HomeMy WebLinkAbout16-004 - Resolutions - FEE SCHEDULE APPLICABLE TO COMMUNITY SERVICES, ENGINEERING SERVICES, PLANNING, AND BUILDING & SAFETY DEPARTMENTS RESOLUTION NO. 16-004
A RESOLUTION OF THE CITY COUNCIL OF RANCHO
CUCAMONGA, CALIFORNIA, ADOPTING AN UPDATED FEE
SCHEDULE APPLICABLE TO COMMUNITY SERVICES,
ENGINEERING SERVICES, PLANNING, AND BUILDING &
SAFETY DEPARTMENTS, AMENDING RESOLUTION NOS. 12-
196, 14-003 AND 14-095.
A. Recitals.
1. The California Government Code allows the City to establish fees and charges for
municipal services, provided such fees and charges do not exceed the estimated reasonable cost
to the City in providing the service to which the fee or charge applies.
2. Data indicating the estimated or actual cost to provide each service, for which the fees
and charges set forth herein apply, was made available to the public at least ten (10) days prior
to the date of the public hearing.
3. On January 20, 2016, City Council of the City of Rancho Cucamonga conducted a duly
noticed public hearing on the amendment.
4. All legal prerequisites prior to the adoption of this Ordinance have occurred.
B. Resolution.
The City Council of the City of Rancho Cucamonga finds and resolves as follows:
SECTION 1: The City Council hereby specifically finds that all of the facts set forth in the
Recitals, Part A, of this Ordinance are true and correct.
SECTION 2: The City Council hereby specifically finds that the fees and charges set forth
do not exceed the estimated reasonable cost of providing the service for which the fee or charge
be levied.
SECTION 3: The City hereby amends Resolution 14-003 and adopts the following fees for
services performed by the Community Services Department.
General Facility Use Fees (Groups 3 — 4)
Addition of Premium Hour category for rentals of Rancho Cucamonga Hall and David Dreier
Hall at Central Park Community Center. Premium Hour category definition: All hours on
Saturdays and designated Holidays.
Fee Description Locations Group New Fee Amount
Premium Hour Rental David Dreier Event Hall with Group 3 $180.00/hr
Kitchen
Group 4 $210.00/hr
Rancho Cucamonga Event Hall Group 3 $270.00/hr
with Kitchen
Group 4 $310.00/hr
Central Park Wedding Ceremony Package (Groups 3 —4)
Fee Description Location New Fee Amount
Wedding Ceremony Package Central Park Mesa Courtyard $620.00
Equipment Use Fee — Community Facilities (Groups 2 — 4)
Fee Description Location New Fee Amount
Additional Stage piece Central Park $25 per piece
(minimum 2 pieces)
General Facilities Use Fee —Victoria Gardens (Groups 2— 4)
Extended hours defined as Friday after 5:00 p.m., Saturdays and Sundays.
Group Category Current Fee New Fee Amount
Lewis Family Playhouse (Theatre & Backstage) PREP DAYS — 4 hour minimum
Group 2 Extended Hours $105.00/hr $265.00/hr
Group 3 Extended Hours $135.00/hr $265.00/hr
Group 4 Extended Hours $135.00/hr $265.00/hr
Lewis Family Playhouse (Theatre & Backstage) PERFORMANCE DAYS — 4 hour
minimum
Group 2 Extended Hours $210.00/hr $265.00/hr
Group 3 Extended Hours $265.00/hr $265.00/hr
Group 4 Extended Hours $265.00/hr $265.00/hr
Sports Organization Light Fees
Fee Description Location New Fee Amount
Light Fee per each field use All fields —Approved Sports $6 per hour/per field
Groups
SECTION 4: The City hereby amends Resolution 14-095 and adopts the following fees for
services performed by the Engineering Services Department for parking at the Metrolink Lot.
Resolution No. 16-004 — Page 2 of 5
Metrolink Lot Parking Permit Fees
Permit Type Current Fee New Fee
Monthly Permit - Residents $25.00 $20.00
Monthly Permit — Non-Residents $30.00 $30.00
Disabled $0.00 $0.00
Daily Parking Permit $4.50 $4.50
SECTION 5: The City hereby amends Resolution No. 12-196 and 14-003 and adopts the
following fees for services performed by the Building and Safety Services department.
The Technology Fee for all applicable Building and Safety Services Department Fees will increase
from 4.5% to 5.0%
Miscellaneous Fire Permit Fee
Work Item Unit Current Fee New Fee
12B Fire Sprinkler review for repetitive per floor or 100% of plan 30% of the
buildings (more than one identical system check fee plan check
building) amount amount
Miscellaneous Items Permit Fee
Note: Change the heading of Re-roofing — Residential to read Re-roofing Residential (including
re-roofing work using the same roofing material) and change the parameters of roofing areas as
shown in items 100 through 103 from 500 sq. ft. to 3,000 sq. ft.
Mechanical, Electrical and Plumbing Fees
Fee Type Fee Description Current Fee New Fee
80B Photovoltaic Solar System Residential Hourly Rate $132.00
(each) 10 kw— 30 kw
82B Temporary Utility Release Each Request $0 $132.00
Plan Check and Inspection Fee
Note: For repetitive buildings of multi-residential buildings with more than one identical building,
the permit fee shall be 45% of the original total fee of the first building.
SECTION 6: The City hereby amends Resolution No. 12-196 and 14-003 and adopts the
following fees for services performed by the Planning Department.
The Technology Fee for all applicable Planning Department Fees will increase from 4.5%to 5.0%
Resolution No. 16-004 — Page 3 of 5
Current
Fee Name Fee New Fee
60 Tribal Consultation $0.00 Current Hourly Rate
$500 or $1,000 Deposit required depending on the
scope of the project.
61 Hourly Rate $0.00 $104.00
Note: Fees for development entitlements or services not listed will be determined on a
case-by-case basis by the Planning Director. It will be based on the hourly rate and the time
of service provided.
SECTION 7: The City hereby adopts the following fees for development services performed
by the Engineering Services Department.
The Technology Fee for all applicable Engineering Services Department Fees will increase
from 4.5% to 5.0%
SECTION 8: The fees set forth in Section 3 of this Resolution shall take effect February 1,
2016 excluding the Sports Organization Light Fees which will be effective upon installation of the
software and card reader equipment on the light poles.
SECTION 9: The fees set forth in Section 4 of this Resolution shall take effect March 1,
2016.
SECTION 10: Subject to the provisions of Section 8, in accordance with California
Government Code Section 66017, those fees and charges set forth in Sections 5, 6 and 7, that
constitute "a fee or charge...upon a development project...which applies to the filing, accepting,
reviewing, approving, or issuing of an application, permit, or entitlement to use" shall become
effective and payable sixty (60) days from the date of adoption of this Resolution.
SECTION 11: Each fee set forth in Sections 5 and 6, except the technology fee, shall be
adjusted annually, commencing on July 1, 2016, and each year thereafter, without further action
of the City Council, based on the Employee Cost Index for State and Local Government
Employees, Total Compensation, during the 12 month period ending on December 31st of the
immediately preceding year, as released by the U.S. Department of Labor's Bureau of Labor
Statistics and rounded to the nearest whole dollar. If this index is discontinued, a replacement
index, as determined by the City Council, shall be utilized.
SECTION 12: The City Clerk shall certify to the adoption of this Resolution.
Resolution No. 16-004 — Page 4 of 5
PASSED, APPROVED, AND ADOPTED this 2011 day of January 2016.
AYES: Alexander, Kennedy, Michael, Spagnolo, Williams
NOES: None
ABSENT: None
ABSTAINED: None
ennis Michael, Mayor
ATTEST:
ice C. Reynolds, City Jerk
I, JANICE C. REYNOLDS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 20th day of January 2016.
Executed this 21St day of January 2016, at Rancho Cucamonga, California.
nice C. Reynolds, City Clerk
Resolution No. 16-004 — Page 5 of 5