CITY OF RANCH0 CUCAMONGA
MEMORANDUM
April 9, 1985
Design Review Committee
ACTION AGENDA
Rick Gomez
Herman Rempel
Dennis Stout
c~c~M~-~,o~
1977
Suzanne Chitiea (Alternate)
Nancy Fong, Assistant Planner
DESIGN REVIEW COMMITTEE ACTION AGENDA FOR APRIL 4, 1985
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses), prior to the meeting date, if you have specific
questions related to the scheduled projects. Dinner will be provided
between 5:00 5:30 p.m., Consent Calendar items will be reviewed
between 5:30 p.m. - 6:00 p.m., with the first design review item being
heard at 6:00 p.m. Please notify our department if you will be unable
to attend the meeting, or if you will be late, so that the dinner can be
properly ordered and the necessary arrangements made.
6:00 - 6:30 (Curt)
TT 11915-2 - ROBERTSON HOMES
6:30 - 7:00 (Howard)
DR 85-08 - AJA & ASSOCIATES
7:00 - 7:30 (Nancy)
DR 84-54 - FORECAST
7:30 - 8:00 (Nancy) CUP 85-06 - CALIFORNIA RETIREMENT
VILLAS, INC.
NF/ns
Attachments
CC:
Planning Commission/City Council
Dan Coleman/Planning Division
Joe Stofa, Paul Rougeau, Barrye Hanson
Bob Akridge
CITY OF RANCH0 CUCAMONGA
MEMORANDUM
1977
DATE:
TO:
FROM:
SUBJECT:
April 11, 1985
To File
Nancy Fong
SUMMARY OF NEIGHBORHOOD MEETING - DEVELOPMENT REVIEW 85-07
A neighborhood meeting was conducted by the Developer on April 10, 1985,
at the Rancho Cucamonga Neighborhood Center. The purpose of this
meeting is for the developer to present their proposed project to the
residents as well as receiving input in addressing those concerns raised
by the residents. Approximately 250 notices were mailed out by the
developer to the property owners within 800 feet radius of the project
site. Twenty-five residents attended this meeting. The following is
the summary of the meeting:
The developer described their proposed project which consisted of
eighty-eight apartment units with a net density of 14 dwelling units per
acre. The amenities proposed include recreation facilities such as
swimming pool, tot lot, and greenbelts; on site parking - two spaces for
each unit, and one space per four units for guest parking; covered
garages; and providing washer/dryer and microwave for each unit. The
unit size ranges from six-hundred-fifty square feet, to nine- hundred-
fifty square feet, with sixteen units in the one bedroom, one bath,
thirty-two units in the two bedroom, I bath and forty units in the two
bedroom, two bath. Proposed rental rates ranges from $580. to $675. per
month. The developer in designing of this project tried to address and
mitigate land use conflict through providing a building setback of
forty-five feet where single-family homes are across the street;
providing a building setback of minimum seventy-feet to the west where
mobile homes are located; and providing adequate on-site parking
facilities for each unit and guest parking so as not to burden the
public street. The developer stated that this project is designed under
condominium standards, so as to leave room in the future for conversion
where the market allows. The developer stressed that they are owner
developer and that there will be a good property management to maintain
this project.
Summary of Neig Meeting
Development Review 85-07
Page #2
The concerns of the residents were as follows:
Density - The residents felt that the proposed project is
too dense to be across from single-family homes. The
increase in dwelling units will impact the school by
contributing to the over crowding of students.
Traffic - The residents felt that at present, they have a
traffic problem with speeding cars, foot traffic from
children and numerous accidents. The result of this
proposed project will add and contribute to the existing
traffic problems. Residents would like the developer to
explore the possibility of having access from Foothill
Boulevard through 2nd Avenue, instead of San Bernardino
Road.
Crime The residents raised concerns regarding the
increase in crime rate as numerous studies have
demonstrated such increase.
Property Values - The residents were concerned that being
adjacent to apartments would lower their property
values. The residents would like the developer to
compromise by developing this project as condominiums.
The reason being that there is no guarantee of any future
property owner to maintain the apartment project, while
the Homeowners Association for a condominium project are
required to maintain the property.
NF:cv
John
DESIGN REVIEW COMMENTS
6:45 - 7:15 May 2, 1985
ENVIRONMENTAL REVIEW AND CONDITIONAL USE PERMIT 85-08 VERNACI A
proposal to locate a single trailer for a caretaker's facility at a
wholesale nursery located in the Edison utility corridor on the north
side of Base Line, east of Rochester - APN 227-091-41.
Design Parameters
The project is located in a utility corridor. The Development Code
mandates a conditional use permit review for the use of temporary
caretaker's quarters. No other accessory structures are permitted, with
the exception of greenhouses. The project site is vacant and slopes
slightly to the south at just under a 2% grade.
Staff Conmnents
Site Plan.
1. The placement of the trailer may be relocated westerly behind the
"tree area" to provide better screening.
2. The storage shed is not permitted and must be removed.
Parking/Circulation. Based on the county regulation for similar uses of
I parking space for every 2,000 gross area up to 10,000 sq. ft. and 1
space for every 5,000 thereafter. Fifteen parking spaces are required,
currently ten are provided. The general circulation of the site is
adequate.
Architecture. The appearance of the trailer
model with a wood panel facade (see picture).
metal variety (see picture).
is a newly constructed
The shed is the standard
Landscaping. Street trees will be provided along with necessary on-site
planting to provide screening.
Design Review Co~nittee Action:
Members Present:
Staff Planner: John Meyer
Curt
DESIGN REVIEW COMMENTS
7:15 - 7:45 May 2, 1985
DESIGN REVIEW FOR TRACT 10047 - PENNHILL COMPANY - The development of 43
single family detached homes on 27.16 acres of land located on the north
side of Wilson Avenue, south side of Hillside Road, east of Archibald.
Design Parameters
The tract map for this project has been recorded. Three floor plans are
proposed ranging in size from a one-story 1,808 sq. ft. unit up to a
two-story 2 19 ft. unit. Each house has a three car garage and the
· 0 sq.
roof material will be concrete shake tile. Surrounding the site are
several houses located on Hillside Road, and on Crooked Creek Road
across the drainage channel to the west; however no consistent design
theme prevails.
Staff Comnents
1. Additional architectural treatment is necessary on the
corner side elevations and the rear of elevations 130BR
and 130C on lots 41 and 43 which back on to Wilson
Avenue.
2. The individual elevations are attractive; however, the
basic design element of the two-story units is
repetitive. The Committee may want to discuss with the
applicant the possibility of adding an additional floor
plan or providing greater variety in the roof structures.
Design Review Cmmaittee Action
Members Present:
Staff Planner: Curt Johnston
Nancy
DESIGN REVIEW COMMENTS
7:45 - 8:15 May 2, 1985
DESIGN REVIEW FOR CONDITIONAL USE PERMIT 83-09 BRETHREN IN CHRIST
CHURCH - A request to change the approved elevation for a 2,800 sq. ft.
education facility within an approved Master Planned church complex on
6.8 acres of land in the Medium Residential District (4-8 du/ac),
located at 9974 19th Street, east of Ramona Avenue - APN 202-171-31, 35.
Oesign Parameters
A conceptual Master Plan for a church complex had been approved by the
Planning Commission in 1979. This proposed 2,800 sq. ft. classroom
building was approved by the Planning Commission on September 14, 1983,
and is designed to function as a private elementary school for 100
students from kindergarten through third grade. The applicant is
requesting to modify the approved elevation for such classroom building.
Staff Coeents
Elevation. The previously approved elevation for the classroom building
has variations in roof pitch, height, and angle, and the roof materials
are of concrete tile which is compatible with the architectural style of
the multi-purpose building. The proposed new elevation has low profile
roof and single-family residential character which is not compatible to
the dramatic architectural statement of the multi-purpose building.
Therefore, it is recommended that the original concept be maintained as
much as possible.
Oesign Review Co~maittee Action
Members Present:
Staff Planner: Nancy Fong
QI BREll. IFIEN ;14 CIIII~T CHU~ ,]'o-'!l .r~ {]W,18'l /
EXTERIOR ELEVATIONS · CLASSROOM BUILDING
11
SOUTH ELEVATION
WEST ELEVATIOr;
EAST ELEVATION SIMILAR
Curt
DESIGN REVIEW COMMENTS
8:15 - 8:45 May 2, 1985
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 12643 - The development of
463 single family lots on 104 acres of land in the Caryn Planned
t
Community (Phase II), loca ed on the north side of Highland Avenue,
south side of Banyan Avenue, west side of Rochester Avenue, east of
Milliken Avenue.
Design Par~ters. This project represents Phase II of the Caryn
Planned Community presently annexed to the City. The basic loop street
pattern and lot sizes were conceptually approved with the Planned
Community application· Average lot sizes required north of the central
east/west road is 7,100 square feet, and 5,000 square feet to the
south. Typical lot widths on the larger lots are 55 feet to 60 feet and
45 feet for the smaller lots. Design review of the houses will occur
following Tentative Map approval·
Staff Coaments
Currently 2:1 slopes up to 12 feet in height are proposed across the
north/south open space corridor. Grading methods to reduce slopes
across the trail should be discussed.
2. Contour grading should be indicated for the 24 foot high slope
facing Rochester Avenue (southeast corner of the project).
Design Review Committee Action
Members Present:
Staff Planner: Curt Johnston
,--)
15HASE t q PHASE
LOTS. :; 7;" ~:
Note:
Outparcels now being acquired by
property owner for inclusion in
project. Lot layout subject to
review by Planning Commission.
LEGEN~
I m PHASE LINE
LOTLAYOUTPLAN
PROPERTIES AT MI LLIKEN AND HIGHLAND
SAN BERNARDINO COUNTY, CALIFORNIA