HomeMy WebLinkAbout91-018A - ResolutionsRESOLUTION NO. FD 91-018-A
RESOI/3TION OF THE tK]ARD OF DIRECiEe~ OF THE
CUCAM3NC4~ FIRE PROTECT/ON DI STRICT, CITY OF
RANC~0Ct~/~A, E OF SAN BtEIn/~)INO, glRTE OF
CAI~F~NIA, AMt~DING RESOI//EION NO. 91-018 TO CLARIFY
ISSUANCE
WHt~EAS, the Board of Directors of the Rancho Cucamonga Fire
Protection District ba~ adopted Resolution No. 91-018 which sets fees
reasonably borne fren special services and activities; and
NOW, THEREPEe~, the Board of Directors of the Rancho Cucamonga Fire
Protection District does hereby resolve that clarification to verbiage
regarding permit is~,ance is made without any change to fees:
Section 6.0 Fire Protection District Fees
6.1 Plans Checking and Inspections
6.1.1 Start-up fee for c~m~ercial, irrlustrial or multi-
family dwelling units (paid prior to ~RC) ......... $ 75.00
6.1.2 Plan review: building and/or system(s) inspection
A. Single family residential ..................... $ 120.00
B. Non-Residential development and nulti-family
Residential dwelling .......................... $ 620.00
C. Interior and/or exterior bailding alteration..$ 190.00
D. New Sprinkler Systems or over 10 heads ........ $ 150.00
Ten heads or less (alteration only) ........... $ 85.00
E. Fixed fire-extinguishing systems (i.e. carbon
dioxide, potassium bicarbonate, halon, etc.)..$
35.00
F. Fire Alarm Systems ............................ $ 140.00
G. The charge for any revision of a previously approved plan or
a change request (form FSD-2) for any of the above, shall be
$85.00 per hour for the estimated time spent in review but not
less than 25% of the original fee.
H. Failure to keep consultation or field in~ion
appointment without notification (one hour minimum)
.................................................. $
60.00
I. Division consultation fees not otherwise stated (except
phone consultations) (one hour minimum) ........... $ 125.00
Resolution No. FD 91-018-A
Page 2
J. Fire flow test (one hour) ..................... $ 40.00
K. Consultant plan check fee shall be paid by
developer/contractor or owner, and shall be paid prior to
plan approval ..................................... $ 40.00
the
L. Field inspection requiring more than the initial
inspection, plus one follow-up .................... $ 100.00
M. Field inspection of self-inspection occupancies who
have refused to oonduct their own inspection ...... $ 54.00
1. Original application/plan check/tank inspection
........................................... $ 135.00
2. Tankremoval .............................. $ 115.00
3. Inspection(s) resulting frumleaksofunauthorized
discharge ................................. $ ~o.oo
O. Hazardous chemicals: application/plan check/inspection
(storage, handling or use as a solid, liquid or gas, other than
~ tanks)
1. 55 gallons corrosive liquid ................ $ 80.00
2. 500 pounds oxidizing material .............. $ e0.00
3. 10 pounds organic or in~ganic peroxides...$ 9O.OO
4. 5OO pounds nitr~m~/~ne .................... $ 90.00
5. 1,000 pounds anmDnia nitrate or fertilizer mixture
(any amount of highly toxic material, pyrophoric,
hypergolic, cryogenic material, poisonous gas or
radioactive material) ...................... $ 90.00
6. Any reactive, unstable or other hazardous
material not herein classified (extent or hazard
and allowable amount to be stored to be
~ by the Fire Marshal) ............ $ 125.00
P. Explosives and blasting agents:
c~eck/~ion
Application/plan
1. Manufacture, possess, store or sell ........ $ 95.00
2. To useexplosives or blastingagents ....... $ 140.00
Q. Fumigation and thermal insecticidal fogging when toxic
flammable flmligant is used: application/plan check/
inspection .......................................... $ 110.00
Resolution No. FD 21-018-A
Page 3
Section 6.2 Permit Fees
I. Permits (annual issuance or as otherwise noted)
General Use Pexmit shall be required for any activity or
operation not specifically described below, which in the
judgment of the Fire Chief is likely to produce conditions
hazardous to life or property. (UFC 4.101)
............................................... $ 75.oo
Storage of readily cumbastile material (UFC 11.203)
............................................... $ 105. oo
Places of Assembly (except churches and schools)
25. lol)
(UFC
1. A-3, 50-299 without stage .................. $
2. A-2.1, 300 or more without stage ........... $
3. A-2, 999 or less with stage ................ $
4. A-i, 1000 or more with stage ............... $
85.00
135.00
155.00
205.00
D. Bowling alleyandpinrefinishing (UFC 26,102).$ 75.00
Cellulose nitrate plastic (Pyroxylin) (UFC 27. 102)
............................................... $ 75.00
Cnmbustjhle fibers storage and handlirrjexoe~ 100
cubic feet (UFE 28,102) ........................ $ 75.00
Garages
Motor vehicle repair (H-4) (UFC 29.102) ........ $
75.00
Lumber yards (over 100,0~ board feet) (UFC 30.101)
............................................... $ 75.00
I. Tire rebuilding plants (UFC 31.102 ............. $ 120.00
A_u~~yards ............................ $ 75.00
Junk orwastematerialhandlingplants (UFC 34.102)
Flammable finishes ............................. $ 75. O0
Spraying or dipping operations, spray booths, dip tanks,
electrostatic apparatus, autcmDbile undercoating, powder
(IEE 45,102) (per spray booth)
Magnesium (more than 10 pc.,~nds per day) (UFC 48.102)
............................................... $ 115.00
M. Oil burning equipment operations (UFC 61,102)..$ 75.00
Resolution No. FD 91-018-A
Page 4
Ovens (industrial baking and drying) (UFC 62.102)
............................................... $ 75.00
Mechanical refrigeration (over 20 pounds of refrigerant)
(UFC 63.101) ................................... $ 105. O0
Ocm{~L~ed gases (store, handle or us exceeding 100 cubic
feet) (UFC 74.103 )
1. non flammable over 100 cubic feet and up to 5,999
cubic feet ................................. $
2. non flammable 6,000 to 12,000 cubic feet... $
3. non-flammable over 12,000 cubic feet ....... $
4. flammable over 100 cubic feet and up to
1,999 cubic feet ........................... $
5. flammable 2,000 to 6,000 cubic feet ........ $
6. flammable over 6,000 cubic feet ............ $
110.00
130.00
195.00
75.00
125.00
125.00
Cryogenic fluids (storage, handling or use)
(E75.103) ................................... $
75.00
Dust-producingprocessesandequipment (UFC75.103)
............................................... $ 80.00
Flammable and combustible liquids (storage or handling or
use) (UPC79.103)
1. auto fueling station (B-l) ................. $ 90.00
2. inside st. rage, less than 60 gallons ....... $ 80.00
3. inside storage, more than 60 gallons ....... $ 115.00
4. outside storage, more than 5000 gallons
(UFC.79.402) ............................... $ 115.00
High piledcombustible stock (UFC 81-103) ...... $ 90.00
Liquifiedpetroleumgas (store, handle, transport
or use more than 120 gallons) (UFC 82.102) .... $ 75.00
Matches (more than60Matdmen'sgross) (UFC 83.101)
............................................... $ 75.00
Welding and cutting operations to conduct welding and/or
cutting operations in any occupancy (UFC 49.101)
............................................... $ 75.00
Alarm company permits (to install units within Fire
District) annual permit ........................ $ 95.00
Resolution No. FD 91-018-A
Page 5
Ae
Board of appeals fee (to file an appeal and requiring a
special meeting) ............................... $ 225.00
Excessive or malicious false alarms causing response of
fire apparatus
Code 3 response due to "failure to notify"
fire department when working on or testing sprinkler
or fire alarm system
$140.00 per hour per piece emergency apparatus
respo~g 1/2 hoLar m4.~.w~
Trouble alarm Code 2 response due to failure to
notify fire department when working on or testing
system
$70.00 per hour per piece of emergency
ap[mratus respona~ng 1/2 hour m{n{..w.
3. Malicious false ale
$140.00 per hour per piece of emergency apparatus
~4TV/With 1/2 hOUr m';n'iwmwn
4. Ale system malfunction resulting in Emergency Code
3 response
$140.00 per hour per piece of emergency apparatus
respona~ng to all false ~m~ in excess of 2 false
~l:.T'm.q in 30 days with 1/2 hour m4n'twmae
5. Alarm systems malfunction resulting in a trouble
alarm Code 2 response
$70.00 per hour per piece of emergency apparatus
r-~poN~ng to all trouble ~lRmq in excess of 2 in
30 days with 1/2 hour m*in4nnm~
Code 3 response to false alarms due to negligeax~,
tamperir~ with system cc~struction or modification
of bailding
$140.00 per hour per piece of emergency apparatus
~*iTY/With 1/2 hour m4.~..~
Resolution No. FD 91-018-A
Page 6
P~sponse to mitigate extended hazardous chemical and
material incidents beyend normal service request (this
includes respcaee to railroad properties, freeways, and
aircraft cra~-~hes)
1. Hazardous incident, per hour
$235 per hour per piece of apparatus
$95.00 per hour per piece of equipment
3. SquadP~
$75.00 per hour
4. Cc~pany with Battalion (hief
$140.00 per hour
5. Hazardous materials or major transportation
incident response due to negligence
$150.00 per hour per piece of equipment
6. Response to mitigate major transportation incidents
(may include but not be limited to jetliner crash,
railroad detailmerit or collision, or major freeway
collision with extraordinary c~)
$150.00 per hour per piece of apparatus
Special Activities -- One time events (ccebination of plan
check, fire permit, field insEBction. These events may
need the services, at permittees expense, of one or more
standby fire~n).
1. Fireworks--public display (UFC Article 78)
$75.00 plus $140.00 per hour per piece of apparatus
2. Specialty public displays and/or sales (i.e.
Christmas tree lots, pumpkin sale lots) .... $ 45.00
3. Corrluctir~ any blasting operation (for each four
hour period or fraction thereof)
$100 plus $140.00 per hour per piece of apparatus
4. Special events (public assembly, stage tExxluctions,
Resolution No. FD 91-018-A
Page 7
III.
a. Less than 30,000 scpm~e feet at an occupant
load of 2,000, whichever is more restrictive
....................................... $ 125. oo
3,000 square feet or more, bat less than
60,000 square feet or an occupant load of
more than2,000k~tt lessthan4,000,
whichever is morerestrictive .......... $
60,000 scUmare feet or more, bat less than
90,000 sc~mre feet or an occupant load of
more than4,000but less than 6,000
whichever is morerestrictive .......... $
165.00
200.00
90,000 s~a~e feet or morewithanoccupant
load of 6,000 or more, whichever is more
restrictive ............................ $ 235.00
Tents and air-supportedstructures (UFCArticle 32)
a. Less than 400 square feet .................. $
b. 401 to 1500 sq. ft ......................... $
c. 1501to 15,000 sq. ft ...................... $
d. 15,001 to 30,000 sq. ft .................... $
e. over30,000 sq. ft ......................... $
Repeal of Resolution
This Resolution repeals Resolution 91018.
PASSED, ~, and ADOPTED this 5th day of August,
AYES: Alexander, Buquet, Stout, Williams, Wright
NOES: None
ABSenT: None
75.00
100.00
130.00
160.00
190. O0
1992.
Resolution No. FD 91-018-A
Page 8
Secretary
I, DNRwA J. ADAMS, S~CREIRRY of the Rancho Cucamonga Fi~e Protection
District do hereby certify that the foregoing P~solution was duly passed,
approved, and adopted by the Board of Directors of the Rancho Cucamonga Fire
Protection District, at a regular meeting of said Board held on the 5th day of
AucJust, 1992.
Executed this 6th day of August, 1992, at Rancho Cucamonga,
California.