HomeMy WebLinkAbout1986/03/20 - Agenda Packet CITY OF RANCH0 CUCAMONGA
MEMORANDUM
DATE: March 25, 1986 ACTION AI;ENDA
TO: Commercial/Industrial 1977
Design Review Committee Herman Rempel
Suzanne Chitiea
Dennis Stout {Alternate}
Dan Coleman
FROM: Nancy Fong, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF MARCH 20~ 1986
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Commi ttee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30 (Dino) DR 86-02 - DARLING
NF:cv
Attachments
cc: Planning Commission/City Council
Conmnercial/Industrial
CONSENT CALENDAR ITEMS AGENDA
March 20~ 1986
1. PR 86-19 - FORECAST Review of Site Plan and Architecture for
(Debra) proposed office building
Committee Action: The Committee would prefer a multi-story
building with architecture exemplary of the
Haven Avenue Overlay concept. This approach
would provide additional land area for
parking and a pedestrian/employee plaza.
Previous approval of the driveway between
parcels 2 and 3 could be reconsidered since
this is not intended to be a restaurant as
applicant had indicated to Planning
Commission on 1/11/86.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Dino March 20, 1986
ENVIRONMENTAL ASSESSMENT FOR DEVELOPMENT REVIEW 86-02 DARLING The
development of a 189,640 square foot warehouse addition to an existing
warehouse building on 11.74 acres of land in the General Industrial (Subarea
1) District located on the east side of Baker Avenue and the north side of the
AT & SF Railroad right-of-way - APN: 207-27-25.
Oesign Parameters: The project site is currently being used as a warehouse
facility for Patrini Shoes. The properties to the north and east are vacant
industrially zoned lots. South of the project site is the AT & SF Railroad
right-of-way, and on the west side of the site, across Baker Avenue, are
single-family homes.
The northwest corner of the project site abutts two non-conforming single-
family residences. It is important that a reasonable buffer be created at the
boundary line between the residential uses and the project site.
Staff Co~l)ents:
Site Plan:
1. Provide for open spaces equiped with benches or other
furniture, to create an outdoor eating plaza.
2. Provide a 10 foot landscape buffer along the north/south
property lines between the project site (northwest corner) and
the adjacent residential lot.
Architecture:
1. Provide typical concrete fin walls along the projects south
elevation, similar to the north elevation design, to break-up
the long expanses of blank wall.
2. Create a stronger architectural statement along the Baker
Avenue and Feron Boulevard building elevations.
3. Provide architectural variation in order to break up the long
expanses of blank wall.
4. The proposed orange building accent band color is too
intense. A subtle color should be used.
5. Change accent band directions in various locations around the
proposed and existing buildings.
Landscaping: Provide a continuous and dense landscaping, such as increased
number of 'trees, specimen size trees and hedgerow, along the south property
line at the truck parking area with shrubs and ground cover.
Design Review Coam~ittee Action:
Members Present: Suzanne Chitlea, Herman Rempel, Dan Coleman
Staff Planner: Dino Putrino
The applicant was unable to attend the meeting. This item has been
rescheduled for the Design Review Committee meeting of April 3, 1986.