MEMORANDUM
DATE: August 7, 1989 ACTION COMMENTS
TO: Commercial/Industrial 1977
Design Review Committee Suzanne Chitiea
Peter Tolstoy
Dan Coleman
Betsy Weinberger {Alternate)
FROM: Bruce Abbott, Associate Planner
SUBJECT: DESIGN REVIEW COMMITFEE MEETING OF August 3~ 1989
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each. project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Conmission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
{Steve H.} ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 86-
20 - WESTERN PROPERTIES - The development of a businesb
park consisting of six {6} buildings totaling 160,155
square feet on 12.9 acres of land in the Office Park
District of the Tetra Vista Planned Community, located
at the northeast corner of Elm Avenue and Town Center
Drive - APN: 1077-421-06, 1077-091-17.
6:30 - 7:00
{Steve H.} ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 89-14 -
AMPAC - The development of two manufacturing buildings
totaling 24,400 square feet on 39.3 acres of land in the
Heavy Industrial District (Subarea 151 of the Industrial
Specific Plan, located at 12167 Arrow Route - APN: 229-
121-15.
DESIGN REVIEW AGENDA
AUGUST 3, 1989
Page 2
7:00 - 7:30
(Steve H.) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 89-07
GILBERT AJA - The development of three industrial
buildings totaling 116,150 square feet on 6.06 acres of
land in the Industrial Park District (Subarea 12) of the
Industrial Specific Plan, located south of 6th Street,
east of Pittsburgh Avenue - APN: 229-263-22.
BA:mlg
Attachments
cc: Planning Commission/City Council
COt4HERCIAL/INDUSTRIAL
CONSENT CALENDAR ITE]4S AX~ENDA
AUGUST 3, 1989
1. CUP 8g-35 - HUGHES)
(Steve H. ) Review of maximum storefront width for
signs.
Committee Action: The Committee did not recommend
approval of the proposed maximum
storefront width for signs of 80
percent. The Committee recommended a
maximum storefront width coverage of
70 percent.
2. CUP 85-19 - RUBY)
(Bev) Review proposed colors.
Committee Action: (Weinberger, McNiel, Coleman) the
Committee approved the use of "Snowy
Peach" for the #2 color and "India
Spice" for the #3 color. The
Committee requested that a test strip
be painted for review and approval
prior to painting the entire building.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Steve H. August 3, 1989
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 86-20 WESTERN
PROPERTIES - The development of a business park consisting of six (6)
buildings totaling 160,155 square feet on 12.9 acres of land in the
Office Park District of the Terra Vista Planned Community, located at
the northeast corner of Elm Avenue and Town Center Drive - APN: 1077-
421-06, 1077-091-17.
Background:
On June 22, 1989, the Committee reviewed a revised color schem~ for the
Terra Vista Business Park as a Consent Calendar item. The Committee did
not recommend approval of the new schem~ due to the similarities with
the approved color schemes for the Terra Vista Town Center and
Professional Center. The applicant was directed to prepare a different
color scheme that incorporates a lighter hue, and that a proposed roof
screening material be reviewed concurrently that incorporates the
requested color scheme.
Staff Conments:
1. Color boards from Town Center and the Professional Center will be
available for review with proposed color samples for Terra Vista
Business Park. A sample of the roof screening material will also
be available for review at the meeting.
Design Review Committee Action:
Members Present: Larry McNiel, Betsy Weinberger, Dan Coleman
Staff Planner: Steve Hayes
The Committee approved the revised color board (utilizing a taupe base
and a blue and teal accent color scheme) as presented.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Steve H. August 3, 1989
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 89-14 - AMPAC - The
development of two manufacturing buildings totaling 24,400 square feet
on 39.3 acres of land in the Heavy Industrial District (Subarea 15) of
the Industrial Specific Plan, located at 12167 Arrow Route - APN: 229-
121-15.
Staff Conments:
Landscape:
1. Additional trees along the west property line, and in all parking
areas.
2. Installation of landscaped planters around the proposed dry cast
building perimeter.
3. Appropriate freeway slope planting abutting the project site.
Architecture:
1. Additional detail to proposed buildings, including variation in
building form.
2. Proposed materials, color scheme, and exterior fingers.
Design Review Conmittee Action:
Members Present: Larry McNiel, Betsy Weinberger, Dan Coleman
Staff Planner: Steve Hayes
The Committee did not recommend approval of the project as proposed.
The following items should be addressed by the applicant in revised
plans for further Committee review.
1. Columnar evergreens {such as Poplar or Cypress trees} should be
provided along the west property line, instead of Oleanders. The
spacing shall depend on the species selected by the applicant and
the growth characteristics exhibited for the purpose of providing
additional screening of the site from the regional trail.
2. Landscaped planters with radius curves should be provided along the
dry cast building perimeter wherever possible. T13e palette within
the planters should include evergreen shrubs and annual color of
low profile.
3. Provide a slope planting plan for the section of the site that
abuts the freeway for review and approval of the City Planner.
DESIGN REVIEW COMMENTS
DR 89-14 - AMPAC
Page 2
4. A chain link fence should be provided for safety purposes around
the interim detention basin, whether located on-site or within the
Southern California Edison right-of-way.
5. The architectu re of the proposed dry cast building should be
revised to not exhibit a pre-engineered look. A kinar finish and
rounded corners were recommended as possibilities for enhancement.
DESIGN REVIEW COMMENTS
7:00 - 7:30 Steve H. August 3, 1989
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 89-07 GILBERT AJA -
The development of three industrial buildings totaling 116,150 square
feet on 6.06 acres of land in the Industrial Park District (Subarea 12)
of the Industrial Specific Plan, located south of 6th Street, east of
Pittsburgh Avenue - APN: 229-263-22.
B ack~ round:
This project is within the Mission Business Center. A Master Plan (DR
88-20) for Mission Business Center was approved on September 14, 1988.
Staff Comments:
Site Plan:
1. Number of dock high doors for Industrial Park.
2. Domination of parking areas as seen from the street.
3. Distribution of compact parking spaces.
Landscape:
1. Plant palette inconsistent with proposed Master Plan Design
Guidelines.
2. Additional evergreen trees near entrance of Building 5.
Architecture:
1. Additional articulation at building entry areas.
2. 360 degree treatment to architecture.
3. Variation in building form.
Design Review Conmittee A~tion:
Members Present: Larry McNiel, Betsy Weinberger, Dan Coleman
Staff Planner: Steve Hayes
The Committee did not approve the project as proposed. The following
items should be addressed by the applicant on revised plans for Consent
Calendar review by the Committee:
1. The compact parking stalls should be distributed more evenly
throughout the site.
DESIGN REVIEW COMMENTS
DR 89-07 - GILBERT AJA
Page 2
2. The following details should be shown on the revised building
elevations:
a) Provide spandrel glass in areas visible from the streets.
Also, spandrel glass should wrap around to the side elevations
of the building.
b) The building entrances should be altered or angled to avoid a
"fixed" design.
c) The building walls need to be articulated to help vary the
building form, especially in areas visible from streets.
3. Provide trees that will aid in creating a "focal point" for each
building.
The Committee requested the applicant to prepare a perspective drawing
and sketches of the entry areas for each building. Revised colored
building elevations and site plans were also requested to be submitted.
CITY OF RANCHO CUCAMONGA
MEMORANDUM
DATE: August 1I, 1989
1977
TO: Chairman and Members of the Planning Commission
FROM: Otto Kroutil, Deputy City Planner
SUBJECT: AUGUST 17~ 1989 PLANNING COMMISSION WORKSHOP: THE CONCOURSF
AT RANCHO CUCAMONGA: FORMA/MESSENGER INVESTMENTS A
preliminary Master Plan ~r a 300-acre mixed use development
located on the west side of Milliken Avenue, between 4th and
8th Streets.
I. BACKGROUND: For the past several months, staff has been involved
in preliminary discussions with Messenger Investments and their
consultant, FORMA, as to the development potential of the General
Dynamics site. Because of the scale of this project (300 acres)
and its scope, it was agreed that the preparation of a Master Plan
would be appropriate, and that the Planning Commission should be
involved early in the design process.
Recently, an initial concept for such a Master Plan was submitted
for staff and Commission review. The purpose of this informal
workshop is (1) to familiarize the Commission with the project,
(2) to discuss several key issues, and (3) to provide initial
feedback to the applicant and staff.
It should be noted that the information avail able at this time is
very conceptual. As the concept is refined, detailed studies will
be required to determine the appropriate level of necessary
improvements and to confirm the validity of the plan concept.
II. PROJECT DESCRIPTION: The Master Plan encompasses about 300 acres
and covers virtually all of the vacant land between Milliken and
Cleveland Avenues, south of the AT & SF Railroad. General
Dynamics will, however, retain the existing tracking facility in
the northeast corner of the site, adjacent to the future Milliken
underpass.
The Industrial Specific Plan, Subareas 10, 11 (General Industrial)
and 12 (Industrial Park) regulate the development of the site,
with requirements for rail service in the northerly portion of the
project. The proposed Master Plan is generally based on the
existing ISP land use and circulation pattern, but there are some
significant differences.
The proposal calls for the development of a mixed use project,
with a wide range of uses and activities. The southern half
(south of 6th Street) is planned for higher and generally more
MEMO TO: PLANNING COMMISSION
RE: 8/17/89 PC WORKSHOP
August 11, 1989
Page 2
intense uses, with an entertainment/retail/hotel/office complex at
its core. This complex, oriented around a strong pedestrian element
(the concourse?) would become the focus of the entire project. We
are told this area could include a convention/conference center, a
recreational facility/fitness center, and mid-rise office
structures.
Separated from the core by a loop road would be a series of office
projects, and yet to be defined retail facilities. A lO-acre
residential site has also been incorporated into this area.
The north half of the project is to be more consistent with current
development patterns in the industrial area; a mix of multi-tenant
industrial buildings, warehouse/distribution facilities, and
offices. Rail service is to be provided in the area north of 7th
Street.
III. ISSUES FOR DISCUSSION: As already noted, the project is generally
based on the ISP, but there are some potentially significant
differences in land use.
o RETAIL COMMERCIAL: The plan calls for about 10 acres of
retail, which is at this point not defined. The ISP allows
certain retail commercial activities in this area, but the
focus is on support commercial rather than consumer
retailing. In other words, restaurants, convenience sales, and
business support sales and services are appropriate, but
supermarkets, drug stores and general sales are not. The
proposed plan does not, at this point, define the type of
commercial uses desired.
o RESIDENTIAL USE: About 10 acres on the south side of 6th
Street is proposed to be designated for multi-family
residential. This would be a significant departure from
existin9 land use policies, in that there are no other
residential areas planned within the ISP. There may be some
advantages to providing a residential element within a high
intensity employment area. At the same time, it would be
difficult to provide the amenities and services a residential
environment requires.
o OVERALL PROJECT INTENSITY: The site is located strategically
near two major freeways, each with access to the Ontario
Airport. It is adjacent to the Ontario Center, a major mixed
use project on the south side of 4th Street. It is also a
major entry to the City of Rancho Cucamonga.
MEMO TO: PLANNING COMMISSION
RE: 8/17/89 PC WORKSHOP
August 11, 1989
Page 3
The ISP allows portions of the site to be developed with
relatively high intensity uses. However, the intensity of
development will and must be controlled by the ability of the
surrounding circulation system to carry traffic to and from the
site. We have requested a traffic study to assess this issue,
and although an initial report has been submitted, the Traffic
Engineer considers the report inadequate at this time.
Significant additional work will need to be done before this
question can be answered.
o URBAN DESIGN/COMMUNITY CHARACTER: The land plan is organized
around the circulation system, with strong diagonal axes in the
south half of the project to provide pedestrian connections.
The north and south halves of the site are joined by a
connector street, which includes a landscaped median. Palm
trees are used to identify all of the major interior
connections, and all major corners include entry statements
which again use palms as a major design element.
Landscaping along the perimeter of the project appears
generally consistent with the established design theme for the
peripheral streets (Milliken, 4th, 6th, and Cleveland). It
should be noted that the placement of structures toward the
interior of the site would leave relatively large expanses of
parking adjacent to the major peripheral arteries. This is a
practice that has been discouraged by the Commission in the
past.
At this point, no architectural concept has been developed for
the project. We are looking for feedback on this issue so that
appropriate guidelines can be developed. It has been suggested
that a defined "theme" is not appropriate for a project of this
size and scope.
IV. COMMISSION ACTION REQUESTED: No formal action is appropriate at
this time. The p pose of the workshop iS to provide an informal
setting f discu sion. The Commission is encouraged to discuss the
project asl~ que tions, and provide informal feedback on the issues
raise in tl~is o or any other topic of interest.
Respectfi~.~nt.t~me~~ ~
OK:ko '
t
ME$SENGERINVESTMENTCOMpANy
August 10, 1989
Mr. Larry McNiel
Chairman, Planning Commission
City of Rancho Cucamonga
9320 Baseline Road
Rancho Cucamonga, CA 91730
Dear Mr. McNiel:
Messenger Investment Company is pleased to present 'q'he Concourse at Rancho
Cucamonga", a Master Planned Mixed-Use' Development to the Commission for
your review and direction. This project is envisioned as an urban center unique
~n its uses, layout and style.
The property is located in a key area at the entrance to the community, allowing
the land use plan to evolve with the type of development Rancho Cucamonga
would like to attract. Our design and marketing team have spent many hours
carefully developing a product which is realistic in its concept and
implementation. We have also worked continually through the design process
with the City Staff and believe we have addressed any concerns they have
expressed.
The urban center concept is a proven method of secure and balanced
development in Southern Cahfornia. Although an interrelated mixed-use plan
is new to your area, we fully believe that the combination of rapid growth and
expanded "lifestyle" expectations make this project concept a natural for the
location. The mixing of uses is the key to successfully responding to an
uncertain and flexible future.
We look forward to meeting with you and presenting this exciting project.
Very truly yours,
MESSENGER INVESTMENT COMPANY
Executive Vice President
175~2 Van Karrnan Avenue, InAne, CA 92774 7~4/474-~300 Facsimile: 7'14/474-84~f
THE CONCOURSE
AT RANCHO CUCAMONGA
A MASTER PLANNF-D ~.D USE DEVELOPMENT
MESSI:NGER|NVESTMENTCOMPANY
THE CONCOURSE
AT RANCHO CUCAMONGA
A MASTER PLANNED MIXED USE DEVELOPMENT
STATISTICAL SUMMARY
USE ACRES
DISTRIBUTION/WAREHOUSE
INDUSTRIAL 98.6
MULTI-TENANT 24.0
OFFICE 90.4
RETAIL 17.9
ENTERTAINMENT/RETAIL 36.4
RESIDENTIALTPARK 10.1
ROADWAY' 19.6
~OTAL
297.0
LAND USE I~LAN
DISTRIBUTION
WAREHOUSE/
· INOUSTRIAL NOT A ~
EXISTING ZONING
LEGEND
ATCHISON, TOPi~KA & SANTA FE RAILROAD
SUBAREA 10
GI~NERAL INOUSTRIAL
.,~" ,L'r.,.~
~'T-:'..7,':~'_-L:.--"
~".~e,T~,-- .---
:/E:'~:+j"~-"'-,-:-.' ........
T H E C O N C O U R S E A MASTER pLANNED MIXED USE DEVELOPMENT
PI~,OPOSED ZONING
THE ONTARIO CF, NIER
DEVELOPMENT ptlASING pLAN
LEGEND- !1
AREA YEAR ACRES
PHASE 1 1990 37.4
PHASE 2 1992 73.4
PHASE 3 1994 59.1
I~PHASE 4 1996 43.8
PHASE 5 1998 19.4
PHASE 6 2000 44.3
6'm ~
SUB-TOTAL 277.4
AREA 19°6
TOTAL 297.0
A MASTER pLANNED MIXED USE DEVELOPMENT
CO NCO U R S E ,~,',,,
T H E 'C O N C 0 U R S E A MASTER PLANNED MIXED USE DEVELOPMENT
rl~,~,, ~ r JOR~
I~ .. MILLIKEN AVE./FOURTll STREET STREETSCAPE
SI~WALK
LANDSCAF~ EDG~
A MASTER pLANNED .',I[XED USE DEVELOPMENT
THE CONCOURSE
LANDSCA,aE EDGE
T H E C 0 N C 0 U R S E A~As'r~ap~.Ar~o ~.X~DUSE
^'r ,~nclmo CUC~ONO~ l~r.~,l~)~[x
L~ EDC~
A MASTER pLANNED MIXED USE DEVELOPMENT
T H E C O N C 0 U R S E A MASTER PLANNED MIXED USE DEVELOPMENT
S~WALK
LAFIT~:C~ EDGE
A M,d. STER pLANNED MIXED USE DEVELOPMENT
THE CONCOURSE ~.,,~,,,r,,lUe~
PROJECT CROSS-SECTIONS
$ECTIO~ C-C
T H E C 0 N C 0 U R S E A MASTER pLANNED MlXED USE DEVELOPMENT