Loading...
HomeMy WebLinkAbout2009/12/01 - Agenda Packet - (2) Oki DESIGN REVIEW COMMITTEE MEETING TUESDAY DECEMBER 1, 2009 7:00 P.M. RANCHO CUCAMONGA CIVIC CENTER RAINS ROOM 10500 CIVIC CENTER DRIVE RANCHO CUCAMONGA Committee Members: Lou Munoz Pam Stewart Corkran Nicholson Alternates: Ray Wimberly Frances Howdyshell Richard Fletcher CONSENT CALENDAR NO ITEMS SUBMITTED. PROJECT REVIEW ITEMS This is the time and place for the Committee to discuss and provide direction to an applicant regarding their development application. The following items do not legally require any public testimony, although the Committee may open the meeting for public input. 7:00 p.m. (Steve/Willie) DEVELOPMENT REVIEW DRC2009-00413 - STANTEC CONSULTING - COMERICA BANK - A request to construct a 3,982 square foot retail bank with a drive thru at an existing retail center within the Industrial Park District, Subarea 7, located at 12035 Foothill Boulevard: APN: 0229-023-05. On January 24, 2007, a Mitigated Negative Declaration was adopted by the Planning Commission for Tentative Parcel Map SUBTPM17818. The California Environmental Quality Act provides that no further environmental review or Negative Declaration is required for subsequent projects or minor revisions to projects within the scope of a previous Mitigated Negative Declaration. PUBLIC COMMENTS This is the time and place for the general public to address the Committee. State law prohibits the Committee from addressing any issue not previously included on the Agenda. The Committee may receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes per individual. ADJOURNMENT I, Gail Elwood, Office Specialist II for the City of Rancho Cucamonga, hereby certify that a true, accurate copy of the foregoing agenda was posted on November 18, 2009, at least 72 hours prior to the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho Cucamonga. DESIGN REVIEW COMMENTS 7:00 p.m. Steve Fowler December 1, 2009 DEVELOPMENT REVIEW DRC2009-00413 - STANTEC CONSULTING - COMERICA BANK - A request to construct a 3,982 square foot retail bank with a drive thru at an existing retail center within the Industrial Park District, Subarea 7, located at 12035 Foothill Boulevard: APN: 0229-023-05. On • January 24, 2007, a Mitigated Negative Declaration was adopted by the Planning Commission for Tentative Parcel Map SUBTPM17818. The California Environmental Quality Act provides that no further environmental review or Negative Declaration is required for subsequent projects or minor revisions to projects within the scope of a previous Mitigated Negative Declaration. Design Parameters: The applicant is proposing to construct a 3,982 square foot bank building with a drive thru ATM at 12035 Foothill Boulevard. This site is on the south side of Foothill Boulevard in the Industrial Park District, Subarea 7. At the Design Review Committee Meeting held on October 6, 2009, the applicant was asked to change the roofing material from standing seam metal to light weight concrete tile. The applicant was proposing a charcoal blend tile. They now would like to change the color to a charcoal brown blend slate tile. The exterior of the building is proposed to use a mixture of Mountain Rose colored brick veneer for the wall plans, a Frosted Almond colored brick veneer band around the lower part of the entire building, and a stone veneer for the tower element and columns around the entire building. Staff Comments: The following comments are intended to provide an outline for Committee discussion regarding this project. Major Issues: The applicant worked hard with staff to follow the criteria outlined in the Development Code, but there is still a color issue with the roof tile. Staff feels the color Charcoal Brown Blend gives a monotone appearance to the building, and the Charcoal blend would be a better fit for the project. Staff recommendation: Staff feels the color Charcoal Brown Blend gives a monotone appearance to the building and the Charcoal blend would be a better fit for the project. Staff recommends that the Design Review Committee keep with its previous recommendation of the Charcoal Blend tile. Design Review Committee Action: Staff Planner: Steve Fowler Members Present: