Loading...
HomeMy WebLinkAbout14-32 - Resolutions RESOLUTION NO. 14-32 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2014-00378,A REVIEW OFA PROPOSAL TO CONSTRUCT AN INDUSTRIAL BUILDING OF 124,500 SQUARE FEET ON A VACANT PARCEL OF ABOUT 240,000 SQUARE FEET (5.5 ACRES) WITHIN THE GENERAL INDUSTRIAL(GI)DISTRICT, LOCATED AT THE NORTHWEST CORNER OF 6TH STREET AND ROCHESTER AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 0229-262-48. A. Recitals. 1. Consolidated Consulting, on behalf of Dedeaux Properties, LLC,filed an application for the approval of Development Review DRC2014-00378 as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 27th day of August 2014 the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A. of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on August 27, 2014, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a property located at the northwest corner of 6th Street and Rochester Avenue; and b. The project site is a rectangular parcel of approximately 240,000 square feet (5.5 acres). The overall dimensions of the project site are approximately 710 feet (east to west) by approximately 320 feet (north to south). At the southwest corner of the project site, there is a triangular extension that is approximately 280 feet(east to west) by approximately 280 feet(north to south); and C. The project site is vacant and is dominated by short grasses. The perimeter of the site along the street frontages is landscaped with ground cover and numerous mature trees; and d. The project site is bound on the east by Rochester Avenue and on the south by 6th Street. The overall project site is bound on the north, south, and west by warehouse distribution buildings between 150,000 and 250,000 square feet in floor area. To the east, is an office complex consisting of five buildings; and PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 —CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 2 e. The zoning of the project site and all surrounding properties is General Industrial (GI) District; and f. The applicant proposes to construct an industrial building of 124,500 square feet; and g. The project is the second phase of a two-phase project. The first phase is located on a parcel (APN: 0229-262-29) of approximately 274,000 square feet(6.3 acres)and consists of a warehouse building of approximately 135,000 square feet and associated improvements that were completed during the mid-1980s. The project site of the second phase is located immediately to the south of the first phase; and h. The second phase was originally reviewed and approved by the Planning Commission on November 12, 2008 (Related file: Development Review DRC2008-00185). Because of the downturn of the economy at around that time, no further, significant activity, i.e. issuance of Construction/Grading Permits and commencement of construction/grading, on the project occurred. On November 12, 2013, the approval of the project expired per Resolution of Approval No. 08-66, Standard Condition B1, as Building Permits had not been issued or the approved use had not commenced within 5 years from the date of approval; and i. In April 2014, a new application was submitted to the City in orderto"re-entitle"the project; and j. The proposed building will be of concrete tilt-up construction. The basic layout of the building will be typical for warehouse buildings. The offices areas will be located at the southeast and southwest corners of the building. There will be a dock loading/storage area with 12 dock doors located on the north side of the building. These doors will face the doors of the existing building to the north. The new and existing buildings will share a common loading area; access to this area will be through shared drive aisles between the buildings; and k. The parking requirement for the project, based on the proposed mix of office, warehouse, and manufacturing floor areas in the proposed building, is 109 parking stalls;the project will have 109 parking stalls. The trailer parking requirement, based on a ratio of one stall per dock door, is 12 parking stalls; the project will have 12 parking stalls; and I. The proposed building will have a floor area of 120,640 square feet and the project site has an area of approximately 240,000 square feet. The calculated FAR for the project will be approximately 50.2 percent. Per Chapter 2, Figure LU-2 Land Use Plan of the General Plan, the maximum Floor Area Ratio (FAR) in the General Industrial (GI) land use category is 60 percent; and m. The current project is substantially the same as the original project that was approved in November 2008; and n. A review and request for approval of land uses are not included in this application. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 — CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 3 a. The proposed project is in accord with the General Plan, the objectives of the Development Code, and the purposes of the district in which the site is located. The proposal is to construct an industrial building of 124,500 square feet. The underlying General Plan designation is General Industrial. b. The proposed project, together with the conditions applicable thereto, will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The potential land uses that would be associated with this project are consistent with the land uses within the vicinity where it is located and the expectations of the community. The zoning of the subject property and all surrounding properties is General Industrial (GI) District; C. The proposed development complies with each of the applicable provisions of the Development Code. The proposed development meets all standards outlined in the Development Code and the design and development standards and policies of the Planning Commission and the City including building and parking setbacks, average landscape depth, floor area ratio, parking, dock and storage area screening, landscape coverage, site planning, and architecture. 4. Based upon the facts and information contained in the application, together with all written and oral reports included for the environmental assessment forthe application,the Planning Commission finds that no subsequent or supplemental environmental document is required pursuant to the California Environmental Quality Act (CEQA) in connection with the review and approval of this application based upon the following findings and determinations: a. Pursuant to the California Environmental Quality Act("CEQA") and the City's local CEQA Guidelines, the City adopted a Mitigated Negative Declaration on November 12, 2008, in connection with the City's approval of Development Review DRC2008-00185 for an industrial building of approximately 125,000 square feet. Pursuant to CEQA Guidelines Section 15162, no subsequent or supplemental EIR or Negative Declaration is required in connection with subsequent discretionary approvals of the same project unless: (i) substantial changes are proposed to the project that indicate new or more severe impacts on the environment; (ii) substantial changes have occurred in the circumstances under which the project was previously reviewed that indicates new or more severe environmental impacts; or (iii) new important information shows the project will have more severe impacts than previously considered; or (iv) additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. b. The Planning Commission finds, in connection with the current proposed project to construct an industrial building of 124,500 square feet,that substantial changes to the project or the circumstances surrounding the project have not occurred which would create new or more severe impacts than those evaluated in the previous Mitigated Negative Declaration. Development Review DRC2008-00185 was originally reviewed and approved by the Planning Commission on November 12, 2008. On November 12, 2013, the approval of the project expired as Building Permits had not been issued or the approved use had not commenced within 5 years from the date of approval. In April 2014, the current subject application was submitted; the proposed project is substantially the same as the previously approved project. The Planning Commission further finds that the project will not have one or more significant effects not discussed in the previous Mitigated Negative Declaration, not have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less-than-significant. The project will not have a significant increase in traffic based upon a trip generation/distribution analysis prepared by Arch Beach Consulting on June 5, PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378—CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 4 2014; there will not be a significant impact on biological resources (specifically the Delhi Sand flower-loving fly) according to a habitat suitability evaluation prepared by Ecological Sciences, Inc. on April 25, 2014; and, there will not be a significant impact on air quality according to an air quality analysis prepared by Vista Environmental on June 13, 2014. The Addendum to the Mitigated Negative Declaration does not include any additional mitigations. C. Based on these findings and all evidence in the record, the Planning Commission concurs with the staff determination that no additional environmental review is required pursuant to CEQA in connection with the City's consideration of Development Review DRC2014-00378 and adopts an Addendum to the Mitigated Negative Declaration of environmental impacts that was adopted by the Planning Commission on November 12, 2008. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the attached standard conditions incorporated herein by this reference. Planning Department 1) Approval is for the construction of one industrial building with a floor area of 124,500 square feet within the General Industrial (GI) District, located at the northwest corner of 6th Street and Rochester Avenue- APN: 0229-262-48. 2) Approval of this request shall not waive compliance with any sections of the Development Code, State Fire Marshal's regulations, Uniform Building Code, or any other City Ordinances. 3) Proposed land uses requiring a Conditional Use Permit as identified in Table 17.30.030-1 of the Development Code, shall require a separate review and approval by the Planning Manager and/or Planning Commission prior to submittal of documents for plan check, issuance of a Business License, and building occupancy. 4) Shared access, parking, and maintenance shall be incorporated in the project Covenants, Conditions, and Restrictions (CC&Rs). 5) Downspouts shall not be visible from the exterior on any elevations of the building. All downspouts shall be routed through the interior of the building walls. 6) All doors (roll-up, dock doors, emergency access) shall be painted to match the color of the adjacent wall or glass panel. 7) All wrought iron fences and sliding gates shall be painted black or a similarly dark color. 8) New walls, including retaining walls, shall be constructed of decorative masonry block such as slumpstone or stackstone or poured in-place concrete with design elements incorporated to match the building. PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378— CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 5 9) All ground-mounted equipment and utility boxes including transformers, back-flow devices, etc. shall be screened by a minimum of two rows of shrubs spaced a minimum of 18 inches on center. This equipment shall be painted dark green. 10) All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or proposed shall be installed at locations generally in front of, and along,the screen walls that enclose the dock areas and not within direct view or line-of-sight of the office corners of each building. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services/Fire Department. All Double Detector Checks(DDC)and Fire Department Connections (FDC) are to be screened behind a 4-foot high block wall. These walls shall be constructed of decorative masonry block such as slumpstone or stackstone or poured in-place concrete with design elements incorporated to match the building. 11) The output surface (face) of all lamp heads on wall-mounted light fixtures and the light standards shall be parallel to the ground in order to eliminate glare and minimize lighting on adjacent properties. The maximum height of light standards, including the base, measured from the finished surface is 25 feet. 12) The employee lunch area shall have an overhead trellis with cross members spaced no more than 18 inches on center with minimum dimensions of 4 inches by 12 inches. Each support column shall have a decorative base that incorporates the architectural design and finishes/trim used on the building. The trellis shall be painted to match the building, and tables, chairs/benches, and waste receptacles shall be provided. 13) All trash enclosures shall be constructed per City standard. The design of the trash enclosures shall incorporate the materials, finish, color, and trim used on the buildings. 14) Decorative paving shall be provided at each vehicle entrance to the site, behind the public right-of-way. These decoratively paved areas shall extend from the front property line to the 45-foot setback line and have a width equal to that of the driveway. 15) Incorporate undulating berms along the street frontages (where applicable), within the landscape setback and landscape areas. The highest part of the berms should be at least 3 feet in height. 16) Landscaping at the southeast and southwest corners of the site shall be intensified to ensure that the presence of the parking areas immediately adjacent to these corners are minimized. 17) The landscaping shall be installed prior to release for occupancy. PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 — CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 6 Engineering Services Department 1) The frontage of 6th Street shall be improved in accordance with City "Major Divided Arterial" standards. Frontage improvements shall be installed as follows: a) Remove the existing 6th Street drive approach and install the new drive approach near the westerly end of the project boundary per City Standards. The sidewalk shall cross the drive approach at the zero-inch curb face. No accent paving within the public right-of-way. b) Provide additional traffic striping, signage and related signs and legends as required to the satisfaction of the City Traffic Engineer including R-26 (s) "NO STOPPING' signs. c) Install the sidewalk from the southwesterly project corner limit to join the existing sidewalk to the east. d) Install the curbside drain outlets per City standards as required. e) Protect or provide/replace curb and gutter, 9500 Lumen HPSV equivalent LED street lights, street trees, and additional traffic striping and signage as required. f) No median island opening will be allowed in the 6th Street median. 2) Rochester Avenue frontage shall be improved in accordance with City "Major Arterial" standards. Frontage improvements shall be installed as follows: a) Provide new street pavement section to centerline of street. b) Protect the existing or provide/replace; 9500 Lumen HPSV equivalent LED street lights, street trees, R-26 (s) "NO STOPPING' signs and additional traffic striping and signage. 3) Buffalo Avenue improvements shall be in accordance with City "Industrial" standards as follows: a) Protect or provide/replace damaged curb and gutter, 9500 Lumen HPSV equivalent LED street lights, R-26 (s) "NO STOPPING' signs and additional traffic striping and signage, as required. b) Protect or provide/replace damaged private landscaping and irrigation on the adjacent west property fronting eastside of Buffalo Avenue. 4) The parkway landscaping shall conform to the 6th Street Beautification Master Plan. PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 — CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 7 5) Revise the existing public storm drain plans to show private storm drain connection to the existing catch basin on Rochester Avenue. 6) All missing public improvements along 6th Street and Rochester Avenue shall be installed per the approved improvement plans, Drawing Nos. 793, 1120, 1049, 1752 and 2268-S. It will be necessary to recheck the plans for conformance to current City Standards, since more than a year has elapsed since their approval. Building and Safety Department—Grading 1) All roof drainage flowing to the public right of way must drain under the sidewalk through a parkway culvert approved by the Engineering Services Department. 2) The applicant shall provide a copy of EPA Form 7520-16 (Inventory of Injection Wells) with the Facility ID Number assigned to the Building and Safety Services Department Official prior to issuance of the Grading Permit. 3) Final WQMP shall be submitted. The Preliminary Water Quality Management Plan has been deemed "Acceptable". Prior to the issuance of a Grading Permit a final project-specific Water Quality Management Plan shall be submitted for review and approval by the Building Official. 4) A Grading Bond will be required to be submitted to the Building and Safety Services Department Official for review and approval prior to issuance of a Grading Permit. 5) RC memo submitted prior to the issuance of a Grading Permit,the City of Rancho Cucamonga's"Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 6) The land owner shall provide an inspection report by a qualified person/company on a biennial basis for the underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all Best Management Practices (BMPs) as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 7) Prior to issuance of a Grading Permit, the applicant shall obtain a . Waste Discharge Identification Number (WDID). PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378—CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 8 Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits,the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 — CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 9 • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB])daily to reduce Fine Particulate Matter(PM,o)emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. 8) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). 11) All industrial and commercial facilities shall designate preferential parking for vanpools. 12) All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. 13) All industrial and commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 — CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 10 Pursue educating the public approximately the archaeological heritage of the area. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report,documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit a summary report to the City of Rancho Cucamonga. Transfer collected specimens with a copy to the report to the San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 —CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 11 vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM,o emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Hydrology and Water Quality 1) Prior to issuance of grading permits, the permit applicant shall submit to Building Official for approval of a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in grading plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) The applicant shall incorporate/implement the BMPs that were identified in the Water Quality Management Plan (WQMP) prepared by Coory Engineering on June 23, 2008, to the satisfaction of the City's Building and Safety Department. Post-Construction Operational: 6) The developer shall incorporate/implement the BMPs that identified in the Water Quality Management Plan (WQMP) prepared by Coory Engineering on June 23, 2008, to reduce pollutants after construction entering the storm drain system to the maximum extent practical. PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378—CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 12 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 8) Prior to issuance of Building Permits, the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 9) Prior to issuance of Grading or Paving Permits, the applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES)General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number)shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. PLANNING COMMISSION RESOLUTION NO. 14-32 DRC2014-00378 – CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC August 27, 2014 Page 13 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 27TH DAY OF AUGUST 2014. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: A&4d,&— �rances Howdyshell, Chairman ATTEST: Candy urne t, Secretary I, Candyce Burnett, Secretary of the Planning Commission for the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed,and adopted by the Planning Commission of the City of Rancho Cucamonga,at a regular meeting of the Planning Commission held on the 27th day of August 2014, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ , OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE ABSTAIN: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: DRC2014-00378 SUBJECT: DEVELOPMENT REVIEW APPLICANT: CONSOLIDATED CONSULTING FOR DEDEAUX PROPERTIES, LLC LOCATION: NORTHWEST CORNER OF 6TH STREET AND ROCHESTER AVENUE-APN: 0229-262-48. ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 14-32 or Approval Letter, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Manager hearing. a) Mitigated Negative Declaration - $ 2,206.25 X 1 Project No. DRC2014-00378 Completion Date B. Time Limits 1. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a time extension has been granted. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, and the Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Manager. 3. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 4. Revised Site Plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Manager review and approval priorto the issuance of Building Permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in effect at the time of Building Permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Manager and Police Department (477-2800) prior to the issuance of Building Permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Manager. For single-family residential developments, transformers shall be placed in underground vaults. 9. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards. 10. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Manager and Engineering Services Department review and approved prior to the issuance of Building Permits. D. SHOPPING CENTERS 1. Graffiti shall be removed within 72 hours. —/—/- 2 Project No. DRC2014-00378 Completion Date 2. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. E. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Manager. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet. 3. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. G. Trip Reduction 1. Bicycle storage spaces shall be provided at a rate equivalent to 5 percent of all required motorized vehicle parking, with a minimum of one rack with a capacity for two bicycles. H. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Manager review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Development Code Section 17.80.050, and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 20 percent of trees planted within industrial projects, and a minimum of 30 percent within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 4. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 3 Project No. DRC2014-00378 Completion Date 5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 6. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 7. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82. I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the Planning Manager in the amount of $ 581 prior to the issuance of Building Permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to Planning Manager review and approval prior to the issuance of Building Permits. 2. The applicant shall comply with all Santa Ana Regional Water Quality Board and Federal EPA water requirements. APPLICANT SHALL CONTACT THE PUBLIC WORKS SERVICES DEPARTMENT (909)477- 4100 FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS. K. PUBLIC WORKS SERVICES DEPARTMENT 1. Form CD-2 shall be submitted to the Engineering Services Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY SERVICES DEPARTMENT, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S). L. Building and Safety Industrial and Commercial Standard Conditions —/—/- 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; 4 Project No. DRC2014-00378 Completion Date f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (DRC2014-00378) clearly identified on the outside of all plans 2. Submit two sets of structural calculations, two sets of energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. _/—/- 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Services Department. 6. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can contact the Building and Safety Services Department staff for information and submittal requirements. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (DRC2014-00378). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Services Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of Building Permits for a new residential project or major addition, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. The applicant shall provide a copy of the School Fees receipt to the Building and Safety Services Department prior to permit issuance. 3. Prior to issuance of permit issuance for a new residential project or major addition, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, and Transportation Development Fee. 4. Prior to issuance of Building Permits for a new commercial or industrial development project or major addition, the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. The applicant shall provide a copy of the school fees receipt to the Building and Safety Services Department prior to permits issuance. 5. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of Building Permits. 6. For projects using septic tank facilities, shall be submitted to the Building and Safety Official for review and approval prior to the issuance of Septic Tank Permits, and prior to the issuance of Building Permits. 5 Project No. DRC2014-00378 Completion Date 7. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday,Saturday, with no construction on Sunday or holidays. 8. Construct trash enclosure(s) per City Standard (available at the Planning Department public —/—/— counter). 9. All commercial/public/multi-family development swimming pool plans shall be submitted to —/—/— the County of San Bernardino's Environmental Health Services Department for review and approval prior to approval from the City of Rancho Cucamonga. 10. The following is required for side yard use for increase in allowable area: —/—/— a. Provide a reduced Site Plan (8 1/2-inches by 11 inches), which indicates the non- buildable easement. b. Recorded "Covenant and Agreement for the Maintenance of a Non-Buildable Easement,"which is signed by the appropriate property owner(s). New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances —/—/— considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. —/—/- 3. Roofing material shall be installed per the manufacturer's"high wind" instructions. —/—/- 4. Plans for food preparation areas shall be approved by County of San Bernardino —/—/— Environmental Health Services prior to issuance of Building Permits. 5. Provide draft stops in attic areas in accordance with CBC Section 1505. —/—/- 6. Roofing materials shall be Class"A." —/—/- 7. Exterior walls shall be constructed of the required fire rating in accordance with CBC . —/—/- 8. Openings in exterior walls shall be protected in accordance with CBC. —/_/- 9. Walls and floors separating dwelling units in the same building shall be in accordance with —/—/— the CBC. 10. Provide smoke and heat venting in accordance with CBC. —/—/- 11. Upon plan check submittal, additional requirements may be needed. —/—/— APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: M. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. —/—/— These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings, with direct lighting to be provided by all entryways. The lighting shall be consistent around the entire development. 6 Project No. DRC2014-00378 Completion Date 3. The lighting in exterior areas shall be in vandal-resistant fixtures. N. Security Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All roof openings giving access to the building shall be secured with either iron bars, metal gates, or or alarmed. O. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with with a keypad access and a unique code. The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed because of a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at(909)941-1488 or by contacting the Crime Prevention Unit at(909) 477-2800 extension 2474 or extension 2475. P. Windows 1. Security glazing is recommended on storefront windows to resist window smashes and impede entry entry to burglars. Q. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. visibility. R. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriffs dispatch number: —�—�— (909) 941-1488. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE CONSTRUCTION SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: The project must comply in design and constructed in accordance with the 2010 California Building and Fire Codes, the RCFPD Ordinance FD50 and the RCFPD Standards. The RCFPD ordinance, procedures & standards which are referenced in this document can be access on the web at www.cityofrc.us. S. Industrial Fire Standard Conditions FSC -1 Public and Private Water Supply Design Guidelines for Fire Hydrants: Reference the RCFPD Standard 5-10. FSC -2-2 Fire Flow 1. The required fire flow for this project is calculated gallons per minute at a minimum residual pressure of of 20 pounds per square inch. This requirement is made in accordance with California Fire Code Appendix, as adopted by the Fire District Ordinances. The required minimum fire flow for this project may be reduced by 50 percent when automatic fire sprinklers are installed. 7 Project No. DRC2014-00378 Completion Date 2. Public fire hydrants located within the immediate vicinity of the proposed project may be used —/—/— to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Fire protection water supply plans are required for all projects that must extend the existing —/—/— water supply to or onto the site. Building Permits will not be issued until the fire protection water supply plans are approved. 4. On all Site Plans to be submitted for review, show all fire hydrants located within 600 feet of —/—/— the proposed project site. FSC-3 Pre-requisite for submittal of Overhead Automatic Fire Sprinkler Systems Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit —/—/— plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirements for Automatic Fire Sprinkler Systems Automatic fire sprinklers shall be installed in buildings as required by the current editions of the —/—/— California Fire Code, the Rancho Cucamonga Fire Protection District Ordinance and/or any other applicable standards that require an approved automatic fire sprinkler system to be installed. FSC-5 Fire Alarm System & Sprinkler Monitoring 1. The current edition of California Building/Fire Codes, the RCFPD Ordinance and Fire Alarm —/—/— Standard 9-3 require most fire sprinkler systems to be monitored by a Central Station sprinkler monitoring system. A manual and or automatic fire alarm system may also be required based on the use and occupancy of the building. Plan check approval and a Building Permit are required prior to the installation of a fire alarm or a sprinkler monitoring system. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standards. Refer to the specified documents for the system requirements. FSC-6 Fire District Site Access: Fire District access roadways include public roads, streets and highways, as well as private roads, drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access Roadways Standard 5-1. 1. Location of Access: All portions of the structures 1st story exterior wall shall be located within —/—/- 150-feet of Fire District vehicle access, measured on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: —/—/— a. The minimum unobstructed width is 26 feet. b. The maximum inside turn radius shall be 24 feet. C. The minimum outside turn radius shall be 50 feet. d. The minimum radius for cul-de-sacs is 45 feet. e. The minimum vertical clearance is 14 feet, 6 inches. f. At any private entry median, the minimum width of traffic lanes shall be 20 feet on each side. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12 percent. 8 Project No. DRC2014-00378 Completion Date i. Support a minimum load of 80,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14 feet, 6 inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be —/—/— provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the current edition of California Building/Fire Codes and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus —/—/— access road to all required building exterior openings. 5. Building Access: Knox boxes for site and building access are required in accordance with —/—/— RCFPD Standard 5-9. 6. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall —/—/— be in accordance with Fire District Standards. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. C. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. e. Manual gates must be equipped with a RCFPD lock. The lock must be purchased at the Fire Administration Office. f. Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due to complexity of the various entry configurations. 7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A Site Plan —/—/— illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to the Building and Safety Services Department for approval. 9 Project No. DRC2014-00378 Completion Date 8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted —/—/— on the Site Plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to the Building and Safety Services Department for plan review. 9. Roof Access: must be in accordance with the RCFPD Roof Access Standard. There shall —/—/— be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family residential structures more than 10,000 square feet or with roof more than 15 feet in height and less than 75 feet above the level of the fire access road. a. This access must be reachable by the Fire Department aerial ladder. b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction features, or high parapets that inhibit roof access. C. The number of ladder points may be required to be increased, depending on the building size and configuration. d. Regardless of the parapet height or construction features the approved ladder point shall be identified in accordance to the roof access standard. e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently mounted access ladder is required. f. Multiple access ladders may be required for larger buildings. g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix. h. A Site Plan showing the locations of the roof ladder shall be submitted during plan check. i. Ladder points shall face a fire access roadway(s). FSC-10 Occupancy and Hazard Control Permits —/—/— Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Aerosol Products • Magnesium Working • Application of Flammable Finishes Motor Vehicle Fuel-Dispensing Operation • Automobile Wrecking Yards • Open Burning • Battery Systems • Organic Coating • Candles and open flames in public assemblies • Ovens • Cellulose Nitrate • Powder Coating • Compressed Gases • Public Assembly 10 Project No. DRC2014-00378 Completion Date • Cryogenics • Pyrotechnical Special Effects • Dry Cleaning Plants Radioactive Materials • Dust-Producing Processes and Operations • Refrigeration Systems • Explosive or Blasting Agents • Repair Garages Flammable and Combustible Liquids • Rubbish Handling Operations Fruit Ripening Plants • Spraying or Dipping Operations Hazardous Materials • Tents, Canopies and/or Air Supported Structures High-Pile Combustible Storage (HPS) • Tire Storage • Liquefied Petroleum Gases • Welding and Cutting Operations • LPG or Gas Fuel Vehicles in Assembly Buildings • Wood Products/Lumber Yards FSC-11 Hazardous Materials–Submittal to the County of San Bernardino —/—/— The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by the Building and Safety —/—/— Services Department will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan, California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a plan is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials -Submittal to Fire Construction Services —/—/- 1. Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the current editions of the California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances and other implemented and/or adopted standards. 11 Project No. DRC2014-00378 Completion Date FSC-13 Alternate Method Application - Fire Construction Services staff and the Fire Marshal will --- review all requests for alternate method, when submitted. The request must be submitted on the Fire District"Application for Alternate Method" form along with supporting documents and payment of the review fee. FCS-14 Map Recordation —/—/- 1. Reciprocal Agreements for Fire Department Emergency Access and Water Supply are required on this project. The project appears to be located on a property that is being subdivided. The reciprocal agreement is required to be recorded between property owners and the Fire District. The recorded agreement shall include a copy of the Site Plan. The Fire Construction Services shall approve the agreement, prior to recordation. The agreement shall be recorded with the County of San Bernardino, Recorder's Office. 2. Reciprocal Access Agreement–Please provide a permanent access agreement between the —/—/— owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access, without Fire Department approval. The agreement shall have provisions for emergency situations and the assessing of cost recovery to the property by the Fire District. 3. Reciprocal Water Covenant – Please provide a permanent maintenance and service —/—/— covenant between the owners granting an irrevocable and non-exclusive easement, favoring the Fire District for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems facilities in general). The covenant shall have provisions for emergency situations and the assessing of cost recovery to the property by the Fire District. FCS-15 Annexation of the Parcel Map: Annexation of the parcel map into the Community --- Facilities District#85-1 or#88-1 is required prior to the issuance of Grading or Building Permits. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS – Please complete the following prior to the issuance of any Building Permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site(private)fire underground and water plans is required prior to any Building Permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building and Safety Services Department and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply(Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CVWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CVWD personnel shall inspect the installation and 12 Project No. DRC2014-00378 Completion Date witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CVWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14 feet, 6 inches above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CVWD must be received. The applicant is responsible for obtaining the fire flow information from CVWD and submitting the letter to Fire Construction Services. 5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services'"Temporary Power Release Checklist and Procedures." PRIOR TO OCCUPANCY OR FINAL INSPECTION - Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in —/—/— the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system —/—/— shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates —/—/— must be inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction Services. 13 Project No. DRC2014-00378 Completion Date 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access —/—/— roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Must be in accordance with the RCFPD Standard 5-7, 5-8 and/or 5-5. Prior to the —/—/— issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address in accordance to the appropriate RCFPD addressing Standard. 10. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire —/—/— Construction Services. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho —/—/— Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Must be in accordance with the RCFPD Standard 5-11. Prior to the —/—/— issuance of a Certificate of Occupancy, a 8 '/" x 11" or 11" x 17" Site Plan of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The Site Plan must be reviewed and accepted by the Fire Inspector. 14