HomeMy WebLinkAbout89-132A - Resolutions RESOLUTION NO. 89-132A
A RESOLUTION OF THE PLANNING COMMISSION APPROVING
CERTAIN MODIFICATIONS TO CONDITIONS OF APPROVAL RELATING
TO THE TIMING OF ON-SITE IMPROVEMENTS FOR DEVELOPMENT
REVIEW NO. 89-14 FOR TWO MANUFACTURING BUILDINGS
TOTALING 26,000 ON 39.3 ACRES OF LAND IN THE HEAVY
INDUSTRIAL DISTRICT, SUBAREA 15 OF THE INDUSTRIAL
SPECIFIC PLAN, LOCATED AT 12167 ARROW ROUTE, AND MAKING
FINDINGS IN SUPPORT THEREOF, APN: 229-121-15 .
A. Recitals .
(i) AMPAC, Inc. , received approval from Rancho Cucamonga Planning
Commission for the approval of Development Review 89-14 , with conditions
included , in Resolution No. 89-132, on October 11 , 1989.
(ii ) AMPAC, Inc . filed an application for the approval of
modifications to conditions of approval for Development Review No. 89-14 as
described in the title of this Resolution. Hereinafter, the subject
Development Review request is referred to as "the application ."
( iii) On the 22nd of August, 1990, and continued to the 12th of
September 1990, the Planning Commission of the City of Rancho Cucamonga
conducted a meeting on the application and concluded said meeting on that
date.
( iv) All legal prerequisites prior to the adoption of this Resolution
have occurred .
B. Resolution .
NOW, THEREFORE, it is hereby found, determined , and resolved by the
Planning Commission of the City of Rancho Cucamonga as follows :
1 . This Commission hereby specifically finds that all of the facts
set forth in the Recitals, Part A, of this Resolution are true and correct.
2 . Based upon substantial evidence presented to this Commission
during the above-referenced meetings on August 22 and September 12 , 1990,
including written and oral staff reports, this Commission hereby specifically
finds as follows :
(a) The application applies to property located at 12167 Arrow
Route with a street frontage of 521 .81 feet and lot depth of 2350.02 feet and
is presently improved with two buildings and related parking areas .
(b) The property to the north of the subject site is vacant,
the property to the south of that site consists of vacant land, the property
to the east is a winery and vacant, and the property to the west is vacant.
PLANNING COMMISSION RESOLUTION NO. 89-132A
MODIFICATIONS - DR 89-14
September 12, 1990
Page 2
(c ) The application contemplates the deferral of on-site
landscaping along the southern boundary of this site and the deferral of the
Arrow Route streetscape and decorative screen wall , west of the approved
driveway location.
(d) The proposed Metropolitan Water District project, the
completion of Day Creek Channel , and the construction of a storm drain
connection to Day Creek Channel would result in the demolition of landscape
and irrigation and wall improvements.
(e) The City Traffic Engineer has reviewed the access
locations on Arrow Route and determined that additional locations do not exist
which could comply with all City codes and policies for access along major
arterials.
3. Based upon the substantial evidence presented to this Commission
during the above-referenced meetings and upon the specific findings of facts
set forth in paragraphs 1 and 2 above, this Commission hereby finds and
concludes as follows:
4. This Commission hereby finds and certifies that the project has
been reviewed and considered in compliance with the California Environmental
Quality Act of 1970 and that a Negative Declaration was issued on October 11,
1989.
5. Based upon the findings and conclusions set forth in paragraphs
1, 2, 3, and 4 above, this Commission hereby modifies its Resolution No. 89-
132 by modifying Planning Condition #4, adding Planning Condition #14, and
modifying Standard Condition Site Development #1, to read as follows:
4) An additional landscaped area shall be
provided along the southern boundary of the
project site. The design of the planters and
locations of trees shall take into account the
permanent drainage facilities required for
proper drainage of the site to the future Day
Creek Channel . Said landscaped area shall be
shown on the detailed landscape/irrigation
plans, which shall be reviewed and approved by
the City Planner prior to the issuance of
building permits. Due to the pending
completion of Day Creek Channel , said
landscaping may be deferred until 90 calendar
days following the completion of the storm
drain facility at the south property line
subject to a performance agreement, including
rights-of-entry and security.
PLANNING COMMISSION RESOLUTION NO. 89-132A
MODIFICATIONS - DR 89-14
September 12, 1990
Page 3
14) Due to the disruption by the proposed
Metropolitan Water District (MWD) project, the
completion of the portion of landscaping and
screen wall within the MWD construction
easement may be deferred until 90 calendar
days following the completion of the MWD
project subject to a performance agreement,
including rights-of-entry in favor of the City
and security.
Standard Condition
Site Development
1. The site shall be developed in accordance with
the approved plans on file in the Planning
Division, the conditions contained herein, and
Development Code regulations. Prior to any
use of the project site or business activity
being commenced thereon, all conditions of
approval shall be completed to the
satisfaction of the City Planner, except
phasing of certain on-site improvements may be
allowed where noted.
6. The Secretary to this Commission shall certify the adoption of
this Resolution.
APPROVED AND ADOPTED THIS 12TH DAY OF SEPTEMBER, 1990.
PLANNING COMMI ` ION OF THE CITY OF RANCHO CUCAMONGA
BY: AA' AA a ca
- La ry .iiii Niel , Ch. • 'r
(ATTEST: A«I � `L
;rad ar eV
I , Brad Buller, Secretary of the Planning Commission of the City of Rancho
Cucamonga, do hereby certify that the foregoing Resolution was duly and
regularly introduced, passed, and adopted by the Planning Commission of the
City of Rancho Cucamonga, at a regular meeting of the Planning Commission held
on the 12th day of September 1990, by the following vote-to-wit:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS :
ABSENT: COMMISSIONERS :