HomeMy WebLinkAbout1988/07/21 - Agenda Packet CITY OFRANCHOCUCAMONGA
MEMORANDUM
DATE: July 25, 1988 A~TION~A ~
TO: Cmm~ercial/Industrial
Design Review Committee Peter Tolstoy
Larry McNiel
Dan Coleman
David Blakesly (Alternate)
FROM: Nancy Fong, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF JULY 21, 1988
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
(Chris) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 88-11
'MATLOCK ASSOCIATES - The development of a 6,385 square
foot two story office building on .40 acres of land on
the southwest corner of Vineyard Avenue and San
Bernardino Road in a Community Commercial District
within the Foothill Specific Plan - APN: 207-102-09.
6:30 - 7:00
(Brett) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-
28 - MAX WILLIAMS - T~e development of a 5,915 square
Toot retail building on .52 acres of land within an
existing shopping center in the Community Commercial
District of the Foothill Specific Plan, located on the
southwest corner of Foothill Boulevard and Klusman
Avenue - APN: 208-261-20.
7:00 - 8:00 BREAK
DESIGN REVIEW COMMITTEE AGENDA
Commercial/Industrial
July 21, 1988
Page 2
8:00 - 9:00
(Nancy) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-
01 - NALBANDIAN/CHIAO - The development of a mixed-use
project consisting of a 46 unit condominium on 5.75
acres of land; a 40,000 square foot commercial center
for a market/drug store, bank, and retail use on 3.75
acres of land in the Community Service District of the
Etiwanda Specific Plan, located at the northwest corner
of Base Line Road and Etiwanda Avenue - APN: 227-522-
01, 02, 03, 04, and 227-521-65. Associated with this
project is a Tree Removal Permit 88-11, requesting the
removal of two mature trees along Etiwanda Avenue.
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 13886 -
NALBANDIAN/CHIAO - The development of a 46 unit
condominium on 5.75 acres of land in the Community
Service District of the Etiwanda Specific Plan, located
at the northwest corner of Base Line Road and Etiwanda
Avenue - APN: 227-522-1, 2, 3, 4, and 227-521-65.
NF:vc
Attachments
CC: Planning Commission/City Council
Commercial/Industrial
CONSENT CAtENDAR ITE)4SAGEN~)A
July 21, 1988
1. CUP 87-26 - OAS
(Nancy) Review of roof tile material and
color.
Committee Action: The Committee approved the darkest
shade of the concrete ranch shake tile
#145.
2. DR 88-02 - ARCHITECTURE ONE
(Scott) Review of revised elevation.
Committee Action: The Committee recommended that the
full Planning Commission review the
elevations.
3. CUP 85-19 - PARCO
(Chris) Review of modification to project.
Committee Action: The Committee requested further design
study of the satellite and easterly
buildings.
4. NDR 88-27 - FONTANASTEEL
(Nancy) Review of modification to elevations
and preliminary comments on proposed
expansion,
Committee Action: The Committee approved the minor
modification to the west elevation
with regards to eliminating the curve
section in the middle of the west
elevation. The Committee also stated
that the proposed expansion of the
maintenance shop and the concrete pad
for the future outdoor crane shall
require a modification to DR 87-51.
5, CUP 87-16 - NINEST
(Nancy) Review of trash enclosure design.
Committee Action: The Committee approved the design with
condition that column shall be
provided at the ends of the wall.
6. DR88-14 - I[ ARCHITECTS
(Scott) Review screening of roll-up doors on
west elevation of Building "E".
Committee Action: Approved as submitted by applicant.
DESIGN REVIEW COMMENTS
6:00 ~ 6:30 Chris July 21, 1988
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 88-11 - MATLOCK
ASSOCIATES - The development of a 6,385 square foot two story office
building on .40 acres of land on the southwest corner of Vineyard Avenue
and San Bernardino Road in a Community Commercial District within the
Foothill Specific Plan - APN: 207-102-09.
Design Parameters:
The site is located within a Foothill Boulevard Activity Center. It is
an undersized legal non-conforming lot and there is an existing building
which has been considered for historic preservation by the Historic
Preservation Commission. Vineyard Avenue will be realigned. There is
an existing apartment house on the property directly west and the
property south is largely vacant with a single family home.
Site Plan
The building siting takes advantage of the activity center standards of
25' from the face of curb. The parking and circulation areas are moved
interior to the site for separation from the streetscape. However, as
proposed, the site plan does not provide for access to adjoining
properties. As they develop, that access will be essential to an
integrated internal circulation plan which minimizes access points onto
adjacent public streets.
Architecture
1. The eave treatment used on the tower element should be continued
under the eaves elsewhere on the building.
2. To create architectural features, a treatment should be provided
around the windows. A contrasting color or furring detail could be
used.
3. The pillar at the southwest corner of the building should be
modified to be more architecturally integrated with the overall
building style.
4. The window treatment on the west elevation should be consistent
with the overall multi-paned window treatment.
The architectural style of the building is generally consistent with the
intent of the Foothill Specific Plan design guidelines for the Subarea 2
activity center. Additional elements could be added to enhance
articulation.
DESIGN REVIEW COMMENTS
DR 88-11 - Matlock Associates
July 21, 1988
Page 2
Landscape
Generally the landscape plan provides the proper design elements. A
great mix of evergreen, deciduous, and accent trees should be provided
and greater emphasis should be given to the northeast corner.
Within Activity Centers trees should be planted in a regimental style at
a minimum of 30" box size in order to achieve sufficient height.
Design Review Ce./.ittee Action:
Members Present: Larry McNiel, David Blakesly, Dan Coleman
Staff Planner: Chris Westman
The Committee reviewed the project and made the following
recommendations:
1. Although future reciprocal access will be a requirement of the
project, a landscape border along the western property line will be
allowed with this project and removed at the time of connection.
2. A recessed window treatment is satisfactory articulated.
3. The style of the windows on the west facade should be changed to
reflect the overall style of the bull ding and windows used
elsewhere on the project.
4. The column at the southwest corner of the building should be
redesigned to accommodate the balance and massing of the second
story.
5. The block wall proposed for the project should be plaster and have
a brick or similar type of cap which is consistent with the
building.
6. The Committee agreed to the applicant's suggestion of providing a
clock in the tower element.
7. The applicant shall restudy the south second story design and
prepare sketches for the next Design Review Committee session.
8. The applicant should study the possibility of designing a street-
oriented entry.
DESIGN REVIEW COMMENTS
DR 88-11 - Matlock Associates
July 21, 1988
Page 3
9. A greater mix of evergreen, deciduous, and accent trees should be
provided and greater emphasis should be given to the northeast
corner.
10. Within Activity Centers trees should be planted in a regimental
style at a minimum of 30" box size in order to achieve sufficient
height.
DESIGN REVIEW COMMITTEE
6:30 - 7:00 Brett July 21, 1988
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-28 - MAX WILLIAMS
- The development of a 5,915 square foot retail building on .52 acres of
land within an existing shopping center in the Community Commercial
District of the Foothill Specific Plan, located on the southwest corner
of Foothill Boulevard and Klusman Avenue - APN: 208-261-20.
Design Parameters:
The project site is currently vacant (asphalt paved) and lies
immediately adjacent to the existing Perry's Market Shopping Center. An
alley and two single family homes abut the southern property line while
to the north, a vacant lot exists. This unpaved lot was the former site
of a service station.
The parcels comprising Perry's Market Center are all currently owned by
one entity. The applicant however, retains a long term lease on the
parcels which contain the existing buildings (Perry's Market and
tenants) and the proposed retail shop addition being reviewed with this
application. The lease allows the applicant the option to use the
property (and to construct improvements on it) until the year 2058, if
the applicant so chooses.
Staff Comments:
A. Issue - Upgrade of Existing Center: Given the condition of the
existing center (which does not meet various Development Code nor
Foothill Specific Plan requirements such as streetscape setbacks,
landscaping, parking lot design, clean up of the back side of the
center, architectural guidelines, and screening), staff requests
direction from the Committee as to the extent of the improvements
which should be required on the developed portion of the shopping
center as part of this application.
As mentioned previously, the applicant does not lease the entire
shopping center site. The front parking lot, for example, is under
separate control. Any proposed upgrading would require cooperation
from the legal property owner of the entire center.
B. New Retail Building:
1. The landscape plan should be revised to include additional tree
plantings on the site.
2. Provide columns along the entire store frontage rather than
just at the corner of the facade.
3. A small plaza area with pedestrian amenities such as a shaded
seating area, bike racks, and/or other features should be
provided.
DESIGN REVIEW COMMENTS
CUP 88-28 - Max Willjams
July 21, 1988
Page 2
4. Adequate landscaping should buffer the existing residences from
the proposed shop building {adjacent to the alley).
5. Should the Committee feel that improvements should be made to
the entire site or additional portions of it, the applicant
should revise the plans and return to the Design Review
Committee at a later date.
Design Review Co~m~ittee A~tion:
Members Present: Larry McNiel, David Blakesly, Dan Coleman
Staff Planner: Nancy Fong
The Committee recommended that the proposed project be revised and
submitted for further review. The revised plans should address the
following concerns:
1. The storefront of the existing building east of Perry's Market and
the new building should be improved by adding a colonade which
would provide continuity and consistency in design.
2. Landscaping such as tree wells should be provided along the
storefront of the new building and the existing one east of Perry's
Market.
3. The east elevation of the new building should be upgraded with
additional roof overhang and adding the same tower element at the
south side of east elevation that wrap around to the south
elevation.
4. Trash enclosure areas should be provided on-site rather than along
the alley.
5. The south elevation should be upgraded with additional
architectural elements.
6. The Committee stated that they strongly encourage the developer to
work with the legal property owner of this center and the owner of
the small corner parcel to upgrade the entire shopping center. The
Committee stated that they would have recommended the total upgrade
of the center based on this proposed expansion. However the
Committee understood the financial burden on the developer just to
expand 5,000 square feet of retail space. The Committee stated
that the design and the upgrade of the new building and the
existing building east of Perry's Market should set the tone for
future redevelopment of the entire center.
DESIGN REVIEW COMMENTS
8:00 - 9:00 Nancy July 21, 1988
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-01 -
NALBANDIAN/CHIAO - The development of a mixed-use project consisting of
a 46 unit condominium on 5.75 acres of land; a 40,000 square foot
commercial center for a market/drug store, bank, and retail use on 3.75
acres of land in the Community Service District of the Etiwanda Specific
Plan, located at the northwest corner of Base Line Road and Etiwanda
Avenue - APN: 227-522-01, 02, 03, 04, and 227-521-65. Associated with
this project is a Tree Removal Permit 88-11, requesting the removal of
two mature trees along Etiwanda Avenue.
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 13886 - NALBANDIAN/CHIAO -
The development of a 46 unit condominium on 5.75 acres of 1 and in the
Community Service District of the Etiwanda Specific Plan, located at the
northwest corner of Base Line Road and Etiwanda Avenue - APN: 227-522-
1, 2, 3, 4, and 227-521-65.
Background:
On June 2, 1988 the Planning Commission conducted a workshop on the
revised plans of this proposed project. At this workshop the Planning
Commission determined that the underlying issue of this mixed-use
project is that of overbuilt and too dense. It creates problems in
areas of tremendous grade differential between the existing single
family homes and a townhouse project, lack of open space, truck and auto
traffic conflict, and etc. The Planning Commission provided directions
to the applicants so he could revise the project. The applicant has
been working diligently with staff to redesign this project to best meet
the Commission's concern. The developer has indicated that they would
not pursue the pre-school project and has expanded the townhomes project
instead. The townhouse project now is a 46 unit condo versus 40
units. Also on June 16, 1988 regular Design Review Committee meeting
the Committee reviewed the preliminary concept of the redesigned site
plan and stated that the main loop driveway could remain as proposed.
Staff Comments:
A. Residential Project
1. The Committee stated that the two driveway entrances to the
project should have an entry statement that includes why the
pavement with a planter median and wider open landscape area.
The revised site plans showed wider landscape areas on both
sides of the driveway entrance into the townhome project.
However, staff recoeeends that pedestrian connection should be
provided from the main project entry off the two streets,
Etiwanda Avenue and Base Line Road, onto the townhome project
as shown in Attachment "A". Further, enhancement of the entire
project entry should be provided as suggested in Attachment
DESIGN REVIEW COMMENTS
CUP 88-01 - Nalbandian/Chiao
TT 13886 - Nalbandian/Chiao
July 21, 1988
Page 2
2. The Committee directed the developer to contact the William
k~on Company and the adjacent property owner/residence in order
to work towards installing a common wall. The Committee stated
that this issue should be resolved prior to scheduling the
project for Planning Commission consideration.
The applicant has indicated that they are in the process of
contacting William ~yon Company.
3. The grade differential between the existing single family homes
to the north and west and in how townhouse projects create a
basement and tunnel effect. The Committee stated that the
applicant should reduce to great difference to no greater than
8'. The bull ding setback from the north and the west property
lines should be increased so as to provide transition to the
existing single family homes and to allow room for taking up
the grades differential.
The revised site plans show a greater building setback from the
north and the west property boundaries, ranging from 20' to 34'
versus the 15' proposed originally.
4. The Commission stated that the applicant should explore the
feasibility of eliminating the middle section of the main loop
road so as to increase area for open space and to take up grade
differential.
Design Review C,,eittee on June 16, 1988 regular meeting
reviewed the preliminary concepts of the revised site plan and
stated that themin loop road could stay as proposed.
5. The Commission stated that variation to proposed elevations
should be provided. This could be achieved by providing
changes to the architectural details of the building, creating
a symmetry to the elevation (typical of Victorian style).
No changes have been proposed for the elevations.
6. The Commission stated that the applicant should provide
examples of projects that have used simulated wood siding and
calshake roof material for Commission to consider.
The applicant will provide examples at the meeting.
7. The applicant should provide additional color shades for
Commission to consider.
DESIGN REVIEW COMMENTS
CUP 88-01 - Nalbandian/Chiao
TT 13886 - Nalbandian/Chiao
July 21, 1988
Page 3
Colored elevations will be provided at the meeting for
Cmmeission to review and consider.
8. The following are additional staff comments regarding the
townhouse project:
a) All walls including retaining, decorative, and screen
walls should have the same consistent material such as
authentic river rock or field stone and should have
decorative treatment such as pilaster and decorative cap.
b) Pedestrian connection should be provided from the greenway
into the townhomes project as shown in Attachment "A".
c} A paseo effect should be provided for the greenway along
the townhome project off the main loop road. The proposed
walkway should be behind a 6' wide planter. Terrace
planters should be provided to take up the grade
differential.
d) Pedestrian connection should be provided towards the
recreational area and the swimming pool. Landscape areas
should be provided in front of the guest parking, screen
them from the recreation facility. The recreation
facility should be secured by providing fencing around it
which includes the tot lot area.
B. Commercial Project
1. The Commission stated that alternative design of the 1 oading
area for the market and drug store should be explored.
The loading dock area is a reversible one and would accoemoodato
a truck trailer parking space.
2. The Commission stated that all trash enclosure areas should be
tel ocated away from driveway entry and away from buildings.
Revised as shown in Attachment "A".
3. The Committee stated that parking spaces along the main loop
road should be eliminated.
Parking spaces eliminated.
4. The following are additional staff comments regarding the
commercial project:
DESIGN REVIEW COMMENTS
CUP 88-01 - Nalbandian/Chiao
TT 13886 - Nalbandian/Chiao
July 21, 1988
Page 4
a) All pedestrian walkways should have textured pavement such
as brick pavers, exposed aggregate, or combination of
them.
b) The trash enclosure design should have pedestrian access,
roll up doors, trellises, and overhead screening to
prevent trash from blowing off.
c) Additional tree wells should be provided along the main
market/drug building.
d) The corner trellis work should be moved away from the
landscape setback area.
Minutes of Planning Coam~ission Workshop of July 21, 1988
Attendants: Planning Commission Larry McNiel
David Blakesly
Bruce Emerick
Suzanne Chitiea
Staff Brad Buller
Otto Kroutil
Dan Coleman
Nancy Fong
Developer Philip Chiao
Mark Elliot
Andrew Barmakian
The Planning Commission at this workshop made the following
recommendations:
1. The developer should in good faith effort resolve the interfacing
of the wall s along north and west property boundary by replacing
the existing wood fence with other durable materials as
woodcrete. Final design subject to City Planner review and
approval. Should the developer be unable to obtain 100%
authorization and/or cooperation from all of the residents that
abut the north and west property boundary, dense landscaping should
be provided to the satisfaction of the City Planner. In each
situation terrace walls with landscaping should be provided along
west and north property boundary to break up the height of the
wall.
TT 13886 - Nalbandian/Chiao
July 21, 1988
Page 5
2. The proposed masonite lap siding for the building material is
acceptable.
3. The cal shake tile may be acceptable if the developer could show
examples of successful application.
4. The developer should add a 4th color of subtle bluish shade for the
condo project.
5. The developer should work with staff to resolve other identified
design and technical items. Once all design and technical items
have been resolved, then the project could be forwarded to Planning
Commission for consideration.