HomeMy WebLinkAbout1985/11/07 - Agenda PacketDATE:
TO:
FROM:
SUBJECT:
CITY OF RANCH0 CUCAMONGA ~ o C~CA~O
MEMORANDUM
October 22, 1985 ACTION AGENDA~
Conmnercial/Industrial 1977
Design Review Committee Dennis Stout
Suzanne Chitlea
Larry McNiel {Alternate}
Brad Buller
Nancy Fong, Associate Planner
DESIGN REVIEW COMMITTEE MEETING OF NOVEMBER 7, 1985
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30 (Nancy)
6:30 - 7:00 (Bruce)
7:00 - 7:30 (Nancy)
7:30 - 8:00 (Nancy).
NF:cv
Attachments
CC:
Planning Commission/City Council
Dan Coleman, Planning Division
Joe Stofa, Paul Rogeau,
Loyd Goolsby, Barrye Hanson
DR 85-38 - AJA
TT 13040 / CUP 85-21 - MASI
DR 85-36 - HIMES-PETERS
(United Model Distributers, Inc.)
(Continued from 10-17-85 meeting)
CUP 84-39 - GARASICH (Discussion)
Y
COMMERCIAL/INDUSTRIAL
CONSENT CALENDAR ITEMS AGENDA
NOVEMBER 7, 1985
DR 85-19 - FORECAST
{John}
Committee Action:
Review of change in roof material.
Cancelled
DR 85-26 - FORECAST
(Nancy)
Committee Action:
Review of revised master plan.
Recommended approval and forward the issue
of 12,000 sq. ft. building expansion into
the plaza area for full Planning Commission
discussions.
CUP 85-20 - HOYT LUNBER
(Nancy)
Committee Action:
Review of revised elevation.
Recommended approval with following
conditions: Provide heavy wood trellis with
a minimum of 6" x 6" wood beam; add
protective guard to roll-up doors; enlarge
the wingwall; and add stucco over and above
the roof of roll-up doors.
1T 12040 - ANDEN
(Nancy)
Committee Action:
Review of roof screen.
The Committee stated that the roof screen
shall be of stucco material. The Comittee
recommended stucco-over treatment should be
provided as shown in the chimney.
DR 85-08 - LAUREL/ASPEN
(Howard)
Committee Action:
Review of texturized treatment to driveway.
Provide texturized treatment to driveway
throats similar to roof tile color. Details
of pedestrian connections shall be submitted
for City Planner review and approval prior
to issuance of building permits.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Nancy November 7, 1985
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 85-38 - AJA - The development
of 3 multi-tenant industrial buildings totaling 62,980 square feet on 4.92
acres of land in the General Industrial District (Subarea 4), located at the
southeast corner of 7th Street and Archibald Avenue - APN 209-211-21, 36, 37
Design Parameters
The site is vacant and vegetation consists of mainly weeds.
multi-tenant industrial park is immediately south of the site.
well site located on the south side of 7th Street belongs CCWD,
The existing
The existing
Staff Comments: The primary size is building #1 orientation/architecture
concept which is condusive to strip commercial uses. The front loaded parking
lot and storefront glass architecture could perpetuate the strip commercial
land uses that have taken over the surrounding complexes that are intended for
industrial/office uses. The Commission addressed this issue during review of
Haven Plaza (see attached).
Site Plan: Building #1 should be placed at or near the 45 foot building
setback line on Archibald with the parking in the rear.
Elevation:
The proposed store front design for the building facing
Archibald Avenue would encourage commercial use which may
conflict with the industrial uses for this area. The store
front design could be deemphasized by providing bermed planters
underneath windows rather than floor-to-ceiling storefront
glass facades.
The proposed canvas canopy at the main building entrance shall
be teflon-coated nylon or other durable material like metal or
wood trellis.
The east elevation for Building #1 that is exposed to public
view along 7th Street should be upgraded with more
architectural treatments at the northeast corner.
4. Upgrade south elevation of Building #1 with windows and
concrete tile roof.
Landscaping:
Special landscape treatment should be provided along Archibald
Avenue that takes into consideration the required flood
protection.
Provide trees along front and side of Buildings 3 at a rate of
1 tree per 30 linear feet of building elevation comparable with
Building 2.
DESIGN REVIEW COMMIllEE ACTION
Members Present: Dennis Stout, Suzanne Chitlea, Brad Buller
Staff Planner: Nancy Fong
The Committee stated that the site planning for the portion of the project
that fronts on Archibald Avenue is conducive to strip commercial in that the
parking area is located to the front and the "store front" glasses are
oriented towards vehicular traffic on Archibald Avenue. This type of site
plan design is in conflict with the purpose of the General Industrial
District. The Committee did not approve the project and recommended that the
site plan be revised as follows:
1. Building No. i should be pushed towards or near the 45 foot
landscape setback and the parking should be located at the
rear.
2. The proposed plaza area should be opened up and made available
to two multi-tenant buildings along 7th Street.
3. The building height for Building No. i should be raised so as
to screen the multi-tenant buildings.
4. The north, east and south elevation for Building No. 1 should
be upgraded with architectural treatments.
5. The applicant should work with CCWD and staff in eliminating
the existing driveway, but providing a reciprocal access for
the Water District.
6. Revised plans shall be submitted for Committee review under
Consent Calendar agenda.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Bruce November 7, 1985
ENVIRONMENTAL ASSESSMENT, TENTATIVE TRACT 13040, AND CONDITIONAL USE
PERMIT 85-26 - MASI - A Tentative Tract and Conceptual Master Plan on
27.13 total acres in the Industrial Park Category (Subarea 7), and the
development of a 61,700 square foot Mini-Storage Facility with a
caretaker's residence on 2.98 acres of the 27 total acres, located on
the southwest corner of Foothill Boulevard and Rochester Avenue - APN
229-011-10, 19, 21, 26, 27 and 28.
Design Parameters
A church and the Cowgirl Theatre presently occupy the site, but would be
removed with development of the industrial park. The site is abutted to
the east, west and south by vacant land designated as Subarea
7/Industrial Park by the Industrial Specific Plan. Across Foothill to
the north is vacant land within the Foothill Commercial Corridor of the
Tetra Vista Planned Community. A recently adopted Area Development Plan
for the southeast quandrant of Terra Vista has designated this area as
Office/Medical/Auto/Commercial. Foothill Boulevard and Rochester Avenue
are classified as Special Boulevards. Further, this site is "an
important land use edge between the City's industrial area and community
oriented non-industrial area and is a gateway to the City."
Issue: Is the proposed Phase I mini-storage complex consistent with the
primary objective within the Industrial Park designation of the
Industrial Specific Plan to promote a distinctive, attractive, and
pleasant office park atmosphere in a campus like setting with high
prestige identity.
Staff Comments
A. RASTER PLAN
Site Plan/Building Orientation: Buildings are arranged as independent,
isolated islands surrounded by sea of parking. The Site Plan should be
revised to reorient buildings into cohesive clusters that relate to each
other to promote a campus like setting. Some elements to be
incorporated include the following:
1. Site buildings to create opportunities for courtyards and
plazas.
2. Buildings should be clustered into cohesive units instead of
being fragmented and unrelated.
Parking areas and circulation aisles along Foothill Boulevard
should be minimized by moving building up to street between
streets B and C.
Land Use: Two drive-thru restaurant pads are proposed with the Master Plan.
City action in the past has been to discourage drive-thru businesses in
industrial park settings. Fast food sales including drive-in type
restaurants, would require separate Conditional Use Permit review and
approval.
Open Space Network/Pedestrian Circulation: Foothill Boulevard is classified
as a Special Boulevard with large setback requirements providing a public open
space corridor. An integrated open space network is an integral element in
the creation of a campus like setting and the provision of a high prestige
identity.
1. Create an internal private open space network through the use
of plazas and courtyards.
The private open areas should connect with the public open
space along Foothill to provide a gateway entry into the
project.
3. Landscaped open space areas should be significantly expanded to
provide a campus like setting.
A strong pedestrian circulation system should be provided to
interconnect the open space network, link places of work with
eating and drinking establishments and other service uses, and
minimize vehicular/pedestrian conflicts.
Pedestrian structures and furniture such as loggias, colonades,
gazebos, benches, light standards, kiosks, trash receptables,
etc., should be included into the open space network to create
a sense of place and to enhance the appearance and function of
the system.
Architecture: The intent of the Industrial Park Subarea is the creation of a
sophisticated, intense, and high prestige environment. The architectural
concepts illustrated indicate multiple story buildings along Foothill and
Rochester that reflect the scale and proportion consistent with the intensive,
urban style. Building styles are contemporary in nature employing a variety
of forms, materials, colors and textures, but that are compatible, with each
other and consistent with a progressive, high quality theme. Design elements
such as accent treatments, embellishments, and articulated building surfaces
are included that contribute to the quality of design.
Landscaping: Landscaping is the design element to be used to create a
consistent design theme and to unify the entire project. A Master Landscape
Plan should be prepared to establish a consistent unifying design element
throughout the project. This could be accomplished by specifying a palette of
plant materials on Sheet 1.
Circulation: The proposed circulation system is a closed loop system
providing internal site access only. With this system, no future connection
to adjacent parcels are possible. Should the circulation system be revised to
provide future access points to the west and to the south?
B. MINI-WAREHOUSE
Phase I of the Master Plan is the development of a 61,700 square foot mini-
storage facility with a caretaker's residence on 2.98 acres in the
southeasternmost portion of the site. The Design Review Committee first
reviewed this project on June 20, 1985, and found the design of the project to
be unacceptable. Revisions to the plan have been incorporated to address
stated concerns as follows:
Site Plan: Building orientation has been revised with all perimeter buildings
being two story. This has the effect of restricting off-site lines of site
into the site interior from adjacent multi-story buildings. Also, site access
has been relocated from street "A" to Rochester Avenue. Street level views
into the site interior are prevented, and a landscaped parkway is provided to
surrounding properties. Views into the site off of the Rochester access are
mitigated through the orientation of a building end directly in line with the
access drive to inhibit views into the site, and the provision of a landscape
element at the building end to soften its visual impact.
Architecture: Revised architecture provides a style consistent with the
intended sophisticated, high-prestige, urban form. Materials include
sandblasted concrete combined with mirrored glass. Articulation of building
surface is achieved through building recesses and embellishments are provided
through the use of terraced planters.
DESIGN REVIEW CO~ITTEE ACTION:
Members Present: Dennis Stout, Suzanne Chitiea, Brad Buller
Staff Planner: Bruce Cook
The Design Review Committee did not approve the project and recommended that
the site plan be revised as follows:
The northerly buildings within the central horseshoe of the
Loop Road should be reoriented closer to Foothill and there
should be no parking in front of the building.
Buildings within the central horseshoe of the Loop Road should
be rearranged into cohesive clusters with the intent of
providing for a more comprehensive and functional use of
internal open spaces and plaza areas.
A greater pedestrian orientation should be introduced into the
design by creating a pedestrian system that links buildings and
open spaces into an interconnected network.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Nancy November 7, 1985
ENVIRONMENTAL ASSESSMENT FOR DEVELOPMENT REVIEW 85-36 - HIMES-PETERS (UNITED
MODEL DISTRIBUTOR The development of a 42,313 square foot
warehouse/distribution facility for hobby model products on 1.9 acres of land
in the General Industrial/Rail Served District (Subarea 10) located at the
northeast corner of 7th Street and Bridgeport Place - APN 229-261-71
Design Parameter: The site is vacant with an old vineyard, and is part of
master planned 75 acres industrial distribution complex. The proposed
warehouse/distribution use is a permitted activity in Subarea 10 of the
Industrial Specific Plan. The street improvements are already existing except
for sidewalks and driveways. Development Review for adjacent parcels 2 and 3
has been approved by the Planning Commission last November.
Staff Conm~ents:
1. Site Plan: The overall site plan could be enhanced with the
following:
a) Provide plaza area, courtyards with shaded seating
area and attractive landscaping at building entrance.
b) Provide decorative wall for screening the loading
area.
Elevations: The proposed elevations could be improved with the
following:
a)
Create more shadow pattern and variety in building
form and plane by the use of openings and cavities
such as window area, recessed or projected landscaped
areas.
b)
Break up the mass of the building with different
textures of building materials such as scored split-
face medium and heavy sandblasted.
c)
Provide adequate screening for the roof mounted
equipment that is architecturally integrated with the
elevations.
3. Landscaping:
a) Provide special landscape treatment along west
elevation to break up the mass of the building.
b) Provide more landscape planters to the parking area
at the north and east elevations.
c) Provide special landscape treatment along Newport
Drive taking into consideration the limitation of the
40' MWD easement.
OCTOBER 17, 1985, DESIGN REVIEW CO)g4ITTEE ACTION
Members Present: Suzanne Chitiea, Dennis Stout, Jack Lam
Project Planner: Nancy Fong
The Committee recommended the following:
Plaza areas, courtyards with shaded seating area and attractive
landscaping at building entrance should be provided.
The column at the building entrance should be increased in size
to be more proportionate to the building.
The proposed metal fascia and roof screen do not meet the
intent of the urban design guidelines of the Industrial
Specific Plan, in that the roof screen is not architecturally
integrated with the fascia design, and materials do not achieve
a total continuity of design. The Committee recommended that
the building entrance could be improved by extending the height
of the fascia and tie in with the roof screen; and by changing
the metal materials to other materials such as fluted or scored
split face block.
The Committee would like to review the adjacent project
elevations (DR) 84-36), for comparison and recommended
continuation of this item to the November 7, 1985, regular
Design Review Committee meeting.
DESIGN REVIEW CO)~III'rEE ACTION
Members Present: Dennis Stout, Suzanne Chitlea, Brad Buller
Staff Planner: Nancy Fong
The Committee did not approve the project and recommended the following
revisions:
1. Plaza areas should be provided at the building entrance or the
northwest corner of the building.
2. The proposed metal fascia should be changed to other materials
such as fluted or scored split face block.
The applicant should enhance the building entrance by recessing
the glass area and adding heavy columns to the northwest and
southeast sides of the building entrances.
4. Revised plans shall be submitted for Committee review under the
Consent Calendar Agenda.
DESIGN REVIEW COMMENTS
7:30 - 8:00 Nancy
November 7, 1985
CONDITIONAL USE PERMIT 85-39 - GARASICH - Review of revised site plan by
shifting Phase I building setback to the same building setback as Phase II.
This project was scheduled on the October 17, 1985 Design Review Committee
Consent Calendar agenda. At that time the Committee did not approve the
proposed changes to the site plan. The applicant requested full Committee
discussion at the November 7, 1985 Design Review Committee meeting.
DESIGN REVIEW COMMITTEE ACTION
Members Present: Dennis Stout, Suzanne Chitiea, Brad Buller
Project Planner: Nancy Fong
The Committee recommended approval with the following conditions:
Special landscape treatment along west elevation of Phase I
building, such as intensifying the number and size of trees,
shrubs, and providing mounding and rockscape, etc.
Reverse the bottom scored split face block with the building
split face block and vice versa, in order to create visual
interest and subtle color tone change.