DESIGN REVIEW COMMITTEE MEETING OF SEPTEMBER 5, 1991
The following is a description of projects which require review and
rating by the Design Review Con~nittee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:45 p.m., Consent Calendar items will be
reviewed between 5:45 p.m. - 6:30 p.m., with the first design review
item being heard at 6:30 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:30 - 7:00
(Scott)
MODIFICATION TO CONDITIONAL USE PERMIT 88-42 - PITASSI-
DALMAU - A request to modify the previous approval to
provide for the phased development of a 45,150 square
foot YMCA facility on 4.83 acres of land in the
Recreation Commercial designation of the Terra Vista
Planned Community, located on the east side of Milliken
Avenue, north of Church Street - APN: 227-15{-13.
7:00 - 7:30
(Scott)
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 91-
20 - SHELL OIL - A request to establish a gas station,
mini-market, and ear wash on a 1.08 acre parcel in the
Medium Residential designation (8-14 dwelling Units per
acre) of the Terra Vista Planned Community, located at
the southwest corner of Base Line Road and Rochester
Avenue - APN: 227-151-27.
DRC AGENDA
SEPTEMBER 5, 1991
Page 2
7:30 - 8:00
(Anna-Lisa)
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 91-
16 - SOUTHWEST DESIGN GROUP - The development of a
1,080 square foot retail addition to the existing
Perry's Market Center on 1.12 acres of land in the
Community Commercial District of the Foothill Specific
Plan, located west of 9451 Foothill Boulevard
APN: 208-261-56.
SM:mlg
Attachments
cc: Planning Commission/City Council
DESIGN REVIEW COMMENTS
6:30 - 7:00 Scott September 5, 1991
MODIFICATION TO CONDITIONAL USE PERMIT 88-42 - PITASSI-DALMAU A
request to modify the previous approval to provide for the phased
development of a 45,150 square foot YMCA facility on 4.83 acres of land
in the Recreation Connuercial designation of the Terra Vista Planned
Community, located on the east side of Milliken Avenue, north of Church
Street - APN: 227-151-13.
Background:
On April 26, 1989, the Planning Commission approved plans for
development of the YMCA facility. Subsequently, the Commission approved
a one-year time extension on May 8, 1991. DUe to the current economic
conditions and available funds for construction of the facility, the
YMCA Board is now pursuing a phased development of the facility.
Attached for your review is a narrative prepared by the architect and an
estimated time line for completion of the various phases and the
ultimate completion of the project.
Staff ~ents:
The following comments are intended to serve as an outline for Committee
discussion:
In phasing the development plans, the applicant has provided
elevations in a finished state to avoid an unattractive appearance
prior to construction of the next phase. The finish has been
coordinated with the approved plans to provide consistent detailing
within each phase. Considering the timing of the phased
construction, staff suggests that the level of detailing provided
by the applicant is acceptable for each interim condition. This
issue, however, should be considered by the Committee.
The colors and materials proposed for development are consistent
with those approved for the original Conditional Use Permit
application.
As indicated in their phasing narrative, any unfinished building
pad area will be hydroseeded with turf and irrigated to provide a
finished appearance.
Design Review Comlttee ACtion:
Member Present: 8uzanne Chitiea, John Melcher, Otto Kroutil
Staff Planner: Scott Murphy
DESIGN REVIEW COMMENTS
CUP 88-42 - PITASSI-DALMAU
SEPTEMBER 5, 1991
Page 2
The Committee reviewed the plans and recommended approval of the phased
development. The Committee felt the applicant had done a good job of
designing the various phases to provide finished appearances for each
phase.
DESIGN REVIEW COF~4ENTS
7:00 - 7:30 Scott
September 5, 1991
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 91-20 - SHELL OIL -
A request to establish a gas station, mini-market, and car wash on a
1.08 acre parcel in the Medium Residential designation (8-14 dwelling
units per acre) of the Terra Vista Planned Community, located at the
southwest corner of Base Line Road and Rochester Avenue - APN: 227-151-
27.
Design Parameters:
Under the definition within the Terra Vista Community Plan, service
stations and the related uses (mini-market and car wash) are considered
"community Facilities." As such, service stations raay be located in any
zoning designation, along any of Terra Vista's major arterials
(Rochester, Foothill, Base Line and Milliken), subject to review and
approval of a Conditional Use Permit. The Community Plan does, however,
require the use to be separated from residential uses by a street,
additional landscape setback, or other "buffer" satisfactory to the
Planning Conm~ission.
As part of the process for gas dispensing, notices were sent out by the
South Coast Air Quality Management District to all property owners
within 500 feet of the site. AS a result of these notices, staff has
received several inquiries abut the project. In Order to receive input
from the residents, a neighborhood meeting has been scheduled for
September 4, 1991. The results of this meeting will be presented to the
Design Review Committee.
Staff Comments:
The following comments are intended to provide an outline for discussion
by the Committee:
Major Issues:
AS noted in the design parameters, service stations are required to
provide a sufficient buffer between them and adjacent residential
uses. This buffer can take on several forms. In this particular
case, the applicant has submitted a master plan depicting the
landscape area, grade separation, and building separation from the
potential development to the west and south. This master plan was
prepared in cooperation with Lewis Homes. In considering the
master plan, staff suggests that the Committee consider the
following:
The majority of the landscape buffer is being provided on the
residential property. Generally, a 10-foot landscape area is
provided on the station site. In the southwest corner,
however, the area is just a few feet. Since the station is
DESIGN REVIEW COMMENTS
CUP 91-20 - SHELL OIL
SEPTEMBER 5, 1991
Page 2
the more intensive user, should the buffering be provided on
their site or should it remain on the residential site? The
residential project has not yet been submitted for review so
the plans will be reviewed by the Design Review Committee and
Planning Commission in the future to assure adequate buffering
is maintained.
The separation between the station and the planned residential
project appears adequate along the southern portion of the
site. Along the western property line, however, the setback
from the property line to the building is 10 feet. Staff does
not feel this separation is sufficient to adequately buffer
the residence from the station.
AS proposed, the driveway off Rochester will also provide egress
only for the future residential project. There has been discussion
by staff as to whether the driveway should connect to the
residential project, even limited to exiting only.
Minor Issues:
With the development of the service station, the applicant is
proposing a drive-thru car wash. The car wash is proposed at the
northeast corner of the sight. In order to try and screen the
cars, a low retaining wall and landscaping are being provided along
the streetside of the drive aisle. Staff suggests that screening
be provided to a greater degree to screen the vehicles from the
street. This may be accomplished through additional height Of the
retaining wall and/or more extensive landscaping.
Extensive landscaping should be provided along the street frontages
to lessen visibility of the gas pump area.
Design Review Committee Action:
Members Present: Suzanne Chitiea, John Melcher, Otto Kroutil
Staff Planner: Scott Murphy
The Committee reviewed the project and did not recommend approval. The
Committee felt that the plans should be revised to address the following
concerns:
DESIGN REVIEW COMMENTS
CUP 91-20 - SHELL OIL
SEPTEMBER 5, 1991
Page 3
Architecture
1. The canopy colunLns seen out of proportion.
The gable, pop-out, roof elements appear unfinished and should be
redesigned to provide a more integrated roof design.
The storefront elevation should be redesigned to eliminate the
glass at the bottom portion of the elevation to screen merchandise
that may be stacked against the window.
A sturdier material (i.e. ceramic tile) should be used at the base
of the columns to minimize damage.
The building should be designed with a sufficient roof overhang to
prevent water from running down the building side and staining the
walls.
Site Plan
The property line at the southeast corner of the site should relate
to the driveway location. It does not seem appropriate to cross
over property not owned by the applicant to access the project.
Some concern was expressed abut the 3-car stacking for each pump
island.
The location of the parking spaces adjacent to the residential area
might create problems with noise, trash, etc.
Concern was expressed about the visibility of the air/water stand
from the cashier's window. Clear visibility should be maintained
for security and safety of the patrons.
In addition to the architecture and site plan comments, the Committee
expressed serious reservations about locating the service station at
this location because of the proximity for future residential
projects. The Committee felt there will be on-going conflicts between
the two uses.
DESIGN REVIEW COMMENTS
7:30 - 8:00
Anna-Lisa
September 5, 1991
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE pERMIT 91-16 - SOUTHWEST
DESIGN GROUP - The development of a 1,080 square foot retail addition to
the existing Perry's Market Center on 1.12 acres of land in the
Community Commercial District of the Foothill Specific Plan, located
west of 9451 Foothill Boulevard - APN: 208-261-56-
Site Characteristics:
The site slopes to the southeast at an approximate slope of 3 percent-
No significant vegetation or historic structures exist on-site.
General:
The Perry's Market Center was built prior to the adoption of the
Foothill Boulevard Specific Plan and the Development Code. As a result,
the Center does not comply with many current development standards,
including streetscape setbacks, landscaping coverage, parking lot
design, and architectural guidelines.
Background:
The parcels comprising Perry's Market shopping center are all currently
owned by one entity- There are long-term leases on several of the
parcels of land. On January 10, 1991, the Planning Commission approved
the proposal to add 5,195 square feet of retail space to the project's
eastern parcel Of land. (Conditional Use Permit 88-28). A condition
was placed on the approval, requiring architectural improvements to the
existing retail frontage for the parcel located directly west of the
addition- Building permits have recently been issued for Conditional
Use Permit 88-28.
This application contemplates the development Of an additional
1,801 square feet to the existing 9,000 square-foot pharmacy within the
center. In addition, the applicant is proposing to restripe the parking
areas located directly east of the site.
Major Issues:
Phasing of the site improvements:
Concern was expressed by the Planning Commission in its review of
Conditional Use Permit 88-28 that the center be upgraded in a
timely and consistent matter. Staff is concerned that: 1) the
improvements along a majority Of the Foothill Boulevard frontage
may not be completed in a timely manner; 2) the developer has
indicated that the improvements may never reach completion as
indicated on the submitted master plan.
DESIGN REVIEW CO~ENTS
CUP 91-16 - SOUTHWEST DESIGN GROUP
SEPTEMBER 5,1991
Page 2
Although the item will be brought before the full Planning
Commission, staff requests that the Design Review Committee discuss
the phasing plan for the center to ensure reasonable timing for the
completion of those improvements to the site consistent with the
Foothill Boulevard Specific Plan and the Development Code.
Site Plan:
The 62-foot drive aisle (main drive off Foothill Boulevard) is
excessively wide. The entrance should be redesigned with a
landscape entrance area to provide a strong focal point for
the primary entrance to the center. The Foothill Boulevard
Specific Plan provides flexibility in the landscape setback
requirement through averaging of the landscape setback
(30-foot minimum, 45-foot average). Opportunity may exist for
additional parking stalls with the re-design of the northern
portion of the site.
The two parking stalls on the east side of the driveway seem
awkward with some potential for conflict between people
pulling out of the stalls and those exiting the drive.
By restriping the parking lot area directly east of the
project parcel, an awkward transition has been designed for
the planter areas along Foothill Boulevard. The landscape
strip near the entrance should be smoothed out and softened
with additional landscaping treatment. A similar situation
exists next to the pharmacy and the existing market structure.
3. Architecture:
The southern elevation requires additional variety and
movement. The building plan is currently flat and shows no
articulation. As a guide, the architecture should be similar
to the southern elevation of the addition on the east side of
the shopping center (CUP 88-28).
The northwest corner of the expansion area needs additional
treatment. Possible options include:
1) Adding a tile roof to the west elevations starting
feet south of corner; or
2) Extending the tile roof around the entire corner
(approximately 16 feet.)
DESIGN REVIEW CO~4ENTS
CUP 91-16 - SOUTHWEST DESIGN GROUP
SEPTEMBER 5, 1991
Page 3
The Foothill Boulevard Specific Plan requires 15 percent
minimum on-site landscaping (includes articulated plazas,
hardscape areas, turf areas, courtyards and patios.)
Design Review Ce"~ttee ACtion:
Members Present: Suzanne Chitiea, John Melcher, Otto Kroutil
Staff planner: Anna-Lisa Hernandez
The Committee reviewed the project and did not recommend approval. The
Committee concurred with staff on the design issues listed above. In
addition, the Committee recommended that the following revisions be made
and that the project return as a full item to the Design Review agenda.
Major Issues:
Master Plan:
In Order to ensure coordinated and comprehensive development Of the
entire center, the Committee recommended that the applicant provide a
revised master plah detailing the ultimate configuration of the parking
lot, building and Foothill Boulevard streetscape directly east of the
project site.
Site
A.
Plan:
Circulation The improvements within the project should be
designed and developed in accordance with the master plan to ensure
efficient circulation and parking access-
pedestrian Access/Amenities The Committee suggested that a
pedestrian access linking the buildings and plaza area to FOOthill
Boulevard be developed in front of the pharmacy area.
A sidewalk structure, utilizing pavement treatment (i.e.
interlocking pavers), should be incorporated into the plans.
2. Landscaping should be increased along the pedestrian access.
3- Benches, lights, and other pedestrian amenities should be
incorporated into the plaza area-
DESIGN REVIEW COF~4ENTS
CUP 91-16 - SOUTHWEST DESIGN GROUP
SEPTEMBER 5, 1991
Page 4
Parking Lot Configuration/Parking Facilities:
The Cou~nittee reco~nended that the parking be removed from the area
in front of the market for efficiency and easier treatment of
landscaping on the master plan.
The Committee suggested that the ultimate landscape setback along
Foothill Boulevard be reduced from 50 feet while still maintaining
a 45-foot average setback to increase parking.
The parking aisles and landscaping adjacent to the main entry drive
should be extended northerly.
Architecture
A 3/4 column element (of quintra stone) should be carried over onto
the west elevation.
The reveal lines on the west elevation should continue on a
horizontal direction instead of angled, which emphasizes the drop
in grade.
The roof lines along the west elevation need additional movement
and articulation. The Committee recommended the following:
The awkward roof line transition between the addition and the
existing pharmacy should be softened with corbel or console
element (may also be referred to as a broken or swale's neck
pediment). The applicant may also consider a 4 or 5-foot wrap
of the roof line onto the south elevation.
Some kind of mansard treatment, similar to the one on the new
east addition, should be considered for the south elevation-
The circle clay elements should be added onto the west elevation to
add interest and break up the elevation.
The existing stain structure should be enclosed with wall
structures to help break up the flat elevation.
The pop-up tower element on the north elevation seems
"inappropriate". A tower element similar to the one approved for
the eastern addition (CUP 88-28) would be more appropriate.