HomeMy WebLinkAbout81-67 - Resolutions RESOLUTION NO. 81-67
A RESOLUTION OF THE RANCHO CUCAMONGA PLANNING COMMISSION
RECOMMENDING APPROVAL OF 1981-82 CAPITAL IMPROVEMENTS
PROGRAM AND FINDING OF CONSISTENCY WITH THE GENERAL PLAN.
WHEREAS, on the 27th day of May, 1981 the Rancho Cucamonga
Planning Commission held a meeting to consider the attached proposed
Capital Improvements Program; and
WHEREAS, the Rancho Cucamonga Planning Commission concurs
in the recommended program as proposed; and
WHEREAS, the proposed program conforms to the Elements of
the General Plan.
NOW, THEREFORE, BE IT RESOLVED, that the Rancho Cucamonga
Planning Commission hereby:
SECTION 1: Find that the attached Capital Improvement Program
is in confromance with the General Plan of Rancho Cucamonga.
SECTION 2: Recommends approval of the attached proposed Capital
Improvements Program for the 1981-82 fiscal year to the City
Council of Rancho Cucamonga for its adoption.
APPROVED AND ADOPTED THIS 10TH DAY OF JUNE, 1981.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: 4:44, G
'ichard Dahl , Chair an
ATTEST: Allci 0
Secretary of the Plannin' Commission
I , JACK, LAM, Secretary of the Planning Commission of the City of Rancho
Cucamonga, do hereby certify that the foregoing Resolution was duly and
regularly introduced, passed, and adopted by the Planning Commission
of the City of Rancho Cucamonga at a regular meeting of the Planning
Commission held on the 10th day of June, by the following vote to-wit:
AYES: COMMISSIONERS: Tolstoy, Rempel , King, Sceranka, Dahl
MO NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: None
j 1981-82 Capital Improvement Program
,a
1. Vineyard Avenue Widening $480,000
. The widening of Vineyard Avenue from Arrow Route to Eighth Street from two to
four lanes with the installation of a traffic signal at Arrow Route and railroad
crossing protection at the Santa Fe Railroad (Federal Aid Urban funding of 84%)
(Portion Gas Tax)
2. North Town Street Improvements (Phase 2) $163,965
The construction of curbs, gutters and sidewalk on the residential streets
of Main, Feron, and Reid just east of Archibald Avenue (Community Development
Block Grand Funds - CDBG) (Portion Gas Tax)
3. Deer Creek Bridges $258,241
Funds to be provided to San Bernardino County Flood Control District for
widening and placement of sidewalks on seven bridges over Deer Creek
being constructed in conjunction with the Corp of Engineers Flood Control
Project. (SB 325)
4. Carnelian Street Realignment $400,000
The realignment of Carnelian Street between Church Street and Vineyard
Avenue to remove hazardous curves (Systems Funds) (Gas Tax)
S. Sapphire Street Reconstruction $ 21,000
The reconstruction of failing pavement sections between Hillside and
Thoroughbred (SB 325) (Gas Tax)
6. Archibald Reconstruction $ 30,000
The reconstruction of failed pavements at Banyan Street and South of
Highland Avenue (SB 325) (Gas Tax)
7. Demens Equestrain Bridge $ 15,000
The construction of an equestrian and pedestrian bridge over Demens at
Jasper Street (Systems)
8. Base Line Widening $140,000
Probable cooperative project with developer to widen and reconstruct
portions of the north side of Base Line from Hermosa to Haven (Systems)
9. Design Assessment District 79-1 $ 30,043
Loan to Industrial Assessment District 79-1 for the Design of Streets
(Gas Tax)
II !
1981-82 Capital Improvement irogram
407 Page 2
Oil STORM DRAIN FUNDS
1. Design Assessment District 79-1 $400,000
One year loan to Industrial Assessment District 79-1 for design
of storm drains.
2. Design Storm Drain 2-G $ 50,000
Design of storm drain 2-G from Beryl and 19th Street to Hellman
Avenue at the Cucamonga Storm Drain.
3. Construction Minor Drainage Facilities $100,364
Construction of minor nuisance and storm drain improvements such
as extension of catch basins at Sapphire and Banyan, addition of
catch basin at Fourth and Archibald, and nuisance drain at Beryl
and 19th Street.
4. Design and Planning Studies $ 50,000
•
Provision of fund for various master plan and other drainage
studies that may be required to deal with unforeseen problems
developed during the year.
BEAUTIFICATION FUNDS
1. Carnelian Landscape Project $200,000
The landscaping of Carnelian Avenue between San Bernardino Road
and Base Line to be phase constructed by maintenance crews.
/ •