HomeMy WebLinkAbout1989/04/20 - Agenda Packet CITY OF RANCHO CUCAMONGA ~~
MEMORANDUM
DATE: April 24, 1989 ACTION CeI~4ENTS ~
TO: Commercial/Ind-strial 1977
)sign Review Comit~e Suzanne Chitlea
Pe~r Tols~y
Dan Coleman
David Blakesley (Al~rna~)
FR): Bruce Abbott, Ass~iate Planner
SU~ECT: DESIGN REVI~ C)MI~EE MEETING OF APRIL ~, 1989
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your conmerits using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Conmnittee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Conmission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner. can be properly ordered and the necessary arrangements made.
5:00- 5:30 DINNER
6:00- 6:30
(Bruce} ENVIRO~4ENTAL ASSESSMENT AND DEVELOPMENT REVIEW 88-04 -
CARNEY-THEODOROU The development of an 11.26 acre
industrial park Master Plan consisting of eight
buildings totaling 165,700 square feet in the Industrial
Park and Haven Avenue Overlay Districts located at the
southeast corner of Haven Avenue and Arrow Route
APN: 209-142-17.
6:30- 7:00
(Brett) ENVIRO~IENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-
28 - PERRY The development of a 5,580 square fool
retail building on 0.52 acres of land within an existing
shopping center in the Conmunity Conmercial District of
the Foothill Specific Plan, located on the southwest
corner of Foothill Boulevard and Malachite Avenue -
APN: 208-261-20.
DESIGN REVIEW AGENDA
APRIL 20, 1989
Pa9e 2
7:00 - 7:30
(Brett) ENVIROfltENTAL ASSESSMENT AND TENTATIVE TRACT 13351
LEWIS HOMES - A residential subdivision and design
review of 120 condominiums on 5 lots and 8 single family
lots on 9.07 acres of land in the Medium Density
Residential District (8-14 dwel ling units per acre)
within the Tetra Vista Planned Conmunity located at the
southwest corner of Tetra Vista Parkway and Milliken
Avenue - APN: 1077-091-34.
7:30 - 8:00
(Cynthia) ENVIROMIENTAL ASSESSMENT FOR DEVELOPMENT REVIEW 89-01 -
BARTON DEVELOPMENT - The development of 3 industrial
buildings totaling 22,772 square feet on 1.28 acres of
land in the General Industrial District (Subarea 8) of
the Industrial Area Specific Plan located at the
southeast corner of Utica Avenue and Fulton Court
APN: 209-142-51.
8:00 - 8:3D
(Cynthia) ENVIRO~ENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-49 -
AjA/BENNETT - The development of 40 acres of Industrial
Master Plan consisting of 18 lots in the General
Industrial District, (Subarea 5) located at the west
side of Hermosa Avenue to the north and south of 7th
Street - APN: 209-211-13, 17, 30 and 31.
8:30
(Jeff) AWARDS OF DESIGN EXCELLENCE - CITY OF RANCHO CUCAMONGA -
A Planning Commission workshop to determine the award
finalists to be presented at the 3rd Annual Awards of
Design Excellence May 8, 1989. Separate Planning
Conmission Action minutes.
BA:mlg
At tac hme nts
CC: Planning Conmission/City Council
Conxnercial/Industrial
CON,.~ENT CN. DIDAR ITEMS AGENDA
April 20, 1989
1. DR 87-14 MANCHING LAM
(Cynthia) Review modified building elevations.
Committee Action: Proposed modifications to building
elevations were denied.
2. DR 88-44BARASCH
(Cynthia) Review modified site plans and
elevations.
Committee Action: The Committee recommended denial of
the proposed project. Building
elevations were not consistent with
previous Design Review Comnittee
directions for an enhanced building
entry. Further, a landscape planter
should be provided on exterior of
employee plaza area.
3. DR 87-16 NUWEST
(Brett) Review Sign Program.
Committee Action: The Committee recommended approavl of
the sign program subject to the
following conditions:
1. The ceramic tile on the pilasters
of all monument signs should be
eliminated and provided with a 2-
tile by 2-tile square as used on
other areas of the wall.
2. The 2-tile by 2-tile square
should also be used below the
delivery sign. The field of tile
should be eliminated.
3. The cap for the monument signs
and walls should be revised to
include a detail similar to the
cornice detail used in the
building elevations.
CONSENT CALENDAR AGENDA
APRIL 20, 1989
Page 2
4. DR 87-19 LENNONARCHITECTS
(Tom) Review revisions to building
elevations,
Committee Action: No action taken,
5. DR 88-25 LENNON
(Cindy) Review revised building elevations.
Committee Action: The Committee did not approve the
requested changes to the elevatios.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Bruce April 20, 1989
ENVIRO~i4ENTAL ASSESSMENT AND DEVELOPMENT REVIEW 88-04 - CARNEY-THEODOROU
The development of an 11.26 acre industrial park Master Plan
consisting of eight buildings totaling 165,700 square feet in the
Industrial Park and Haven Avenue Overlay Districts located at the
southeast corner of Haven Avenue and Arrow Route - APN: 209-142-17.
Background:
On October 6, 1988, the Design Review Conmittee discussed proposed
architectural revisions to two three story office buildings within an
approved 11.25 acre Mastor Plan development at the southeast corner of
Haven Avenue and Arrow Route in the Haven Avenue Overlay District. At
its January 19, 1989 meeting, the Design Review Conmittee reviewed the
schematic plaza design for the three story office buildings as part of
the conditions of approval for DR 88-04.
Staff Comments:
The applicants are now requesting review and approval of materials and
colors for the two proposed three story office buildings. The
applicants' will be providing samples of materials and colors with
labeled elevations and color photographs of the proposed buildings for
review and conmnent at the meeting.
Oesign Review Comittee Action:
Members Present: Suzanne Chitlea, Petor Tolstoy, Dan Coleman
Staff Planner: Bruce Abbott
The Design Review Committee examined building elevations with material
descriptions and they reviewed actual samples of the dark blue glass and
12" x 12" grey tile for the proposed building. The applicants also
showed a charcoal grey, smooth marble that is proposed for columns at
the building entrances. Grey polished ceramic tile will be used in
horizontal banding separated from flamed or textured ceramic tile with
clear anodized aluminum reveals. Aluminum reveals will align with the
horizontal glazing mullions. The Design Review Committee approved the
materials, colors and use of the materials as proposed for the project.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Brett April 20, 1989
ENVIRO)ENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-28 - PERRY - The
development of a 5,580 square foot retail building on 0.52 acres oF land
within an existing shopping center in the Conmunity Conmercial District
of the Foothill Specific Plan, located on the southwest corner of
Foothill Boulevard and Malachite Avenue - APN: 208-261-20.
Staff Co~ents:
On December 7, 1989, the City Council directed the applicant to return
to this Committee for additional review of the project. Based on the
Planning Conmission's concerns raised at the September 14, lg88 meeting,
and based on staff's review of the revised plans, the following items
need to be addressed by the Conmittee.
1. The rear elevation should be enhanced, perhaps with a roof tile
element.
2. Additional store front detailing is needed, such as multi-paned
windows, tile, etc.
3. The Master Plan should be designed to meet current City Standards.
4. Planters should be provided outside the store fronts.
5. A true building overhang (arcade) should be provided along the east
elevation. If not, the column reveal size should be increased.
Oesign Review Comittee Action:
Members Present: Suzanne Chitlea, Peter Tolstoy, Dan coleman
Staff Planner: Brett Homer
The Committee directed the applicant to return to the Committee with the
following revisions made and issues addressed:
1. The Master P1 an should be completely revised. The plan should
include a new site plan for the corner parcel to the north of the
proposed addition, for the residential parcel to the south, and the
area behind the existing shops building. In general, the Committee
was concerned with the "locking-in" of these parcels due to the
configuration of the proposed addition.
2. The Master Plan should conform to all Foothill Specific Plan
standards and all City requirements.
3. A colonnade should be added to the east elevation. Full detailing
should be provided underneath the canopy. The colonnade should
wrap around the south elevation.
DESIGN REVIEW CO1MENTS
CUP 88-28 - PERRY
APRIL 20, 1989
Page 2
4. Pre-cast (round) stone columns should be utilized for the
colonnade.
5. Stone or similar material should be used to accent the arches
between the columns.
6. 2-3 storefront design schemes should be utilized. The stoKefronts
should contain appropriate detailing, such as a base, multi-paned
windows, tile accent. etc.
7. The rear elevation should include a tile roof element and
architectural enhancement along the facade. Tree, shrub, vine, and
groundcover planting should be provided behind the proposed
addition.
8. The accent color should be revised.
A meeting with the property owners, leasees, City staff, and others
involved with the shopping centor expansion should be scheduled to
discuss the proposed renovation of the center.
DESIGN REVIEW CClIMENTS
7:00- 7:30 Brett April 20, 1989
ENVIROtlIENTAL ASSESS)iENT AND TENTATIVE TRACT 13351 LEWIS HOMES - A
residential subdivision and design review of 120 condominiums on 5 lots
and 8 single family lots on 9.07 acres of land in the Medium Density
Residential District (8-14 dwelling units per acre) within the Tetra
Vista Planned Conmunity located at the southwest corner of Tetra Vista
Parkway and Milliken Avenue - APN: 1077-091-34.
Staff Coments:
This project was previously reviewed on February 16, 1989. The
following are areas of concern based on previous Committee comments and
staff's review of the revised plans:
Site Plan:
1. One unit has not been.deleted from Building 19 per the Conmittae's
direction. However, the setback has been increased from 15 feet to
24 feet.
2. Parking stalls close to site boundary (by Buildings 10 and 19)
should be relocated or eliminated.
Architecture:
1. The perimeter wall design, architectural design "theme", roof tile,
and color scheme has been revised. However, additional
architectural detailing may be needed, particularly on the side
elevations.
Design Review Conmittee Action:
Members Present: Suzanne Chitlea, Peter Tolstoy, Dan Coleman
Staff Planner: Brett Homer
The Conmittee reconmended approval of the project subject to the
following conditions:
1. The B-reverse and (A) units should be deleted from Building 10 to
provide more distance to the existing homes to the south. The
parking stalls in this area should also be relocated to provide
more of a landscape setback.
2. The rear lot line on lot 6 should be revised to provide more
backyard area.
3. Special detailing, such as wood rafters or brackets/beams should be
provided at the bottom of the second story building overhangs above
the garages. The details should be reviewed and approved by the
Planning Division.
DESIGN REVIEW C04MENTS
TT 13351 - LEWIS HOMES
APRIL 20, 1989
Page 2
4. Stucco trim should be used around the inset underneath the stairs
on the side elevations. This detailing should also be used around
the shower adjacent to the recreation building.
5. The gas meters and all other utility fixtures should be screened
with low walls, berming, or landscaping. These fixtures may also
be enclosed within the outdoor storage areas.
6. The green accent color should be changed to less intense hue.
DESIGN REVIEW COMMENTS
7:30- 8:00 Cynthia April 20, 1989
ENVIRO~4ENTAL ASSESSMENT FOR DEVELOPMENT REVIEW 89-01 BARTON
DEVELOPMENT - The development of 3 industrial buildings totaling 22,772
square feet on 1.28 acres of land in the General Industrial District
(Subarea 8) of the Industrial Area Specific Plan located at the
southeast corner of Utica Avenue and Fulton Court - APN: 209-142-51.
Design Parameters:
This is Phase IV of a previously approved Master Plan. The proposal is
consistent with the Master Plan and existing development.
Design Review Comittee ~tion:
Members Present: Suzanne Chitlea, Peter Tolstoy, Dan Colemen
Staff Planner: Cynthia Kinset
The Conmittee reviewed the proposed project and reconmended that revised
plans be resubmitted for Consent Calendar review prior to consideration
by the Planning Conmission, The revised plans should include the
fol 1 owing:
1. Rounded corners should be provided at building entry, six inch
minimum radius.
2. Painted band should be removed. Reveals should be painted with a
light color.
3. Spandrel glass should be provided above entry. Glass color should
be consistent with accent color.
4. A parkway should be provided between the curb and straight sidewalk
on both Utica Avenue and Jersey Boulevard.
5. Provide 2 sketches of building elevations, one with accent color at
building entry, the other with no accent color.
DESIGN REVIEW COMMENTS
8:00 - 8:30 Cynthia April 20, 1989
ENVIROh~4ENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-49 - AJA/BENNETT -
The development of 4D acres of Industrial Master Plan consisting of 18
lots in the General Industrial District, (Subarea 5) located at the west
side of Hermosa Avenue to the north and south of 7th Street - APN: 209-
211-13, 17, 30 and 31.
Design Parameters:
This is a proposal for a 40 ache Master Plan. At this time, no
development is proposed.
Staff Coments:
The following is a list of concerns and/or conments that should be
addressed by the Design Review Committee.
Site Plan:
1. Review truck/car/rail spur conflict along south property line.
2. Buildings on north side of 7th Street should have greater variation
in building setbacks.
3. The site falls within the rail service requirement, applicant does
not proposed a rail spur along north property line due to Municipal
Water District easement.
4. Design/Development guideli nes for the future development of the
lots should address such issues as, minimum landscape area per lot,
employee plaza area, truck parking, etc.
Landscaping:
1. Landscape planters should be incorporated on all building
elevations.
Oesign Review Committee Action:
Meters Present: Suzanne Chitlea, Peter Tolstoy, Den Colemen
Staff Planner: Cynthia Kinset
The Conmittee reviewed the proposed master plan and reconmended that
revised plans be resubmitted for Consent Calendar review prior to
consideration by the Planning Conmission. The revised plan should
include the following:
1. Building on north side of 7th Street should provide greater
building setback variation.
DESIGN REVIEW C04MENTS
DR 87-49 - AjA/BENNETT
APRIL 20, 1989
Page 2
2. Rail service should be inclusive of all lots along the north, south
and west project boundary.
3. Buildings size should be increased to accomnodate rail service
usage.
4. Landscape planters and/or tree wells should be included within all
parking areas and along all building elevations.
5. Development/Design guidelines should be revised and submitted for
review.