HomeMy WebLinkAbout14-24 - Resolutions RESOLUTION NO. 14-24 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2013-00966, A PROPOSAL TO DEVELOP A 23,675 SQUARE FOOT INDUSTRIAL/WAREHOUSE BUILDING ON A 1.25-ACRE PARCEL WITHIN THE GENERAL INDUSTRIAL(GI) DISTRICT, LOCATED AT 8705 AND 8725 9TH STREET; MAKING FINDINGS IN SUPPORT THEREOF —APN: 0207-271-14 AND -28. A. Recitals. 1. Ranchwood Holdings, LLC filed an application forthe issuance of Development Review DRC2013-00966, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 9th day of July 2014,the Planning Commission of the City of Rancho Cucamonga conducted a duly notice public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced meeting on July 9, 2014, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to two (2) parcels with a combined area of approximately 54,319 square feet (1.25 acres); and b. The project site is comprised of two (2) rectangular-shaped parcels and is approximately 230 feet (east to west) and a depth of approximately 330 feet (north to south); and C. The site has two (2) single-family residences on the site that will be demolished. The structures on the site do not have any historical significance; and d. The property is bound on the south vacant land; to the west by industrial office/warehouse buildings; to the east by a radio station building; and to the north across 9th Street by condominiums and a single-family residence; and e. The zoning of the property is General Industrial (GI) District. The zoning of the properties to the north are General Industrial (GI) District and Medium (M) Residential District. The zoning of the properties to the south is General Industrial (GI) District. The zoning of the properties to the west is Industrial Park (IP) District; and PLANNING COMMISSION RESOLUTION NO. 14-24 DEVELOPMENT REVIEW DRC2013-00966— RANCHWOOD HOLDINGS, LLC July 9, 2014 Page 2 f. The applicant proposes to construct a 23,675 office/warehouse building; and g. The application contemplates warehouse tenants. As defined in Development Code Section 17.30.030, "light" and "medium" warehouse uses are permitted in this development district. Other potential uses that are permitted, subject to the availability of parking on-site, include "custom" and "light" manufacturing; and h. The applicant is required to provide 33 parking stalls. They have provided 35 parking stalls; and i. This application is in conjunction with Tree Removal Permit DRC2014-00608; and j. A review and request for approval of land uses are not included in this application. 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed development is in accord with the General Plan,the objectives of the Development Code, and the purposes of the district in which the site is located. The proposed project is an industrial office/warehouse building. The underlying General Plan designation is General industrial. b. The proposed development,togetherwith the conditions applicable thereto,will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The proposed land use is consistent with the land uses of the surrounding community. The zoning of the properties to the north, south, and east are General Industrial (GI) District. The zoning of the properties to the northwest is Medium (M) Residential District and the zoning of the properties to the west is Industrial Park (IP) District. C. The proposed development complies with each of the applicable provisions of the Development Code. The proposed development meets all standards outlined in the Development Code and the design and development standards and policies of the Planning Commission and the City. The proposal does not contemplate any review and action for land use entitlements. 4. The Planning Department staff has determined that the project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA Guidelines. The project qualifies under as a Class 32 exemption under State CEQA Guidelines Section 15332 In-Fill Development projects because the project is consistent with the applicable General Plan and zoning designations, and is located within the City limits on a project site less than 5 acres. The site has no value as habitat for endangered, rare or threatened species and the site is adequately served by all required utilities and public services and will not result in any significant effects relating to traffic, noise, air quality, or water quality and there is no substantial evidence that the project may have a significant effect on the environment. The Planning Commission has reviewed the Planning Department's determination of exemption, and based on its own independent judgment, concurs in the staffs determination of exemption. PLANNING COMMISSION RESOLUTION NO. 14-24 DEVELOPMENT REVIEW DRC2013-00966 — RANCHWOOD HOLDINGS, LLC July 9, 2014 Page 3 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the construction of a 23,675 square foot office/warehouse buildings, within the General Industrial (GI) District, located at 8705 and 8725 9th Street- APN: 0207-271-14 and -28. 2) Proposed land uses requiring a Conditional Use Permit as identified in Table 17.30.030 of the Development Code, shall require a separate review and approval by the Planning Manager and/or Planning Commission prior to submittal of documents for plan check, issuance of a Business License, and building occupancy. 3) Downspouts shall not be visible from the exterior on any elevations of the building. All downspouts shall be routed through the interior of the building walls. 4) The output surface (face) of all lamp heads on wall-mounted light fixtures and the light standards shall be parallel to the ground in order to eliminate glare and minimize lighting on adjacent properties. The maximum height of light standards, including the base, measured from the finished surface is 25 feet. 5) New walls, including retaining walls, shall be constructed of decorative masonry block such as slumpstone or stackstone,or have a decorative finish such as stucco. 6) All wrought iron fences and sliding gates shall be painted black or a color that matches the color scheme of the building. 7) Decorative paving shall be provided at each vehicle entrance to the site, behind the public right-of-way. These decoratively paved areas shall extend from the front property line to the setback line and have a width equal to that of the driveway. 8) The Landscape Plan shall comply with Ordinance No. 823 adopted by the City Council on December 2, 2010. All landscaping shall be installed prior to final acceptance of the buildings and/or project site complete and release for occupancy. Engineering Services Department 1) The 9th Street frontage improvements are to be in accordance with the City "Industrial Collector" standards as required and including: a) Dedication shall be made as measured from the centerline a total of 33 feet on 9th Street. PLANNING COMMISSION RESOLUTION NO. 14-24 DEVELOPMENT REVIEW DRC2013-00966— RANCHWOOD HOLDINGS, LLC July 9, 2014 Page 4 b) Provide curb, gutter, sidewalk, and street trees, as required. c) Provide one (1) 5800 Lumen HPSV street light at the east property line. d) Provide a commercial drive approach per City Std. 101, Type C. e) Provide signing and striping as required. 2) Tract 17455 has undergrounded existing overhead utilities along 9th Street. The developer of Tract 17455 is eligible for reimbursement to recover the proportionate cost of the undergrounding. The fair share amount has been determined per recorded Reimbursement Agreement as Document Number 2010-0526984, which shall be paid prior to Building Permit issuance. 3) The separate parcels contained within the project boundaries shall be legally combined into one parcel prior to the issuance of Building Permits. Grading Division 1) The applicant shall provide a copy of EPA Form 7520-16 (Inventory of Injection Wells) with the Facility ID Number assigned to the Building and Safety Official prior to the issuance of the Grading Permit for any underground Water Quality Management Plan (WQMP) Best Management Practices (BMPs). 2) Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard-lined gutters and swales where concentrated flows exceed 3fps and anywhere that flow lines exceed 10 percent. 3) Prior to removing fences or walls along common lot lines, and prior to constructing walls along common lot lines,the applicant shall provide a letter from the adjacent property owner(s) allowing work on the adjacent property. 4) Prior to the issuance of a Grading Permit, the applicant shall provide to the Building and Safety Services Director a copy of the City of Rancho Cucamonga's Memorandum of Agreement for Storm Water Quality Management Plan for review prior to recordation of the document. The Memorandum of Agreement for Storm Water Quality Management Plan shall be recorded prior to the issuance of a Grading Permit. 5) The land owner shall provide an inspection report on a biennial basis for the underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan prepared forthe subject project.All costs associated with the underground infiltration chamber are the responsibility of the land owner. . PLANNING COMMISSION RESOLUTION NO. 14-24 DEVELOPMENT REVIEW DRC2013-00966 — RANCHWOOD HOLDINGS, LLC July 9, 2014 Page 5 6) The final permitted Grading Plan shall show the direction of the roof drainage and all roof drain locations. All roof water shall be directed away from and adjacent property line(s). 7) A Storm Water Quality Management Plan shall be approved by the Building and Safety Official and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit. 8) The Water Quality Management Plan (WQMP) submitted with the application does not follow current WQMP templates / guidance and regulations set forth by the Santa Ana Regional Water Quality Control board (RWQCB). Access the following website for an updated San Bernardino County Water Quality Management Plan (WQMP)for New Development and Redevelopment Projects: http://www.swrcb.ca.gov/rwgcb8/html/sb wgmp.html. This site provides Guidance and Templates that can be filled out electronically and printed. Adhere to these guidelines and use the templates provided. Also, include the BMPs identified in the plan on the Grading Plans when submitted for plan check 9) The (Preliminary) Water Quality Management Plan prepared by Thienes Engineering, dated January 23, 2014, has been reviewed and deemed "Preliminary-Acceptable"dated March 11, 2014. The intent of the structural storm water treatment device is shown. The applicant shall make the requested changes to the document prior to issuance of the Grading Permit. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 9TH DAY OF JULY 2014. PLANNING COMMISSION OF THE CI/TTY/OFF RANCHO CUCAMONGA BY: Frances Howdyshell, Chairman 1 ATTEST: r,— Candyc<!B nett, Secretary I, Candyce Burnett, Secretary of the Planning Commission for the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 9th day of July 2014, by the following vote-to-wit: PLANNING COMMISSION RESOLUTION NO. 14-24 DEVELOPMENT REVIEW DRC2013-00966— RANCHWOOD HOLDINGS, LLC July 9, 2014 Page 6 AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL,OAXACA, MUNOZ,WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE ABSTAIN: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: DRC2013-00966 SUBJECT: DEVELOPMENT REVIEW APPLICANT: RANCHWOOD HOLDINGS, LLC LOCATION: 8705 AND 8725 9TH STREET - APNS: 0207-271-14 AND -28. ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No.14-24, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Manager hearing. a) Notice of Exemption -$50 X B. Time Limits 1. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a time extension has been granted. 1 Project No. DRC2013-00966 Completion Date C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, the Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Manager. 3. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 4. Revised Site Plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Manager review and approval prior to the issuance of Building Permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in effect at the time of Building Permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Manager and Police Department (477-2800) prior to the issuance of Building Permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Manager review and approval prior to the issuance of Building Permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Manager. For single-family residential developments, transformers shall be placed in underground vaults. 10. Street names shall be submitted for Planning Manager review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map 11. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards. 12. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Manager and Engineering Services Department review and approved prior to the issuance of Building Permits. 13. The developer shall submit a construction access plan and schedule for the development of all lots for Planning Manager and Engineering Services Department approval; including, but not limited to, public notice requirements, special street posting, phone listing for community concerns, hours of construction activity, dust control measures, and security fencing. 2 Project No. DRC2013-00966 Completion Date 14. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owners at least 30 days prior to the removal of any existing walls/fences along the project perimeter. D. INDUSTRIAL COMPLEX 1. Trash collection shall occur between the hours of 7 a.m. and 8p.m. only. 2. Graffiti shall be removed within 72 hours. 3. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 4. Signs shall be conveniently posted for"no overnight parking"and for"employee parking only." 5. All operations and businesses shall be conducted to comply with the following standards which shall be incorporated into the lease agreements for all tenants: a. Noise Level - All commercial activities shall not create any noise that would exceed an exterior noise level of 65 dB during the hours of 10 p.m. until 7 a.m. and 70 dB during the hours of 7 a.m. until 10 p.m. b. Loading and Unloading - No person shall cause the loading, unloading, opening, closing, or other handling of boxes, crates, containers, building materials, garbage cans, or other similar objects between the hours of 10 p.m. and 7 a.m. unless otherwise specified herein, in a manner which would cause a noise disturbance to a residential area. E. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Manager. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet. 3. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. 3 Project No. DRC2013-00966 Completion Date G. Trip Reduction 1. Bicycle storage spaces shall be provided at a rate equivalent to 5 percent of all required motorized vehicle parking, with a minimum of one rack with a capacity for two bicycles. 2. All development projects subject to TDM (Transportation Demand Management) provisions shall reserve and designate at least 10 percent of the employee parking spaces for the project for ridesharing vehicles by marking such spaces"Carpool/Va n pool Only.". 3. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other non-residential development. 4. All development projects where TDM(Transportation Demand Management)provisions apply shall provide shower and locker facilities for use by employees or tenants who commute to the site by bicycle or walking. Such facilities shall be clearly indicated on all development/improvement plans. One shower and eight lockers with minimum dimensions of twelve inches (12") by eighteen inches (18") by thirty-six inches (36") shall be provided for each two hundred (200)employees or fraction thereof, based on the equivalent development size data. The shower and locker facilities must be located convenient to one another and should be located near the employee bicycle parking facilities whenever possible. H. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development,shall be prepared by a licensed landscape architect and submitted for Planning Manager review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services. 2. A minimum of 20 percent of trees planted within industrial projects, and a minimum of 30 percent within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 5. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 6. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department. 7. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82. I. Signs 1. The signs indicated on the submitted plans are conceptual only and not apart of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. 4 Project No. DRC2013-00966 Completion Date J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to Planning Manager review and approval prior to the issuance of Building Permits. 2. The applicant shall comply with all Santa Ana Regional Water Quality Board and Federal EPA water requirements. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY SERVICES DEPARTMENT, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S). K. Building and Safety Industrial and Commercial Standard Conditions 1. Submit five complete sets of plans including the following: a. Site/Plot Plan, b. Foundation Plan; C. Floor Plan, d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (DRC2013-00966) clearly identified on the outside of all plans 2. Submit two sets of structural calculations, two sets of energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Services Department. 6. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can contact the Building and Safety Services Department staff for information and submittal requirements. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2013-00966). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety 5 Project No. DRC2013-00966 Completion Date Services Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of Building Permits for a new residential project or major addition, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. The applicant shall provide a copy of the School Fees receipt to the Building and Safety Services Department prior to permit issuance. 3. Prior to issuance of permit issuance for a new residential project or major addition, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, and Transportation Development Fee. 4. Prior to issuance of Building Permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. The applicant shall provide a copy of the school fees receipt to the Building and Safety Services Department prior to permits issuance. 5. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of Building Permits. 6. For projects using septic tank facilities, shall be submitted to the Building and Safety Official for review and approval prior to the issuance of Septic Tank Permits, and prior to the issuance of Building Permits. 7. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 8. Construct trash enclosure(s) per City Standard (available at the Planning Department public counter). 9. All commercial/public/multi-family development swimming pool plans shall be submitted to the County of San Bernardino's Environmental Health Services Department for review and approval prior to approval from the City of Rancho Cucamonga. 10. The following is required for side yard use for increase in allowable area: a. Provide a reduced Site Plan (8 1/2-inches by 11 inches), which indicates the non- buildable easement. b. Recorded "Covenant and Agreement for the Maintenance of a Non-Buildable Easement,"which is signed by the appropriate property owner(s). New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. 6 Project No. DRC2013-00966 Completion Date 4. Plans for food preparation areas shall be approved by County of San Bernardino Environmental Health Services prior to issuance of Building Permits. 5. Provide draft stops in attic areas in accordance with CBC Section 1505. 6. Roofing materials shall be Class"A." 7. Exterior walls shall be constructed of the required fire rating in accordance with CBC. 8. Openings in exterior walls shall be protected in accordance with CBC. 9. Walls and floors separating dwelling units in the same building shall be in accordance with the CBC. 10. Provide smoke and heat venting in accordance with CBC. _/—/- 11. Upon plan check submittal, additional requirements may be needed. L. Grading 1. Grading of the subject property shall be in accordance with current adopted California Building Code, City Grading Standards, and accepted grading practices. The grading and drainage plan(s) shall be in substantial conformance with the approved conceptual grading and drainage plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 3. A geologic report shall be prepared by a qualified engineer or engineering geologist and submitted at the time of application for Grading and Drainage Plan review. 4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of Building Permits. 5. If human remains are discovered on-site before or during grading, no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98 and California Health and Safety Code Section 7050.5. 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a Grading Permit. 7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review, that plan shall be a separate plan/permit from the Precise Grading and Drainage Plan/Permit. 8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on- site storm water drainage prior to issuance of a Grading Permit. All reports shall be wet signed and sealed by the Engineer of Record. 9. It shall be the responsibility of the applicant to acquire any required off-site drainage easements prior to the issuance of a Grading Permit. 7 Project No. DRC2013-00966 Completion Date 10. It shall be the responsibility of the applicant to acquire any required off-site drainage acceptance letter(s) from adjacent downstream property owner(s) or discharge flows in a natural condition (concentrated flows are not accepted) and shall provide the Building and Safety Official a drainage study showing the proposed flows do not exceed the existing flows prior to the issuance of a Grading Permit. 11. It shall be the responsibility of the applicant to obtain written permission from the adjacent property owners to construct walls on property lines or provide a detail(s) showing the perimeter wall(s) to be constructed off-set from the property line. 12. The Grading and Drainage Plan shall implement City Standards for on-site construction where possible, and provide details for all work not covered by City Standard Drawings. 13. All slopes shall be a minimum 2-foot off-set from the public right-of-way or adjacent private property. 14. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. 15. The maximum parking stall gradient is 5 percent. Accessibility parking stall grades shall be constructed per the current adopted California Building Code. 16. The final Grading and Drainage Plan shall show existing topography a minimum of 100 feet beyond the project boundary. 17. The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a Grading Permit. The grading agreement and bond shall be approved by the Building and Safety Official. 18. Provide documentation for CVWD sewer off-set program to the Building and Safety Official for review prior to issuance of a Grading Permit. 19. This project shall comply with the accessibility requirements of the current adopted California Building Code. 20. The precise Grading and Drainage Plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit." 8 Project No. DRC2013-00966 Completion Date 21. Grading Inspections: _/—/— a. Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations, the Grading Permit may be subject to suspension by the Building Inspector; b. The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Services Department at least 1 working day in advance to request the following inspections prior to continuing grading operations: i. The bottom of the over-excavation; ii. Completion of rough grading-The grading contractor or owner shall submit to the Permit Technicians (Building and Safety Services Department front counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iii. The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a Building Permit. 22. Prior to the issuance of the Certificate of Occupancy the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) best management practices (BMP) devices. 23. Private streets for multi-family developments will include street plans as part of the Grading and Drainage Plan set. Plan view to show typical street sections. Profile view to show centerline and top of curb profiles. 24. Roof storm water is not permitted to flow over the public parkway and shall be directed to an under parkway culvert per City of Rancho Cucamonga requirements prior to issuance of a Grading Permit. M. Water Quality Management Plan 1. A Storm Water Quality Management Plan shall be approved by the Building and Safety Official and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a Grading Permit THE APPLICANT SHALL CONTACT THE ENGINEERING SERVICES DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: N. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from street centerline): 33 total feet on 9t' Street O. Street Improvements 1. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy, fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, 9 Project No. DRC2013-00966 Completion Date regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. 2. Construct the following perimeter street improvements including, but not limited to: Curb 8 A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pmt walk Appr. Lights Trees Trail Island Trail Other 91h Street X X X X X X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. 3. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of Building Permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. cl. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer. Notes: / I 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Access ramps for the disabled shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. 10 Project No. DRC2013-00966 Completion Date g. Concentrated drainage Flows shall not cross sidewalks. Under sidewalk drains shall be —/—/— installed to City Standards, except for single-family residential lots. h. Street names shall be approved by the Planning Manager prior to submittal for first plan —/—/— check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in —/—/— accordance with the City's street tree program. 5. Install street trees per City street tree design guidelines and standards as follows. The —/—/— completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on Sheet —(typically Sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. Min. Grow Street Name Botanical Name Common Name Space Spacing Size Qty. 91" Street Quercus ilex Holly Oak 6' 55' 15 gal. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. Street trees are to be planted per public improvement plans only. P. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting —/—/— Districts shall be filed with the Engineering Services Department prior to final map approval or issuance of Building Permits whichever occurs first. Formation costs shall be borne by the developer. Q. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, —/—/— gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. —/—/- 3. Water and sewer plans shall be designed and constructed to meet the requirements of the —/—/— Cucamonga Valley Water District(CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 11 Project No. DRC2013-00966 Completion Date 4. Approvals have not been secured from all utilities and other interested agencies involved. —/—/— Approval of the final parcel map will be subject to any requirements that may be received from them. R. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for —/—/— all new streetlights for the first six months of operation, prior to final map approval or prior to Building Permit issuance if no map is involved. 2. Prior to the issuance of Building Permits, a Diversion Deposit and related administrative fees —/—/— shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50 percent of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD- 1 shall be submitted to the Engineering Services Department when the first Building Permit application is submitted to the Building and Safety Services Department, Form CD-2 shall be submitted to the Engineering Services Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: S. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. —/—/— These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings, with direct lighting to be provided by all entryways. The lighting shall be consistent around the entire development. 3. The lighting in exterior areas shall be in vandal-resistant fixtures. —/—/— T. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are —/—/— within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. —/—/- 3. All roof openings giving access to the building shall be secured with either iron bars, metal —/—/— gates, or alarmed. U. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the —/—/— police with a keypad access and a unique code. The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed because of a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at(909)941-1488 or by contacting the Crime Prevention Unit at(909) 477-2800 extension 2474 or extension 2475. V. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for —/—/— nighttime visibility. 12 Project No. DRC2013-00966 Completion Date 2. All developments shall submit an 8 ''/z' x 11" sheet with the numbering pattern of all multi- tenant developments to the Police Department as approved by the Building and Safety Services Department. W. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and —/—/— employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriffs dispatch number: —/—/— (909) 941-1488. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE CONSTRUCTION SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: The project must comply in design and constructed in accordance with the 2010 California Building and Fire Codes, the RCFPD Ordinance FD50 and the RCFPD Standards. The RCFPD ordinance, procedures & standards which are referenced in this document can be access on the web at www.cityofrc.us. X. Industrial Fire Standard Conditions FSC -1 Public and Private Water Supply Design Guidelines for Fire Hydrants: Reference the RCFPD Standard 5-10. —/—/— FSC -2 Fire Flow 1. The required fire flow for this project is calculated gallons per minute at a minimum residual —/—/— pressure of 20 pounds per square inch. This requirement is made in accordance with California Fire Code Appendix, as adopted by the Fire District Ordinances. The required minimum fire flow for this project may be reduced by 50 percent when automatic fire sprinklers are installed. 2. Public fire hydrants located within the immediate vicinity of the proposed project may be used —/—/— to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Fire protection water supply plans are required for all projects that must extend the existing —/—/— water supply to or onto the site. Building Permits will not be issued until the fire protection water supply plans are approved. 4. On all Site Plans to be submitted for review, show all fire hydrants located within 600 feet of —/—/— the proposed project site. FSC-3 Pre-requisite for submittal of Overhead Automatic Fire Sprinkler Systems Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit —/—/— plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirements for Automatic Fire Sprinkler Systems Automatic fire sprinklers shall be installed in buildings as required by the current editions of the —/—/— California Fire Code, the Rancho Cucamonga Fire Protection District Ordinance and/or any other applicable standards that require an approved automatic fire sprinkler system to be installed. 13 Project No. DRC2013-00966 Completion Date FSC-5 Fire Alarm System & Sprinkler Monitoring 1. The current edition of California Building/Fire Codes, the RCFPD Ordinance and Fire Alarm —/—/— Standard 9-3 require most fire sprinkler systems to be monitored by a Central Station sprinkler monitoring system. A manual and or automatic fire alarm system may also be required based on the use and occupancy of the building. Plan check approval and a Building Permit are required prior to the installation of a fire alarm or a sprinkler monitoring system. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standards. Refer to the specified documents for the system requirements. FSC-6 Fire District Site Access: Fire District access roadways include public roads, streets and highways, as well as private roads, drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access Roadways Standard 5-1. 1. Location of Access: All portions of the structures 1st story exterior wall shall be located within —/—/- 150-feet of Fire District vehicle access, measured on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: —/—/— a. The minimum unobstructed width is 26 feet. b. The maximum inside turn radius shall be 24 feet. C. The minimum outside turn radius shall be 50 feet. d. The minimum radius for cul-de-sacs is 45 feet. e. The minimum vertical clearance is 14 feet, 6 inches. f. At any private entry median, the minimum width of traffic lanes shall be 20 feet on each side. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12 percent. i. Support a minimum load of 80,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14 feet, 6 inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be —/—/— provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the current edition of California Building/Fire Codes and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus —/—/— access road to all required building exterior openings. 5. Building Access: Knox boxes for site and building access are required in accordance with —/—/— RCFPD Standard 5-9. 14 Project No. DRC2013-00966 Completion Date 6. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall —/—/— be in accordance with Fire District Standards. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. C. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. e. Manual gates must be equipped with a RCFPD lock. The lock must be purchased at the Fire Administration Office. f. Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due to complexity of the various entry configurations. 7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A Site Plan —/—/— illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to the Building and Safety Services Department for approval. 8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted —/—/— on the Site Plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to the Building and Safety Services Department for plan review. 9. Roof Access: must be in accordance with the RCFPD Roof Access Standard. There shall —/—/— be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family residential structures more than 10,000 square feet or with roof more than 15 feet in height and less than 75 feet above the level of the fire access road. a. This access must be reachable by the Fire Department aerial ladder. b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction features, or high parapets that inhibit roof access. C. The number of ladder points may be required to be increased, depending on the building size and configuration. d. Regardless of the parapet height or construction features the approved ladder point shall be identified in accordance to the roof access standard. e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently mounted access ladder is required. 15 Project No. DRC2013-00966 Completion Date f. Multiple access ladders may be required for larger buildings. g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix. h. A Site Plan showing the locations of the roof ladder shall be submitted during plan check. i. Ladder points shall face a fire access roadway(s). FSC-10 Occupancy and Hazard Control Permits —/—/— Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Aerosol Products • Magnesium Working • Application of Flammable Finishes • Motor Vehicle Fuel-Dispensing Operation • Automobile Wrecking Yards • Open Burning • Battery Systems • Organic Coating • Candles and open flames in public assemblies • Ovens • Cellulose Nitrate • Powder Coating • Compressed Gases • Public Assembly • Cryogenics • Pyrotechnical Special Effects • Dry Cleaning Plants • Radioactive Materials • Dust-Producing Processes and Operations • Refrigeration Systems • Explosive or Blasting Agents • Repair Garages • Flammable and Combustible Liquids • Rubbish Handling Operations • Fruit Ripening Plants • Spraying or Dipping Operations • Hazardous Materials • Tents, Canopies and/or Air Supported Structures • High-Pile Combustible Storage (HPS) • Tire Storage • Liquefied Petroleum Gases 16 Project No. DRC2013-00966 Completion Date • Welding and Cutting Operations • LPG or Gas Fuel Vehicles in Assembly Buildings • Wood Products/Lumber Yards FSC-11 Hazardous Materials–Submittal to the County of San Bernardino —/—/— The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by the Building and Safety —/—/— Services Department will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a plan is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials -Submittal to Fire Construction Services —/—/- 1. Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the current editions of the California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances and other implemented and/or adopted standards. FSC-13 Alternate Method Application - Fire Construction Services staff and the Fire Marshal will --- review all requests for alternate method, when submitted. The request must be submitted on the Fire District"Application for Alternate Method" form along with supporting documents and payment of the review fee. FCS-14 Map Recordation —/—/- 1. Reciprocal Agreements for Fire Department Emergency Access and Water Supply are required on this project. The project appears to be located on a property that is being subdivided. The reciprocal agreement is required to be recorded between property owners and the Fire District. The recorded agreement shall include a copy of the Site Plan. The Fire Construction Services shall approve the agreement, prior to recordation. The agreement shall be recorded with the County of San Bernardino, Recorder's Office. 2. Reciprocal Access Agreement–Please provide a permanent access agreement between the —/—/— owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access, without Fire Department approval. The agreement shall have provisions for emergency situations and the assessing of cost recovery to the property by the Fire District. 3. Reciprocal Water Covenant – Please provide a permanent maintenance and service —/—/— covenant between the owners granting an irrevocable and non-exclusive easement, favoring 17 Project No. DRC2013-00966 Completion Date the Fire District for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems facilities in general). The covenant shall have provisions for emergency situations and the assessing of cost recovery to the property by the Fire District. I I FCS-15 Annexation of the Parcel Map: Annexation of the parcel map into the Community --- Facilities District#85-1 or#88-1 is required prior to the issuance of Grading or Building Permits. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS – Please complete the following prior to the issuance of any Building Permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site(private)fire underground and water plans is required prior to any Building Permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building and Safety Services Department and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CVWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CVWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CVWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14 feet, 6 inches above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CVWD must be received. The applicant is responsible for obtaining the fire flow information from CVWD and submitting the letter to Fire Construction Services. 5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' 'Temporary Power Release Checklist and Procedures." PRIOR TO OCCUPANCY OR FINAL INSPECTION - Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating —/—/— the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On 18 Project No. DRC2013-00966 Completion Date private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in —/—/— the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler —/—/— system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler —/—/— monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, —/—/— tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system —/—/— shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates —/—/— must be inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access —/—/— roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services, The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Must be in accordance with the RCFPD Standard 5-7, 5-8 and/or 5-5. Prior to the —/—/— issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address in accordance to the appropriate RCFPD addressing Standard. 10. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire —/—/— Construction Services. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho —/—/— Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Must be in accordance with the RCFPD Standard 5-11. Prior to the —/—/— issuance of a Certificate of Occupancy, a 8 ''/2' x 11" or 11" x 17" Site Plan of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual 19 Project No. DRC2013-00966 Completion Date location of all devices and building features as required in the standard. The Site Plan must be reviewed and accepted by the Fire Inspector. 20