HomeMy WebLinkAbout1992/02/06 - Agenda Packet - (2)DATE:
TO:
February 24, 1992
CITY OF RANCH0 CUCAMONGA
MEMORANDUM
~3L~ION AGENDA
Co---ercial/Industrial
Design Review Committee
Larry McNiel
Suzanne Chitiea
Otto Kroutil
John Melcher (Alternate
FROM:
SUBJECT:
Scott Murphy, Associate Planner~
DESIGN REVIEW COMMITTEE MEETING OF FEBRUARY 6, 1992
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Comittee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:45 p.m., Consent Calendar items will be
reviewed between 5:45 p.m. - 6:30 p.m., with the first design review
item being heard at 6:30 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:30 - 7:00
(Nancy F.)
DEVELOPMENT REVIEW 91-15 - MONARCH FOODS (SHAKEY'S)
The development of a 5,000 square foot restaurant within
the Terra Vista Town Center in the Community Commercial
District of the Terra Vista Planned Community, located
at the north side of Foothill Boulevard, east of Haven
Avenue - APN: 1077-421-76.
SM:mlg
Attachments
cc: Planning Commission/City Council
COMMERCIAL/INDUSTRIAL
COSSENT C~T.ENDAR ITEMS AG~qDA
February 6, 1992
DR 91-22 - FOOT~TTJ. MARKEEPLACE pARTNERS
(Scott) Review of storefront design.
Committee Action:
The Committee (McNiel, Kroutil)
reviewed the storefront design and
felt that it did not tie in with the
building design or the center
design- The Conunittee requested that
alternatives be pursued.
'3.
DRIVE-THRU POLICY
( Steve H./Scott )
Committee Action:
Consideration of requirement for
drive-thru lanes to be screened by
building (i.e., Burger King).
The Committee reconunended that the
site plan designs being proposed by
Carl's Jr. and In N' Out Burger fast
food restaurants may be pursued as
proposed. The Committee felt the
proposed building orientation and
drive-thru lane configuration would be
able to meet the intent of the interim
drive-thru policies by screening the
drive-thru lane with substantial
berming and dense landscaping.
However, the Committee expressed
concern with the proposed site plan
for the Taco Bell restaurant in the
Vineyards Marketplace Shopping
Center. Visibility of standing
vehicles in the drive-thru lane and
pick up window orientation did not
meet the intent of the interim drive-
thru policies.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Nancy
February 6, 1992
DEVELOPMENT REVIEW 91-15 - MONARCH FOODS (SHAKEY'S) - The development of
a 5,000 square foot restaurant within the Terra Vista Town Center in the
CoreRunity Commercial District of the Terra Vista Planned Co~ununity,
located at the north side of Foothill Boulevard, east of Haven Avenue -
APN: 1077-421-76.
Staff Comments:
The Committee (Tolstoy, Vallette, Kroutil) reviewed the proposed design
on January 2, 1992 and recommended that the project be revised to
address the following items:
The tower element in the middle of the building is out of
proportion with the rest of the building. A proper transition
should be provided from the flat roof to the top of the element.
The Committee stated that outdoor seating area is encouraged-
However, the stone colums shall meet the ~uinimum building
setback. The Committee agreed to a Minor Exception to decrease the
building setback from 38 feet to 34 feet.
The stairs going up to the main building should be of decorative
textured materials consistent with the theme established in the
center.
Shrubs ~k~ssing and vines should be provided to discourage
pedestrians from walking through the planting areas along the east
elevation. However, two landing areas should be set aside for
pedestrians to step onto the walkway.
Landscape area should be provided to the north side of the trash
enclosure area. The overhead trellis work for the trash enclosure.
area should not overhang into the parking space.
The pedestrian walkway north of the trash enclosure area should be
connected to the easterly parking area.
7. A loading/delivery parking space should be provided.
The Committee agreed to review sketches and overlays that addressed the
above design issues at the meeting.
Design Review Com~{ttee Action:
Members Present: Larry McNiel, Otto Kroutil
Staff Planner: Nancy Fong
DESIGN REVIEW CO~ENTS
DR 94-15 - MONARCH FOODS (SHAKEY'S)
FEBRUARY 6, 1992
Page 2
The Committee reviewed the revised site plan and the four alternative
sketches of the tower element provided by the applicant at the
meeting. The applicant also stated that the delivery trucks are
normally 30 feet long. The Committee recommended approval of the
project subject to the following conditions:
The tower element should be of the shorter plaster dome with an
architectural element at the top of the dome instead of the
proposed ball.
The pedestrian connection located north of the building should be
modified to decrease the width of the connection subject to City
Planner review and approval. The design of the walkway should be
of integral color Concrete, 42 inches square, consistent with the
shopping center.
The proposed loading/delivery parking space should be increased to
the minin~m size of 22 feet by 12 feet.