HomeMy WebLinkAbout1988/05/19 - Agenda Packet MEMORANDUM
DATE: May 12, 1988 ACTION AGENDA
TO: Commercial/Industrial
Design Review Committee Peter Tolstoy
Larry McNiel
Dan Coleman
David Blakesley (Alternate)
FROM: Nancy Fong, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF MAY 19, 1988
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always~ feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
(Brett) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 88-08
~OLDENWEST - The development of three (3) multi-tenant
buildings totaling 155,142 square feet on 10.49 acres of
land in the General Industrial District (Subarea 3)
located on the north side of 7th Street, approximately
600 feet east of Hellman Avenue - APN: 209-171-58.
6:30 - 7:00
(Nancy) ENVIRONMENTAL ASSESSMENT AND MODIFICATION TO DEVELOPMENT
'REVIEW 86-13 - MESSENGER A modification to the
approved Phase II development by adding 33,700 square
feet to Building 12 on 6.58 acres of land in the General
Industrial District (Subarea 2), located on the north
side of 9th Street, east of Vineyard Avenue - APN: 209-
012-20.
May 19, 1988
Page 2
7:00 - 7:30
(Debra) CONDITIONAL USE PERMIT 88-12 MODIFICATION NO. i -
WES)ERN PROPERTIES - The development of an integrated
community shopping center consisting of four major
retail buildings totaling 319,000 square feet, adjoining
mall shops totaling 137,395 square feet, nine satellite
retail buildings totaling 27,325 square feet, four
restaurant pads, and a 30,000 square foot theater.
Conceptual approval for a design center consisting of
ten buildings totaling 195,660 square feet. All on 71
acres of land in the Community Commercial District of
the Tetra Vista Planned Con~nunity, located at the
northeast corner of Haven Avenue and Foothill Boulevard
- APN: 1077-421-05, 06, and 13.
7:30 - 8:30
(Nancy} PLANNING COMMISSION WORKSHOP ON CONDITIONAL USE PERMIT
88-01 - NALBANDIAN/CHIAO
Continued to June 2, 1988 Design Review Committee
meeting.
NF:te
Attachments
cc: Planning Commission/City Council
DESIGN REVIEW COMMENTS
6:30 - 7:00 Nancy May 19, 1988
ENVIRONMENTAL ASSESSMENT AND MODIFICATION TO DEVELOPMENT REVIEW 86-13 -
MESSENGER - A modification to the approved Phase II development by
a"~,700 square feet to Building 12 on 6.58 acres of land in the
General Industrial District (Subarea 2), located on the north side of
gth Street, east of Vineyard Avenue - APN: 209-012-20.
Design Parameters:
The site is vacant and rough graded. Both Phase I development and
Building 13 of Phase II development have been completed. To the west of
the site is the recently approved auto service center as shown on the
attached Site Utilization Map (Attachment "A"). The developer is
proposing to add 33,700 square feet to the west side of Building 12.
Staff Comaents:
Site Plan
1. The proposed expansion reduces a sizable piece of land for
open landscaping area at the southwest corner of Building
12 as shown in Attachment "B". The developer should
mitigate this issue by providing additional and sizable
open landscape area.
2. The northern portion of Building 12 should be set back a
minimum of 10 feet in order to accommodate planting and
also pedestrian walkway.
Elevations
1. Additional articulation to the northwest corner of Building
12 should be provided as it is subject to public view from
9th Street.
Landscaping
One of the conditions of approval require that dense landscaping be
provided along the west property boundary to screen and provide visual
relief to the east elevation of Building 12. It included new windrows
of Eucalyptus maculata, 5 gallon size at eight feet on center, specimen-
size trees, accent trees, and appropriate shrubs and groundcover. The
proposed expansion would not meet this condition of approval.
Design Review Committee Action:
Members Present: David Blakesley, Dan Coleman
Staff Planner: Nancy Fong
May 19, 1988
Page 2
The Committee reviewed the project and recommended approval subject to
the following conditions:
1. Add glass panels to the southwest side of south elevation and the
south side of west elevation.
2. Dense landscaping should be provided along the south elevation and
the lower portion of the west elevation.
3. Landscapin9 should be provided to the slope area located at the
adjacent westerly parcel. Landscape and landscape maintenance
easements should be recorded between the project site and the
westerly parcel.
4. Truck parking spaces should be provided per code. Revised site
plan should be subjected to City Planner review and approval.
COMMERCIAL/INDUSTRIAL
CONSENT CALENDAR ITIENSAGENDA
MAY 19, 1988
ACTION AGENDA
1. MI)R 87-61 - MARRIOll CORP - BOB'S BIG BOY
(Cynthia)
Structural modification covering gable ends
and windows of existing restaurant.
Committee Action: The Design Review Committee recommended the
stain glass windows on the side and front
elevations remain.
2. DR 87-56 - DAVIS
(Nancy) Review of office entry design.
Committee Action: The Committee has reservations in approving
the office entry design. The Committee
recommended a perspective view with
landscaping being provided and refer this
item to the Planning Commission for review.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Brett May 19, 1988
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 88-08 - GOLDENWEST - The
development of three (3) multi-tenant buildings totaling 155,142 square
feet on 10.49 acres of land in the General Industrial District {Subarea
3) located on the north side of 7th Street, approximately 600 feet east
of Hellman Avenue - APN: 209-171-58.
Design Parameters:
The site is vacant and is part of a 18.43 acre legal parcel. The
applicant has submitted a parcel map to subdivide the northern portion
from the project site area. There are no development proposals for this
northern portion. An east-west windrow exists in the middle of the site
while a north-south windrow exists east of the site boundary. The
applicant has submitted a tree removal permit to remove the east-west
windrow. The developer completed eight industrial buildings on the
parcel west of the project site in 1987, which are currently occupied.
Staff Cmmaents:
Site Plan
1. To provide continuity along the 7th Street frontage,
parking stalls located adjacent to the front landscape
setback should be eliminated or relocated.
2. Curvilinear drive aisles should be utilized at the east and
west sides of the project to reduce long, linear expanses
of pavement.
3. The drive aisle width along the west side should be reduced
to allow for curvilinear design, additional landscape
areas, and improved pedestrian connection.
4. The continuous planter in front of the north elevation of
Building "B" and the south elevation of Building "C" should
be at least 12 feet wide to accommodate a continuous
walking and planting.
5. Pedestrian connections between buildings (east and west
sides) are also recommended with textured connections
across drive aisles and to link the existing buildings to
the west.
6. Satellite plaza areas should be provided at the corners of
each building by enlarging the landscape areas. These
areas should be conveniently accessible from building
entries, and should be an integral part of the on-site
pedestrian network.
May 19, 1988
Pa9e 2
7. Plaza areas should be buffered from traffic circulation
through use of low-level screen walls and landscaping.
Amenities within plazas should include benches, tables,
trash receptacles, drinking fountains, etc. which relate to
the building finish.
8. Screen walls eight feet in height should be provided
between Buildings "A" and "B" (east end of buildings),
similar to those used at the west end of each building.
9. Only two points of access are needed for this project.
Should the driveway access in the middle be eliminated to
increase landscape area and improve the streetscape?
Landscape Plan
1. Landscape planters at the east side of each building should
be increased in depth to allow for improved pedestrian
connections, satellite plaza areas, and to provide an
opportunity for landscape focal elements at the more
visible areas of the project.
2. Landscape lanters at least three (3) feet in width (inside
dimensionsl should be provided adjacent to refuse
enclosures.
3. Annual col or plantings should be provided adjacent to
project drive and building entries, and within plaza areas.
Architecture
1. Variety to the roof form/parapet height should be
established to mitigate the long, linear building design
currently proposed. Parapets should be sufficient in
height to screen all roof-mounted equipment.
2. Additional articulation to the building surface should be
utilized to enhance finish richness and provide interest.
Suggested applications include texture banding in lieu of
wood soffits, or the use of sandblasted material.
3. Variation in the storefront/facade design should be
provided, through use of alternative glass patterns, and
more extensive use of openings and breaks in the building
plane.
4. Glass elements should be returned 10 to 15 feet around
building corners to provide additional treatment to side
elevations.
May 19, 1988
Page 3
5. Reveals should be used more creatively to establish
continuity across each elevation. Color accent reveals
adjacent to a texture band, stepped reveal patterns, etc.
could serve to address this issue.
Design Review Cmm=ittee Action:
Members Present: David Blakesley, Dan Coleman
Staff Planner: Brett Homer
The Design Review Committee recommended that staff review revised
plans incorporating the comments listed below prior to scheduling
for Planning Commission.
1. The curvilinear parking aisle fronting 7th Street should be
moved northward in order to meet the 35 foot minimum setback
from curb face.
2. The drive aisle width along the west side should be reduced.
Additional landscaping area should be provided. A pedestrian
walkway should also be provided.
3. The plaza areas should be buffered from traffic circulation
through the use of 1 ow-level screen walls, berming, and/or
landscaping. Trash enclosures should also be provided.
4. Screen walls should be provided between buildings "A" and "B"
at the east end of the buildings.
5. The center drive access to 7th Street should be eliminated.
6. The applicant should explore relocation of the existing trash
enclosure at the end of the west side drive aisle (in Phase I).
7. Landscape planters at least three feet in width (inside
dimension) should be provided adjacent to the two trash
enclosures located at the north property boundary.
8. Annual or perennial color plantings should be provided adjacent
to project and building entries, and within plaza areas.
g. Glass elements should be returned 10 to 15 feet around building
concerns to provide additional treatment to side elevations.
May 19, 1988
Page 4
10. The parapet height near the center entryway of building "A"
should be increased to provide interest to the 7th Street
elevation. Accent col or may also be revised to achieve the
desired effect.
11. The landscape plan should be revised to include the required
number of tree plantings.
DESIGN REVIEW COMMENTS
7:00 - 7:30 Debra May 19, 1988
CONDITIONAL USE PERMIT 88-12 MODIFICATION NO. I - WESTERN PROPERTIES -
The development of an integrated community shopping center consisting of
four major retail buildings totaling 319,000 square feet, adjoining mall
shops totaling 137,395 square feet, nine satellite retail buildings
totaling 27,325 square feet, four restaurant pads, and a 30,000 square
foot theater. Conceptual approval for a design center consisting of ten
buildings totaling 195,660 square feet. All on 71 acres of land in the
Community Commercial District of the Tetra Vista Planned Community,
located at the northeast corner of Haven Avenue and Foothill Boulevard -
APN: 1077-421-05, 06, and 13.
Background:
Terra Vista Town Center was approved December 9, 1987, the Conditional
Use Permit replaced that original approval on April 27, 1988.
Modification No. 1 includes the area around Majors I and 2, which is
essentially the first construction phase. Specifically, this
modification is two-fold:
I. A realignment of the entry drive from Haven Avenue, and
II. Revisions to the footprint of Major 2.
I. The realignment of the entry drive from Haven Avenue was done to
accomplish the following goals:
A. Provides a greater number of parking spaces directly in
front of the Target Store.
B. Provides a more aesthetic entrance to the project by
eliminating the long, straight driveway and having
architectural focal points as one enters the project.
C. The drive approach would align with the Virginia Dare/
Brunswick driveway on the west side of Haven Avenue.
The physical realignment of the drive necessitated architectural
changes to Building "A". Also, the modification includes revisions
to the south end of Building "A" that are to accommodate a specific
tenant in that location.
As you will recall, a primary consideration along the east side of
Bull ding "A" was the continuity of the promenade. Key elements of
the promenade are to be provided along the sidewalk to clearly
distinguish the route of the promenade.
May 19, 1988
Page 2
II. The revisions to the footprint of Major 2 are also being done to
accommodate the needs of a specific tenant. The store area is
increasing in size from the approved 80,000 square feet to 96,000
square feet. The increased square footage encroaches slightly
toward Buildings "B", "C", and "D", and also has expanded to the
rear. The rear area of the building will also be designed to
accommodate a tire/battery/auto service area. This service area
will have one drive-in access with all work performed completed
within an enclosed area.
The architecture has not changed, and parking calculations have
been done to insure that the requested changes have adequate
parking.
Design Review Co~m~ittee A~tion:
Members Present: David Blakesley, Dan Coleman
Staff Planner: Debra Meier
In reviewing Modification No. I to Terra Vista Town Center the Committee
had the following comments:
A. Revisions to the footprint of Major 2:
1. Additional parking will be required near the tire/battery
center. The goal is to locate at least 35 spaces within the
vicinity of the tire/battery area.
2. Maintain 10'-12' landscaping between roadway curb and rear
corners of tire/battery portion of the building.
3. The Committee recommended approval of architectural elevations
of Major 2.
B. Revisions to footprint and elevation of Building A:
1. The Committee recommended approval of site planning and
architectural aspects regarding the building A revisions.
C. Realignment of the entry drive from Haven Avenue:
1. Staff recommended to the Committee that the applicant had the
following options with respect to the driveway issue -
May 19, 1988
Page 3
a. Proceed to Planning Commission on June 8, 1988 with
modification to Building A as proposed. However, the drive
aisle would remain in a straight line location as was
originally approved; or
b. The issue of Haven Avenue would be taken for City Council
direction prior to proceeding to a Planning Commission
meeting.
In addition to the modification as discussed above, the Committee was
able to review the final designs for the Target store. (This
presentation was provided for Committee information only.) The
Committee made the following suggestions with regard to the Target
design:
1. With the shortening of the trellis near the garden section of
the building, a corner of the building becomes very stark in
appearance. The Committee suggested using tile insets as was
used near the store entry along with some type of low level
landscape material. Landscaping could be shrubbery within a
planter or potted plants and street furniture that would accent
that area.
DESIGN REVIEW COMMENTS
7:30 - 8:30 Nancy May 19, 1988
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-01 - NALBANDIAN/
'CHIAO - The development of a mixed Use project consisting of a 40 unit
~minium on 5 acres of land; a 40,000 square foot commercial center
for a market/drug store, bank, and retail use on 3.7 acres of land; and
a future preschool, all in the Community Service District of the
Etiwanda Specific Plan, located at the northwest corner of Base Line
Road and Etiwanda Avenue - APN: 227-522-01, 02, 03, 04, and 227-521-
65. ~sociated with this project is Tree Removal Permit 88-11,
requesting the removal of two (2) mature trees along Etiwanda Avenue.
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 13886 - NALBANDIAN/CHIAO -
The development of a 40 unit condominium on 5 acres of land in the
Community Service District of the Etiwanda Specific Plan, located at the
northwest corner of Base Line Road and Etiwanda Avenue - APN: 227-522-
01, 02, 03, 04, and 227-521-65.
Background:
The Planning Commission, on March 17, 1988, conducted a workshop
regarding this project. The Commission identified numerous design
issues and concerns. They are as stated in the minutes of the March 17,
1988 Planning Commission Workshop meeting. A copy has been attached for
your reference (see Attachment "A"). Since then, the applicant has met
with staff several times to review and discuss those concerns as
identified by the Commission and to work towards acceptable solutions.
Neighborhood Meeting:
A neighborhood meeting was held on April 28, 1988. Staff, the
developer, and 14 residents attended this meeting. Six of the residents
live in homes immediately abutting the north and west sides of the
project. Representatives from The William Lyon Company and For Kids
Only also artended this meeting.
The developer and architect presented this project to the residents.
Colored plans and a model of the proposed project were also available at
the meeting for the residents to examine. The following are some of the
concerns the residents have regarding this project:
1. Buffering is needed along the north and west property
boundaries. Private open space should be designed as
private yards for transition and buffering purposes.
2. Loss of privacy with the second story balcony of the
units.
PLANNING COMMIS: WORKSHOP
CUP 88-01/TT NALBANDIAN/CHIAO
May 19, 1988
Page 4
3. The existing wood fence on the property does not provide
adequate security.
4. During construction of the project, signs should be
posted to prohibit alcohol and loud music.
The developer stated that they could address these concerns in the
revised plans by providing dense landscaping along the north and west
property boundaries to provide buffering between the two land uses and
to preserve privacy. With regard to the wood fence, staff interjected
at the meeting that perhaps the developer of this project and The
William Lyon Company could look into jointly developing a common wall
between the two projects. However, this concept would require
cooperation from every one of the residences that abut the north and
west property boundaries.
Staff Coalnents:
A. Traffic/Circulation Issues:
One of the concerns raised by the Planning Commission is the
traffic conflict created by the different land uses the
preschool, the residential project, and the commercial center. The
developer has provided a traffic study. The parameters of this
study is to determine the extent of the conflict and the impact to
the site and the surrounding area and provide mitigation measures
if needed. The City Traffic Engineer is in the process of
reviewing this traffic study (see Attachment "B"). Comments will
be available at the Design Review Committee meeting.
B. Site Plan:
Residential Project:
I. The two driveway entrances to the project should have
an entry statement that includes wider pavement with
a planter median, and wider open landscape area.
This is especially so with the end units of Numbers 8
and g.
2. One of the residents' concern was the existing wood
fence along their property boundary which does not
provide for adequate privacy and sound attenuation.
Should the developer contact The William Lyon Company
to work towards installing a common wall?
PLANNING COMMIS WORKSHOP
CUP 88-01/TT 13~- NALBANDIAN/CHIAO
May 19, 1988
Page 5
Commercial Project:
1. The loading area behind Building "A" should be
redesigned as shown in Alternative "B" (see
Attachment "C"). This alternative provides a flip
bridge for loading. In other words, trucks could
enter the loading zone on either side without backing
into it. The Traffic Division has reviewed this
alternative and determined it to be acceptable
provided that there is a 65 foot truck stacking
distance. This alternative design minimizes the
conflict created by the loading and unloading
activity with the main private drive.
C. Elevations:
Residential Project:
The developer has not proposed any changes to the elevations.
It is still of victorian architectural style which meets the
design guidelines of the Etiwanda Specific Plan. However, the
Planning Commission at the March 17, 1988 workshop recommended
that authentic materials should be used such as wood clapboard
siding, fieldstone, and concrete tile (calshake would be an
acceptable roof material). In addition to the above, the
applicant should provide the following items:
1. A standard patio cover that is consistent with the
design theme of this architectural style.
2. The gazebo and all other related buildings or
structures in the common open space area should also
be designed to be consistent with this architectural
style.
3. Signage should be sandblasted wood signs rather than
individual channelized letters. Further, the signage
should hang underneath the colonade instead of forced
into the space below the fascia as shown.
Commercial Project:
1. Authentic wood siding and fieldstone materials should
be used rather than the fieldstone veneer and
simulated wood siding. The roof material should be
of tile instead of asphalt shingles.
2. The developer has provided details of the pedestrian
amenities such as benches, bike racks, and trash
receptacles (see attached brochure).
PLANNING COMMIS WORKSHOP
CUP 88-01/TT NALBANDIAN/CHIAO
May 19, 1988
Page 6
D. Landscaping:
Residential Project:
1. Windrows should be provided along the north and west
property boundaries per the requirements of the
Etiwanda Specific Plan and to provide a buffer
between the single family homes and the duplexes
linear feet per acre, approximately 250 feet).
2.The applicant still has not provided fence and walls
to delineate the 600 square foot required open space.
3. The entrance into the project should have special
landscape treatment with specimen-size trees,
pedestrian walkways, accent trees, etc.
Commercial Project:
1. Trees should be provided along the storefront which
has not been addressed by the developer.
E. Future Preschool Located at Base Line Road:
The applicant is proposing a future preschool to be located along
Base Line Road. The prospective tenant for this preschool is For
Kids Only. However, the applicant stated that For Kids Only has
not fonnalized the lease for this site area. Therefore, the
applicant is only requesting for conceptual approval at this
time. Future development will require a separate Development
Review process. Staff's review of this future preschool site is
limited to overall circulation and site planning. The number of
parking spaces required for a preschool can not be reviewed at this
time as it is based on the student capacity for this preschool and
the number of staff members. Such information has not been
provided to staff.
,I)esign Revie~ Coaaittee Action:
Continued to June 2, 1988 Design Review Committee Meeting.