HomeMy WebLinkAbout1989/09/07 - Agenda Packet - (2) MEMORANDUM
DATE: September 11, 1989 ACTION COI~MENTS (~
TO: Residential/Institutional
Design Review Committee Larry McNiel
David Blakesley
Otto Kroutil
Betsy Weinberger (Alternate}
FROM: Brett Horner, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF September 7, 1989
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
(Steve H.) MODIFICATION TO DESIGN REVIEW FOR TRACT 12659-2 -BLANTON
- The design review of a new building elevation and
revised unit mix for Phase II of a previously approved
tract map consisting of 135 single family lots on 67.69
acres of land in the Very Low Residential District (1-2
dwelling units per acre) of the Etiwanda Specific Plan,
located at the southwest corner of Etiwanda Avenue and
24th Street. APN: 225-111-38 and 39.
DESIGN REVIEW AGENDA
SEPTEMBER 7, 1989
Page 2
6:30- 7:00
(Tom) ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14263
-MINNIS - A residential subdivision and design review o~
32 condominium units on 3.35 acres of land in the Medium
Residential District (8-14 dwelling units per acre) and
Flood Control Distr~ct, located on the west side of
Carnelian Street at Vivero Street. APN: 207-022-54 and
64. Associated with this project is General Plan
Amendment 89-02A and Development District Amendment
87-12.
BN:mlg
Attachments
cc: Planning Commission/City Council
RESIDENTIAL/INSTITUTIONAL
CONSENT CALENDAR ITE]~S AGENDA
September 7, 1989
1. DR 12462 - FIRST FAMILY
(Tom} Revised elevation.
Committee Action: The Committee (Blakesley, Kroutil)
reviewed the project but did not
recommend approval due to the
following concerns:
1. The massing of the entryway on
elevation 2850C should be similar
to elevation 2850A.
2. A brick element should be
provided on both sides of the
entryway.
3. The front elevation of elevation
3200C should be mere
symmetrical. This can be
accomplished by shifting the
window to the side of the garage
elevation to the center of the
wall.
4. Extend the brick element around
the side of elevation 3200C.
2. DR 13565 {PH. 5, g, & 10) -
STANDARD PACIFIC
(Bev) 1. Review of return walls.
2. Additional elements to Elevation
4A.
3. Revisions to Elevation 3A.
Committee Action: The Committee {Blakesley, Kroutil}
approved the return wall with the
condition that the gate be painted or
stained and that the size of the
members be mere substantial. The
revised 3A elevation was approved with
the additional use of shutters on the
first story windows in front and on
the right side. The revised 4A
elevation was approved, although the
CONSENT CALENDAR AGENDA
Page 2
brick chimney should not be painted,
but constructed of a material similar
in color to the siding.
3. TRACT 12895 - R.J. INVEST.
(Bev} Change in roof tile material.
Committee Action: The red roof tile was approved, but a
construction detail of how the rolled
tile would work should be provided for
staff level review.
4. lltA~T 13566 - ROCKRE).O
{Bey) Change in cap material of peri~ter
wall.
Committee Action: The Committee {Blakesley, Kroutil}
approved the brick cap material on the
wall on Wardman Bullock Road only.
The concrete cap is to remain on the
wall along 24th Street.
5. ll~A~T 13351 - LEWIS
(Brett) Architectural revisions.
Committee Action: The Committee (Blakesley, Kroutil)
approved the 5 revisions which were
requested at the July 28, 1989
Planning Commission meeting to be
reviewed by the Committee again.
However, the new accent color was not
approved. Instead, the original Teal
color was approved for use.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Steve H. September 7, 1989
MODIFICATION TO DESIGN REVIEW FOR TRACT 12659-2 -BLANTON The design
review of a new building elevation and revised unit mix for Phase II of
a previously approved tract map consisting of 135 single family lots on
67.69 acres of land in the Very Low Residential District (1-2 dwelling
units per acre) of the Etiwanda Specific Plan, located at the southwest
corner of Etiwanda Avenue and 24th Street. APN: 225-111-38 and 39.
Background:
Tentative Tract 12659 was approved by the City of Rancho Cucamonga on
November 13, 1985. Subsequent to City approval, the tract was divided
into four (4) phases. Phase I is already under construction.
The tract includes a centralized equestrian center for the keeping of
horses, instead of the typical stable on each homeowner's lot. The City
approved smaller lot sizes and the deletion of a local trail access for
every lot in exchange for the equestrian center. This was permitted,
since the project was approved under the Optional Development Standards.
Staff Co~ents:
Site Plan:
1. Due to the creation of the equestrian center within this tract, the
average lot size is much smaller than is typical of lots within the
Very Low Residential District (approximately 15,000 square feet).
However, the house sizes are more consistent with this development
district, ranging from 2,122 to 3,542 square feet. Due to these
conditions, there are some areas of concern where the models
proposed for lots may appear to be "forced" or out of scale. Some
examples of this situation are:
a) Model ~B on Lot 32.
b) Model 5A on Lot 30.
2. Decrease the driveway width so as to reduce the amount of pavement
as seen from the street.
Architecture:
1. Provide additional wood siding on all elevations to aid in creating
complete 360 degree articulation.
2. Provide additional articulation to accent elements such as, but not
limited to, foundations, chimneys, columns, windows, etc., that is
consistent with the amount of articulation on previously approved
models within this tract.
DESIGN REVIEW COMMENTS
T 12659-2 - BLANTON
Page 2
Design Review Committee Action:
Members Present: David Blakesley, Otto Kroutil
Staff Planner: Steve Hayes
The Con~nittee recommended approval of the project to the Planning
Commission with the following conditions:
1. The amount of pavement should be reduced at driveway approaches and
front yard setbacks wherever possible.
2. Additional wood siding should be continued along the side
elevations of Plan 6 to provide more complete side elevation
articulation.
3. Additional articulation should be added to the accent elements of
Plan 6 such as, but not limited to, chimneys, columns and
foundations.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Tom September 7, 1989
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14263 -MINNIS A
residential subdivision and design review of 32 condominium u,.its on
3.35 acres of land in the Medium Residential District (8-14 dwelling
units per acre) and Flood Control District, located on the west side of
Carnelian Street at Vivero Street. APN: 207-022-54 and 64. Associated
with this project is General Plan Amendment 89-02A and Development
District Amendment 87-12.
B ackg r ou nd:
The original proposal on this project site was for a total of 42
condominium units. The proposal included a Development District
Amendment (DDA 87-12) to change a portion of the project site from Flood
Control to Medium Residential. The Development District Amendment was
reviewed by the Planning Commission on March 8, 1989. A recommendation
of denial was made based on the determination that a General Plan
Amendment (GPA) would also be required. Since that time, the applicant
has submitted GPA 89-02A and has reduced the proposal to 32 condominium
units.
Staff Conmnents:
1. Provide additional architectural treatment on the right and left
elevations of both buildings to break up large blank building
expanses. Architectural treatment may include windows, decorative
tile, quatrefails, etc.
2. Remove glass block element from Elevation 2.
3. Provide additional landscaping between the recreation area and the
entryway. The security wall around the pool should include wrought
iron and a stucco finish wall.
Design Review Coaaittee Action:
Members Present: David Blakesley, Larry McNiel, Otto Kroutil
Staff Planner: Tom Grahn
The Committee reviewed the project and recommended approval subject to
the following conditions:
1. Remove the glass block element and replace with standard windows-
2. Extend the pot shelf element on the right and left side elevations
of Building Type 1.
3. A texturized paving treatment or concrete band should be provided
along the front of al 1 garages to create a pedestrian path leading
to the recreation area.