Loading...
HomeMy WebLinkAbout81-67 - Resolutions RESOLUTION NO. 81-67 A RESOLUTION OF THE RANCHO CUCAMONGA PLANNING COMMISSION RECOMMENDING APPROVAL OF 1981-82 CAPITAL IMPROVEMENTS PROGRAM AND FINDING OF CONSISTENCY WITH THE GENERAL PLAN. WHEREAS, on the 27th day of May, 1981 the Rancho Cucamonga Planning Commission held a meeting to consider the attached proposed Capital Improvements Program; and WHEREAS, the Rancho Cucamonga Planning Commission concurs in the recommended program as proposed; and WHEREAS, the proposed program conforms to the Elements of the General Plan. NOW, THEREFORE, BE IT RESOLVED, that the Rancho Cucamonga Planning Commission hereby: SECTION 1: Find that the attached Capital Improvement Program is in confromance with the General Plan of Rancho Cucamonga. SECTION 2: Recommends approval of the attached proposed Capital Improvements Program for the 1981-82 fiscal year to the City Council of Rancho Cucamonga for its adoption. APPROVED AND ADOPTED THIS 10TH DAY OF JUNE, 1981. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: 4:44, G 'ichard Dahl , Chair an ATTEST: Allci 0 Secretary of the Plannin' Commission I , JACK, LAM, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga at a regular meeting of the Planning Commission held on the 10th day of June, by the following vote to-wit: AYES: COMMISSIONERS: Tolstoy, Rempel , King, Sceranka, Dahl MO NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None j 1981-82 Capital Improvement Program ,a 1. Vineyard Avenue Widening $480,000 . The widening of Vineyard Avenue from Arrow Route to Eighth Street from two to four lanes with the installation of a traffic signal at Arrow Route and railroad crossing protection at the Santa Fe Railroad (Federal Aid Urban funding of 84%) (Portion Gas Tax) 2. North Town Street Improvements (Phase 2) $163,965 The construction of curbs, gutters and sidewalk on the residential streets of Main, Feron, and Reid just east of Archibald Avenue (Community Development Block Grand Funds - CDBG) (Portion Gas Tax) 3. Deer Creek Bridges $258,241 Funds to be provided to San Bernardino County Flood Control District for widening and placement of sidewalks on seven bridges over Deer Creek being constructed in conjunction with the Corp of Engineers Flood Control Project. (SB 325) 4. Carnelian Street Realignment $400,000 The realignment of Carnelian Street between Church Street and Vineyard Avenue to remove hazardous curves (Systems Funds) (Gas Tax) S. Sapphire Street Reconstruction $ 21,000 The reconstruction of failing pavement sections between Hillside and Thoroughbred (SB 325) (Gas Tax) 6. Archibald Reconstruction $ 30,000 The reconstruction of failed pavements at Banyan Street and South of Highland Avenue (SB 325) (Gas Tax) 7. Demens Equestrain Bridge $ 15,000 The construction of an equestrian and pedestrian bridge over Demens at Jasper Street (Systems) 8. Base Line Widening $140,000 Probable cooperative project with developer to widen and reconstruct portions of the north side of Base Line from Hermosa to Haven (Systems) 9. Design Assessment District 79-1 $ 30,043 Loan to Industrial Assessment District 79-1 for the Design of Streets (Gas Tax) II ! 1981-82 Capital Improvement irogram 407 Page 2 Oil STORM DRAIN FUNDS 1. Design Assessment District 79-1 $400,000 One year loan to Industrial Assessment District 79-1 for design of storm drains. 2. Design Storm Drain 2-G $ 50,000 Design of storm drain 2-G from Beryl and 19th Street to Hellman Avenue at the Cucamonga Storm Drain. 3. Construction Minor Drainage Facilities $100,364 Construction of minor nuisance and storm drain improvements such as extension of catch basins at Sapphire and Banyan, addition of catch basin at Fourth and Archibald, and nuisance drain at Beryl and 19th Street. 4. Design and Planning Studies $ 50,000 • Provision of fund for various master plan and other drainage studies that may be required to deal with unforeseen problems developed during the year. BEAUTIFICATION FUNDS 1. Carnelian Landscape Project $200,000 The landscaping of Carnelian Avenue between San Bernardino Road and Base Line to be phase constructed by maintenance crews. / •