Loading...
HomeMy WebLinkAbout1991/08/08 - Agenda PacketDATE: TO: FROM: SUBJECT: CITY OF RANCHO CUCAMONGA MEMORANDUM August 15, 1991 ACTION CO~TS Commercial/Industrial Design Review Committee Larry McNiel Wendy Vallette Otto Kroutil John Melcher (Alternate) Scott Murphy, Associate Planner ~ DESIGN REVIEW COMMITTEE MEETING OF AUGUST 8, 1991 1977 The following is a description of projects which require review and rating by the Design Review Committee. Please review the attached plans, visit the project sites, and write down your comments using the blank space provided under each project on the attached sheets. After the meeting, the consensus of the Committee's concerns will be typed up as the formal action/recommendation of the Committee and distributed to the Commission and Council. AS always, feel free to contact the appropriate project manager (noted in parentheses along the left margin), prior to the meeting date, if you have specific guestions related to the scheduled projects. Dinner will be provided between 5:00 5:45 p.m., Consent Calendar items will be reviewed between 5:45 p.m. - 6:30 p.m., with the first design review item being heard at 6:30 p.m. Please notify our department if you will be unable to attend the meeting, or if you will be late, so that the dinner can be properly ordered and the necessary arrangements made. 6:30 - 7:00 (Tom) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 90-20 - RANCON REALTY FUND III- The development of a 30.63 acre Office Park Master Plan within the Industrial Park District (Subarea 7) of the Industrial Area Specific Plan, located on the north side of Civic Center Drive between White Oak Street and Red Oak Street - APN: 208- 352-23, 24, 25, 49, and 50. 7:00 - 7:30 (Tom) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 91-09 - RANCHO CUCAMONGA REDEVELOPMENT AGENCY The development of a fire station totaling 11,787 square feet on 2.46 acres of land in the Medium-High Residential District (14-24 dwelling units per acre) Of the Victoria Community Plan, located on the west side of the proposed Day Creek Boulevard, approximately 800 feet north of Base Line Road - APN: 227-091-18 and 19. DRC AGENDA AUGUST 8, 1991 Page 2 7:30 - 8:00 (Tom) ENVIRONMENTAL ASSESSMENT AND MODIFICATION TO CONDITIONAL USE PERMIT 89-23 - RANCHO CUCAMONGA REDEVELOPMENT AGENCY The development of Phase II of Fire Station No. 4, consisting of a 24,030 square foot maintenance facility and training center, a 3,432 square foot training tower and a 120 square foot pump test facility On 7.08 acres of land in the Minimum Impact Heavy Industrial District (Subarea 9) of the Industrial Area Specific Plan, located at the southwest corner of Jersey Boulevard and Milliken Avenue - APN: 229-111-23. SM:mlg Attachments cc: Planning Commission/City Council COMMERCIAL/INDUSTRIAL C(~qS]~NT CAT,MAR I~4S A~A August 8, 1991 DR 91--04 - W'RT,T_c: FaJ~GO BANK ( Steve H. ) Committee Action: Revised elevations.' The Design Review Committee (Vallette, Meicher, Buller) recommended approval Of the project subject to the following conditions: The specific design of the door facing the pedestrian plaza (i.e., west elevation) should be reviewed and approved by the Design Review Committee prior to the issuance of building permits. A Minor Exception application for the Kenyon Way setback reduction of 2 feet shall be submitted for review of the City Planner prior to the issuance of building permits. Additional tree wells should be included along the north and east building frontages, beyond the roof ovehangs to the satisfaction of the City Planner. Cu~ 90-42 - ~D,a~KS INVESTMENTS (Steve H.) Additional tile s~mples. Committee Action: The Design Review Committee (Vallette, Melcher, Buller) recommended the use of either quarry tile manufacturers product for the ornamental medallion and wainscot areas. Suggested colors included samples in the blue/green ranges. Specific tile colors and use areas shall be subject to review and approval of the City Planner. To clarify, the Committee reaffirmed their preference for the iridescent tiles on the dome towers. If the applicant would prefer to select other tile samples with even a greater iridescence and brightness, the CONSENT CALENDAR AGENDA AUGUST 8, 1991 Page 2 Committee suggested this would be acceptable, subject to the review and approval of any specific changes by the City Planner. ~)R 91-23 - ALTA LOMA CODNTRY ( Bruce ) Committee Action: VILLAGE Propoeed painting sch~m~ revisions. The Comittee (Vallette, Melcher, Buller) reviewed the proposed color changes to the shopping center and approved the new color scheme subject to the following conditions: Color no. 2 should be revised to a deeper shade of color no. 3, subject to review and approval by the City Planner. Color no. 2 when used as a banding near the roof line should only be used on the wood fascia of Stater Brothers and the sub-major tenant to the east. DESIGN REVIEW COMMENTS 6:30 - 7:00 Tom August 8, 1991 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 90-20 - RANCON REALTY FUND III The development of a 30.63 acre Office Park Master Plan within the Industrial Park District (Subarea 7) of the Industrial Area Specific Plan, located on the north side of Civic Center Drive between White Oak Street and Red Oak Street - APN: 208-352-23, 24, 25, 49, and 50. Background: The master plan concept for the office park was reviewed by the Committee (McNiel, Melcher, Coleman) On November 8, 1990, and (McNiel, Melcher, Buller) on December 20, 1990. The previous Committee reviews were conducted to provide specific direction to the applicant on site plan design issues. In addition to the Site Plan, the applicant has established Master Plan Design Guidelines for the project area regulating parcel size, building design, circulation, landscaping and signage. AS the site development standards have had no previous Committee review, staff comments will focus on the attached design guidelines. Staff ~oments: The following comments are intended to provide an outline for Committee discussion. Site Planning Guidelines: The Master Plan Guidelines do not adequately integrate the existing medical campus into the project. Incorporating the medical campus is important to provide for integrated development and unity to the Master Plan. Paseos are provided for greenbelt pedestrian links between the projects, however, a strong plaza statement should also be provided. The previously approved Master Plan (DR 87-25 and CUP 87-17) show a large centralized plaza area between the existing 3-story medical office/ambulatory care facility and the future building. The guidelines do provide some language establishing requirements to provide for development of the plaza, however, the criteria should be expanded as this centralized plaza is one of the primary focal points of the project. Building locations at the northeast corner of Red Oak Street and Civic Center Drive and at the northwest corner of White Oak Street and Civic Center Drive should be revised to locate the buildings adjacent to the right-of-way and provide parking behind the buildings. DESIGN REVIEW COMMENTS DR 90-20 - RANCON REALTY FUND III AUGUST 8, 1991 Page 2 The Master Plan should expand upon the environmental factor of strong Santa Ana winds. Special attention should be given to the building orientation and site plan design. Where possible, design solutions should be used to protect the plazas from winds. Written and graphic criteria with graphic design solutions should be developed and added to the Master Plan. Internal circulation patterns should be revised to allow for vehicle connections between parcels through reciprocal access. While some parcels do provide shared drive approaches, a stronger link between parcels through the provision of reciprocal access should be provided. At the December 20, 1990 Design Review Committee meeting, the applicant was requested to provide a Phasing Plan identifying how the project site would be broken down into phases and what the limits of each phase would be. The Phasing Plan is included on pages 18 and 19 of the Design Guidelines. Architecture: The desired primary and accent building colors were provided on page 24. Proposed building materials are identified on page 25. These items should be reviewed by the Committee. The primary building colors are earth toned and are successfully used in the architectural prototypes. The Committee should also review the accent colors. Design prototypes have been included within the Master Plan Design Guidelines and are provided On pages 27, 28, and 29. The building types conform to the architectural styles presented in the guidelines. However, the guidelines should be expanded to establish more definite criteria to ensure a project identity and architectural continuity. Signage: The Master Plan Design Guidelines include a Uniform Sign Program establishing criteria for all signage within project boundaries. The Uniform Sign Program is provided on pages 44 through 49. The number of project monument signs should be revised. The Sign Ordinance limits projects to a maximum of two monument signs regardless of the number of parcels, buildings or size of the project. A total of three monument signs are included in the project. DESIGN REVIEW COMMENTS DR 90-20 - RANCON REALTY'FUND III AUGUST 8, 1991 Page 3 The sign program should establish all criteria pertaining to signage (i.e., letter style, size, color, etc.). Design Review Comm{ttee ACtion: Members Present: John Melcher, Wendy Vallette, Brad Buller Staff Planner: Tom Grahn The Committee reviewed the project and recommended approval with the following modifications: The Master Plan Guidelines should adequately integrate the existing medical campus into the project. Written and graphic criteria should be established identifying the size, design, and features of the plaza area. At a minimum, the criteria should establish the same features and level of detail approved for the plaza through development of the previous master plan and medical complex (DR 87-25 and CUP 87-17). Additional cross-sections should be provided at the northeast corner of Red Oak Street and Civic Center Drive and the northwest corner of W~3ite Oak Street and Civic Center Drive. The cross-sections should identify parkway improvements, berming, landscaping and parking to ensure that adequate screening of vehicles is provided. The cross-sections may result in additional modifications by further increasing the parking setback measured from the ultimate face of curb. Internal circulation patterns should be revised to allow for adequate connections between parcels to satisfy access requirements of the Fire District. This may be accomplished through reciporal drive aisles or landscaped areas with turf block. Perimeter parkway improvements (i.e., sidewalk, street trees, etc.) for the entire master plan should be installed with the development of Phase I. The Guidelines should be revised to clarify that when a cul-de-sac is adjacent to a phase boundary, the entire cul-de-sac, including parkway improvements, should be installed with the respective phase. Section 3.4, page 23 of the Master Plan Guidelines, should be revised to delete "rain gutters, drains, vents and scuppers." Rain gutters, drains, etc., should be internalized so that no mechanical or utility devices are visible on the exterior of buildings. DESIGN REVIEW COMMENTS DR 90-20 - RANCON REALTY FUND III AUGUST 8, 1991 Page 4 The Committee expressed an open feeling towards a Uniform Sign Program designed consistent with architectural styles established in the Guidelines. Existing street monument signs may be removed and replaced with combination project identification and street signage. Use of the project monument signs should be limited to the corner of Red Oak Avenue and Civic Center Drive and the corner of White Oak Avenue and Civic Center Drive. The monument sign proposed at the intersection of Red Oak Avenue, Spruce, and White Oak Avenue should be deleted. The Committee deferred review of the Uniform Sign Program specifics to the Planning Con~ission. These items should be submitted for City prior to scheduling the application consideration. Planner review and approval for Planning Co~aission DESIGN REVIEW COMMENTS 7:00 - 7:30 Tom August 8, 1991 ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 91-09 - RANCHO CUCAMONGA REDEVELOPMENT AGENCY - The development of a fire station totaling 11,787 square feet on 2.46 acres of land in the Medium-High Residential District (14-24 dwelling units per acre) of the Victoria Community Plan, located on the west side of the proposed Day Creek Boulevard, approximately 800 feet north of Base Line Road - APN: 227- 091-18 and 19. Background: The project has been revised based upon design issues identified at the Planning Commission workshop on February 7, 1991, and by the Fire Station Subcommittee (Chitiea, Melcher) on May 9 and May 16, 1991. Staff Comments: Review designs of the carport and service station buildings for consistency with the primary facility. The Con~nittee should note the design of gable roofs provided on the north and south elevations of the carport. Review design of the carport with walls carport design open to all sides and pillars. on three sides versus a supported by multi-post 3- The perimeter wall at the northeast corner should include additional detailing/decorative treatment extending on both the north and east faces of the wall. The decorative treatment of the response and visitor parking driveways should tie in with materials used in the primary facility (i.e., native stone). Desi~ Review Comm{ttee ACtion: Members Present: John Melcher, Wendy Vallette, Brad Buller Staff Planner: Tom Grahn The Committee reviewed the project and recommended approval with the following modifications: The wall proposed adjacent to Day Creek Boulevard should be reviewed by the Community and Park Division for consistency with the Day Creek Boulevard wall design concept. Design reconunendations should be brought back to the Committee for approval of the wall design. DESIGN REVIEW COMMENTS CUP 91-09 - RDA AUGUST 8, 1991 Page 2 A design option incorporating the parcel located directly north of the project site (Railroad Avenue South) should be provided. If the applicant is able to obtain the parcel and incorporate it within project boundaries, a shift in the location of project improvements (i.e., the fire station building) should also be provided. Should the Fire District continue the collection of household hazardous waste at the Fire Station facility, proposed improvements indicating location, method of containment (building Or removable bin) should be provided. Approval by the San Bernardino County Environmental Health Services Department will be a condition of approval for locating household hazardous waste collection at this site. Should the Fire District choose to locate a "Heliport" within project boundaries, approval from all other governing bodies (i.e., FAA, Caltrans, Etc.) shall be obtained prior to scheduling for Planning Commission consideration. If approval from these governing bodies is not sought, all reference to the "Heliport" shall be deleted from the plans. The gable roof on the front and rear of the carport building should be deleted. False truss elements should be deleted from the roof system. Should the perimeter wall be capable of providing adequate wind protection, the side walls of the carport building should be removed. This will result in a carport structure open to all sides and supported by multi-post pillars. Roofing materials used at the translucent roofing system should be clarified. The decorative treatment of the response and visitor parking driveways should tie in with materials used in the primary facility. The applicant was directed to explore various material options for review by the Planning Con~nission. DESIGN REVIEW COMMENTS 7:30 - 8:00 Tom August 8, 1991 ENVIRONMENTAL ASSESSMENT AND MODIFICATION TO CONDITIONAL USE PERMIT 89-23 - RANCHO CUCAMONGA REDEVELOPMENT AGENCY - The development of Phase II of Fire Station No. 4, consisting of a 24,030 square foot maintenance facility and training center, a 3,432 square foot training tower and a 120 square foot pump test facility on 7.08 acres of land in the Minimum Impact Heavy Industrial District (Subarea 9) of the Industrial Area Specific Plan, located at the southwest corner of Jersey Boulevard and Milliken Avenue - APN: 229-111-23. Background: Phase I of the project, which includes the primary facility, carport, and service station buildings is currently under construction. The current application contains the proposal for Phase II of the project which includes the maintenance facility, training center, training tower, and pump test pit enclosure buildings. Building elevations for Phase II have been revised based upon design issues identified at the Planning Commission workshop on February 7, 1991. Staff Coments: The overall architectural concept for Phase II should be reviewed for design consistency with Phase I, currently under construction. Materials, color, building mss, etc., are consistent between phases. The painted metal column, on the northeast and northwest elevations, should be reviewed for design consistency with the established architectural style. As there are no other building forms that contain such a dominant element, providing a painted metal finish may be inappropriate. The painted metal fascia on the pump test enclosure building should be revised and a brick fascia, consistent with the brick lintels, should be provided. Review the design of the plaza area centered between the fire station, training center, and maintenance center. The current design expands upon the texturized patterns established at the project driveways. The brick material used in the sidewalks is the same as that used in the driveways. Design Review COmmittee Action: Members Present: John Melcher, Wendy Vallette, Brad Buller Staff Planner: Tom Grahn DESIGN REVIEW COMMENTS CUP 89-23 - RDA AUGUST 8, 1991 Page 2 The Committee reviewed the project and recommended approval with the following modifications: 1. The design Of metal columns on the northeast and northwest elevations was revised. The proposed finish will be either a brushed or anodized aluminum. The design of the pump test enclosure building fascia was considered acceptable and will remain a painted metal finish. Review of the plaza design was deferred to the Planning Con~nission. The Committee suggested removal of the proposed palm trees and replacing with a large canopy shade tree. Should the Fire District choose to locate a "Heliport" within project boundaries, approval from all other governing bodies (i.e., FAA, Caltrans, Etc.) shall be obtained prior to scheduling for Planning Commission consideration. If approval from these governing bodies is not sought, all reference to the "Heliport" shall be deleted from the plans. DATE: TO: FROM: CITY 0FRANCHOCUCAMONGA MEMORANDUM August 12, 1991 Technical Review Committee: Tim Fejeran, Rancho Cucamo~ Fire Protection District; Jim Cline, CCWD; Jim Martin, Building & Safety Division; Barrye Hanson, Engineering Division; Dan Coleman, Planning Division; Sandra Fatland, Sheriff's Department; Karen McGuire, Community Services; Paul Rougeau, Traffic Beverly Nissen,~Associate Planner SUBJECT: TECHNICAL REVIEW CO~e4ITTEE MEETING OF AUGUST 21,1991 The following is a description of projects which require review and rating by the Technical Review Committee. Please review the attached plans, visit the project sites, and prepare comments to be handed out to the applicant. After the meeting, the consensus of the Committee's concerns will be typed up as the formal action/recommendation of the Committee and forwarded to the Planning Commission. As always, feel free to contact the appropriate project manager (noted in parentheses along the left margin), prior to the meeting date, if you have specific questions related to the scheduled projects. In addition, if you are unable to attend a meeting, or will be late, please notify our department so we can make the appropriate arrangements. 2:00 - 2:30 (Anna-Lisa) ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14476 KNITTER AND ASSOCIATES - A residential subdivision and design review of 8 single family lots on 2.39 acres of land in the Low Residential District (2-4 dwelling units per acre), located at the northeast corner of London and Church Streets - APN: 1077-311-74. 2:30 - 3:00 (Anna-Lisa) ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14509 BAAyOUN DEVELOPMENT - A residential subdivision and design review of 18 single family lots on 3.84 acres of land in the Low Residential District (2-4 dwelling units per acre), located on the east side of Hermosa Avenue between Wilson Avenue and Banyan Street - APN: 201-~83-01. BN:mlg Attachments cc: Planning Division Engineering Division - Land Development County DESIGN REVIEW COP~4ENTS 6:30 - 7:00 Anna-Lisa August 22, 1991 ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14509 - BAAYOUN DEVELOPMENT - A residential subdivision and design review of 18 single family lots on 3.84 acres of land in the Low Residential District (2-4 dwelling units per acre), located on the east side of Hermosa Avenue between Wilson Avenue and Banyan Street - APN: 201-183-01. Site Characteristics: The site is surrounded by Low Residential to the north and south, Low-Medium Residential to the east and Very-Low Residential to the west. The site is currently vacant except for some native vegetation. The site slopes to the north at approximately 6 percent. The applicant is proposing 3 primary elevations with 3 variations of each style. Staff Comments: The primary ridge line for elevation 1A-C should be broken up for greater variation. The side and rear elevations appear flat for Plan 1. The elevations should incorporate pop-out elements for greater movement in building planes. The river rock detailing on the left side of elevation 1B provides an abrupt transition between the pop-out window element and the chimney to the left. The Committee should review the river rock detailing for elevation 1B. The river rock and brick detailing on the elevations should be revised to finish off at a logical point. In addition, the accents should be carried around the chimney element and the rest of the front elevation. The roof line above the garage unit of elevation 2C should be redesigned. All that is visible is roofing material for 16-feet vertically on the elevation. The elevations for Plans 2 and 3 appear to be almost identical in roof lines, massing and detailing. Site Plan Only 4 of the 18 units are proposed to be single story. Plan 1C should be incorporated into the plan to provide variation in the streetscape. DESIGN REVIEW COMMENTS TT 14509 - BAAYOUN DEVELOPMENT AUGUST 22, 1991 Page 2 Design Review Comm{ttee Action: Members Present: Staff Planner: Anna-Lisa Hernandez DESIGN REVIEW COMMENTS 7:00 - 7:30 Anna-Lisa August 22, 1991 ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14476 - KNITTER AND ASSOCIATES - A residential subdivision and design review of 8 single family lots on 2.39 acres of land in the Low Residential District (2-4 dwelling units per acre), located at the northeast corner of London and Church Streets - APN: 1077-311-74. Design Parameters: The applicant is proposing an eight lot subdivision with lots ranging in size from 7,204 square feet to 13,922 square feet. Two floor plans are proposed and two basic elevations with three different architectural treatments to each elevation. All plans offer either a 3-car garage or a 2-car garage with a bonus area/den. Associated with the project is the request for the removal of eight (8) Eucalyptus globulus (Blue Gum) trees. The majority of the trees are located along the projects northern boundary. The trees, as indicated by the arborist study, are in poor health as a result of severe pruning and environmental conditions in the last year. Staff Comments: The side and rear elevations should contain as much detail and articulation as the front elevations. Although window trim pieces and pop-out window details have been added, some of the elevations still appear flat and lack movement. All boundary and interior wall structures within the project should be of permanent decorative materials. Design Review COmmittee Action: Members Present: Staff Planner: Anna-Lisa Hernandez