DESIGN REVIEW COMMITTEE MEETING OF MAY 16, 1991
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project On the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:45 p.m., Consent Calendar items will be
reviewed between 5:45 p.m. - 6:30 p.m., with the first design review
item being heard at 6:30 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:30 - 7:00
(Steve H.)
DESIGN REVIEW OF BUILDING 11 OF CONDITIONAL USE PERMIT
89-08 - HUGHES INVESTMENTS - The design review of the
revised detailed site plan and building elevations for
shops Building 11 within the previously approved
Vineyards Marketplace Shopping Center, which consists of
11 buildings totaling 122,673 square feet on 12.9 acres
of land within the Village Commercial District of the
Victoria Community Plan, located at the southeast corner
of Highland and Milliken Avenues - APN: 227-011-22.
7:00 - 7:30
(Steve H.)
ENVIRON[~NT~Ju ~gSESSMENT ~ND CONDITIONAL USE
PERMIT 90-20 SYCAMORE VILLAGE The development of
16.94 acres for a mixed office/commercial master plan,
consisting of 11 office/retail buildings totaling
173,450 square feet with Phase 1 development consisting
DRC AGENDA
CUP 89-08 - HUGHES INVESTMENTS
MAY 16, 1991
Page 2
of 6 two-story office/retail buildings totaling 113,450
square feet on 3.21 acres of land in the Special
Commercial District of Subarea 1 of the Foothill
Boulevard Specific Plan, located on the north side of
Foothill Boulevard, between Baker Avenue and Red Hill
Country Club Drive - APN: 207-101-13, 17, 24, 25 and
41. Tree Permit Removal application pending.
SM:mlg
Attachments
cc: Planning Commission/City Council
COMMERCIAL/INDUSTRIAL
O0~SEMT CALENDAR IT]~4S AGENDA
May 16, 1991
DR 88-04 - CAI~MEY-THKODO ROU
(Tom)
Committee Action:
P~vised paver color.
The Committee (Chitiea, Vallette,
Kroutil) reviewed the proposed color
modification and did not recommend
approval. It was the opinion of the
Committee that the proposed color
would blend in too much with the
adjacent asphalt and concrete. The
approved color provided enough
variation that it made the pavers
stand out and differentiate from
adjacent material.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Steve H.
May 16, 1991
DESIGN REVIEW OF BUILDING 11 OF CONDITIONAL USE PERMIT 89-08 - HUGHES
INVESTMENTS - The design review of the revised detailed site plan and
building elevations for shops Building I~ within the previously approved
Vineyards Marketplace Shopping Center, which consists of 11 buildings
totaling 122,673 square feet on 12.9 acres of land within the Village
Commercial District of the Victoria Community Plan, located at the
southeast corner of Highland and Milliken Avenues - APN: 227-011-22.
Abstract:
As directed by the Planning Commission, per Resolution No. 89-146A, this
building was required to be re-evaluated by the Design Review Co~auittee
to address potential design concerns associated with the building pad
switch for Buildings "~0" and "11", which was approved by the Planning
Commission on April 10, 1991.
It is the developers intent to construct Building "11" with Phase 1.
The site has been graded and Phase 1 construction of Buildings "3"
through "7" has begun.
Background:
The Vineyards Marketplace Shopping Center was conceptually approved by
the Planning Commission On November 29, 1989. The Original approval
included conceptual building elevations for Buildings "10" and "11", as
well as a detailed site plan that indicated the larger (now Building
"11") building adjacent to the pedestrian plaza (at the southwest corner
of the site) and the smaller Building "10" adjacent to the Kenyon Way
vehicular entrance. Since that time, the Planning Commission
conceptually approved a modification to the previously approved site
plan that plotted the smaller Building "10" adjacent to the corner and
the larger shops Building "11" by the Kenyon Way entrance.
Staff ~ents:
At the time of comment preparation, plans depicting any architectural
modifications to Building "11" had not been submitted to staff; it is
staffs understanding that the developer will be proposing the identical
elevations for Building "11" that were previously conceptually approved
by the Planning Commission on November 29, 1989. Therefore, the Design
Review Committee should review the Building "11" elevations and adjacent
affected areas as they relate to the buildings new location.
Design Review Committee Action:
Members Present: Suzanne Chitiea, Wendy Vallette, Otto Kroutil
Staff Planner: Steve Hayes
DESIGN REVIEW COMMENTS
CUP 89-08 - HUGHES INVESTMENTS
MAY 16, 1991
Page 2
The Committee recommended approval of Building 11 in its new location
subject to the following conditions:
The west and east elevations should be "mirrored" to allow the more
articulated side elevation to be viewed from the Kenyon Way
vehicular entrance.
Additional storefront glass should be provided on the new east
elevation of Building 11.
Full columns should be provided in areas where half columns were
proposed.
On the north elevation, the popped out area should be shifted to an
area of greater depth from the parking lot.
DESIGN REVIEW COMMENTS
7:00 - 7:30 Steve H.
May 16, 1991
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 90-20 - SYCAMORE
VILLAGE - The development of 16.94 acres for a mixed office/commercial
master plan, consisting of 11 office/retail buildings totaling
173,450 square feet with Phase 1 development consisting of 6 two-story
office/retail buildings totaling 113,450 square feet on 3.21 acres of
land in the Special Commercial District of Subarea 1 of the Foothill
Boulevard Specific Plan, located on the north side of Foothill
Boulevard, between Baker Avenue and Red Hill Country Club Drive
APN: 207-101-13, 17, 24, 25 and 41. Tree Permit Removal application
pending.
Abstract:
The purpose of tonight's review is to allow the applicant the
opportunity to address specific design issues raised at the most recent
Planning Commission workshop of May 2, 1991. These issues can be
briefly summarized as follows:
1. Open swale screening on Red Hill (grading and landscape);
2. Expansion of Phase 1 parking lot;
3. Building "G" massing, rooflines, material use, and detailing; and
4. Accent colors.
Staff Comments:
Revised plans were not available for staff review at the time of comment
preparation. Therefore, the Committee should review the revised plans
based on the previous workshops design issues.
Design Review Corm{tree Action:
Members Present: Suzanne Chitiea, Wendy Vallette, Otto Kroutil
Staff Planner: Steve Hayes
The Design Review Committee recommended approval of the project subject
to the following conditions:
The Committee recommended approval of the revised south elevation
alternative for Building "G" (see attached) with the following
conditions:
a) The window and door treatment used on the pentagonal entrance
alternative should be utilized;
DESIGN REVIEW COMMENTS
CUP 90-20 - SYCAMORE VILLAGE
MAY 16, 1991
Page 2
5.
6.
7.
8.
b)
Low stone or concrete capped cheek walls should be provided to
flank the main entry stairway. Potted plants should be
utilized at the upper and lower termini of the cheek walls, to
the satisfaction of the City Planner;
c)
The wood members used to accent the central roof gable should
be more substantial to appear in proportion with other wood
elements of the building;
d)
Wheel chair ramps for handicap access should be shown on the
revised Building "G" elevations;
e) A detail of the exposed ceiling rafters above the primary
entrance should be provided for Committee review; and
f)
The stone areas behind the low stone planters on the south
elevation may be replaced with wood siding. In trade, the
bases of all courtyard buildings should include stone bases to
reflect the heritage of craftsman architecture.
The Committee recommended approval of the revised west elevation of
Building "G" and directed the architect to revise the east
elevation accordingly.
The gable roof accent detail should be revised to include return
timbers, plates and ledgers where the wood frame accent element
returns to the building wall.
The window trim should be upgraded to a minimum size of 2 x 6
inches for all buildings.
All railings within the project should be changed to be consistent
with the new design reflected on the Building "G" elevations.
The post beam cage detail on the courtyard buildings should be
modified to a less contemporary design.
All courtyard building windows should be similar in design (shape,
mullion use) to windows on Building "G."
The Committee recommended that the architect purpose a three
dimensional rendering of the Buildings "A" and "B" courtyard
elevations. This request stemmed from the Committee's concern for
a symmetry of the roof massing and the lattice detailing near the
roof hip.
DESIGN REVIEW COFa~ENTS
CUP 90-20 - SYCAMORE VILLAGE
MAY 16, 1991
Page 3
The Committee directed the architect to include a detail of the
termination between the wood siding and window framing for staff
review during the plan checking process. The Committee preferred
to have the wood siding die into the window framing as opposed to
the window framing placed over the siding.
Finally, the Committee suggested that the pentagonal entrance proposed
on one of the Building "G" south elevation options may be acceptable on
the future phase two buildings, provided other site plan considerations
(circulation, viewsheds) accentuate this feature properly.