HomeMy WebLinkAbout1991/01/03 - Agenda Packet - (2)DATE:
TO:
CITY OF RANCHO CUCAMONGA
MEMORANDUM
January 7, 1991
ACTION COI~a~ENTS
1977
FROM:
Residential/Institutional
Design Review Committee Larry McNiel
Wendy Vallette
Dan Coleman
John Melcher {Alternate}
Steve Haye,/~Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF jANUARY 3, 1991
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
(Bruce B.)
6:30 - 7:30
(Anna-Lisa)
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 90-
40 SIERRA VISTA BAPTIST CHURCH - A request to
establish a church sanctuary and classroom building in
conjunction with an existing church administration in
the Low Residential Designation (2-4 dwelling units per
acre), located on the south side of Jasper, west of
Sierra Vista - APN: 202-026-13.
DESIGN REVIEW FOR TENTATIVE TRACT 13717 - WESTERN
PROPERTIES - The development of 394 condominium units on
23.5 acres of land in the Medium-High Residential
District (14-24 dwelling units per acre) within the
Terra Vista Planned Community, located at the northeast
corner of Church Street and Spruce Avenue -
APN: 1077-421-13.
Y
DRC AGENDA
JANUARY 3, 1991
Page 2
7:30 - 8:30
(Scott)
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14368
WESTERN PROPERTIES A residential subdivision and
design review of 157 condominium units on 8.67 acres of
land in the Medium-High Residential District (14-24
dwelling units per acre), located on the west side of
Milliken Avenue, north of Church Street
APN: 1077-421-16.
SH:mlg
Attachments
cc: Planning Commission/City Council
DESIGN REVIEW COMMENTS
6:00 - 6:30 Bruce B.
January 3, 1991
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 90-40 - SIERRA VISTA
BAPTIST CHURCH - A request to establish a church sanctuary and classroom
building in conjunction with an existing church administration in the
Low Residential Designation (2-4 dwelling units per acre), located on
the south side of Jasper, west of Sierra Vista - APN: 202-026-13.
Background:
The Sierra Vista Baptist Church was originally approved by the Planning
Commission as Conditional Use Permit 87-19 in July 1987. It consisted
of four buildings; an administration building, a sanctuary, a classroom
and a multi-purpose room. In July 1989, the Conditional Use Permit
expired with only the administration building constructed. At this
time, the church is reapplying for the approval of the Master Plan and
Design Review approval for Phase II consisting of the sanctuary building
and parking lot expansion.
Staff Comments:
Buildinq Elevations:
1. The large flat areas of plaster on building corners should be
reduced or lessened by the introduction of different building
materials or treated with additional architectural detailing or
fenestration.
2. The roof design of the sanctuary building proposes large expanses
facing west (towards the Cucamonga Channel) and east (towards
single family residences). The long ridge design is similar to
other churches existing in the City but elements are introduced to
break up the horizontal feel of the roof. Dormers or intersecting
roof elements have been used in other locations to break up the
roof plane. While staff does not necessarily advocate the
introduction of dormers in this location, the applicant should
explore alternatives to break up the roof line.
3. Along the southern portion of the building, the applicant is
proposing a rock retaining/planter wall ranging in height from
three to eight feet. Because this elevation faces Base Line Road,
staff suggests providing terraced walls, with landscaping in
between, to minimize the impact of one continuous wall.
4. Staff suggests the use of planters (at grade or raised) along the
middle portion of the west elevation to break up the building
plane.
5. In keeping with current Planning Commission policy, all rock veneer
should be native stone.
DESIGN REVIEW COMMENTS
CUP 90-40 - SIERRA VISTA BAPTIST CHURCH
JANUARY 3, 1991
Page 2
Staff Comments:
Landscape Issues:
1. Along the west and south property lines, Planning Commission has
conditioned, as part of the original approval, the construction of
a 5 foot high retaining wall with a stucco finish and river rock
pilasters and a 5 foot high wrought iron fence on top. Currently,
only the precision block retaining wall has been constructed.
Therefore, staff recommends that the wall should be finished as a
condition of Phase II.
2. Extensive landscaping should be provided along the south and west
property lines to soften impacts of the retaining wall and
buildings from Base Line Road.
3. A cap element should be introduced at the top of the retaining wall
along the west property line.
Design Revie~ Coa~aittee Action:
Members Present: Larry McNiel, Wendy Vallette, Dan Coleman
Staff Planner: Bruce Buckingham
The Committee recommended the following items be brought back to Design
Review Committee as a Consent Calendar item on january 17, 1991 for
review.
1. The top of the parapet wall on the large flat stucco panels on the
corner of the building should be redesigned to introduce a cap or
cornice element built on top of the parapet to create a shadow line
and compliment the proposed stucco banding. (The cornice should be
2 x 6 minimum and stucco-over). The flashing on top of the cornice
element should be painted to match the building.
2. The roof overhang appears unfinished and should tie back into the
vertical portion with some type of hip element. The applicant was
directed to bring back colored sketches to the Committee.
3. The eave detail should be redesigned to eliminate the 4 x 6 lattice
element on the end of the rafter tails.
The Committee recommended the following as conditions of approval:
1. All rock veneer should be native stone in keeping with current
Planning Commission policy.
DRC COMMENTS
CUP 90-40 - SIERRA VISTA BAPTIST CHURCH
JANUARY 3, 1991
Page 3
2. The three service doors on the west elevation should be painted to
match the building wall.
3. The entrance doors on the north elevation should be stained
decorative wood or glass.
4. The 5 foot high retaining wall, along the west and south property
lines, should be decorative cap, stucco finish, and river rock
pilasters with a 5 foot high wrought iron fence on top. This
should be finished as part of Phase II of the project.
Extensive landscaping should be provided along the south and west
property lines to soften impacts of the retaining wall and building
from Base Line Road.
DESIGN REVIEW COMMENTS
6:30 - 7:30
Anna-Lisa
January 3, 1991
DESIGN REVIEW FOR TENTATIVE TRACT 13717 WESTERN PROPERTIES The
development of 394 condominium units on 23.5 acres of land in the
Medium-High Residential District (14-24 dwelling units per acre) within
the Terra Vista Planned Community, located at the northeast corner of
Church Street and Spruce Avenue - APN: 1077-421-13.
Backqround:
Tentative Tract 13717 was approved by the Planning Commission on
February 14, 1990. The tract was approved for the development of
394 condominium units within 52 buildings. There are four (4) two-story
building types. The project was designed as two distinct villages, each
with its own architectural scheme. The units to the north of the site
will have a contemporary appearance with siding, stucco and flat tile
roofing, while the units to the south will have a mediterranean style
with stucco and s-tile roofs. In addition, there were three
recreational facilities featuring three pools, two recreation buildings,
two tot lots, a sports court, and an open play area.
Since the project's approval, the applicant, due to market conditions,
has decided to market the units as "for sale" products instead of
rentals. In accordance with this decision, all recreational buildings
have been redesigned and scaled down to eliminate the rental offices.
In addition, the applicant is proposing a modification to the rear
elevation for building Type A {previously reviewed by the Design Review
committee on Consent Calendar December 6, 1990}.
Abstract:
Due to the significant number of changes to the detailed site plan,
staff recommends that the Committee review the following changes and
determine whether the applicant should apply for a modification to the
approved Design Review for Tentative Tract 13717 and obtain Planning
Commission approval. The majority of the revisions are primarily
related to the redesign of all con~non open space areas. Staff is
concerned that the modifications will detract from the original
intention of the project to establish "village" communities. The
project underwent Design Review on six different meetings. The
following are modifications to the approved plans that should be
reviewed by the Committee:
The applicant is proposing to eliminate the balcony structures on
the rear elevation of building Type A. Staff supports this
modification to add the hip elements as it helps to break up the
elevation, providing relief and variation.
DESIGN REVIEW COMMENTS
TT 13717 - WESTERN PROPERTIES
JANUARY 3, 1991
Page 2
The Del Mar Recreation building has been scaled down and relocated
to the Spruce Avenue entry. Revised elevations have not yet been
submitted by the applicant. The revised building elevations should
be reviewed by the Committee prior to the issuance of building
permits.
A paved traffic circle has been added at the Spruce Avenue entry.
Any special paved treatment and/or landscaping should be consistent
with previous approvals.
The sports court has been relocated to the central open play area,
eliminating the only opportunity for a large passive green space
within the complex. In a project as dense as this, such an amenity
should be maintained.
Building 27 and the parking lot on the west side of the project has
been inverted, placing the parking area directly adjacent to the
Spruce Avenue entry. Staff feels that the previous configuration
is more efficient and should be maintained for aesthetic purposes.
Building 42 has been relocated to the southern portion of the
project where the recreation building was originally located. In
addition, another interior access has been created by eliminating
the open space between Building 38 and the recreation facility.
Staff feels that the open space area can be maintained while still
ensuring efficient circulation.
Design Review Committee Action:
Members Present: Larry McNiel, Wendy Vallette, Dan Coleman
Staff Planner: Anna-Lisa Hernandez
The Committee (McNiel, Vallette, and Coleman) made the determination
that the number of changes the applicant is proposing to the detailed
site plan, warrants that a modification to the approved Design Review
for Tentative Tract 13717 be approved by the Planning Commission.
Overall, the Committee approved of the proposed modifications with the
following revisions:
1. The pool area on the north side of the tract should be eliminated
and maintained as a passive open space area.
DRC COMMENTS
TT 13717 - WESTERN PROPERTIES
JANUARY 3, 1991
Page 3
Landscaping should be added to the circular element for the Spruce
Avenue entrance. The applicant should submit for a modification to
the Design Review for Tentative Tract 13717 through the Planning
Division. All details for the revised Spruce Avenue entry and the
recreation building should be reviewed by the Planning Division
through the plan check process. In addition, the plans should be
reviewed and approved by the Fire District to ensure proper turning
radius.
The sidewalk on the north side of the Spruce Avenue entry should be
eliminated. In addition, landscaping should be added to ensure
proper screening of the parking area.
The access road between Buildings 38 and 42 should be blocked from
the west side with a landscaping planter area and should be
reviewed and approved by the Planning Division.
The applicant should eliminate the balcony structures on the rear
elevation of Building Type A and add hip elements to break up the
elevation, providing relief and variation.
The applicant should submit for a modification to the Design Review
Committee for Tentative Tract 13717 through the Planning Division. In
order to meet the scheduling deadline for the February 13, 1991 Planning
Commission meeting, the applicant should submit a uniform application, a
letter stating the intent of the proposed mofidications by January 14,
1991. Revised 8 1/2 x 11 copies of the detailed site plan and 40 scale
colored boards should be submitted by February 6, 1991.
DESIGN REVIEW COMMENTS
7:30 - 8:30 Scott
January 3, 1991
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14368 - WESTERN PROPERTIES
- A residential subdivision and design review of 157 condominium units
on 8.67 acres of land in the Medium-High Residential District (14-24
dwelling units per acre), located on the west side of Milliken Avenue,
north of Church Street - APN: 1077-421-16.
Background:
This tract is an extension of Tract 13270,
located to the south.
a 384 unit apartment project
This project has been reviewed by the Design
previous occasions. The actions from the
meetings are summarized as follows:
Review Committee on six
Design Review Committee
1. August 17, 1989 The Committee recommended that the plans be
revised to include:
The architecture should be substantially revised as to
eliminate the "false" appearance of the dormers, the
significant blank elevations, and many other detail items.
b. A low stucco retaining wall should be used to screen the
parking areas from Milliken Avenue.
c. The fencing, walls, and landscaping south of the underpass
should be constructed so that it is consistent with the
Milliken Avenue and Greenway landscaping.
Patios should meet the City standard of 150 square feet for
ground floor units and 100 square feet for upper story units.
Improved pedestrians connections should be made to Tract 13270
to better link the two projects together.
Significant and substantial landscaping breaks should be made
along the loop drive aisle. Parking "pods" should be employed
to achieve a minimum 5 foot wide landscaping finger should be
provided between the open parking stalls and the enclosed
garages.
December 21, 1989 - The Committee recommended
provided to include:
that revisions be
The proposed colors were deemed too bold and should be toned
down. The color and materials board should be provided.
DESIGN REVIEW COMMENTS
TT 14368 - WESTERN PROPERTIES
JANUARY 3, 1991
Page 2
b. Buildings should contain more than one floor plan type to
provide architectural variation.
c. A perspective rendering was suggested for review.
d. The architectural style should be revised to provide more
detailing, particularly around the stairways. The gas meter
closets to Building B should be painted the same building
color and not highlighted. Much more detailing should be
provided on the stairways (see Building B).
More variation in roof and plate lines was recommended. The
Committee felt this would break up the symmetrical appearance
of the units.
The accent score lines should be used in a consistent manner
throughout the project. Multi-paned windows were also
suggested for greater use.
The garage design needs much more variation and
articulation. The Committee suggested use of a shed or gable
roof form or other changes in the building bulk.
The space under the second-story decks should be filled in
with storage space for the garage. These spaces do not need
to be flush with the deck wall, but should not be the depth of
the stairs and deck.
The site plan should be revised to include the courtyard
paving and garage approach detail use on previous multi-family
projects.
January 18, 1990 - The Committee reviewed a new architectural
design scheme on the Consent Calendar. The Committee recommended
that the applicant be directed to investigate the concept of
developing a three-part design scheme in conjunction with Tract
13270. The built portion of Tract 13270 would remain as it
exists. The lower portion of Tract 13270 and Tract 14368 would be
developed with different colors and architectural details (i.e.,
roof tile, chimney, etc.). The variation in the three project
would create three distinct "villages" even though the architecture
would remain substantially the same.
DESIGN REVIEW COMMENTS
TT 14368 - WESTERN PROPERTIES
JANUARY 3, 1991
Page 3
February 8, 1990 The Committee again reviewed architectural
design scheme on the Consent Calendar and approved the scheme for
Phase 2 of Tract 13270 and recommended that the new architecture
and colors for Tract 14368 be brought back for additional Committee
review as a full item.
April 19, 1990 - The Committee reviewed the project and recommended
revisions be provided to include:
a. The island parking stalls between Buildings 8 and 9 should be
oriented so that the landscape ends meet the 6 foot minimum
dimension.
b. Special paving should be provided within the parking courts.
Suggestions were made to double the depth of the pop-out areas
from 4 inches to 8 inches to create a more substantial shadow
line.
The Committee suggested that Lewis Homes present a workshop to
discuss the diversity of housing types and architectural
styles within Terra Vista as was done in previous years.
The color palette was deemed acceptable.
One building should be removed to provide a sufficient open
play area. The applicant should explore alternative building
types or configurations if loss of eight units was not
acceptable.
The applicant was directed to move away from the use of the
same floor plan in the same building and stacking the same
floor plan as well. Mixing floor plans within the same
building was recommended to break up the symmetry of the
elevations.
h. The applicant indicated that a whole architectural scheme
would be pursued.
June 21, 1990 - The Committee reviewed the new architectural scheme
on the Consent Calendar. The Committee did not feel comfortable
with approving the design scheme for the entire project. Instead,
the Committee recommended that the architectural concept be
developed further and address the following:
a. If planter boxes are used, irrigation and plants should be
provided.
DESIGN REVIEW COMMENTS
TT 14368 - WESTERN PROPERTIES
JANUARY 3, 1991
Page 4
Inset window areas and other reveals should be greater than 4
to 6 inches.
Accent color or suttle color change should be explored for use
in the inset areas particularly around the windows.
The left end of the side elevation should be studied for
alternative designs. The Committee felt that it did not
appear to be integrated into the remainder of the elevation.
The front elevation should also be developed further, with
alternative design schemes including different window wrap
treatments, more consistent use of shutters, and revise roof
lines in massing above the Plan I units.
General:
The applicant has revised the plans to provide 157 condominium units.
The units have been designed to provide different floor plans within the
same building to break up the semitrical designs previously submitted.
In addition, the applicant is proposing the use of a carriage unit above
the garage buildings.
Staff Co~ents:
The major design issues in relationship of the site to the West
Greenway Park. The site plan, as proposed, turns its back on the
Greenway and has only one token sidewalk connection (located at the
school site). Site plans should be redesigned to take advantage of
this unique opportunity to open "onto West Greenway Park." This
can be accomplished be providing a major open space corridor that
runs from the main project entry over to the Greenway Park. The
tennis court and tot lot can be relocated to provide part of the
open space spine to connect the pool area with the park/trail.
Greater separation should be provided between the carriage units
and the 8-plexes. Some units are separated by as little as
12 feet.
3. Landscaping should be provided between sidewalks and garages.
4. Variation in the detailing on the rear end side elevations of the
garages should be provided.
DESIGN REVIEW COMMENTS
TT 14368 - WESTERN PROPERTIES
JANUARY 3, 1991
Page 5
The Design Review Committee comments of August 17, 1989,
recommended the use of a low stucco retaining wall along the
Milliken Avenue frontage to screen the parking areas along the
streetscape. No wall, however, is shown on the plans. Along the
northern portion of the site, the parking area is below the grade
of Milliken Avenue. At the southern portion of the site, the
applicant is proposing berming areas between the Milliken Avenue
right-of-way and the parking area to screen cars parked in this
location. Staff, however, feels that the use of the low retaining
wall may provide additional height to the berm to further screen
the vehicles.
Oesiqn Review Committee Action
Members Present: Larry McNiel, Wendy Vallette, Dan Coleman
Staff Planner: Scott Murphy
The Committee reviewed the proposal and recommended approval subject to
the following conditions:
An additional connection should be provided to the West Greenway
Park between Buildings 12 and 13. The sidewalk should extend into
the park and connect to the main east-west sidewalk.
2. Landscaping should be provided between sidewalks and garages.
Variation should be provided in the detailing on the rear and side
elevations of the garages.
4. The parking area along Milliken Avenue should be screened through
the use of berming and shrub planting.