HomeMy WebLinkAbout1989/09/07 - Agenda Packet CITY OF RANCH0 CUCAMONGA
MEMORANDUM
DATE: September 11, 1989 ACTION CO[~MENTS
TO: Conm~ercial/Industrial
Design Review Committee Suzanne Chitlea
Peter Tolstoy
Dan Coleman
Betsy Weinberger (Alternate)
FROM: Bruce Abbott, Associate Planner
SUBJECT: DESIGN REVIEW COMMITFEE MEETING OF September 7~ 1989
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
(Bruce) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-49 -
AJA/BENNETT - The development of 40 acres of Industrial
Master Plan consisting of 18 lots in the General
Industrial District (Subarea 5) located at the west side
of Hermosa Avenue south of 22nd Street.
APN: 209-211-30, 31, 17 and 13.
6:30 - 7:00
(Vince) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 89-20 -
GRACE RESTAURANT COMPANY - The design review of building
elevations and detailed site plan for a 6,100 square
foot restaurant within an existing commercial shopping
center in Terra Vista Planned Community located on the
northeast corner of Haven Avenue and Base Line Road.
APN: 1076-~1-31.
BA:mlg
Attachments
cc: Planning Commission/City Council
COI4HERCIAL/INDUSTRIAL
CONSENT CALENDAR ITEHS AGENDA
September 7, 1989
1. MDR 8g-23 - SIMMONS CABLE
(Vince) Review revised elevations.
Committee Action: The revised elevations were approved
as presented.
2. CUP 88-35 - HUGHES INVEST.
{Steve H.} Review of proposed bulkhead material.
Committee Action: The Committee approved the material
change of the bulkheads from ceremic
tile to fishscale wood siding as
presented. The Committee again
expressed the need for angular pop-
outs for all storefront entries with
additional articulation above the
entrances. It was suggested that the
white color be carried up the front of
the building, thereby, unifying the
storefronts.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Bruce Septe~er 7, 1989
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-49 - AJA/BENNETT -
The development of 40 acres of Industrial Master Plan consisting of 18
lots in the General Industrial District (Subarea 5) located at the west
side of Hermosa Avenue south of 22nd Street. APN: 209-211-30, 31, 17
and 13.
Background:
The proposal for a 40 acre industrial development master plan was
reviewed by the Design Review Committee (Suzanne Chitiea, Peter Tolstoy
and Dan Coleman) on April 20, 1989. During that meeting the Committee
recommended that development guidelines for the future construction on
the lots be submitted to the Design Review Committee for review and
approval. The Committee also recommended that revised plans be
resubmitted for review prior to scheduling for the Planning
Commission. The revised plans should include:
1. Buildings on north side of 7th Street should provide greater
building setback variation.
2. Rail service should be inclusive of all lots along the south and
west project boundary.
3. Buildings size should be increased to accommodate rail service
usage.
4. Landscape planters and/or tree wells should be included within all
parking areas and along the sides of all buildings.
5. Development/Design Guidelines should be revised and submitted for
review.
On June 22, 1989, the Design Review Committee examined the Design
Guidelines for the proposed industrial master plan. The Committee
(Suzanne Chitlea, Peter Tolstoy and Dan Coleman) recommended that:
1. The Design Guidelines for Bixby Business Park be utilized as an
example for the Bennett Consolidated Master Plan Design Guidelines.
2. Additional text and revisions to existing text be provided
according to Planning Division requirements.
3. Additional graphics and revised page layout be provided according
to Planning Division direction. After the additional information,
graphics and revisions are complete, the Guidelines should be
resubmitted to staff for review prior to scheduling for Design
Review Committee.
DESIGN REVIEW COMMENTS
DR 87-49 - AJA/BENNETT
Page 2
Staff Comments:
The applicant has resubmitted the Design Guidelines and revised plans as
requested. The Committee should examine the plans and design guidelines
in order to determine if the Committee's recommendations for revision
and additional information have been satisfactorily completed. Staff
feels that there are many areas of the design guidelines which have been
greatly clarified through revised text and additional graphics.
However, some minor revisions still remain. Staff will review the
revisions with the Committee and recommends that the guidelines be
resubmitted to staff for review and approval prior to scheduling for
Planning Commission.
Design Review Committee Action:
Members Present: Suzanne Chitiea, Peter Tolstoy, Dan Coleman
Staff Planner: Bruce Abbott
The Design Review Committee examined the revised plans for the proposed
master plan and determined that the plans met those revisions as
recommended during the April 20, 1989 meeting.
The Committee also reviewed the Design Guidelines for completion
utilizing the Design Guidelines for Bixby Business Park as an example.
The Committee determined that additional text, revised page layout, and
revisions to the existing text be provided according to Planning
Division requirements. Additional and revised graphics were also
recommended as follows:
1. Master site plan indicating conceptual use of the proposed Building
Color Palette so that no calico color effect occurs, adjoining
building colors blend well and that a complimentary conceptual
color mix occurs.
2. Photos or refined sketches of consistent building styles showing:
a cohesive direction for linear or vertical building design, glass,
colors, building geometry and building massing.
3. Sketches including plan view of monument signs indicating
geometrical planting scheme, a closer tie with architecture
(form/color) and a 24 square foot sign area.
The Design Review Committee recommended that the Design Guidelines be
reviewed as a full item at the next meeting.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Vince September 7, 1989
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 89-20 - GRACE RESTAURANT
COMPANY The design review of building elevations and detailed site
plan for a 6,100 square foot restaurant within an existing commercial
shopping center in Terra Vista Planned Community located on the
northeast corner of Haven Avenue and Base Line Road. APN: 1076-481-31.
Background:
This is the last freestanding pad in the Terra Vista Village to be
submitted for design review. Coco's Restaurant is scheduled to be the
tenant.
Staff Comments:
Site Plan:
1. The main entrance should be relocated to the southeast corner of
the building in order to relate to the plaza.
Architecture:
1. More detail should be added to the east elevation below the
proposed sign.
2. The roof should be wrapped around the south and west elevations.
3. West elevation should have enhanced treatment such as spandrel or
vision glass.
4. The columns should be brought around to the north elevation or
spandrel glass should be used.
5. A detail of the canopy section should be provided.
Design Review Comnittee Action:
Members Present: Suzanne Chitlea, Peter Tolstoy, Dan Coleman
Staff Planner: Vince Bettoni
The Committee did not approve the project as proposed. The following
items should be addressed by the applicant in revised plans for
additional Committee review.
1. Decorative panel doors should be used on the south and west
elevations.
2. Field tile insets should be added to the south and west elevations.
DESIGN REVIEW COMMENTS
DR 89-20 - GRACE RESTAURANT COMPANY
Page 2
3. The service entrance should be screened by a 4 foot wall with
planters using Burger King to the north as an example.
4. The wall adjacent to the entrance should be enhanced with an
architectural element(s) such as the quadrafoils used in the
center.
5. The Cantera columns should be brought around to the north elevation
or spandrel glass should be used as a window element.
6. The parapet finish should be stucco on the north elevation.
7. A mission style wing wall should be used at the west terminus of
the greenhouse on the north elevation.
8. The greenhouse element style should be less contemporary, such as
the greenhouse at the Edwards Mansion in Redlands
9. Use a rust color on cornice to match the rest of the center.
10. Spanish style tile accents should match the rest of the center.
11. Delete landscaping on revised building elevations.
CO)~4ERCIAL/INOUSTRIAL
CONSENT CALENDAR ITE)tS AGENDA
September 21, 1989
1. DR 87-56 - DAVIES DEVELOPMENT
(Vince) Review of proposed colors.
Committee Action:
2. DR88-04 - CARNEY ARCHITECTS
{Bruce) Review of proposed paving materials
and colors.
Committee Action:
3. DR 87-19 - LENNON ARCHITECTS
(Tom) Review revised building elevations.
Committee Action:
4. TRACT 13886 & CUP 88-01 - BARMAKIAN
(Bey) Review of roof material.
Committee Action: