weather-stripping. 14) All new development in the City of Rancho Cucamonga shall comply with South Coast Air Quality Management District's Rule 445, Wood Burning Devices. Rule 445 was adopted in March 2008 to reduce emissions of PM2.5and precludes the installation of indoor or outdoor wood burning devices (i.e. fireplaces/hearths)in new development on or after March 9, 2009. Biological Resources 1) Prior to grading or other ground disturbance of the site, the applicant shall conduct a final focused survey to determine the presence/absence of this species following protocols established by the United States Fish and Wild Life Services(USFWS). In the event that CAGN is detected or observed within the area of disturbance, avoidance, minimization, and/or mitigation measures shall be developed and implemented. 2) The removed Blue Gum Eucalyptus tree shall be replaced with a matching species (or equivalent)of a minimum 24-inch box size. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Prepare a mitigation plan consistent with Section 21083.2 Archaeological resources of CEQA to eliminate adverse project PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES June 13, 2012 Page 9 effects on significant, important, and unique prehistoric resources, including but not limited to, avoiding archaeological sites, capping or covering sites with soil, planning the site as a park or green space or paying an in-kind mitigation fee. • Prepare a technical resources management report,documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate,the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository(i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES June 13, 2012 Page 10 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Greenhouse Gases 1) The project must comply with all rules that assist in reducing short-term air pollutant emission in compliance with SCAW MD Rule 403 regarding fugitive dust including treating the site with water or other soil-stabilizing agent twice daily or replanting disturbed areas as quickly as possible. 2) The construction contactor shall select construction equipment based on low-emission factors and high energy efficiency and submit a statement on the grading plan that ensures all construction equipment will be tuned and maintained in accordance with the manufactures specification. 3) Trucks shall not idle continuously for more than 5 minutes. 4) Alternative fuel powered equipment shall be utilized in lieu of gasoline- or diesel-powered engines where feasible. 5) Construction should be timed so as not to interfere with peak-hour traffic. 6) Ridesharing and transit incentives shall be supported and encouraged for construction crew. 7) Construction and Building materials shall be produced and/or manufactured locally. Use "Green Building Materials' such as materials that are resource efficient, recycled and manufactured in an environmentally friendly way including low-volatile-organic-compound (VOC) materials. 8) Design all buildings to exceed California Building Code Title 24 energy standard including but not limited to any combination of: • Increased insulation, • Limit air leakage through the structure, • Incorporate Energy Star or better rated windows, space heating and cooling equipment, light fixtures, and appliances, • Landscape and developed site utilizing shade, prevailing winds and landscaping, PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747— K.U. &ASSOCIATES June 13, 2012 Page 11 • Install efficient lighting and lighting control systems, • Install light colored "cool" roofs and cool pavements, • Install solar or light emitting diodes (LED's)for outdoor lighting. 9) Prepare a comprehensive water conservation strategy appropriate for the project and include the following: • Install water efficient landscapes and irrigation systems and devices in compliance with the City of Rancho Cucamonga Water Efficient Landscape Ordinance. • Use reclaimed water for landscaping within the project if available and/or install the infrastructure to deliver and use reclaimed water. • Design building to be water efficient by installing water efficient fixtures and appliances including low flow faucets, dual flush toilets, and waterless urinals/water heaters. • Design irrigation to control runoff and to remove water to non- vegetated surfaces. 10) Reuse and recycle construction and demolition waste. Provide interior and exterior storage areas for recyclables and green waste in public areas. Educate employees about reducing waste and about recycling. Hazards and Waste Materials 1) The project shall comply with Chapter 7A of the California Building Code(CBC),which includes building standards forthe Wildland-Urban Interface Fire Area. The standards call for the use of ignition-resistant materials and design to inhibit the intrusion of flame or burning embers projected by a vegetation fire and help reduce losses resulting from repeated cycles of interface fire disasters. Hydrology and Water Quality 1) Prior to issuance of grading permits, the permit applicant shall submit to the Building Official for approval a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in the Grading Plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747 — K.U. &ASSOCIATES June 13, 2012 Page 12 Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) The developer shall implement the BMPs identified in the Water Quality Management Plan (WQMP), prepared on August 24, 2011, by W&W Technologies to reduce pollutants during construction entering the storm drain system to the maximum extent practical. 6) The developer shall implement the BMPs identified in the Water Quality Management Plan (WQMP), prepared by W&W Technologies on August 24, 2011,to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 8) Prior to issuance of Building Permits, the applicant shall submit to the Building Official for approval of a Water Quality Management Plan (WQMP), including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 9) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollutant Discharge Elimination System(NPDES)General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number)shall be submitted to the PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747 — K.U. & ASSOCIATES June 13, 2012 Page 13 City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) The perimeter block wall shall be constructed as early as possible in the first phase. 4) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 13TH DAY OF JUNE 2012. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Luis Munoz, Jr., Chairman ATTEST: Candy a Burnett, Senior Planner I, Candyce Burnett, Senior Planner of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning PLANNING COMMISSION RESOLUTION NO. 12-27 TENTATIVE TRACT MAP SUBTT18747— K.U. & ASSOCIATES June 13, 2012 Page 14 Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 13th day of June 2012, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, OAXACA, MONOZ, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: HOWDYSHELL ABSTAIN: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: SUBTT18747 SUBJECT: TENTATIVE TRACT MAP APPLICANT: K.U. & ASSOCIATES LOCATION: EASTTERMINUS OFARAPAHO ROAD BETWEEN EASTAVENUEAND CHOCTAW PLACE- APN: 0225-181-73. ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Dace 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 12-27 Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Mitigated Negative Declaration -$ 2,151.50 X B. Time Limits 1. This tentative tract map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. 1 Project No.SUBTT18747 Completion Date C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Department,the conditions contained herein, Development Code regulations, and the Etiwanda Specific Plan. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed plan indicating trail widths, maximum slopes, physical conditions, fencing, and weed control, in accordance with City Master Trail drawings, shall be submitted for Planning Director review and approval prior to approval and recordation of the Final Tract Map and prior to approval of street improvement and grading plans. Developer shall upgrade and construct all trails, including fencing and drainage devices, in conjunction with street improvements. 8. Local Feeder Trail entrances shall also provide access for service vehicles,such as veterinarians or hay deliveries,including a 12-foot minimum drive approach. Entrance shall be gated provided that equestrian access is maintained through step-throughs in accordance with Engineering Department Standard Drawing 1006-B and 1007-B. 9. Local Feeder Trail grades shall not exceed 0.5%at the downstream end of a trail for a distance of 25 feet behind the public right-of-way line to prohibit trail debris from reaching the street. Drainage devices may be required by the Building Official 10. Provide a 24-foot by 24-foot or 12-foot by 48-foot corral area in the rear yard adjacent to the Local Feeder Trail. Grade access from corral to trail with a maximum slope of 5:1 and a minimum width of 10 feet. 11. For single-family residential development within the Equestrian/Rural Overlay District,at least one model home shall be provided with a constructed 24-foot by 24-foot corral with appropriate fencing. 12. Where corner side,interior side or rear yard property lines are adjacent to local equestrian trails, construct minimum 6 foot high decorative masonry walls. Decorative masonry shall mean split- face double sided block,'slump stone'or an alternative material that is acceptable to the Design Review Committee. 2 Project No.SUBM 8747 Completion Date 13. The Covenants, Conditions, and Restrictions(CC&Rs)shall not prohibit the keeping the equine _/_/_ animals where zoning requirements for the keeping of said animals have been met. Individual lot owners in subdivisions shall have the option of keeping said animals without the necessity of appealing to boards of directors of homeowners'associations for amendments to the CC&Rs. 14. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and Engineering Services Department review and approved prior to the issuance of building permits. 15. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. 16. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 17. Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and PVC. 18. For residential development, return walls and corner side walls shall be decorative masonry. 19. Where rock cobble is used,it shall be real river rock. Other stone veneers may be manufactured products. D. Building Design 1. For all residential development,provide conduit from each unit/lot and a pull box to connect to the street. Provide interior structured wiring for each house/building with minimum Category 5 copper wire, Radio Grade 6 coaxial cable, and a central distribution panel, prior to release of occupancy (fiber-to-the building, FTTB). Plans shall be submitted for Planning Director and Building Official review and approval prior to issuance of building permits. E. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 3 Project No.SUBTT18747 Completion Date 3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area, and appropriate ground cover. In addition, slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 4. For single-family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Department to determine that they are in satisfactory condition. 5. Front yard and corner side yard landscaping and irrigation shall be required per the Development Code and/or the Etiwanda Specific Plan. This requirement shall be in addition to the required street trees and slope planting. 6. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department. 7. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 8. All walls shall be provided with decorative treatment. If located in public maintenance areas,the /_/_ design shall be coordinated with the Engineering Services Department. 9. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping as defined in Ordinance 823 of the Rancho Cucamonga Municipal Code F. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the amount of$557 prior to the issuance of building permits,guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. G. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to Planning Director review and approval prior to the issuance of building permits. 4 Project No.SUBTT18747 Completion Date APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) H. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets, detached)including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number(i.e., SUBTT18747)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can contact the Building and Safety Department staff for information and submittal requirements. I. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., SUBTT18747). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition, the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. The applicant shall provide a copy of the School Fees receipt to the Building and Safety Department prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5 Project No.SUBTT18747 completion Date J. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind"instructions. 4. All structures are required to be equipped with automatic fire sprinklers 5. All structures must be constructed in accordance with Chapter 7A of the California Building Code. K. Grading 1. Grading of the subject property shall be in accordance with current adopted California Building Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s)shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 3. A geological report shall be prepared by a qualified engineer or engineering geologist and submitted at the time of application for Grading and Drainage Plan review. 4. The final Grading and Drainage Plan,appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate Grading and Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer. 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place _/_/_ a dust control sign on the project site prior to the issuance of a Grading Permit. 7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review,that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit. 8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a Grading Permit. All reports shall be wet signed and sealed by the Engineer of Record. 9. It shall be the responsibility of the applicant to acquire any required off-site drainage easements prior to the issuance of a Grading Permit. 10. It shall be the responsibility of the applicant to acquire any required off-site drainage acceptance letter(s)from adjacent downstream property owner(s) or discharge flows in a natural condition (concentrated flows are not accepted) and shall provide the Building and Safety Official a drainage study showing the proposed flows do not exceed the existing flows prior to the issuance of a Grading Permit. 11. It shall be the responsibility of the applicant to obtain written permission from the adjacent property owners to construct walls on property lines or provide a detail(s)showing the perimeter wall(s)to be constructed offset from the property line. 6 Project No.SUBTT18747 Completion Date 12. The Grading and Drainage Plan shall implement City Standards for on-site construction where possible, and provide details for all work not covered by City Standard Drawings. 13. All slopes shall be a minimum 2-foot offset from the public right of way or adjacent private property. 14. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. 15. The maximum parking stall gradient is 5 percent. Accessibility parking stall grades shall be constructed per the current adopted California Building Code. 16. The final Grading and Drainage Plan shall show existing topography a minimum of 100-feet beyond the project boundary. a) The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a Grading Permit. The grading agreement and bond shall be approved by the Building and Safety Official. b) Provide documentation for CVWD sewer offset program to the Building and Safety Official for review prior to issuance of a Grading Permit. 17. This project shall comply with the accessibility requirements of the current adopted California Building Code. 18. The precise Grading and Drainage Plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit." 7 Project No.SUBTT18747 Completion Date 19. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations,the Grading Permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following inspections prior to continuing grading operations: i. The bottom of the over-excavation ii. Completion of rough grading,the grading contractor or owner shall submit to the Permit Technicians (Building and Safety front counter)an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv. The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a Building Permit. c) Prior to the issuance of the Certificate of Occupancy the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) best management practices (BMP) devices. L. WATER QUALITY MANAGEMENT PLAN 1. A Storm Water Quality Management Plan shall be approved by the Building and Safety Official and the City of Rancho Cucamonga's"Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a Grading Permit. APPLICANT SHALL CONTACT THE ENGINEERING SERVICES DEPARTMENT,(909)477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: M. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails,public paseos, public landscape areas,street trees,traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or noted on the final map. 8 Project No.SUBTT18747 Completion Date N. Street Improvements 1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement, drive approaches, sidewalks, street lights, and street trees. 2. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy,fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings,structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. 3. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Arapaho Road X X X X X X (a) (b) East Avenue (C) Notes: (a) protect/replace as necessary existing community trail adjacent to Lots 2 and 5(b) provide traffic signing and striping as required where directed by Traffic Engineer(c) upgrade existing curbside drain to City Standard 107-B Medium Capacity Drain Outlet. 4. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required e. Street names shall be approved by the Planning Director prior to submittal for first plan check. 5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 9 Project No.SUBTT18747 Completion Date 6. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet---(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The Engineering Services Department reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size Qty. Arapaho Road Lagerstroemia Crape Myrtle 2' 20' 15 Gal Fill tuscarora Pink/Red O.C. In Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils reportshall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. 4) Any private landscape plans that show street trees: "All improvements within the public right-of-way, including street trees, shall be installed per the public improvement plans." If there is a discrepancy between the public and private plans,the street improvement plans will govern. O. Drainage and Flood Control 1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. P. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. 10 Project No.SUBTT18747 Completion Date Q. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. 2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Services Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Services Department within 60 days following the completion of the construction and/or demolition project. 3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the Engineering Services prior to final map approval or issuance of Building Permits whichever occurs first. Formation costs shall be borne by the developer. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: None. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 11 City of Rancho Cucamonga MITIGATED NEGATIVE DECLARATION {t.l. The following Mitigated Negative Declaration is being circulated for public review in accordance with the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code. Project File No.: Tentative Tract Map SUBTT18747,Variance DRC2010-00963 and Tree Removal Permit DRC2010-00964 Public Review Period Closes: June 13, 2012 Project Name: Project Applicant: Philip Chung K.U. & Associates, Inc.650 Camino De Gloria Walnut, CA 91789 Project Location (also see attached map): Located at the east terminus of Arapaho Road between East Avenue and Choctaw Place - APN: 0225-818-73 Project Description: A proposal to subdivide a vacant parcel of about 3.4 acres into 5 lots in the Very Low Residential District within the Etiwanda Specific Plan. The application includes a requested Variance to allow a reduction in lot depth and the removal of 4 trees. FINDING This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an Initial Study to determine if the project may have a significant effect on the environment and is proposing this Mitigated Negative Declaration based upon the following finding: The Initial Study identified potentially significant effects but: (1) Revisions in the project plans or proposals made or agreed to by the applicant before this proposed Mitigated Negative Declaration was released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur, and (2) There is no substantial evidence before the agency that the project, as revised, may have a significant effect on the environment. If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not be required. The factual and analytical basis for this finding is included in the attached Initial Study. The project file and all related documents are available for review at the City of Rancho Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909) 477-2847. NOTICE The public is invited to comment on the proposed Mitigated Negative Declaration during the review period. June 13 2012 Date of Determination Adopted By