HomeMy WebLinkAbout1992/08/04 - Agenda PacketDATE: AUguSt 6, 1992
CITY OF RANCHO CUCAMONGA
MEMORANDUM
ACTION CO~S
TO:
FROM:
Primary
Design Review Conunittee
Wendy Vallette
Peter Tolstoy
Dan Coleman
John Melcher (Alternate
Steve Hayes, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF AUGUST 4, 1992
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
AS always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Consent
Calendar items will be reviewed between 5:00 p.m. - 5:30 p.m., with the
first design review item being heard at 5:40 p.m. Please notify our
department if you will be unable to attend the meeting.
5:40 - 6:00
(Steve H.)
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 92-07 -
GTE - A request to construct a possible multi-phase
facility with Phase I consisting of a 650 square foot
remote switching station on 1.5 acres of land in the
Industrial Park District (Subarea 12) of the Industrial
Area Specific Plan, located on the east side of Milliken
Avenue, between 5th and 6th Streets - APN: 229-341-
06. Related File: Lot Line Adjustment No. 361.
6:10 - 7:00
(Steve H.)
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14405 - HU
- A residential subdivision and design review for the
development of 20 single family lots on 4.39 acres of
land in the Low-Medium Residential development district
(4-8 dwelling units per acre), located on the north side
of San Bernardino Road, east of Vineyard Avenue
APN: 208-091-08. Related File: Variance 91-11.
DRC AGENDA
AUGUST 4, 1992
Page 2
7:10 - 8:00
(Scott)
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE
PERMIT 92-17 - CHEVRON - A request to establish a gas
station, foodmart, and car wash within a previously
approved 60-acre commercial retail center in the
Regional Related Con~nercial designation (Subarea 4) Of
the Foothill Boulevard Specific Plan, located on the
south side of Foothill Boulevard between 1-15 and
Etiwanda Avenue - APN: 229-031-03 through 13, 15, 16,
20, and a portion of 59.
SH:mlg
Attachments
cc: Planning Conunission/City Council
CONSENT CALRJDAR l'r~MS AGENDA
August 4, 1992
DR 13890 GREYSTONE
(Bey)
Committee Action:
P~view of revised building elevations.
The Conunittee (McNiel, Vallette,
Buller) did not initially feel
comfortable with the level of
modifications proposed by the
applicant. However, after review of
the originally approved elevations
which were completed by Homestead
submittal, the Committee reconsidered
their decision. The Committee then
directed staff to carefully compare
the level of detail provided in this
application with that provided in the
model complex which has already been
constructed by Homestead. If staff
feels the level of detail is adequate
or requires minor revisions which the
applicant can comply with, then the
project may proceed to Planning
Commission. However, if staff is not
satisfied with the proposal, it should
return to the Design Review Committee
as a full item.
DESIGN REVIEW COMMENTS
5:40 - 6:00 Steve N.
August 4, 1992
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 92-07 - GTE - A request
to construct a possible multi-phase facility with Phase I consisting of
a 650 square foot remote switching station on 1.5 acres of land in the
Industrial Park District (Subarea 12) of the Industrial Area Specific
Plan, located on the east side of Milliken Avenue, between 5th and 6th
Streets - APN: 229-341-06. Related File: Lot Line Adjustment No. 361.
Design Parameters:
The site is vacant and contains remnants of a former grape vineyard.
The Sears Credit Center is directly north of the site and one of the
original industrial/office buildings constructed in the Bixby Business
Park exists south of the site. The site slopes from north to south at
approximately two percent.
Staff Comments:
The following comments are intended to provide an outline for Committee
discussion:
Major Issues: The following broad design issues will be the focus of
Committee discussion regarding this project:
Architecture:
The architectural concept follows the architectural guidelines
established for the Bixby Business Park through the use of theme
walls, trellises, flat roofs and simple forms. However, the
proposed exterior plaster finish is not consistent with the
adjacent buildings; they are constructed of tilt-up concrete
panels. In addition, Resolution No. 89-158 requires the use of a
minimum Of two primary building materials (i.e., smooth concrete;
sandblasted concrete, rock, brick veneer, etc.) and two secondary
accent materials (tile, granite, marble, etc.) for all buildings in
the industrial area. The Committee should determine if, given the
much smaller scale of the Phase I building, tilt-up concrete should
be used as the primary exterior material and whether two primary
and secondary accent treatments are necessary in this situation.
In staffs opinion, concrete tilt-up panels should be utilized as
the primary material to be compatible with adjacent buildings but
two primary and secondary treatments are not necessary in this
situation.
Secondary Issues:
time permitting,
design issues:
Once all of the major issues have been addressed, and
the Committee will discuss the following secondary
DESIGN REVIEW COMMENTS
DR 92-07 - GTE
AUGUST 4, 1992
Page 2
The building pad should be lowered to allow the existing
streetscape and berming to remain intact and reduce the massing of
the building.
Additional landscaping, including trees and vines on the trellis
posts, should be provided around the building perimeter to soften
its appearance from Milliken Avenue.
Additional trees should be provided at the front end of parking
stalls to increase shade potential.
Policy Issues: The following items are a matter of Planning Commission
policy and should be incorporated into the project design without
discussion:
Enriched paving (i.e., interlocking pavers) should be introduced as
an accent material at the driveway entrance and in the walkway
around the building.
A shrub hedgerow and additional trees should be introduced in the
streetscape area south of the building to screen the parking area
and driveway from Milliken Avenue.
Design Review C~-m~ttee ACtion:
Members Present: Larry McNiel, Wendy Vallette, Brad Buller
Staff Planner: Steve Hayes
The Committee recommended approval of the project subject to the
following conditions:
The building and colonade should be constructed with tilt-up
concrete panels.
The building should be moved east 6 feet to accommodate the
potential future conduit room expansion while maintaining the
proper clearance between the colonade posts and the addition. In
the interim, the 6-foot strip adjacent to the building should be
landscaped to the satisfaction of the Planning Division.
The roof drainage system should be inside the building; down spouts
on the building exterior should be eliminated.
The color of the colonade and tile insets should be modified to a
deep grey to reduce the prominence of the unmanned building.
All referenced secondary and design policy items should be
incorporated on the plans.
DESIGN REVIEW COMMENTS
6:10 - 7:00 Steve H.
August 4, 1992
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14405 - HU - A residential
subdivision and design review for the development of 20 single family
lots on 4.39 acres of land in the Low-Medium Residential development
district (4-8 dwelling units per acre), located on the north side of San
Bernardino Road, east of Vineyard Avenue - APN: 208-091-08. Related
File: Variance 91-11.
Design Parameters:
The parcel is directly across from two driveways in the Thomas Winery
Plaza. The tentative tract has been designed to have its access point
"line up" as close as possible with one of the driveways for the Thomas
Winery. Dubonnet Drive, which is currently a barricaded stub street
through Tract 9602 to the east, is proposed to be continued to its
intersection with Street "A", to satisfy the Fire District requirement
for two points of access through the project. LOts 17 through 20 will
have access to Street "A" so that no additional driveways will be
required on San Bernardino Road, which is a secondary/collector
street. South of Lot I a remnant piece of property is proposed to be
landscaped and dedicated to and maintained by the City. At the time
that the adjacent office parcel to the west develops, maintenance will
be the responsibility of the property owner of the office parcel.
Lot sizes range from 5,000 to 12,757 square feet with an average lot
size of 6,706 square feet. In conjunction with the tentative tract map,
a Variance is being processed for a reduction in lot depth for Lot 7
from 90 feet to 59 feet.
The site slopes from northwest to southeast at roughly 6 percent and
contains no vegetation subject to the City's Tree Preservation
Ordinance.
Background:
Originally, this project was proposed for subdivision purposes only; the
design review for its development was not included with the proposal.
However, when the Committee (McNiel, Chitiea, Kroutil) reviewed the
subdivision on November 21, 1992, they reconmlended that the applicant
submit a total development package for the project, which will then be
processed concurrently with the tentative map. The Committee
recommended this action due to concerns created by the site
configuration, which limit the design flexibility for this infill
project.
DESIGN REVIEW COMMENTS
TT 14405 - HU
AUGUST 4, 1992
Page 2
Staff Cuu.~ents:
The following comments are intended to provide an outline for Committee
discussion:
Major Issues: The following broad design issues will be the focus of
Committee discussion regarding this project:
The proposed circulation pattern and access locations were
generated from a joint meeting between the Fire District and the
Planning and Engineering Divisions. The Committee should determine
if the proposed lot configurations are acceptable given the
constraints of the circulation pattern. In staffs opinion, the
irregular lots and slopes have been mitigated by the building
footprints.
The pad elevations for the proposed two-story homes on Lots 9
through 16 are significantly higher (up to 8 feet) than those of
adjacent single story residences immediately east of the site. The
pad elevations should be lowered as much as possible on these lots
to minimize the blockage of views for existing residents or
introduce a single story plan.
The rear elevations should be modified for variety, given their
prominence from San Bernardino Road.
Secondary Issues:
time permitting,
design issues:
Once all of the major issues have been addressed and
the Committee will discuss the following secondary
The right elevations of all three models should be modified to
break up long expanses of flat wall areas.
Front yard landscaping and decorative pavement patterns in the
driveways should be provided to add interest to the streetscape.
Upgraded roll-up sectional garage doors should be utilized to
mitigate the prominence of the garage door on the three floor plan
designs.
Policy Issues: The following items are a matter of Planning Commission
policy and should be incorporated into the project design without
discussion:
All perimeter and return walls should be of a decorative masonry
material and include elements such as plane variations, offsets,
pilasters, planter-pockets, etc., along the San Bernardino Road
frontage.
DESIGN REVIEW COMMENTS
TT 14405 - HU
AUGUST 4, 1992
Page 3
Driveways should be reduced to a maximum 16-foot width at driveway
approaches.
Front yard building setbacks should be varied to a greater extent
to provide variety of the streetscape.
On lots proposed with RV storage access, the 10-foot setback area
should be free of any obstructions that would limit access to the
side and rear yards (i.e., slopes, retaining walls, AC condensers,
overhanging eaves, etc.).
Corner side yard walls should be setback a minimum of 5 feet behind
the back of sidewalks to allow for a landscaped area sufficient for
tree growth between the sidewalk and wall.
Wood trim should be provided around all windows, attic vents, and
doors of the proposed homes.
Design Review Cr-m-~ttee Action:
Members Present: Larry McNiel, Wendy Vallette, Brad Buller
Staff Planner: Steve Hayes
The Committee recommended that the project be forwarded to a
neighborhood meeting, which will occur prior to Planning Commission
review, with the following recommendations:
In order to mitigate the pad elevation and building height
differences between the existing one-story homes to the east of the
site and the two-story units on Lots 9 through 16, all existing
healthy, mature trees should remain in place and additional
specimen size, fast growing trees should be planted in the rear
yards of Lots 9 through 16, to the satisfaction of the Planning
Division.
The applicant should consider relocating the master bedroom windows
from the rear to the side elevation on Lots 9 through 16 to
minimize summer morning sun and views into rear yards of existing
residences to the east.
The units on Lot 10 should be flipped to create a more symmetrical
streetscape appearance at the end of the cul-de-sac street.
DESIGN REVIEW COMMENTS
TT 14405 - HU
AUGUST 4, 1992
Page 4
On lots intended to provide RV storage access to side and rear
yards, the building setback should be increased to 12 feet to
ensure a minimum 10-foot wide area is left free and clear of any
obstructions.
The right side elevations of all models should be significantly
upgraded to the satisfaction of the Planning Division. Suggested
items include, stucco banding, pop-outs and recesses in the
building wall, roof line variety, etc.
The applicant should work closely with staff to ensure that all
wall materials, locations, exterior treatments, and transitions to
adjacent properties conform to City policies and design standards.
The required wood trim around windows should be stuccoed over on
the side and rear elevations.
8. Secondary issues 2 and 3 and all policy issues should be addressed.
Dependent upon the discussion that occurs at the neighborhood meeting
relative to Action Comment NO. 1, the project will either be forwarded
to the Planning Commission with a Committee recommendation of approval
with the referenced comments as conditions or reconsidered by the
Committee, if modified by the applicant.
DESIGN REVIEW COMMENTS
7:10 - 8:00 Scott
August 4, 1992
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 92-17 - CHEVRON - A
request to establish a gas station, foodmart, and car wash within a
previously approved 60-acre commercial retail center in the Regional
Related Comnercial designation (Subarea 4) of the Foothill Boulevard
Specific Plan, located on the south side of Foothill Boulevard between
1-15 and Etiwanda Avenue - APN: 229-031-03 through 13, 15, 16, 20, and
a portion of 59.
The approved Master Plan included a gas station for the location being
proposed. The condition of approval for the master plan required the
establishment of an architectural vocabulary to be provided across the
entire site.
Since that original master plan approval, two workshops have been held
to consider the architectural elements. Additionally, the elevations
for Wal-Mart and In-N-Out have been approved by the Commission. Through
these various reviews, in conjunction with the approval of Price Club
with the master plan, the architectural concept for Foothill Marketplace
has been defined and refined.
Staff Oomments:
The following comments are intended to provide an outline for Committee
discussion:
Major Issues: The following broad issues will be the focus of Committee
discussion regarding this project:
Architecture (foodmart and canopy) should be revised consistent
with the theme established for the center (i.e., wainscot, cornice,
stucco, and color treatments).
Secondary Issues:
time permitting,
issues:
Once all of the major issues have been addressed, and
the Committee will discuss the following secondary
Trees and extensive shrub planting should be installed along the
west property line of the service station.
Because of the large expanse of paving necessary for the service
station operation, landscaping should be increased at every
opportunity.
Decorative paving should be provided throughout the site (i.e.,
around the pump island) to break up the pavement and add interest.
DESIGN REVIEW COMMENTS
CUP 92-17 - CHEVRON
AUGUST 4, 1992
Page 2
4. The canopy columns should be enlarged.
Policy Issues: The following items are a matter of Planning Commission
policy and should be incorporated into the project without discussion:
The retaining wall along the north side of the site should be
finished to match the building (i.e., stucco) and should have a
decorative cap feature.
The trash enclosure should be designed to be consistent with the
design approved for the center including a roll-up door, separate
pedestrian access, overhead trellis, etco
Design Review Committee Action:
Members Present: Larry McNiel, Wendy Vallette, Brad Buller
Staff Planner: Scott Murphy
The Design Review Committee reviewed the proposed gas station and did
not recommend approval. The Committee recommended that the plans be
revised to address the following:
The architectural concept for the gas station (foodmart and canopy)
should be completely revised to provide consistency with the
architectural concept and details approved for the Foothill
Marketplace center. Such revisions may include, but are not
limited to, revising the fascia treatment, stucco color, canopy
column dimensions, wainscot treatment, etc.
The parking configuration at the northeast corner of the site
should be revised to provide a landscape area immediately behind
the center's monument sign location. Additional landscaping
(vertical trees) should be provided to supplement the streetscape
design and screen the canopy and pump islands.
The landscaping along the east side of the site should be increased
through reducing the parking stall dimension from 20 feet to
17 feet. Also, the wheel stops should be eliminated.
Additional pavement treatment should be provided within the site.
This treatment may take the form of the colored and/or sandlbasted
concrete being used at the center entries. Possible locations for
the pavement treatment include the south side of the site adjacent
to the center's drive aisle.
DESIGN REVIEW COMMENTS
CUP 92-17 - CHEVRON
AUGUST 4, 1992
Page 3
The planter area south of the pump island should be enlarged to
accommodate the planting of a specimen tree(s).
The north elevation of the car wash should be redesigned to provide
some additional architectural feature to create a deep shadow line
and recessed appearance to obscure the entry visibility from
Foothill Boulevard.
The grade separation between Foothill Boulevard and the site was
sufficient, taking into account the retaining wall, berming and
landscaping. Raising the pad elevation of the site is not
acceptable.
The applicant should work with staff on revisions to the plan prior to
returning to the Design Review Comittee for further review.