HomeMy WebLinkAbout1987/05/21 - Agenda Packet CITY OF RANCH0 CUCA GA
MEMORANDUM
DATE: April 29, 1987 ACTION AGENDA
TO: Com~erci al /Industria) 1977
Design Review Committee Suzanne Chitlea
Larry McNiel
Dan Coleman
FROM: Nancy Fong, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF MAY 21, 1987
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commissi on and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
(Debra) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 87-
U4 - DONLEY-BENNETT ARCHITECTS - The development of a
neighborhood commerciaI Shopping center consisting of
five structures totaling 30,770 square feet on 3.8 acres
of land within the Neighborhood Commercial (NC) District
located at the southwest corner of Lemon Avenue and
Haven Avenue - APN: 201-262-48.
6:30 - 7:00
(Chris) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-05 -
LUSK COMPANY - A proposal to bulld a 9,07U square foot
speculative industrial building on .69 acres of land in
an Industrial Park District Subarea, located on the
north side of Trademark Street and west of Haven Avenue
- APN: 210-381-05
DESIGN REVIEW COMMITTEE AGENDA
Commercial/Industrial
May 21, 1987
Page 2
7:00 - 7:30
(Nancy) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-17 -
UNOCAL - A development of a 2,700 square foot, 4 bay
service station on 0.89 acres of land within an approved
shopping center in a Neighborhood Commercial District
located at the northeast corner of Haven Avenue and
Highland Avenue - APN: 201-271-53.
7:30 - 7:45
(Nancy) DEVELOPMENT REVIEW 86-35 - CITY OF RANCHO CUCAMONGA
The development of a corporation yard and vehicle
maintenance facility master plan on 5.69 acres of land
in General Industrial - Subarea 2 of the Industrial Area
Specific Plan located on the south side of 9th Street
(9153 9th) between Hellman Avenue and Vineyard Avenue -
APN: 209-013-27 and a portion of 209-013-24.
7:45 - 8:00
(Chris) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-10 -
SOUTHWEST SAVINGS - A proposal to construct a two-story
office/bank building of 9,000 square foot in the
Neighborhood Commercial District located at the
northeast corner of Base Line Road and Archibald Avenue
- APN: 202-731-08.
NF:vc
Attachments
CC: Planning Commission/City Council
Commercial/Industrial
CONSENT CALENDAR ITEMS AGEMDA
May 21, 1987
1. DR 87-15 - BARMAKIAR
(Chris) Review of revised site plan.
Committee Action: Scheme 2 revisions were approved as
submitted for the southern most
building elevation. The Committee
also recommended that a planter area
be incorporated with the building jogs
and use such elements as low planter
walls and mounding.
2. le)R 86-33 - CARL'S
(Chris) Review of color scheme.
Committee Action: The Committee required that the col ors
should reflect those of the existing
Stater Bros. Center.
3. DR 86-19 - GABRIC
(CnrisJ Review of color scheme.
Committee Action: Approved as submitted.
4. DR 86-26 - BARTON
(Nancy) Clarification of color scheme.
Committee Action: Approved Phase II color scheme for
Phase I
5. DR 86-40 - C.G.H.
(Nancy) Review of adding an exit door.
Committee Action: Approved.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Debra May 21, 1987
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 87-04 DONLEY-
BENNETT ARCHITECTS - The deve]opment of a neighborhood commercial
shopping center consisting of five structures totaling 30,770 square
feet on 3.8 acres of land within the Neighborhood Commercial (NC)
District located at the southwest corner of Lemon Avenue and Haven
Avenue - APN: 201-262-48.
Design Parameters:
The site is presently vacant, improvements were partially constructed
some time ago, including curbs, landscaping and a paved parking area.
The Cucamonga County Water District is presently considering a portion
of this property as a potential well site. The Water District has been
performing preliminary tests and the exact arrangement with the District
is not yet known. The proposed well site is located in the southwest
corner of the property, to the south of the proposed carwash. The well
is expected to be used only for ten years. Upon termination of the
Water District use, the owner expects to more fully utilize this parcel
within additional neighborhood commercial development. Therefore the
intent at this time is for the carwash to be an interim use during the
lO-year period.
The property is bounded to the north by an apartment project, to the
west by single family residences, to the south by the "Garden
Condominium" project, and to the east by a neighborhood commercial
shopping center.
Staff Comments:
Site Plan
1. The pedestrian orientation of the center should be improved as
follows:
a. Provide a strong, direct link from both streets to the plaza.
b. Use texturized pavement across driveway aisles.
c. The pedestrian circulation around building 3, shown as a 5
foot width, is not sufficient to provide a walkway and
required landscaping along building frontages. 10 to 12 feet
would better satisfy the objective.
DESIGN REVIEW COMMENTS
CUP 87-04 - Donley-Bennett Architects
May 21, 1987
Page 2
2. The central plaza should be developed as the focal point of the
center. Appropriate pedestrian ammenities such as seating
benches, other street furniture, and kiosks should be provided.
This space should be defined and enhanced by special landscaping
and hardscape treatment. Enlarged details and specific product
information should be submitted for review and approval prior to
issuance of building permits (see comments under architecture).
Architecture
1. The rear elevation of building 2 should be treated in a similar
manner to the detail shown for the rear of building 1, using
stucco arch details along the entire rear elevation.
2. The towers appear very massive and stark, particularly the tower
reflected on the partial Lemon Avenue elevation, which would be
located at the central plaza. Additional decorative
architectural detail should be used to lessen the massive
appearance.
3. The architecture does not provide any dominant elements or
features at the plaza to create a focal point. Possible
modifications could include, raising the building height at this
location or providing a single tower element here rather than
several,throughout site.
4. It would appear that no glazing (store front windows) is being
provided on the north elevation of Buildings i and 2 (see Sheet
6).
Landscaping
1. Additional tree planting should be provided on the north side of
Building 1; east, south and west sides of Buildings 2 and 3.
2. Tree wells should be used within the parking lot to aid in
achieving the parking lot shading requirements.
2. Landscaping should be utilized at property boundaries to provide
a screen to adjacent residences. Proposed materials include
Oleander and White Alder. Along the west property line perhaps a
more extensive use of tall growing evergreen trees would provide
a more appropriate screen.
The residential project to the south has an abundance of mature
landscaping, therefore adequately screen from the shopping
center. In that case, the oleander and the White Alder are
probably more appropriate.
DESIGN REVIEW COMMENTS
CUP 87-04 - Donley-Bennett Architects
May 21, 1987
Page 3
Design Review CommitteeAction:
Members Present: Suzanne Chitiea, Dan Coleman
Staff Planner: Debra Meier
The Committee recommended approval of the project based on the
following:
Site Plan
1. Pedestrian circulation should be enhanced by including direct
links to Lemon and Haven Avenues.
2. The conceptual design of the central plaza, including all
appropriate pedestrian amenities as well as special landscape and
hardscape treatment, shall be presented in the form of an
enlarged detail for review by the Planning Commission prior to
approval.
Architecture
1. The rear elevation of Building 1 should be detailed with a stucco
relief arch treatment. A1 so, provide an illustrative perspective
of the view along Haven Avenue toward the rear of Building 1 for
review by Planning Commission prior to approval.
2. The rectangular elements on the towers should become deeper, or
cut them completely through, to provide a more defined shadow
pattern.
3. Details and/or sections that illustrate treatment of columns and
soffit shall be reviewed by the Planning Commission prior to
approval.
4. Samples and/or photographs of storefront elements depicting use
of aluminum window frames and wood mullions shall be reviewed and
approval by Design Review Committee prior to Planning Commissi on.
Landscaping
1. Additional trees shall be planted on the north side of Building 1
and the east, west and south sides of Buildings 2 and 3 (1 tree
per linear foot of building dimension).
2. Tree wells should be utilized within the parking lot to aide in
achieving the parking lot shading requirements.
DESIGN REVIEW COMMENTS
CUP 87-04 - Donley-Bennett Architects
May 21, 1987
Page 4
3. Landscaping should be utilized along the west and south property
lines to insure screening of the shopping center from adjacent
residences. The plant material along the west boundary should
include tall growing evergreen trees to provide such screening.
DESIGN REVIEW COM~4ENTS
6:30 - 7:00 Chris May 21, 1987
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-05 - LUSK COMPANY - A
proposa| to build a 9,UTU square foot specu|ative industrial building on
.69 acres of land in an Industrial Park District Subarea, located on the
north side of Trademark Street and west of Haven Avenue - APN: 210-381-
05.
Design Parameters:
The site is vacant and relatively flat, The lot to the north is vacant,
the lots south and west have projects proposed, however are still vacant
at this time, Street improvements are complete except for sidewalk and
drive approaches. There is an existing building to the east which is
very similar to the proposed project,
Staff Comments:
Site Plan
The first parking space at the entry should be eliminated in order to
provide a 25' minimum throat depth for stacking.
Architecture
The proposed architecture is the same style and materials as three other
Lusk buildings which are existing directly to the east. Should the
color accent stripe be of the same hue as those which already exist?
Landscaping
The landscaping should be coordinated to tie into the project to the
east, especially along the east property line.
Design Review Committee Action:
Members Present: Suzanne Chitiea, Larry McNiel, Dan Coleman
Staff Planner: Chris Westman
The Committee reviewed the project and approved it as submitted with the
understanding that the first parking space at the entry would be
eliminated in order to provide a 25 foot throat depth for stacking.
DESIGN REVIEW COMMENTS
7:00 - 7:30 Nancy May 21, 1987
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-17 - UNOCAL - The
development of a 2,IUD square foot, 4 bay service station on 0.69 acres
of land within an approved shopping center in a Neighborhood Commercial
District located at the northeast corner of Haven Avenue and Highland
Avenue - APN: 201-271-53.
Design Parameters:
The project site is vacant and is part of an improved integrated
shopping center Haven Village. This pad area is approved for a
service station and the applicant is proposing to construct a UnOcal
station. Attached for your reference is a copy of the approved Master
Plan for this shopping center.
Staff Comaents:
Site Plan
The proposed site plan for this pad area is consistent with the approved
Master Plan of this Haven Village Shopping Center. The service bays
face away from Haven Avenue and the building is used to screen the pump
islands per Commission policy.
Architecture
The proposed elevations, wood shingles, river rock veneer and wood
siding is generally consistent with the archi tectural style of the
approved shopping center. However, it is recommended that the following
details should be added to the elevation for consistency purposes:
1. All colors should match the existing center, rather than
"Unibrown Trim" and Unocal White".
2. Exposed heavy wood rafter tails should be added to the soffit
area on all sides of the building including the canopy for the
gas pump island.
3. The extended vertical portion of the flat roof in the middle of
the building shou1 d be of wood siding, heavy wood trim consistent
with the entire shopping center, not "textured Palomino".
4. All window areas should have heavy wood trim consistent with the
entire shopping center.
5. The river rock veneer should be of the "Lake Tahoe" blend from
Stucco Stone Products consistent with the shopping center.
DESIGN REVIEW COMMENTS
DR 87-17 - Unocal
May 21, 1987
Page 2
6. Six inches concrete curb around the base of the rock veneer
column for the gas pump island should be provided in order to
protect the rock veneer work.
7. The beam work for the canopy column should be of heavy duty size.
8. The trash enclosure area backing up to Haven Avenue would be
subject to public view. It should be improved by providing a
overhead wood trellis consistent with those existing in the
center, for aesthetic purposes.
9. The raised middle portion of the building should be revised to
reflect the treatment used on similar portions of the shopping
center. Further, this portion should "pop-out" about 2-3 feet.
10. The sheet cap across the top of the roof elements should be
deleted as inconsistent with the shopping center.
Landscaping
1. Should additional specimen size trees be provided along the
entire west building frontage?
Design Review CoamaitteeAction:
Members Present: Suzanne Chitiea, Larry McNiel, Dan Coleman
Staff Planner: Nancy Fong
The Committee recommended that the proposed elevations be revised for
further review as follows:
1. The west elevation along Haven Avenue should be improved by
adding a tower treatment with windows and by extending the river
rock treatment upwards to the middle and raised portion of the
building. (Exhibit A)
2. Multi-pane windows consistent with those shown on the overhead
doors should be provided to the office area.
3. Double wood beams on all sides of building should be added.
(Exhibit A)
4. Exposed heavy wood rafter tail s should be added to the soffit
area on all sides of the building including the canopy for the
gas pump island.
DESIGN REVIEW COMMENTS
DR 87-17 - Unocal
May 21, 1987
Page 3
5. All window areas should have heavy wood trim consistent with the
entire shopping center.
6. The river rock veneer should be of the "Lake Tahoe" blend from
Stucco Stone products consistent with the shopping center.
7. The river rock veneer column of the gas pump island should be
enlarged in size and heavy duty double wood beam work should be
used.
8. The trash enclosure area backing up to Haven Avenue should be
improved by providing an overhead wood trellis consistent with
those existing in the center, for aesthetic purposes.
9. Six inches concrete curb around the base of the rock veneer
column for the gas pump island should be provided in order to
protect the rock veneer work.
10. The sheet cap across the top of the roof elements should be
deleted as it is consistent with the shopping center.
11. All colors and materials used such as wood siding and trim should
match the existing center.
DESIGN REVIEW COMMENTS
7:30 - 7:45 Nancy May 21, 1987
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 86-35 - CITY OF RANCHO
CUC/V~DNGA The development of a corporation yard and vehicie
ma~"'~i~'{enance facility master plan on 5.69 acres of land in General
Industrial - Subarea 2 of the Industrial Area Specific Plan located on
the south side of 9th Street (9153 9th) between Hellman Avenue and
Vineyard Avenue - APN: 209-013-27 and a portion of 209-013-24.
Background:
The Committee at its regular meeting of February 5, 1987 directed the
consultant Pitassi/Delmau & Associates to develop an architectural
scheme that include element representation of the City's heritage. The
purpose for this meeting is for the Con~ittee to review the new
scheme/and made recommendations.
Design Review Clittee Action:
Members Present: Suzanne Chitiea, Larry McNiel, Dan Coleman
Staff Members: Duane Baker, Nancy Fong
The Con~nittee reviewed the new scheme and recommended approval with the
following conditions:
1. The metal vault should be extended to cover the ends of the
columns.
2. The metal coping should be of substantial size.
3. The roof extension portion should have extra depth, rather than
looking like a fireplace from the west elevations.
4. The main entrance door should have the same smaller grid pattern.
5. A City's logo should be added to the north elevation.
DESIGN REVIEW COMMENTS
7:45 - 8:00 Chris May 21, 1987
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-10 SOUTHWEST
SAVINGS AND LOAN - A proposal to construct a 9,UUO square foot two-story
office/banK building in the Neighborhood Commercial District located at
the northeast corner of Base Line Road and Archibald Avenue - APN: 202-
731-08.
Background:
The Committee at the May 7, 1987 meeting reviewed the project and
recommended that revised plans be submitted for their review on May 21,
1987 regular regular meeting. The following were the concerns raised by
the Committee on May 7, 1987:
1. The area by the automatic teller machine should be enhanced
through the use of hardscape treatments and low free standing
planters with landscaping.
2. Vine pockets should be provided at the column elements around the
entire building.
3. The applicant should address Committee's concerns regarding arch
treatment on the second floor, landscaping adjacent to the
building, the drive aisle configuration directly north of the
proposed building, and conceptual drawings for a transitional
area between the existing building and any future building to the
east.
Design Review Co~maittee Action:
Members Present: Suzanne Chitlea, Larry McNiel, Dan Coleman
Staff Planner: Chris Westman
The Committee reviewed the project for concerns that were raised at a
previous Design Review meeting and determined the following
recommendations:
1. Architecture:
a. The overhang on the second story should be shortened in order
to reflect that of the ground floor arcade.
b. A similar facia treatment should be provided to the second
story that is found on the ground level arcade facia.
DESIGN REVIEW COMMENTS
DR 87-10 - Southwest Savings
May 21, 1987
Page 2
c. The ground floor office windows should not extend down to the
floor but should begin above a plaster finished three foot
wall section.
d. In order to open the plaza area to the east side of the
building, the arcade should provide an open beam section the
length of the plaza area approximately five feet in depth.
e. Low terra cotta potted planters should be provided in the ATM
area.
2. Site Plan:
a. The plaza area was approved as submitted.
b. The parking lot drive aisle configuration to the north will
remain as approved under CUP 84-13.
c. Revised elevations shall be reviewed by the Committee on the
consent calendar of June 4, 1987.