HomeMy WebLinkAbout1992/01/02 - Agenda Packet - (2)DATE:
TO:
January 8, 1992
CITY OF RANCH0 CUCAMONGA
MEMORANDUM
ACWION CO)~QTS
FROM:
Residemtial/Institutiomal
Design Review Committee
Wendy Vallette
Peter Tolstoy
Dan Coleman
John Melcher (Alternate
Steve Hayes, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF JANUARY 2, 1992
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/reconunendation of the Committee and distributed to
the Commission and Council.
AS always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 p.m. - 5:45 p.m., Consent Calendar items will
be reviewed between 5:45 p.m. - 6:30 p.m., with the first design review
item being heard at 6:30 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:30 - 7:00
(Steve R.)
ENVIRONMENTAL ASSESSMENT AND VESTING TENTATIVE TRACT
15354 - WILLIAM LYON COMPANY - The development review of
a 156 unit condominium development on 12.4 acres of land
in the Medium Residential District (8-14 dwelling units
per acre) of the Victoria Community Plan, located at the
northeast corner of Woodruff Place and Kenyon Way -
APN: 227-011-26.
7:00'- 7:30
(Anna-Lisa)
ENVIRONFdENTAL ASSESSMENT AND VESTING TENTATIVE TRACT
15289 WILLIAM LYON COMPANY The development of
193 condominium units on 18 acres of land in the Medium
Residential District (8-14 dwelling units per acre) in
the Victoria Planned Conununity, located on the southeast
corner of Kenyon Way and Milliken Avenue - APN: 227-
011-17.
DRC AGENDA
JANUARY 2, 1992
Page 2
7:30 - 8:00
(Anna-Lisa)
DESIGN REVIEW FOR TENTATIVE TRACT 13717 WESTERN
PROPERTIES - Review of the revised recreation building
elevations and recreation facilities within a previously
approved condominium project, located at the northeast
corner of Church Street and Spruce Avenue - APN: 1077-
421-13.
SH:mlg
Attachments
cc: Planning Commission/City Council
DESIGN REVIEW COMMENTS
6:30 - 7:00 Steve R.
January 2, 1992
ENVIRONMENTAL ASSESSMENT AND VESTING TENTATIVE TRACT 15354 - WILLIAM
LYON COMPANY - The development review of a 156 unit condominium
development on 12.4 acres of land in the Medium Residential District (8-
14 dwelling units per acre) of the Victoria Community Plan, located at
the northeast corner of Woodruff Place and Kenyon Way - APN: 227-011-
26.
Design Parameters:
The site is bounded by Highland Avenue and a Community Facility parcel
on the north, a trail and existing single family homes to the east,
Kenyon Way on the south, and Woodruff Place on the west. The Vineyards
Marketplace shopping center is on the west side of Woodruff Place, and a
park is located on the south side of Kenyon Way, next to a vacant school
site.
Background:
The Design Review Committee (Melcher, Vallette, Buller) first reviewed
the project on October 3, 1991 and made the following comments:
Graded 2:~ slopes should be softened by using variable, undulating
slopes and rounding off the top/toe to create a more interesting,
semi-natural appearance and to provide a better foundation for
landscaping.
Retaining walls should be treated as a design element within the
project. Walls should have a curvilinear appearance to soften
their appearance. Low retaining walls are acceptable adjacent to
sidewalks.
A decorative wrought iron fence should be provided around the
perimeter of the site. The black wrought iron fence should have
decorative slumpstone columns consistent with the Victoria theme.
Gates should be provided for connections at the entries and the
greenway connections.
A conceptual site plan for the church property should be provided
to help address issues of mutual concern (i.e., vehicular access,
pedestrian connections, sound attenuation, landscape treatment). A
pedestrian connection should be provided from the northwest portion
of the tract to the church property.
Provide a sidewalk connection from the tract to the greenway trail
between Buildings 19 and 28.
6. Buildings 9 and 10 should be replotted to accommodate the loop
drive aisle for their access rather than the alley.
DESIGN REVIEW COMMENTS
TT 15354 - WILLIAM LYON COMPANY
JANUARY 2, ~992
Page 2
7. Provide architectural plans and elevations for the proposed
recreation building- Submit enlargements of the recreation areas
and their contents.
8. Provide a standard set of plans for patio covers which may be used
by future homeowners-
9. The six-unit building should offset in the center to add interest
to the roofline and the building plane.
~0. The second story deck above the utility room should be extended to
replace the small shed roof in order to simplify maintenance and
construction.
1~. A stucco wall, or possibly woodcrete, should be used to enclose the
private yard areas in place of the proposed wood fence to simplify
maintenance-
12. Tall shrubs should replace trees in those locations where the
second floor cantilevers over a landscaped area.
Staff Cowments:
The following comments are intended to provide an outline for Committee
discussion-
will be the focus of Committee
Major Issues:
The following broad design issues
discussion regarding this project:
1. A greater landscaping setback should be provided between the
building and curb in those locations where sidewalks, utility
enclosures, and stairways encroach into the intended landscape
area. The deletion of the solitary parking spaces from these areas
could help to meet the intent of the newly revised multi-family
development standards.
The proposed architecture of the recreation building should be
revised to be consistent with the style used throughout the
project.
The design of the six unit building is still basically the same.
It should have an offset to break-up the mass of the building as
previously noted.
DESIGN REVIEW COMMENTS
TE 15354 - WILLIAM LYON COMPANY
JANUARY 2, 1992
Page 3
Secondary Issues:
Once all of the major issues have been resolved, and time permitting,
the Committee will discuss the following secondary design issues:
A large number of 2:1 slopes still exist throughout the site and
should be softened by using variable, undulating slopes.
2. A greater separation should be provided between the curvilinear
retaining wall and the northwest drive aisle at those locations
where the wall curves close to the curb.
A greater separation should be provided between retaining walls and
building or patio walls near Buildings l, 11, 12, 25, 26, and 27.
Design Review Comm{ttee Action:
Members Present: Wendy Vallette, Peter Tolstoy, Brad Buller
Staff Planner: Steve ROSS
The Committee made the following comments and stated that the project
should return to the Design Review Co~nittee as a regular item:
The plotting of the buildings along the eastern side of the site
does not provide for an adequate transition of density. The
buildings should be replotted to lessen their apparent size as
viewed from the existing single family homes to the east. If this
cannot be done, smaller buildings should be plotted in this area.
The required 15-foot building to curb separation must be met by the
recreation building as well as elsewhere on-site. A minimum
10-foot area shall be maintained free and clear for landscaping.
The parking space between Buildings 18 and 19 should be relocated
elsewhere on-site.
The architecture of the recreation building should be revised to be
consistent with the style used throughout the project.
%
The change to the architecture of the six-unit building did not
achieve the desired effect of breaking-up the bulk of the
building. Another attempt should be made.
Provide an exhibit to show the typical location of air conditioning
units.
7. Provide renderings of the entries to the site.
DESIGN REVIEW COMMENTS
7:00 - 7:30 Anna-Lisa January 2, 1992
ENVIRONMENTAL ASSESSMENT AND VESTING TENTATIVE TRACT 15289 WILLIAM
LYON COMPANY - The development of 193 condominium units on 18 acres of
land in the Medium Residential District (8-14 dwelling units per acre)
in the Victoria Planned Conununity, located on the southeast corner of
Kenyon Way and Milliken Avenue - APN: 227-011-17.
Design parameters:
There are no significant structures or features on the site. The site
is bounded by a park site and single family residential to the east,
single family residential to the west and south, and a village
conunercial shopping center to the north, under construction- The
project is one of the first to incorporate the new multi-family
development standards. The 193 unit townhouse project is proposed with
3 different unit types: duplex, tri-plex, and four-plex units with
stucco and concrete tile roofing.
Background:
The project was reviewed by the Design Review committee on October 3,
199~, and did not receive approval. The Committee advised the applicant
to revise the plans on the following issues.
Site Plan:
Open space should be increased throughout the site to achieve
better balance between building massing and paving.
The smaller building types, i.e., duplex, should be used along the
south eastern project boundary for better transition to the single
family project directly east.
The special paving used at the north and south entries to the
project should be extended to establish a more formalized entry.
The paving, as it is currently proposed, is not substantial
enough. In addition, the type of paving to be used should be
identified.
Additional landscape treatment should be used in the open space
areas to establish focal points at the entries within the revised
plans.
The spine road should feature a formal landscape theme. This could
be accomplished with the use of a singular type of tree along the
spine instead of several species.
6. The "emergency access" landscape areas should be eliminated.
DESIGN REVIEW COF~4ENTS
T~ 15289 - WILLIAM LYON COMPANY
JANUARY 2, 1992
Page 2
7. All parallel parking stalls should be eliminated off the main
spine.
8. The Victoria Theme Wall along Milliken Avenue should be staggered,
similar to the condition directly west with Tract 13722. Also,
more pilasters should be used to break-up the expanse of walls.
9. The flared-out sides of the south project entry should be slightly
decreased.
10. The bus bay/shelter structure should be designed as a permanent
shade structure to match the primary architecture within the area.
The street between Buildings 6 and 9 should be eliminated for
safety purposes due to the slope at the end of the drive aisle.
12. The bus bay should be located 20 feet further south.
13. Interior trails are inefficiently located within the project. The
following should be considered in the plans:
a. Trails should be located on both sides of the north entry to
facilitate access to the commercial center to the north-
b. Better access around the pool should be provided (residents
should not have to go through the recreation areas).
c- A sidewalk should be provided along the south side of Unit
103.
14. The wrought iron fencing along the eastern border of the tract,
adjacent to the park, should be continued, without breaks, to the
single family area further south-
Architecture/Details:
1.
2.
All building elevations should be consistent with the floor plans.
Elevations and a floor plan of the recreation building should be
provided-
A uniform patio cover design (lattice structure) should be provided
for this project.
A color board displaying all proposed materials and colors to be
used in the elevations should be provided.
DESIGN REVIEW COMMENTS
~T 15289 - WILLIAM LYON COMPANY
JANUARY 2, 1992
Page 3
Special attention should be paid to architectural details, (i.e.,
streetscape furniture, lighting elements, etc.).
The entry designs for the proposed units should incorporate more
defined and formal elements consistent with the architecture.
Additional detailing and articulation is needed in the building
elevations, most especially the side and rear elevations. For
example, there are a number of windows on the rear elevations but
there is almost no movement within the building planes.
Staff has reviewed the revised plans and a number of the minor issues
have been addressed by the applicant. The "major" land use issues and
the following items still remain:
Major Issues:
1. Site Plan:
The overall site plan is still rigid in design and lacks
creativity in the clustering of units. Concerns include the
following:
There is still an excessive amount of paving within the
project. Increased landscaping would help to balance
building massing and paving.
The smaller building types, such as duplexes, should be
used along the south eastern project boundary to provide
a better transition to the adjacent single family
residences.
Better access around the pool should be provided so that
residents do not have to go through the recreation area
for access to the open areas to the east.
2. Architecture:
The right side of the front elevation and the left elevation
of the recreation building lacks articulation and is
inconsistent with the Planning Commission policy Of 360 degree
architecture.
B. The size of the posts at the unit entry of Plan 2, Elevation
A, should be increased to achieve better proportion.
DESIGN REVIEW CO~ENTS
· T 15289 - WILLIAM LYON COMPANY
JANUARY 2, 1992
Page 4
C. Window trim should be added to all elevations for better
articulation.
Design Review Committee Action:
Members Present: Wendy Vallette, Peter Tolstoy, Brad Buller
Staff Planners: Anna-Lisa Hernandez and Nancy Fong
The Committee did not approve the project and recommended it be revised
for further Committee review.
1. The overall site plan should be improved as follows:
be
The applicant should make an effort to further increase the
clustering of the units so as to provide more of an open
feeling within the site.
Minimize the number of backyard to backyard buildings. If
possible, 50 percent fewer such cases than shown in the
proposed plan.
The buildings that back up to Milliken Avenue should be pulled
further away from Milliken Avenue and additional side-on
buildings should be used so as to increase the openness into
the site and create a more pleasing streetscape.
de
Relocate away from the greenbelt or eliminate the 3 parking
spaces located at the southeast side of the project
perpendicular the greenbelt trail (Lot E).
2. The proposed architecture should be improved as follows:
Add multi-pane windows to the second-story window of all the
units.
b. Wrap the wainscoat around all sides of the recreational
building.
The AC condensers for each dwelling unit should be oriented
away from the buildings and the entries and shall be screened
on all sides by landscaping.
3. The landscaping concept for the project should be improved as
follows:
DESIGN REVIEW COMMENTS
~ 15289 - WILLIAM LYON COMPANY
JANUARY 2, 1992
Page 4
a. Provide rear yard landscaping for all backyards along the
perimeter of the project.
b. Move the pedestrian walkway from the south side of the central
open space area closer to the recreation building.
c. provide a sketch Of the view into the project at both project
entries.
DESIGN REVIEW COMMENTS
7:30 - 8:00
Anna-Lisa
January 2, 1992
DESIGN REVIEW FOR TENTATIVE TRACT 13717 - WESTERN pROPERTIES - Review of
the revised recreation building elevations and recreation facilities
within a previously approved condominium project, located at the
northeast corner of Church Street and Spruce Avenue - APN: 1077-421-13.
Site Characteristics:
The site is presently vacant with some grapevine vegetation- The site
slopes approximately 2 percent from north to south. An east-west row of
12 eucalyptus trees exists near the southwestern edge of the project.
In addition, 33 olive trees of some historical value have been boxed for
relocation, a minimum of 12 of these will be planted within the future
La Mission Park, located directly southeast of the tract. (Additional
conditions have been added through a previous modification to the
project to ensure protection of these trees - Resolution NO. 90-20A.)
Background:
Tentative Tract 13717 was approved by the Planning Commission on
February 14, 1990. The tract was approved for the development of 394
condominium units within 52 buildings. There are 4 two-story building
types. The project was designed as two distinct villages, each with its
own architectural scheme. The units to the north of the site will have
a contemporary appearance with siding, stucco, and flat tile roofing
while the units to the south will have a Mediterranean style with stucco
and s-tile roofs.
Since the project's approval, the applicant has decided to market the
tract as a "for sale" product type instead of rental units due to
economic and market conditions. In accordance with this decision, they
have scaled down the recreational areas, modified the Spruce Avenue
entry, and relocated two buildings to eliminate the rental office and
increase open space.
On July 18, 1991, the Design Review Committee reviewed the revised
scaled down recreation building elevations on Consent Calendar. The
Committee requested that the item return to the Co~unittee for full
review. They, at that time, could not support the project due to its
marked lack of articulation, utilization of innovative materials, and
multi-panes (or pop-outs). The applicant then revised the plans and
incorporated a number of the key architectural elements of the
buildings, more consistent with the original design. Tile accents,
pop-out window treatments and glass block detailing achieved more
consistency with the original approval.
DESIGN REVIEW COMMENTS
~T 13717 - WESTERN PROPERTIES
JANUARY 2, 1992
Page 2
The applicant also modified the recreation amenities and designed the
primary tot lot area.
The Design Review Committee reviewed the tot lot and recreation building
elevations on October 17, 1991, and recommended that the applicant
return to the Design Review Committee with the following revisions:
The tot lot pool should be relocated to the southern portion of the
primary recreation facility.
A smaller scaled tot lot facility should be added to the primary
recreation area, adjacent to the wading pool on the south side.
All tot lots should be fenced in to ensure adequate safety and
protection of the children. A suggested material is wrought iron.
The detailing on the tower element should be reconsidered. AS it
is currently designed, maintenance could be a problem in the
future.
A circular glass detail should be substituted for the clock element
within the tower.
The recreation building elevations indicate a stuccoed fascia
painted in a different accent tone. The Committee suggested that
the fascia match the building color to establish a "clean, crisp
line" to the roof.
Staff Comments:
The applicant has since revised the plans to address those comments
identified above. It is staff's opinion that the modifications are
consistent with the architecture of the project. In addition, the
applicant has provided elevations of the restroom facilities within the
recreation areas and demonstrated how the trellis structures will tie in
to the buildings. The tot lot areas have been revised as suggested.
Design Review Co~-ittee ACtion:
Members Present: Wendy Vallette, Peter Tolstoy, Brad Buller
Staff Planners: Anna-Lisa Hernandez and Nancy Fong
The Committee reviewed the revised plans for the recreation building and
the related amenities consisting of restroom facilities, trellis
structures and tot lots. The Committee did not reach a consensus
whether the smaller recreation building and the proposed related
amenities meet the intent of the original project approval. The
Committee recommended that this issue be brought before the full
Commission for discussion under a Director's Report.