Loading...
HomeMy WebLinkAbout89-132A - Resolutions RESOLUTION NO. 89-132A A RESOLUTION OF THE PLANNING COMMISSION APPROVING CERTAIN MODIFICATIONS TO CONDITIONS OF APPROVAL RELATING TO THE TIMING OF ON-SITE IMPROVEMENTS FOR DEVELOPMENT REVIEW NO. 89-14 FOR TWO MANUFACTURING BUILDINGS TOTALING 26,000 ON 39.3 ACRES OF LAND IN THE HEAVY INDUSTRIAL DISTRICT, SUBAREA 15 OF THE INDUSTRIAL SPECIFIC PLAN, LOCATED AT 12167 ARROW ROUTE, AND MAKING FINDINGS IN SUPPORT THEREOF, APN: 229-121-15 . A. Recitals . (i) AMPAC, Inc. , received approval from Rancho Cucamonga Planning Commission for the approval of Development Review 89-14 , with conditions included , in Resolution No. 89-132, on October 11 , 1989. (ii ) AMPAC, Inc . filed an application for the approval of modifications to conditions of approval for Development Review No. 89-14 as described in the title of this Resolution. Hereinafter, the subject Development Review request is referred to as "the application ." ( iii) On the 22nd of August, 1990, and continued to the 12th of September 1990, the Planning Commission of the City of Rancho Cucamonga conducted a meeting on the application and concluded said meeting on that date. ( iv) All legal prerequisites prior to the adoption of this Resolution have occurred . B. Resolution . NOW, THEREFORE, it is hereby found, determined , and resolved by the Planning Commission of the City of Rancho Cucamonga as follows : 1 . This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2 . Based upon substantial evidence presented to this Commission during the above-referenced meetings on August 22 and September 12 , 1990, including written and oral staff reports, this Commission hereby specifically finds as follows : (a) The application applies to property located at 12167 Arrow Route with a street frontage of 521 .81 feet and lot depth of 2350.02 feet and is presently improved with two buildings and related parking areas . (b) The property to the north of the subject site is vacant, the property to the south of that site consists of vacant land, the property to the east is a winery and vacant, and the property to the west is vacant. PLANNING COMMISSION RESOLUTION NO. 89-132A MODIFICATIONS - DR 89-14 September 12, 1990 Page 2 (c ) The application contemplates the deferral of on-site landscaping along the southern boundary of this site and the deferral of the Arrow Route streetscape and decorative screen wall , west of the approved driveway location. (d) The proposed Metropolitan Water District project, the completion of Day Creek Channel , and the construction of a storm drain connection to Day Creek Channel would result in the demolition of landscape and irrigation and wall improvements. (e) The City Traffic Engineer has reviewed the access locations on Arrow Route and determined that additional locations do not exist which could comply with all City codes and policies for access along major arterials. 3. Based upon the substantial evidence presented to this Commission during the above-referenced meetings and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: 4. This Commission hereby finds and certifies that the project has been reviewed and considered in compliance with the California Environmental Quality Act of 1970 and that a Negative Declaration was issued on October 11, 1989. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby modifies its Resolution No. 89- 132 by modifying Planning Condition #4, adding Planning Condition #14, and modifying Standard Condition Site Development #1, to read as follows: 4) An additional landscaped area shall be provided along the southern boundary of the project site. The design of the planters and locations of trees shall take into account the permanent drainage facilities required for proper drainage of the site to the future Day Creek Channel . Said landscaped area shall be shown on the detailed landscape/irrigation plans, which shall be reviewed and approved by the City Planner prior to the issuance of building permits. Due to the pending completion of Day Creek Channel , said landscaping may be deferred until 90 calendar days following the completion of the storm drain facility at the south property line subject to a performance agreement, including rights-of-entry and security. PLANNING COMMISSION RESOLUTION NO. 89-132A MODIFICATIONS - DR 89-14 September 12, 1990 Page 3 14) Due to the disruption by the proposed Metropolitan Water District (MWD) project, the completion of the portion of landscaping and screen wall within the MWD construction easement may be deferred until 90 calendar days following the completion of the MWD project subject to a performance agreement, including rights-of-entry in favor of the City and security. Standard Condition Site Development 1. The site shall be developed in accordance with the approved plans on file in the Planning Division, the conditions contained herein, and Development Code regulations. Prior to any use of the project site or business activity being commenced thereon, all conditions of approval shall be completed to the satisfaction of the City Planner, except phasing of certain on-site improvements may be allowed where noted. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 12TH DAY OF SEPTEMBER, 1990. PLANNING COMMI ` ION OF THE CITY OF RANCHO CUCAMONGA BY: AA' AA a ca - La ry .iiii Niel , Ch. • 'r (ATTEST: A«I � `L ;rad ar eV I , Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 12th day of September 1990, by the following vote-to-wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS : ABSENT: COMMISSIONERS :