Loading...
HomeMy WebLinkAbout1992/05/21 - Agenda Packet - (2)DATE: May 5, 1992 CITY OF RANCHO CUCAMONGA MEMORANDUM ACTION AGENDA TO: Covm.-rcial/Industrial Design Review Committee Larry McNiel Suzanne Chitiea Otto Kroutil John Melcher Alternate FROM: SUBJECT: Scott Murphy, Associate Planner ~ DESIGN REVIEW COMMITTEE MEETING OF MAY 21, 1992 The following is a description of projects which require review and rating by the Design Review Committee. Please review the attached plans, visit the project sites, and write down your comments using the blank space provided under each project on the attached sheets. After the meeting, the consensus of the Committee's concerns will be typed up as the formal action/recommendation of the Committee and distributed to the Commission and Council. As always, feel free to contact the appropriate project manager (noted in parentheses along the left margin), prior to the meeting date, if you have specific questions related to the scheduled projects. Dinner will be provided between 5:00 5:45 p.m., Consent Calendar items will be reviewed between 5:45 p.m. 6:30 p.m., with the first design review item being heard at 6:40 p.m. Please notify our department if you will be unable to attend the meeting, or if you will be late, so that the dinner can be properly ordered and the necessary arrangements made. 6:40 - 7:00 (Nancy) DEVELOP~NT REVIEW 91-15 - MONARCH FOODS (SPL~KEY'S) The review of the final design for the dome element for Shakey's restaurant, located in the Terra Vista Town Center - APN: 1077-421-76. 7:00 - 8:00 BREAK 8:00 - 9:00 (Scott) PLANNING COMMISSION WORKSHOP FOOTHILL MARKETPLACE UNIFORM SIGN PROGRAM SM:mlg Attachments cc: Planning Commission/City Council CO~4ERCIAL/INDUSTRIAL C30NSENT C~T.RMDAR ITEMS AG~DA May 21, 1992 ~EXACO -- FOO~ILL & RED BTT.T. COUNTRY CLUB (Scott) Committee Action: Revised building materials. The Design Review Committee (Chitiea, McNiel,. Kroutil) reviewed the proposed building material and approved its use. DESIGN REVIEW COMMENTS 6:40 - 7:00 Nancy May 21, 1992 DEVELOPMENT REVIEW 91-15 - MONARCH FOODS (SHAKEY'S) - The review of the final design for the dome element for Shakey's restaurant, located in the Terra Vista Town Center - APN: 1077-421-76. Background: Shakey's restaurant was approved by the Planning Commission on April 8, 1992. One of the conditions of approval requires that the final design of the dome and the element on top of it shall be subject to Design Review Committee review and approval prior to issuance of building permits. The applicant has not started the Plan Check process for the restaurantlto date. Staff Comets: The applicant has submitted two schemes for the Committee to review at the meeting. One of the schemes is the original dome conceptually approved by the Commission on April 8, ~992. The applicant has not made any changes to this design. In lieu of making changes to the dome design, the applicant proposes a new scheme which consists of a hip roof tower design with a pole element on top- The following are staff comments on the two schemes: 1. Dome tower: Instead of painted plaster, ceramic tiles could be added to the dome. Another alternative is to add a cupola on top of the dome. 2. Hip roof tower: The hip roof tower design is safe in that it is better integrated into the building design and is more in keeping with the design of the center. Desi~ Review Committee Action: Members Present: McNeil, Chitiea, Kroutil Staff Planner: Nancy Fong The Committee reviewed the dome design as conceptually approved by the Commission and a new scheme consisting of a hip roof tower design. The Committee felt that the dome design would add an interest to the building more than the hip roof tower design. However, the Committee could not reach a consensus on whether the dome should remain plastered or should have ceramic tiles added to it, and referred the matter to the full Commission for review.