CITY OF RANCH0 CUCAMONGA
MEMORANDUM
i~ION COI{~ENTS
1977
FROM:
SUBJECT:
Cummercial/Industrial
Design Review Committee
Suzanne Chitiea
Wendy Vallette
Otto Kroutil
John Melcher (Alternate)
Scott Murphy, Associate Planner~
DESIGN REVIEW COMMITTEE MEETING OF MARCH 21, 1991
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the ConEaittee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 6:00 p.m., Consent Calendar items will be
reviewed between 6:00 p.m. - 6:30 p.m., with the first design review
item being heard at 6:30 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:30 - 7:00
(Scott)
DESIGN REVIEW 91-01 - LEWIS DEVELOPMENT COMPANY - Review
of detailed site plan and building elevations for Pad
"E", a 7,000 square foot retail building, within a
previously approved shopping center within the
Neighborhood Commercial Designation of the Terra Vista
Planned Community~ located at the southeast corner of
Milliken Avenue and Base Line Road - APN: 227-151-21.
7:00 - 8:00
(Steve H.)
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE
PERMIT 90-20 ARROYO DE LOS OSOS, LTD. - The
development of 16.94 acres for a mixed office/commercial
master plan, consisting of 11 office/retail buildings
totaling 173,450 square feet with Phase 1 development
consisting Of 6 two-story office/retail buildings
totaling 113,450 square feet on 3.21 acres of land in
DRC AGENDA
MARCH 21, 1991
PAGE 2
the Special Commercial District of Subarea 1 of the
Foothill Boulevard Specific Plan, located on the north
side of Foothill Boulevard, between Baker Avenue and Red
Hill Country Club Drive - APN: 207-101-13, 17, 24, 25
and 41. Tree Removal application pending.
8:00
(Scott)
PLANNING COMISSION WORKSHOP
CONDITIONAL USE PERMIT 90-37 - FOOTHILL MARKETPLACE
SM:mlg
Attachments
cc: Planning Commission/City Council
COMMERCIAL/INDUSTRIAL
CONSM CAT.R]X~,AR ITEMS AGMNDA
March 21, 1991
DR 90-19 -- FORIA INTE~NATIONAL
(Steve R.) Review of revised elevations.
Committee Action:
The Committee (Chitiea, Melcher,
Kroutil) recommended approval to the
Planning Commission subject to the
following conditions:
The secondary entry,
mid-building, and lunch court
should receive the same
popped-out column treatment that
is proposed for the main entry.
The parapet height should be
raised at the secondary entry to
match that of the main entry at
the southeast corner of the
building.
The second floor of the lunch
court columns should have
polished granite to match the
rest of the building. The
southerly panel of the garden
wall surrounding the lunch court
should be removed to allow access
from the lunch court to the
surrounding landscaping.
Paving treatment of the
pedestrian areas should utilize
washed aggregate bands
surrounding sandblasted squares
which are emphasized by rough
finished granite pavers where the
aggregate bands intersect.
Exposed walls in these areas
shall match the corresponding
horizontal treatment.
The final accent color shall be
reviewed and approved by staff
once the shipment of granite has
arrived. The accent color should
be subtle to avoid overpowering
the elegance of the polished
granite.
CONSENT CALENDAR AGENDA
MARCH 21, 1991
Page 2
~t~ 90-27 - FAMILy FITNESS
(Steve R. ) 2nd illmmnl-ated sign.
Committee Action:
The Conxnittee (Chitiea, Melcher,
Kroutil) denied the proposal to apply
a second sign to the building. The
Committee stated that the previously
approved illuminated sign on the north
elevation was more than enough signage
to identify the building.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Scott March 21, 1991
DESIGN REVIEW 91-01 LEWIS DEVELOPMENT COMPANY - Review of detailed
site plan and building elevations for Pad "E", a 7,000 square foot
retail building, within a previously approved shopping center within the
Neighborhood Conunercial Designation of the Terra Vista Planned
Community, located at the southeast corner of Milliken Avenue and Base
Line Road - APN: 227-151-21.
Background:
On June 27, 1990, the Planning Commission approved the master plan for
the Neighborhood Shopping and Day Care Facility. In addition, the
Commission approved the building elevations for Phase 1, consisting of
Majors 1 and 2 and Shops 1, 2, and 3.
Staff Comments:
The applicant is proposing to develop Pad "E", a 7,000 square foot
retail building located at the northwest corner of the site. The
footprint proposed is almost identical to that of the master plan. A
small plaza area will be constructed at the north-east corner of the
building.
Architecture:
The applicant is proposing the same type of architectural detailing that
was approved for Phase 1. The one area that is not consistent with
Phase 1, however, is the design of the tower elements at the northeast
and southwest corners of the building. The towers in Phase 1 are
designed with sloping roofs and a blend of barrel tile; the towers
proposed for Pad "E" have flat roofs. Staff feels that both towers
should have tile roofs consistent with Phase 1. Because the tower at
the northeast corner is wider than the southeast tower, the Committee
may wish to review the proportions of the towers.
Design Review Co-~ttee Action:
Members Present: Suzanne Chitiea, john Melcher, Otto Kroutil
Staff Planner: Scott Murphy
The Committee expressed concern about the "unfinished" appearance of the
octagonal tower elements proposed at the corner of the building. The
Committee felt that the tower elements should include a sloped roof
element consistent with the towers used within the center. Revised
plans should be submitted for additional Committee review.
DESIGN REVIEW COMMENTS
7:00 - 8:00 Steve H.
March 21, 1991
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 90-20 - ARROYO DE
LOS OSOS, LTD. - The development of 16 · 94 acres for a mixed
office/conunercial master plan, consisting Of 11 office/retail buildings
totaling 173,450 square feet with Phase 1 development consisting of 6
two-story office/retail buildings totaling 113,450 square feet on 3-21
acres of land in the Special Commercial District of Subarea 1 of the
Foothill Boulevard Specific Plan, located on the north side of Foothill
Boulevard, between Baker Avenue and Red Hill Country Club Drive
APN: 207-101-13, 17, 24, 25 and 41. Tree Removal application pending.
Background:
This project has been reviewed on three separate occas~ n by the
o s
Planning Con~nission with joint support and interaction with' the Historic
/
Preservation Commission at the first workshop. The pri~mary issues of
discussion throughout all three meetings can be generally sun~arized as
follows:
1. First Workshop - July 19, 1990: /
a. FUture status of the Red Chief MOtel and Cafe - The
Historic Preservation Commission and Planning Conmission
took no formal action On this ma,tter. However, historic
references to the motel was determined to be a issue for
further discussion before the Historic Preservation
Commission and City Council. At a later date, the
Historic Preservation Commission and City Council
reconmended removal of the motel with historic references
to the site as a whole be incorporated) .
b. Tree Preservation The overall consensus of both
Commissions' was to assure the long term growth potential
and preservation of all healthy Sycamore trees. The
Commissions' felt that the trees are a significant part
of the overall "museum''{ quality of the site.
Preservation of Red Hill view corridors - The
Commissions' recommended that viewsheds from Foothill
Boulevard to Red Hill be incorporated into the site
planning of the project.
2. Design Review Meeting - November 8, 1990
Tree Preservation/Conservation - It was recommended that
the developer and arborists prepare a tree conservation
plan for Committee review that specifically~ identifies
each tree for the purpose of determining the ui~timate
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROYO DE LOS OSOS, LTD.
MARCH 21, 1991
Page 2
life span, assuming development occurs a~ proposed.
Information such as replacement methods, tree maintenance
and pruning, etc., should be included.
Overall, the importance of preserving as many healthy
trees as possible was stressed and, if needed, reworking
building and parking lots may be required to accomplish
this goal. Furthermore, the Committee recognized the
need for a long term conservatio~ plan in order to
preserve the unique, "museum" atmosphere created by the
trees on-site.
Orientation Of Buildings "A" through "E" - The Committee
recommended that focusing on the Sycamore Inn and
creating an interior courtyard between Buildings "A"
through "E" was acceptable if the front drive aisle was
redesigned to be less rigid and formal.
Parking lot configuration - It was recommended that a
less formal and rigid parking lot be designed for the
area in front of the Sycamore Inn and westward to the
west drive entrance. It was strongly expressed that the
informal feeling created by the parking lot on the west
side of the Sycamore Inn shguld be kept.
Landscape treatment of Red H~ll - The question was posed
to preserve Red Hill as naturally as possible or to
consider developing a landscape scheme that would alter
its natural appearance. Introduced species mentioned for
possible use included Oak trees and many types of drought
tolerant, fire resistant groundcovers.
At this time, no formal recommendation was made on this
issue. This would be discussed further as the project
continues through the development review process.
Building "G" - Comments were raised that this building
should be designed and plotted to mitigate the negative
impacts associated with development in hillside areas by
moving Building "G" forward to an area of flatter slope
or cut into the hillside. By opting for either of these
alternatives, the need for retaining walls, artifically
contoured and manufactured slopes and landscape areas
would be reduced and view corridors to Red Hill would be
preserved.
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROYO DE LOS OSOS, LTD.
MARCH 21, 1991
Page 3
/
General architectural issues - The maj6rity of the
Con~nission members felt that the proposed architectural
scheme was a direction that should be pursued. However,
they stressed the importance of substantial details and
quality construction for a successful project. The
Con~nittee recommended that more muted'colors be explored
that contrast, yet compliment the Sycamore Inn to insure
the Inn will be a unique structure.'
The level and type of details' shown on the south
elevation of Building "G" were more acceptable to the
Committee. than other elevations and directed the
applicant ~o utilize these elements on other buildings.
3. Planning Commissioh workshop - February 7, 1991
Tree perpetuation plan - AS requested from the previous
meeting, the applicants arboricultural consultant
prepared a plan identifying individual trees' health and
a general tree perpetuatign plan to insure the long term
success of the Sycamore, grove. The Commission stated
that the idea of tree perpetuation could be pursued if
supporting evidence (second opinions, examples) was
provided to indicate that the perpetuation concept has
worked in similar situations.
Contour grading behind Buildings "G", "I", and "J" - The
Commission, in concept, generally preferred the contoured
grading plan, with more natural undulation, as opposed to
the less natural, uniform grading plan, despite the need
for a larger graded surface area. However, supporting
evidence and specific data (sight line studies,
comparisons of graded areas and daylight elevations with
each concept) ahould be provided at the next meeting in
order for the Commissioners to potentially support
contour grading.
Crib wall behind Buildings "G", "I",',and "J" - AS part Of
the more "natural" contour grading concept, a meandering
crib wall would be constructed at the base of the graded
area, behind the above-referenced buildings. Overall,
the Commission felt that the crib wall may be the best
alternative in this situation, but it could not be proven
that the landscape will survive on a south facing slope
in the hot, inland valley climate. Therefore, a specific
drought and sun tolarent landscape palette, with
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROY DE LOS OSOS, LTD.
MARCH 21, 1991
Page 4
cascading vining and drip irrigation should be'indicated
on the revised landscape plans for further review of the
Design Review Committee.
Building "G" orientation - The general consensus of the
Commission was that the orientation of Building "G" may
be acceptable as proposed if the supporting evidence for
contour grading and crib walls can be provided.
Landscaping of Red Hill - The Commission recommended that
a drought tolarent landscape be provided in the contour
graded area that accentuates the natural appearance of
the hill. Drought tolarent groundcovers, mats of shrubs
of varying heights, textures, and irregularly spaced Oak
trees on the hillside should be utilized to provide a
natural hillside condition.
Parking lot configuration in front of Buildings "A"
through "E" - The Commission directed the applicant to
remove the parking spaces directly in front of the
Sycamore Inn and continue to make an effort to keep the
informal parking lot atmosphere in front of the Inn.
Staff C~.~uents:
The emphasis of tonight's discussion should be on issues related to
Phase 1. For this reason, staff has attempted to separate issues in the
following order: 1) general development issues for the site;
2) specific issues to Phase 1; 3) general architectural
issues; and 4) general issues associated with Phase 2-
General:
At the time of commen~ preparation, the requested information to
support the tree perpetuation program had not been submitted to the
Planning Division. However, staff assumes this information will be
available prior to the meeting. Therefore, the Committee should
review the data in light of the previous meetings concerns with the
tree prepetuation plan.
Staff has reviewed ~he requested sight line studies for the contour
grading concept, which have been included in the latest development
package. The Co~ittee should review these plans in accordance
with the previous meeting's grading concerns, potential for
significant visual alteration of Red Hill, and the plotting of
Building "G."
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROY DE LOS OSOS, LTD.
MARCH 21, 1991
Page 5
Site Plan (Phase 1):
The parking lot in front of Buildings "A", "E",y~nd "F" (Sycamore
Inn) has been further modified to eliminate parking directly in
front of the Inn and continue the informa~/ atmosphere of the
l
parking lot currently in front of the Inn. The Committee should
consider this modification in light of the previous meetings design
concern of increasing the Sycamore Inn's role as a "focal point."
In order to address staffs concern with the symmetry of the parking
lot along the west property boundary, the ~pplicant is providing an
enriched texture pavement with interlocking paver crossings
adjacent to trees to create a "parking court" effect. The
Committee should review this concept given previous concern of
symmetry in this area.
A well pronounced, enriched pedestrian circulation system should be
provided throughout the project to connect parking areas with
buildings and to reduce pedestrian/automobile conflicts.
Grading (Phase 1):
The Original grading plan concepts for Phases 1 and 2 are still
included within the development package (pages 7 and 12). However,
given the direction at the previous Planning Conunission workshop,
the applicant has prepared a grading plan reflecting the contour
grading/crib wall concept (page 30 of the Development package).
This plan, together with the sight line studies provided within the
plan set, should be reviewed by the Commkttee to clarify that the
contour grading/crib wall concept is preferred to the original
plan.
Landscape (Phase 1):
As stated earlier, a native slope planting concept utilizing a
drought tolerant landscape palette was reco~nended for the portion
of Red Hill to be altered. The Committee should review the revised
conceptual landscape plan with consideration for this issue, and
specific recommendations for use.
The landscape design of the main project intersection should be
consistent with the pedestrian activity center for Bear Gulch as
specified in the Foothill Boulevard Specific Plan.
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROYO DE LOS OSOS, LTD.
MARCH 21, 1991
Page 6
General Architectural Issues:
//
At past workshops, a generally favorable response to the
architectural concept was expressed by a majority of the Commission
members, with the understanding that specific recommendations for
upgrading elements and details would be .,addressed at the Design
Review Committee level. Therefore, the Committee should review the
building elevations in more detail at this point. Suggested issues
of discussion include:
a)
More variation of horizontal ahd vertical building planes
should be provided, especially on the larger, two-story office
buildings toward the rear (north) of the site;
b)
Details such as metal railings, rafter tails, chimneys, and
other wood details should be substantial in nature as not to
appear as a "tacked on" or non-supportive structural elements;
c)
The color scheme and material concept should be reviewed by
the Comittee, specifically considering its compatibility with
the Sycamore Inn; and
d)
Further enhancement of all storefronts should be provided by
varying planes, providing alternative treatments in certain
areas, etc.
Issues Associated with Phase 2:
The proposed grading scheme for Phase 2 should be modified further
to comply with the spirit and intent of the Hillside Development
Regulations, as well as to protect view sheds of Red Hill as
follows:
All buildings in areas where
utilize elements to reduce
natural surroundings such as,
decks, dense landscaping and
the hillside.
slopes exceed 8 percent should
the effects on the immediate
stepped foundations, low level
second-stories that "fit" into
Two-level parking structures should be hidden and/or softened
in areas of public view as much as possible by utilizing any,
or a combination, of the following:
(1)
Plot buildings closer to the street and subsequently
"cut" the two-story parking structures into the hillside,
behind the buildings, stepping the upper level back,
hence, reducing the amount of grading. This solution
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROY DE LOS OSOS, LTD.
MARCH 21, 1991
Page 7
would be consistent with the design criteria of the Bear
Gulch Activity Center. The promot~oh of a pedestrian
oriented activity center will be created at the street.
(2) Treat the parking structure with a combination of
enhanced articulation and a I,dense landscape screen.
Steep slopes or larg~berms in front of this structure
should not be utilized,. for '~hey reduce the pedestrian
scale of the project.
Retaining walls, and man mad~ ~slopes adjacent to Foothill
Boulevard should be reduced,~y incorporating small structural
stem walls into buildings~ Any r~taining walls exposed to
public view shall not exceed 4 feetl~in height and should be
softened by terracing, thereby creating usable planter areas
between walls. Wall materials should be consistent with the
decorative treatments of proposed buildings.
The Phase 2 site plan indicates a two-story parking structure
in the northwest portion of the site, where the healthiest
mature Sycamore trees exist. With construction of the parking
structure as proposed, severe pruning or removal of these
trees will be necessary. Therefore, the Phase 2 parking
structure should be designed to preserve the ~ew healthy
Sycamore trees that exist on-site, which are located ~rimarily
in this area. This issue should be addressed in t~e final
tree perpetuation program. ~
Design Review Co-~{ttee Action
Members Present: Suzanne Chitiea, John Melcher, Otto Kroutil
Staff Planner: Steve Hayes
The Design Review Committee did not recommend approval of the project as
presented. Previously requested information (ex. retaining wall
options, architectural details) was still needed to evaluate the project
sufficiently. The Committee reco~unended that the project return to the
Committee as a regularly scheduled item addressing the following design
issues:
1- The following interrelated issues should be addressed to promote
aesthically upgraded viewsheds to Red Hill:
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROYO DE LOS OSOS, LTD.
MARCH 21, 1991
Page 8
A terraced retaining wall concept alternative should be
prepared behind Buildings "G", "I", and "J." The Committee
suggested that the retaining walls be faced with real river
rock, other natural materials or a combination thereof;
Building "G" should be significantly lowered in height to
allow views of the top part of the hill from Foothill
Boulevard and other public view areas. Suggested means to
address this issue included excavating the underground parking
lot further into the hill, providing terraced rock walls with
planters on the south elevations adjacent to the parking
garage, and lowering the plate line to 12 feet;
The higher daylight line and greater graded area of the
contour grading plan was preferred by the Committee as long as
a sensitively selected, native landscape palette (in
accordance with City slope planting requirements) was provided
in conjunction with items l(a) and l(b).
For clarification, issues l(a) through 1(c) were not specifically
addressed in relation to Phase Two Buildings "I" and "J." It has
been interpreted that Phase Two is shown for master planning
purposes only with specific development review and approval
required at a later date.
The Committee directed the applicant to revise the architectural
concept as follows:
The "Craftsman bungalow" style architecture was considered
inappropriate for Building "G" due to its mass and scale. It
was suggested that a much simpler, cleaner approach to
architecture, (similar to buildings within National Parks such
as Zion, and Yosemite), be pursued on Building "G." Details
should not necessarily be reduced in number to achieve the
suggested approach; instead, the substance and massing of all
details should be upgraded to achieve the rustic look the
Committee recommended. (example: lintels, columns and bases,
foundations, use of rock over flat openings, material use
etc..)
The general architectural approach to Buildings "A" through
"E" was favorable to the Con~nittee, provided design details
such as colors, detail massing, storefront articulation, etc.,
are worked out at the Design Review Committee level.
DESIGN REVIEW COMMENTS
CUP 90-20 - ARROYO DE LOS OSOS, LTD.
MARCH 21, 1991
Page 9
The color scheme for all buildings should be revised to
include darker primary building colors and less contrast
between primary building and accent trim colors.
The tree perpetuation concept was accepted by the Committee,
provided all technical aspects are resolved between staff and the
City's and the developers arborist and put in a detailed program
for review and approval of the full Planning Commission.
The Committee recomended approval of the revised parking lot
layout in front of the Sycamore Inn and Buildings "A" and "E" as
long as the valet parking area was striped for regular parking and
included an enriched paving material (i.e., interlocking pavers).
The Committee requested that the following information be provided for
the next review of the project to resolve the major design issues:
Revised grading plans, sight line studies, retaining wall plans and
Building "G" concepts addressing the Committee's concerns for
viewsheds to Red Hill.
Architectural elevations that are drawn with a higher level of
detail and additional architectural details addressing the
Committee's concerns for massing and material use.