Loading...
HomeMy WebLinkAbout2011/04/05 - Agenda Packet - (2) DESIGN REVIEW COMMITTEE MEETING TUESDAY APRIL 5, 2011 7:00 P.M. RANCHO CUCAMONGA CIVIC CENTER RAINS ROOM 10500 CIVIC CENTER DRIVE • RANCHO CUCAMONGA Committee Members: Lou Munoz Ray Wimberly James Troyer Donald Granger Alternates: Frances Howdyshell Richard Fletcher Francisco Oaxaca CONSENT CALENDAR 7:00 p.m. Tom/Carlo CONDITIONAL USE PERMIT DRC2011-00045 - PEP BOYS AUTO - A request to establish an automotive repair and auto parts retail store within an existing building in the Regional Related Commercial (FB/RRC) Foothill Boulevard District, located in an existing • shopping center at the southwest corner of Foothill Boulevard and Etiwanda Avenue. APN: 0229-031-27. PROJECT REVIEW ITEMS This is the time and place for the Committee to discuss and provide direction to an applicant regarding their development application. The following items do not legally require any public testimony, although the Committee may open the meeting for public input. 7:10 p.m. (Mike/Carlo) MINOR DEVELOPMENT REVIEW DRC2010-00400 - CHARLES.JOSEPH ASSOCIATES for ARCO - A request to construct a self-service carwash of 940 square feet at an existing automotive fueling services center on a parcel of 2 acres in the Industrial Park (IP) District (Subarea 6) Haven. Overlay, located at 9280 Haven Avenue - APN: 0209-262-20.. Related files: Development Code Amendment DRC2010-00399 and Conditional Use • Permit CUP99-53. 7:30 p.m. DESIGN REVIEW COMMITTEE WORKSHOP TRAINING DRC2011-00159 - CITY OF RANCHO CUCAMONGA - A presentation by staff and workshop training on Hillside Design Review requirements and Design Policies for single-family custom homes in the Hillside Overlay District. The report and workshop qualifies under State CEQA Guideline Section 15061(b)(3) because the report is for informational purposes and will not result in an intensification of environmental impacts. PUBLIC COMMENTS This is the time and place for the general public to address the Committee. State law prohibits the Committee from addressing any issue not previously included on the Agenda. The Committee may receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes • per individual. • DRC AGENDA April 5, 2011 Page 2 ADJOURNMENT • I, Gail Elwood, Office Specialist II for the City of Rancho Cucamonga, hereby certify that a true, accurate copy of the foregoing agenda was posted on March 28, 2011, at least 72 hours prior to the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho ucamonga. • CONSENT CALENDAR DESIGN REVIEW COMMENTS 7:00 p.m. Tom Grahn • April 5, 2011 CONDITIONAL USE PERMIT DRC2011-00045 - PEP BOYS AUTO - A request to establish an automotive repair and auto parts retail store within an existing building in the Regional Related Commercial (FB/RRC) Foothill Boulevard District, located in an existing shopping center at the southwest corner of Foothill Boulevard and Etiwanda Avenue. APN: 0229-031-27. • Background: On September 11, 1996, the City Planner approved Development Review 96-23 for the development retail pad for Hollywood Video in the Foothill Market Place shopping center, located at the southwest corner of Foothill Boulevard and Etiwanda Avenue. The project site is located within an existing shopping center and contains the existing 6,550 square foot building and 35 parking spaces. The applicant is proposing to utilize the existing building but will modify the floor plan to include 2,525 square feet of retail/stock and 3,954 square feet of auto service, including 6 vehicle service bays. Staff Comments: The application proposes minimal changes to the buildings exterior and site plan. Changes to the building exterior are proposed on the west elevation where the existing storefront window will be replaced with overhead garage doors to access the service bay. Changes to the site plan are proposed to the west of the building to establish a drive aisle to the service bay and the removal of 3 parking spaces and minimal landscaping.. Major Issues: 1. None. Secondary Issues: 1. The building is located directly south of and adjacent'to Foothill Boulevard. The existing glass storefront windows are located along the easterly half of the building allowing unobstructed views of the future service bay area. Staff has concerns with the visibility of the service bays from Foothill Boulevard and suggests the use of opaque glass or other material to shield views into the service bay. Staff Recommendation: Staff recommends that the Committee recommend approval of the project and forward the project to the Planning Commission for final review and approval. Design Review Committee Action: Staff Planner: Tom Grahn Members Present: • • DESIGN REVIEW COMMENTS 7:10 p.m. Mike Smith April 5, 2011 MINOR DEVELOPMENT REVIEW DRC2010-00400 - CHARLES JOSEPH ASSOCIATES for ARCO - A request to construct a self-service carwash of 940 square feet at an existing automotive fueling services center on a parcel of 2 acres in the Industrial Park (IP) District (Subarea 6) Haven Overlay, located at 9280 Haven Avenue - APN: 0209-262-20. Related files: Development Code Amendment DRC2010-00399 and Conditional Use Permit CUP99-53. Background: A proposal for a carwash was formally submitted to the City for review on June 1, 2010. The initial proposal was substantially similar to this proposal with the exception of the plotting of the carwash building on the site. The applicant originally proposed to plot the carwash building in the parking and landscaped area near the southwest corner of Building B. Staff was concerned about the proximity, orientation, and general compatibility of the proposed carwash relative to Building B. The applicant subsequently proposed an alternate solution which is the subject of this review. There are related applications pending — Development Code Amendment DRC2010-00399 to allow carwashes within the Haven Overlay and a modification of Conditional Use Permit CUP99-53 (a previously approved gas station/convenience market) as described below. To ensure that all applications are processed in an efficient and timely manner, staff is presenting it to the Committee to determine if the project, specifically the location of the carwash, is acceptable as proposed. Design Parameters: The project site is located within an automotive fueling services center that is part of a commercial/office development that was reviewed and approved by the Planning Commission on July 12, 2000 (related file: Conditional Use Permit DRCCUP 99-53). The overall commercial/office development is comprised of two (2) parcels with a combined area of approximately 174,000 square feet (4 acres). The site is approximately 659 feet (north to south) by approximately 264 feet (east to west) and is comprised of three (3) buildings with a combined floor area of 40,000 square feet. The buildings are, from south to north, an ARCO gas station/convenience store with a Subway restaurant (Building A), an El Ranchero restaurant (Building B), and a multi-tenant office building (Building C). To the north and east of the development are offices; to the south is an automotive trade school; and to the west is a warehouse/storage/distribution building. The .zoning of the center and all surrounding properties is Industrial Park (IP) District (Subarea 6). With the exception of the property to the west, the site and all surrounding properties are also within the Haven Overlay. The applicant, on behalf of ARCO, proposes to construct a freestanding, automated self-service carwash building of 880 square feet. The car wash is proposed to be situated between the west property line and a north to south drive aisle that extends along the entire length of the west property line of the site. The area of work is presently developed with parking stalls and landscaping. The primary axis of the carwash will be north to south and parallel to the previously mentioned drive aisle. The entrance and exit will be on the north and south sides, respectively. To ensure safe exiting from the carwash, an area is proposed at the exit of the carwash that is sufficient in length to allow a vehicle to pause before proceeding into the drive aisle. Similarly, a drive aisle leading to the carwash is proposed that will allow up to three vehicles to queue without blocking or otherwise interfering with traffic circulation in the existing, adjoining drive aisle. Ten parking stalls and nearby landscaping will be removed to accommodate the new building. The width of the building is 20 feet, and the drive aisle width adjacent to the building is only slightly wider than the minimum 26 feet required by the Fire Department. As a result, the landscape planter along the east side of the building will be only 1 foot in width. There will be landscape planters separating the drive aisle for the carwash and the existing parking lot drive aisle that will be about 8 feet wide. The architecture of the carwash building (Exhibit A) will match the design and general appearance of the existing buildings (Exhibit B) and include matching finish, colors, trim, and materials. No revisions to the existing buildings are proposed. DRC AGENDA DRC2010-00400 — CHARLES JOSEPH ASSOCIATES April, 5, 2011 Page 2 Staff Comments: The following comments are intended to provide an outline for Committee discussion. Major Issues: The following broad design issues will be the focus of Committee discussion regarding this project. 1. The carwash building will have a zero setback from the west property line. Per Section 17.30.040(D)(3)(b) and (d) of the Development Code, the minimum setback along the west property line is 5 feet. If the Committee determines that a zero setback is acceptable, then the submittal of a Variance application is required for review by the Planning Commission. Secondary Issues: Once all of the major issues have been addressed, and time permitting, the Committee will discuss the following secondary design issues. 1. Replacement light standards shall not exceed 15 feet in height measured from the adjacent finished surface or finished grade. This height includes the base, pole, and the fixture. 2. If it is possible, the existing trees that are displaced by the construction of the carwash shall be relocated to another location on the property. Otherwise, replacement trees shall be planted on a one-to-one basis for each existing tree that is removed. - 3. Shrubs of a minimum 5 gallon size shall be planted at an interval of 18 inches on center in the 1-foot wide planter located along the east'side of the building. 4. The vine trellises proposed to be placed on the east wall face of the building shall be rectilinear in design and the height of both increased to match the height of the horizontal overhead trellises as shown on the full set of plans. 5. The windows on the east elevation of the car wash building shall be one-way vision glass that restricts visibility of the interior of the car wash from the outside. 6. The tile on the support columns for the horizontal overhead trellises shall match the tile on the existing support columns on-site. Policy Issues: The following items are a matter of Planning Commission policy and should be incorporated into the project design without discussion. 1. All doors (roll-up, emergency access, etc.) shall be painted to match the color of the adjacent wall. 2. All downspouts on all elevations of the building shall be routed through the interior of the building. Note: the downspouts shall be relocated to the east side of the building so that water drains onto the subject site and not onto the adjacent property to the west (as currently proposed). 3. All signs shall comply with the applicable provisions of the City's Sign Ordinance and Uniform Sign Program No. 204. Signs identifying products, advertising services, or identifying the car wash building as "car wash" are not permitted. Signs required by Federal, State, or local agencies are exempt. DRC AGENDA DRC2010-00400 — CHARLES JOSEPH ASSOCIATES April, 5, 2011 Page 3 Staff Recommendation: Staff requests direction from the Committee to determine if the project is acceptable as proposed. Staff recommends that the architecture of the proposed carwash be approved. If the location of the carwash is acceptable as proposed, then processing of the applications will continue and will be forwarded to the Planning Commission for review and action. If the location of the carwash is not acceptable as proposed, then Staff will coordinate with the applicant to revise the proposal. Revisions will be presented to the Committee for review prior to forwarding to the Planning Commission for review and action. Design Review Committee Action: Staff Planner: Mike Smith • Members Present: I, i g L _ 0 . . li s? y 0 wii mirtuumi , . 1 le ism mo . H- i. . p -- . -It -r1 -1 .1 ' • LI 71 r iiF _.; •1 -_ _i -__ !--n . _ _ I II 1171÷1 NE 1 i r hi- ) , f, 1 , , l-4-1-1 ' I q-i-j1-111 - . 1!! L:-7.--I , II 4 - ill! _ ; - -mt-ii- t ...1_, , 1# .,- ITE-1--t_ii; EXHIBIT A i ■ . " . N Ira _ .� ti; 4 a ��aa h ig 5 q ''1iLJI3__IIJiL ' / �lif�"�� 2I � I x � Q J I I , I �s�r u. ��s II i_ IL I 1 ELME i EP 1'r g _ _.:- 'al; i rilinimum 1\14 : fry � . M � . 1 $ F r I � ' T� r $ Y . 4... rifamL I 50 0 � � �1 � � V =��� ' F ' . /z= le i— + rc z . 1 Air 4' 5 Imi Pi lag I- � Jill mUrif if flii-r—ge :mom _ i I. I EXHIBITB ._..o-.._.,__.a ._.._._. I 41164„, 41.8 i Inc _ Old, i ill I, ,I ? Q 'I C'. _ F Y __ . :, iii in � ' 1 'IR .Q -t 1` , t � � I■1 c ...0 0 �.m '. , -i • Q I 14 . cq ri i "3 Y 3 `1\`\l11 . ...707` ,s., , W I1f ...oOQITiii diet �. ° Li a la O■ i s -•w I■1 . pis 81 ���� as— rod ----_ ma. 4 KM I--'i —r gam I �■ � 1111 f1[:Sr i :::° j°i C■ ii! r f!ii — :; I .- _ II�!Y'ry egg 19 I�6I !j. ¢ • ci i i 1 riii� '°51 s 1 _ 11 , '�1A Pi i I 1 , a. 1'x.1 Trill_ 1 1141,1 .1 I �7itl ti _ w i. ).,,iL g ,, i I 71 i 1 • 1 �a m ri, se•.ai i11, /�/i�e' ' ,;r:a5 i3 ■1■I■G _� m•un■1■I■il iEi:_. Rua rii,c ■�■I■[1 I:oeiel /ue�a & d■1■I■E' lK:� ■1■I■E e.el ■�■1■t. g-- I■1■1■!; lest. its. ` on mind. 111ii■1■ MINI 1' ■l0cll�E1. ■I■■I lea. ,,, Or( �j�"iBeRc�ii:n' •Iir_lei �y...Ii Q y gi'oy�■Iiiii lll:■I■■1 1■11 r' lit. �I•` ■�■■E I.:■1■■I.NE Iy1 19 NUMMI an ■1■1■E 1=�excise!e m � ' li°Fi.i •ra ni irii �■o 1i: ■ ■■e uii•�sci■ ■I■0 ii lss�il■ ■I■lei ■1 ■l iiiiyie ii 7I �i-3 <,11 zEla a �■ 61■ NMI■E; � � uF �3YSP` .■.- I I 1�a1 ■ I1'G � r b.ill \■ '111,1111E Op II, ,.H•0I/: •• III/ I:J 1 Il_L] I �� �sEm/� %- - ; i Rl,..a....l • ''�- ■1■I■C ice°. 'hu• cli• ki E "...i•i•:• --ui Enna E MEMIri°nUM ° �K∎'ec■I■1■El °-71■■I 1■la I .I ■1■I■II l■iek■1■■IH�l■p' E n'Ee E•-ra ■I■■1 1■-I Iig u u'bs ■ ■1■i i E■I.0 I■ii i l ■1■ ■1 ' ■1■■1jI■ ■ ■■ I■6 F i3 3i5 FiSfl••ILME?ieef3 - iiEi — IiiiieiMEiE I w c • DESIGN REVIEW COMMENTS 7:30 p.m. Donald Granger April 5, 2011 DESIGN REVIEW COMMITTEE WORKSHOP TRAINING DRC2011-00159 - CITY OF RANCHO CUCAMONGA = A presentation by staff and workshop training on Hillside Design Review requirements and Design Policies for single-family custom homes in the Hillside Overlay District. The report and workshop qualifies under State CEQA Guideline Section 15061(b)(3) because the report is for informational purposes and will not result in an intensification of environmental impacts. Background: At the March 1, 2011, Design Review Committee meeting, Chairman Munoz directed staff to prepare a workshop training session for single-family dwelling units in the Hillside Overlay District. Chairman Munoz directed staff to present an overview of the key Design Policies and Code requirements applicable to single-family dwelling units in the Hillside Overlay District. Staff will present a training session at the Design Review Committee meeting. - Staff Recommendation: Staff recommends that the Committee receive the training, provide input, and ask questions as needed. Design Review Committee Action: Staff Planner: Donald Granger Members Present: • •