No preview available
HomeMy WebLinkAbout97-019 - ResolutionsRESOLUTION NO. FD 97-019 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE RANCHO CUCAMONGA FIRE PROTECTION DISTRICT ESTABLISHING AND MODIFYING CERTAIN FEES ADOPTED IN RESOLUTION 96-012 RECITALS. The Government Code Section 54992 requires that prior to levying a new fee or increasing an existing fee or service charge, local agencies shall hold a public meeting at which oral or written presentations may be made; and (ii) Notice of the time and place of the hearing has been properly provided; and (iii) No valid request for mailed notice is on file with the City; and (iv) Copies of the required data were made available to the public in the City Clerk's office October 17, 1997; and (v) All legal prerequisites to adoption of this Resolution have occurred. B. RESOLUTION. NOW, THEREFORE, THE City Council of the City of Rancho Cucamonga does hereby resolve that the following fees are established: SECTION 6.0 FIRE PROTECTION DISTRICT FEES 6.1 Plan Checking Fees (Includes plan review and two inspections. required Fire District Permits.) Does not include fee for any Start-up fee for commercial, industrial or multi-family dwelling units .... $82.00 (Paid prior to TRC) Plan Review Fees 1. Single family residence ................................. $132.00 2. Single family residential tract, per phase .................... $132.00 3. Multi-family residential, per building ........................ $677.00 4. Commercial and industrial development, per building .......... $677.00 5. Water plan/underground water supply ...................... $132.00 6. Conditional use permit .................................. $132.00 Resolution No. FD97-019 Page 2 6.2 Permit 7. Minor Development Review .............................. $132.00 8. Parcel Map review ..................................... $132.00 9. Tenant Improvement (per hour, one hour minimum) ............ $87.00 10. Special Events review ................................... $87.00 11. Accessory plans review (aisles, access, seating, etc.) .......... $66.00 12. Application for Alternate Method ........................... $92.00 13. Revision to existing plan (e.g., as-builts, excluding TI plans) ...... $92.00 14. New fire sprinkler systems or standpipes, over 10 heads ....... $164.00 15. Fire sprinkler alteration, ten heads or less .................... $92.00 16. Pre-engineered fire protection systems ..................... $147.00 17. Fire detection and alarm systems ......................... $154.00 18. Flammable finishes spray booth, per booth .................. $164.00 19. LPG tank installation review, per tank ...................... $147.00 20. Underground storage tank removal review, per tank ........... $147.00 21. Flammable and combustible liquid (includes tank and piping) .... $147.00 22. Failure to keep appointment (one hour minimum) .............. $66.00 23. Microfilm charges, per page ............................... $1.00 24. Minor plan review not requiring a Fire District inspection ......... No Fee Inspection Fees (per hour, one hour minimum) 1. Field inspection required after the initial inspection and follow-up.. $110.00 2.' Failure to keep an inspection appointment ................... $66.00 3. Field inspection of self inspection occupancies, failure to comply .. $66.00 4. Witness Fire Flow Test .................................. $87.00 5. Unscheduled field inspection or investigation ................. $66.00 6. Same day, short notice inspection .......................... $87.00 Fees [Initial permit and subsequent renewal of permit unless otherwise indicated (e.g., one time only activity permit)] Permits 1. 2. 3. 4. 5. 6. 7. General Use Permit ..................................... $82.00 Aerosol products, more than 500 lbs. of Level 2 or Level 3 ...... $131.00 Aircraft refueling vehicles ................................ $95.00 Aircraft repair hangar .................................... $84.00 Automobile wrecking yard ................................ $82.00 Asbestos removal ..................................... $132.00 Bowling pin or alley refinishing (involving flammable finishes) ..... $82.00 Resolution No. FD97-019 Page 3 8. Candles and open flames in assembly areas ........... Not Permitted 9. Carnivals and fairs (see 6.2.11.D) .......................... $132.00 10. Cellulose nitrate film .................................... $82.00 11. Cellulose nitrate storage, more than 25 lbs ................... $84.00 12. Combustible fiber storage, more than 100 cubic feet ........... $82.00 13. Combustible fiber storage, more than 2,500 cubic feet ......... $115.00 14. Compressed gases: a. Corrosive, 200 cubic feet or more ................... $95.00 b. Flammable, 200 cubic feet or more .................. $84.00 c. Highly toxic, any amount .......................... $95.00 d. Inert/Simple asphyxiant, 6000 cubic feet or more ....... $85.00 e. Irritant, 200 cubic feet or more ..................... $84.00 f. Other health hazards, 650 cubic feet or more .......... $84.00 g. Oxidizing, including oxygen, 504 cubic feet or more ..... $84.00 h. Pyrophoric, any amount .......................... $95.00 i. Radioactive, any amount ......................... $98.00 j. Sensitizer, 200 cubic feet or more ................... $95.00 k. Toxic, any amount .............................. $95.00 I. Unstable and/or reactive, any amount ............... $132.00 15. Commercial rubbish-handling operations .................... $84.00 16. Cryogens: a. Corrosive-inside, over 1 gallon ..................... $95.00 b. Corrosive-outside, over 1 gallon .................... $95.00 c. Flammable-inside, over I gallon .................... $84.00 d. Flammable-outside, 60 gallons or more .............. $84.00 e. Highly toxic-inside, over 1 gallon .................... $95.00 f. Highly toxic-outside, over 1 gallon ................... $95.00 g. Nonflammable-inside, 60 gallons or more ............. $95.00 h. Nonflammable-outside, 500 gallons or more ........... $84.00 i. Oxidizer-inside, 50 gallons or more .................. $84.00 j. Oxidizer-outside, 50 gallons or more ................. $84.00 17. Dry cleaning plants .................................... $132.00 18. Dust-producing operations ............................... $84.00 19. Explosives or blasting agents: a. Storage, manufacture, process or sell ............... $84.00 b. Use of explosives or blasting agents ................ $150.00 20. Fire hydrants and water-control valves used for other purposes... $84.00 Resolution No. FD97-019 Page 4 21. 22. Fireworks: a. Retail sales .............................. Not Permitted b. Aerial displays .................................. $84.00 Flammable or combustible liquids: a. Pipeline, to use, operate, repair or modify a pipeline ....$132.00 b. Class I liquids, more than 5 gal./inside bldg ............$84.00 c. Class I liquids, more than 10 gal./outside bldg ..........$84.00 Exceptions to b & c: 1. Storage or use of Class I liquids in vehicle, vessel, aircraft or equipment fuel tanks. 2. Storage or use of paints, oils, varnishes, or similar mixtures for maintenance, painting or similar purposes for less than 30 days. d. Class II or II-A liquids, more than 25 gallons inside a building ............... $84.00 e. Class II or II-A liquids, more than 60 gallons outside of a building ............ $84.00 f. To remove Class I or II liquids from an UST by other than normal operation .......... $95.00 g. Installation, construction, alteration, or operation where flammable or combustible liquids are produced, processed, transported, stored, dispensed or used in any of the following: Tank vehicles .............. $95.00 Equipment ............... $105.00 Tanks, per tank ............ $121.00 Plants ................... $132.00 Terminals ................ $132.00 Wells, per well ............. $84.00 Fuel - dispensing stations (single and/or multiple pump stations) .................. $95.00 Refineries ................ $132.00 Distilleries ................ $132.00 h. Installation, alteration, removal, abandon, place temporarily out of service or otherwise dispose of a tank which contained flammable or combustible liquid ...... $132.00 Resolution No. FD97-019 Page 5 23. 24. 25. f. g. h. i. To change the type of contents in a flammable or combustible liquid .............................. $132.00 Fruit ripening process .................................. $105.00 Fumigation or thermal insecticidal fogging ................... $121.00 Hazardous materials: For multiple permits within this item, the fee will be the total of all related permits to a maximum of $400.00: Carcinogens, 10 lbs. or more ..................... $132.00 Corrosive liquids, 55 gallons or more ................ $84.00 Corrosive solids, 500 lbs. or more ................... $95.00 Flammable solids, 100 lbs. or more ................. $95.00 Highly toxic liquids and solids, any amount ............ $95.00 Irritant liquids, 55 gallons or more ................... $84.00 Irritant solids, 500 lbs. or more Oxidizing liquids: Class Class Class Class i. Oxidizing solids: ..................... $84.00 4, any amount ........ $84.00 3, 10 lbs. or more ...... $84.00 2, 100 lbs. or more ..... $84.00 1, 500 lbs. or more ..... $84.00 Class 4, any amount ........ $84.00 Class 3, 10 lbs. or more ...... $84.00 Class 2, 100 lbs. or more ..... $84.00 Class 1, 500 lbs. or more ..... $84.00 Organic peroxide liquids and solids: Class I, any amount ......... $95.00 Class II, any amount ........ $95.00 Class III, any amount ........ $95.00 Class IV, 20 lbs. or more ..... $95.00 k. Other health hazards: Liquids, 55 gallons or more .... $84.00 Solids, 500 lbs. or more ...... $84.00 I. Pyrophodcliquids, any amount ..................... $95.00 m. Pyrophoric solids, any amount ..................... $95.00 n. Sensitizer liquids, 55 gallons or more ................ $95.00 o. Sensitizer solids, 500 lbs. or more .................. $95.00 p. Toxic liquids, 10 gallons or more .................... $95.00 q. Toxic solids, 100 lbs. or more ...................... $95.00 Resolution No. FD97-019 Page 6 Unstable (reactive)liquids: Class 4, Class 3, Class 2, Class 1, Unstable (reactive) solids: Class Class Class Class t. Water-reactive liquids: u. Water-reactive solids: any amount ....... $132.00 any amount ....... $132.00 5 gallons or more... $132.00 10 gallons or more.. $132.00 4, any amount ....... $132.00 3, any amount ....... $132.00 2, 50 lbs. or more ..... $132.00 1, 100 lbs. or more .... $132.00 Class 3, any amount ........ $95.00 Class 2, 5 gallons or more .... $95.00 Class 1, 10 gallons or more... $95.00 Class 3, any amount ........ $95.00 Class 2, 50 lbs. or more ..... $95.00 Class 1, 10 gallons or more... $95.00 26. Hazardous production materials for Group H Division 6 Occupancies.. $132.00 27. High piled combustible storage ............................ $99.00 28. Liquefied petroleum bases (store, use, handle, or dispense) ...... $84.00 29. Liquid or gas-fueled vehicles or equipment in assembly buildings. $105.00 30. Lumber yards ......................................... $84.00 31. Magnesium workings ................................... $121.00 32. Mall, covered .......................................... $84.00 33. Motor vehicle fuel-dispensing stations ...................... $100.00 34. Open burning ...................................... No Charge 35. Organic coatings ...................................... $132.00 36. Ovens, industrial baking or drying .......................... $84.00 37. Places of assembly: a. A-4 (stadiums, reviewing stands and amusement parks) $84.00 b. A-3 (occupant load of 50 - 299, without a stage) ........ $95.00 c. ^-2.1 (occupant load of 300 or more without a stage)... $147.00 d. A-2 (occupant load of less than 1,000 with stage) ...... $169.00 e. A-1 (occupant load of 1,000 or more with stage) ....... $225.00 38. Pyrotechnical special effects material (see 6.2.11.D) ............ $84.00 39. Radioactive materials .................................. $132.00 40. Refrigeration equipment ................................ $115.00 Resolution No. FD97-019 Page 7 41. Repair garages ........................................ $84.00 42. Spraying or dipping ..................................... $84.00 43. Tents, canopies and temporary membrane structures: a. 201 - 400 square feet ............................ $84.00 b. 401 - 1,500 square feet .......................... $110.00 c. 1,501 ~ 15,000 square feet ....................... $147.00 d. 15,001 - 30,000 square feet ...................... $178.00 e. Over 30,000 square feet ......................... $210.00 44. Tire storage .......................................... $132.00 45. Welding and cutting operations ............................ $84.00 6.2.1!. SPECIAL SERVICES. Excessive or malicious false alarms causing response of Fire Distdct apparatus and crew: 1. Response due to "Failure to Notify" the Fire Distdct when working on or testing sprinkler or fire alarm system. $153.00 per hour per piece of Fire District apparatus and crew responding -- '/2 hour minimum charge. Malicious false alarms. $153.00 per hour per piece of Fire District apparatus and crew responding - 1/2 hour minimum charge. Response due to alarm malfunction. $153.00 per hour per piece of Fire District apparatus and crew responding to all false alarms in excess of 2 false alarms in 30 days -- '/2 hour minimum charge. Response to false alarms due to negligence, tampering with the system, construction or modification of the building. $153.00 per hour per piece of Fire District apparatus and crew responding -- 1/2 hour minimum charge. 5. Response to false alarm by Battalion Chief and/or Fire Inspector. $$0.00 per hour -- '/2 hour minimum charge. Resolution No. FD97-019 Page 8 Response to firesetter incidents (juvenile or adult) and "DUI" callouts: 1. Cost recovery for Fire District apparatus responding. $2.50 per minute per piece of equipment. 2. Cost recovery for crew responding. $ .83 per minute per piece of equipment. 3. Cost recovery for Battalion Chief or Fire Investigator responding. $ .45 per minute. Response to mitigate extended hazardous chemical and material incidents beyond normal service requests. (This includes response to railroad properties, freeways, and aircraft crashes). 1. Hazardous incident, overhead and command, per hour. $273.00 per hour per Fire District apparatus and crew. Fire District apparatus and crew assigned to the incident, per hour. $170.00 per hour per Fire District apparatus and crew. 3. Specialized resources (HAZMAT crews and equipment). Actual Costs 4. Materials and supplies used for the incident. Actual Costs Special Activities (Fire Distdct apparatus and crews assigned to activities that require the services, at permittee's expense, of one or more standby firefighters). $153.00 per hour per Fire District apparatus and crews $30.00 per hour per additional Fire District employee, two hour minimum charge Accelerant Detection Canine Team (Use of Arson K-9 Team by other agencies) Resolution No. FD97-019 Page 9 1. Fire Scene Examinations: $50.00 per hour, two hour minimum charge 2. Hourly Travel Rate: $25.00 per hour, one hour minimum charge (to and from search area) 3. Mileage (round trip): $ .35 per mile 4. Administrative Reports: $25.00 per hour 5. Mounted Photographs: $1.50 each Board of Appeals (Filing fee to appeal an item requiring a special meeting) $245 per appeal C. EFFECTIVE DATE. This Resolution shall become effective with its adoption. PASSED, APPROVED, AND ADOPTED this 17th day of December, 1997. AYES: NOES: ABSENT:: ABSTAINED:: Alexander, Biane, Curatalo, Williams None Gutierrez None William J. ~~exa , ' Resolution No. FD97-019 Page 10 A'I-FEST: I, DEBRA J. ADAMS, SECRETARY of the Rancho Cucamonga Fire Protection District, do hereby certify that the foregoing Resolution was duly passed, approved, and adopted by the Board of Directors of the Rancho Cucamonga Fire Protection District, at a regular meeting of said Board held on the 17th day of December, 1997. Executed this 18th day of December, 1997, at Rancho Cucamonga, California.