HomeMy WebLinkAbout15-27 - Resolutions RESOLUTION NO. 15-27
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2014-00232, A PROPOSAL TO CONSTRUCT A 4-STORY
HOTEL WITH A FLOOR AREA OF 60,989 SQUARE FEET WITH 105
ROOMS ON A VACANT PARCEL OF ABOUT 91,000 SQUARE FEET(2.08
ACRES) IN THE INDUSTRIAL PARK (IP) DISTRICT, WITHIN THE
INDUSTRIAL COMMERCIAL OVERLAY DISTRICT (ICOD)LOCATED ON
THE WEST SIDE OF PITTSBURGH DRIVE, NEAR THE INTERSECTION
WITH MISSION VISTA DRIVE, ABOUT 700 FEET NORTH OF 4TH
STREET;AND MAKING FINDINGS IN SUPPORTTHEREOF— APN: 0229-
341-11.
A. Recitals.
1. Woodbridge Hospitality, Inc.filed an application forthe approval of Development Review
DRC2014-00232 as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 8th day of April 2015 the Planning Commission of the City of Rancho Cucamonga
conducted a noticed public hearing on the application and concluded said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on April 8, 2015, including written and oral staff reports, together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to a parcel located on the west side of Pittsburgh Drive,
near the intersection with Mission Vista Drive, about 700 feet north of 4th Street; and
b. The parcel has an area of about 91,000 square feet(2.08 acres)and is about 289
feet(east-west) by about 308 feet (north-south); and
C. The parcel is vacant and is dominated by short grasses/shrubs; and
d. The project site is bound on the north by a California Highway Patrol(CHP)station.
To south and west are hotels (Towne Place Suites by Marriot and Holiday Inn Express). To the
east, on the opposite side of Pittsburgh Avenue, is an industrial office building and another hotel
(Homewood Suites by Hilton); and
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 2
e. The zoning of the property and all properties to surrounding it is Industrial Park(IP)
District. The property and the properties to the east, west, and south are also within the Industrial
Commercial Overlay District (ICOD); and
f. The applicant proposes to construct a 4-story hotel with a floor area of 60,989
square feet and 105 rooms. The hotel will operate as a Fairfield Inn and Suites by Marriot; and
g. The parking requirement for hotels is one parking stall per unit/room and two
parking stalls for the manager/employees. The required parking for the proposed hotel is 107
parking stalls; 108 parking stalls will be provided; and
h. The proposed hotel has a floor area of 60,989 square feet. As the area of the
project site is about 91,000 square feet(2.08 acres),the building will have a floorarea ratio(FAR)of
67 percent(60,989/91,000 = 0.67). As the FAR of the proposed hotel exceeds the maximum FAR
of 0.60 (60 percent) that is permitted in the Industrial Park (IP) District per Figure LU-2 of the
General Plan and Table 17.36.040-1 of the Development Code, General Plan Amendment
DRC2014-00877 and Development Code Amendment DRC2014-00879 are being presented to the
Planning Commission in conjunction with the subject application in order to establish a higher
maximum FAR that will be specific to hotels and motels.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
a. The proposed project is in accord with the General Plan(subject to the approval of
General Plan Amendment DRC2014-00877), the objectives of the Development Code (subject to
the approval of Development Code Amendment DRC2014-00879),and the purposes of the Zoning
District in which the site is located. The proposal is to construct a 4-story hotel with a floor area of
60,989 square feet and 105 rooms. The underlying General Plan designation is Industrial Park.
b. The proposed project, together with the conditions applicable thereto, will not be
detrimental to the public health, safety or welfare, or materially injurious to properties or
improvements in the vicinity. The potential land uses that would be associated with this project are
consistent with the land uses within the vicinity where it is located and the expectations of the
community. The zoning of the property and all properties to surrounding it is Industrial Park (IP)
District. The property and the properties to the east, west, and south are also within the Industrial
Commercial Overlay District (ICOD);
C. The proposed development complies with each of the applicable provisions of the
Development Code, except maximum Floor Area Ratio,forwhich a Development Code Amendment
(related file: DRC2014-00567)is being presented in order to allow the floor area ratio to be greater
than 0.60 (60 percent). The proposed development otherwise complies with all other standards
outlined in the Development Code and the design and development standards and policies of the
Planning Commission and the City including building and parking setbacks, building height,average
landscape depth, parking, landscape coverage, site planning, and architecture.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration,together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 3
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. Pursuant to the California Environmental Quality Act("CEQA") and the City's local
CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of
the project. Based on the findings contained in that Initial Study, City staff determined that,with the
imposition of mitigation measures, there would be no substantial evidence that the project would
have a significant effect on the environment. Based on that determination, a Mitigated Negative
Declaration was prepared. Thereafter, the City staff provided public notice of the public comment
period and of the intent to adopt the Mitigated Negative Declaration.
b. The Planning Commission has reviewed the Mitigated Negative Declaration and all
comments received regarding the Mitigated Negative Declaration and, based on the whole record
before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA;
and (ii)that, based on the imposition of mitigation measures, there is no substantial evidence that
the project will have a significant effect on the environment. The Planning Commission furtherfinds
that the Mitigated Negative Declaration reflects the independent judgment and analysis of the
Planning Commission. Based on these findings and prior to the approving Development Review
DRC2014-00232, the Planning Commission hereby recommends the City Council adopt the
Mitigated Negative Declaration.
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission therefore
recommends the City Council adopt the Mitigation Monitoring Program for the project.
d. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program and all other materials which constitute the record of proceedings
upon which the Planning Commission's recommendation is based is the Planning Director of the
City of Rancho Cucamonga. Those documents are available for public review in the Planning
Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho
Cucamonga, California 91730, telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the attached standard conditions incorporated herein by this reference.
Planning Department
1) Approval of Development Review DRC2014-00232 is contingent upon City
Council approval of General Plan Amendment DRC2014-00877 and
Development Code Amendment DRC2014-00879 and their adoption of the
Mitigated Negative Declaration of environmental impacts, the Mitigation
Monitoring Program and all mitigations contained therein for all project
components.
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 4
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits,the developer shall submit
construction plans to the City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized,or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
PLANNING COMMISSION RESOLUTION NO. 15-27 .
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 5
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB])daily to reduce Fine Particulate Matter(PM,o)emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM,o emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) Provide preferential parking to high occupancy vehicles and shuttle
services.
11) Improve thermal integrity of the buildings and reduce thermal load with
automated time clocks or occupant sensors.
12) Landscape with native and/or drought-resistant species to reduce
water consumption and to provide passive solar benefits.
13) Provide lighter color roofing and road materials and tree planting
programs to comply with the AQMP Miscellaneous Sources MSC-01
measure.
14) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods(i.e., in excess of 10
minutes).
15) All industrial and commercial facilities shall designate preferential
parking for vanpools.
16) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
17) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 6
Biological
1) A preconstruction nesting survey shall be conducted three (3) days
prior to the commencement of vegetation removal, soil disturbance,
grading, and/or construction on the project site. If nests are
discovered, they should be avoided through establishment of an
appropriate buffer setback, as determined by a qualified wildlife
biologist and consistent with California Department of Fish and Wildlife
(CDFW)protocols.The temporary"no construction"area would have to
be maintained until the nest has completed its cycle, as determined by
a qualified wildlife biologist. Once the nest cycle is complete and all
nestlings have fledged and left the nest, then construction in the area
could resume.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public approximately the archaeological
heritage of the area.
• Prepare a mitigation plan consistent with Section 21083.2
Archaeological resources of CEQA to eliminate adverse project
effects on significant, important, and unique prehistoric
resources, including but not limited to, avoiding archaeological
sites, capping or covering sites with soil, planning the site as a
park or green space or paying an in-kind mitigation fee.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) The applicant shall contact the Gabrieleno Band of Mission Indians —
Kizh (Kit'c) Nation to discuss monitoring of the project to ensure that
prehistoric archaeological resources that may be encountered during
grading are protected or preserved for study. The applicant shall
submit the results of this consultation to the City prior to issuance of
permits for grading of the site.
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 7
3) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures(i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate, the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository(i.e., San Bernardino County Museum).
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy to the report to the San
Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM,() emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM,o emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 8
Greenhouse Gas Emissions
1) The project must comply with all rules that assist in reducing short-term
air pollutant emission in compliance with SCAWMD Rule 403 regarding
fugitive dust including treating the site with water or other soil-
stabilizing agent twice daily or replanting disturbed areas as quickly as
possible.
2) The construction contractor shall select construction equipment based
on low emission factors and high energy efficiency and submit a
statement on the grading plan that ensures all construction equipment
will be tuned and maintained in accordance with the manufactures'
specification.
3) Trucks shall not idle continuously for more than 5 minutes.
4) Alternative fuel powered equipment shall be utilized in lieu of gasoline-
or diesel-powered engines where feasible.
5) Construction should be timed so as not to interfere with peak-hour
traffic.
6) Ridesharing and transit incentives shall be supported and encouraged
for construction crew.
Long Term (Operational) GHG Emissions
7) Construction and Building materials shall be produced and/or
manufactured locally. Use "Green Building Materials" such as
materials that are resource efficient, recycled, and manufactured in an
environmentally friendly way including low-volatile-organic-compound
(VOC) materials.
8) Design all buildings to exceed California Building Code Title 24 energy
standard including but not limited to any combination of:
• Increased insulation
• Limit air leakage through the structure
• Incorporate Energy Star or better rated windows, space heating
and cooling equipment, light fixtures, and appliances
• Landscape and developed site utilizing shade, prevailing winds
and landscaping
• Install efficient lighting and lighting control systems
• Install light colored "cool" roofs and cool pavements
• Install solar or light emitting diodes (LED's) for outdoor lighting.
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 9
9) Prepare a comprehensive water conservation strategy appropriate for
the project and include the following:
• Install water efficient landscapes and irrigation systems and
devices in compliance with the Cityof Rancho Cucamonga Water
Efficient Landscape Ordinance.
• Use reclaimed waterfor landscaping within the project if available
and/or install the infrastructure to deliver and use reclaimed
water.
• Design building to be water efficient by installing water efficient
fixtures and appliances including low flow faucets, dual flush
toilets and waterless urinals/water heaters.
• Design irrigation to control runoff and to remove water to non-
vegetated surfaces.
10) Reuse and recycle construction and demolition waste. Provide interior
and exterior storage areas for recyclables and green waste in public
areas. Educated employees about reducing waste and about
recycling.
Hydrology and Water Quality
1) Prior to issuance of grading permits, the permit applicant shall submit
to Building Official for approval of a Storm Water Pollution Prevention
Plan (SWPPP) specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to the maximum
extent practical.
2) An Erosion Control Plan shall be prepared, included in grading plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
Erosion Control Plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 10
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by RMA-Riverside, Inc.October6,
2014 to reduce pollutants after construction entering the storm drain
system to the maximum extent practical.
6) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
grading permits.
Grading Activities:
7) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in June
2004.
8) Prior to issuance of grading or paving permits, the applicant shall
obtain a Notice of Intent(NOI)to comply with obtaining coverage under
the National Pollutant Discharge Elimination System(NPDES)General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Prior to the issuance of any grading plans a construction-related noise
mitigation plan shall be submitted to the City for review and approval.
The Plan shall depict the location of the construction equipment and
how the noise from this equipment would be mitigated during
construction.
2) Business operations shall maintain a noise level at 60dB or less during
the hours of 10:00 p.m. until 7:00 a.m. No loading and unloading
activities including opening, closing, or other handling of boxes,crates,
containers, building materials, garbage cans, or other similar objects
between the hours of 10:00 p.m. and 7:00 a.m. in a manner which
would cause a noise disturbance to residential areas.
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DR02014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 11
3) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
4) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.66.050,as measured at the
property line. The developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development Code
Section 17.66.050. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
5) Stationary construction noise sources such as generators or pumps
must be located at least 100 feet from sensitive land uses, as feasible,
or at maximum distance when necessary to complete work near
sensitive land uses. This mitigation measure must be implemented
throughout construction and may be periodically monitored by the
Director of Community and Economic Development,or designee during
routine inspections.
6) Construction staging areas must be located as far from noise sensitive
land uses as feasible. This mitigation measure must be implemented
throughout construction and may be periodically monitored by the
Director of Community and Economic Development,or designee during
routine inspections.
7) Throughout construction, the contractor shall ensure all construction
equipment is equipped with included noise attenuating devices and are
properly maintained. This mitigation measure shall be periodically
monitored by the Director of Community and Economic Development,
or designee during routine inspections.
8) Idling equipment must be turned off when not in use. This mitigation
measure may be periodically monitored by the Director of Community
and Economic Development, or designee during routine inspections.
9) Equipment must be maintained so that vehicles and their loads are
secured from rattling and banging. This mitigation measure may be
periodically monitored by the Director of Community and Economic
Development, or designee during routine inspections.
10) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips(counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
PLANNING COMMISSION RESOLUTION NO. 15-27
DEVELOPMENT REVIEW DRC2014-00232 —WOODBRIDGE HOSPITALITY, INC.
April 8, 2015
Page 12
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 8TH DAY OF APRIL 2015.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:E;) w �"n
Ravenel Wimberly, Chairman
ATTEST: CAJI &.A.�
Candyc urnett, Secretary
I, Candyce Burnett, Secretary of the Planning Commission for the City of Rancho Cucamonga, do
hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted
by the Planning Commission of the City of Rancho Cucamonga,at a regular meeting of the Planning
Commission held on the 8th day of April 2015, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, OAXACA, WIMBERLY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
ABSTAIN: COMMISSIONERS: NONE
Conditions of Approval
I
&".41110
AXGNIGA Community Development Department
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: - 022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
A. Planning Department
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers, or employees, because of the issuance of such approval, or in the alternative, to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees,
for any Court costs and attorney's fees which the City, its agents, officers, or employees may be
required by a court to pay as a result of such action. The City may, at its sole discretion, participate
at its own expense in the defense of any such action but such participation shall not relieve applicant
of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions
of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet(s)
are for information only to all parties involved in the construction/grading activities and are not
required to be wet sealed/stamped by a licensed Engineer/Architect.
3. The applicant shall be required to pay California Department of Fish and Wildlife Notice of
Exemption and Mitigated Negative Declaration fee in the amount of $2,260.00. All checks are to be
made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission
Secretary prior to public hearing.
4. Any approval shall expire if Building Permits are not issued or approved use has not commenced
within 5 years from the date of approval or a time extension has been granted.
5. Approval of this request shall not waive compliance with all sections of the Development Code, all
other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in
effect at the time of Building Permit issuance.
6. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination and in conformance with Building and Safety Services Department
standards, the Municipal Code and the Rancho Cucamonga Fire Department(RCFD) Standards.
7. The developer shall submit a construction access plan and schedule for the development of all lots
for Planning Director and Engineering Services Department approval; including, but not limited to,
public notice requirements, special street posting, phone listing for community concerns, hours of
construction activity, dust control measures, and security fencing.
8. The site shall be developed and maintained in accordance with the approved plans which include
Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and
grading on file in the Planning Department, the conditions contained herein, the Development Code
regulations, the Specific Plan, Master Plan and the Community Plan
Pnnted:3/24/2015 w .CltyofRC.us
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: -022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
A. Planning Department
9. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners' association, or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and Engineering Services Department review
and approved prior to the issuance of Building Permits.
10. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved
by the Planning Director and Police Department (909-477-2800) prior to the issuance of Building
Permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as
not to adversely affect adjacent properties.
11. Occupancy of the facilities shall not commence until such time as all California Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services
Department to show compliance. The buildings shall be inspected for compliance and final
acceptance granted prior to occupancy.
12. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building,
etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has
commenced, whichever comes first.
13. Prior to any use of the project site or business activity being commenced thereon, all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
14. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall
condition would result, the developer shall make a good faith effort to work with the adjoining property
owners to provide a single wall. Developer shall notify, by mail, all contiguous property owners at
least 30 days prior to the removal of any existing walls/fences along the project perimeter.
15. Revised Site Plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of Building Permits.
16. Graffiti shall be removed within 72 hours.
17. The lighting fixture design shall compliment the architectural program. It shall include the plaza
area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting fixtures.
18. Signs shall be conveniently posted for"no overnight parking" and for"employee parking only."
wviw CityofRC.us
Printed 3/24/2015 Page 2 of 11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: -022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
A. Planning Department
19. All operations and businesses shall be conducted to comply with the following standards which
shall be incorporated into the lease agreements for all tenants:
a. Noise Level - All commercial activities shall not create any noise that would exceed an exterior
noise level of 65 dB during the hours of 10 p.m. until 7 a.m. and 70 dB during the hours of 7 a.m. until
10 P.M.
b. Loading and Unloading - No person shall cause the loading, unloading, opening, closing, or other
handling of boxes, crates, containers, building materials, garbage cans, or other similar objects
between the hours of 10 p.m. and 7 a.m. unless otherwise specified herein, in a manner which would
cause a noise disturbance to a residential area.
20. Provide for the following design features in each trash enclosure, to the satisfaction of the
Planning Director:
a. Architecturally integrated into the design of(the shopping center/the project).
b. Separate pedestrian access that does not require the opening of the main doors and to include
self-closing pedestrian doors.
c. Large enough to accommodate two trash bins.
d. Roll-up doors.
e. Trash bins with counter-weighted lids.
f. Architecturally treated overhead shade trellis.
g. Chain link screen on top to prevent trash from blowing out of the enclosure and designed to be
hidden from view.
21. The entire site shall be kept free from trash and debris at all times and in no event shall trash and
debris remain for more than 24 hours.
22. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
23. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections shall be screened from all sides and the sound shall be buffered from adjacent properties
and streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the Planning Director. Any
roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches
above the roof or roof parapet, shall be screened by an architecturally designed enclosure which
exhibits a permanent nature with the building design and is detailed consistent with the building. Any
roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches
above the roof or roof parapet shall be painted consistent with the color scheme of the building.
Details shall be included in building plans.
24. All parking lot landscape islands shall have a minimum outside dimension of 6 feet.
25. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over
a curb stop).
26. All parking spaces shall be double striped per City standards and all driveway aisles, entrances,
and exits shall be striped per City standards.
Printed.7/24/2015 w .CityolRC us
Page 3 0(11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: - 022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
A. Planning Department
27. Bicycle storage spaces shall be provided at a rate equivalent to 5 percent of all required
motorized vehicle parking, with a minimum of one rack with a capacity for two bicycles.
28. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other
non-residential development.
29. For multi-family residential and non-residential development, property owners are responsible for
the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within
the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing,
and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30
days from the date of damage.
30. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for Planning Director review and approval prior to the issuance of Building Permits for the
development or prior final map approval in the case of a custom lot subdivision. For development
occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by
Fire Construction Services.
31. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
32. A minimum of 20 percent of trees planted within industrial projects, and a minimum of 30 percent
within commercial and office projects, shall be specimen size trees -24-inch box or larger.
33. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
34. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in
the required landscape plans and shall be subject to Planning Director review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Services Department.
35. All walls shall be provided with decorative treatment. If located in public maintenance areas, the
design shall be coordinated with the Engineering Services Department.
36. Landscaping and irrigation shall be designed to conserve water through the principles of water
efficient landscaping per Development Code Chapter 17.82.
37 The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
wvnv.CityofRC.us
Printed 9/24/2015 Page 4 of 11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: - 022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
A. Planning Department
38. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to post
cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the amount of
$729 prior to the issuance of Building Permits, guaranteeing satisfactory performance and completion
of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for
City staff time to monitor and report on the mitigation measures. Failure to complete all actions
required by the approved environmental documents shall be considered grounds for forfeit.
39. The applicant shall comply with all Santa Ana Regional Water Quality Board and Federal EPA
water requirements.
40. Approval is for the construction of a 4-story hotel with a floor area of 60,989 square feet with 105
rooms on a vacant parcel of about 91,000 square feet (2.08 acres) in the Industrial Park (IP) District,
Industrial Commercial Overlay District (ICOD) located on the west side of Pittsburgh Drive, near the
intersection with Mission Vista Drive, about 700 feet north of 4th Street; APN: 0229-341-11.
41. Downspouts shall not be visible from the exterior on any elevations of the building. All
downspouts shall be routed through the interior of the building walls.
42. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or
proposed shall be installed at locations not within direct view or line-of-sight of the office corner of the
building. The specific locations of each DDC and FDC shall require the review and approval of the
Planning Department and Fire Construction Services/Fire Department. All Double Detector Checks
(DDC) and Fire Department Connections (FDC) are to be screened behind a 4-foot high block wall.
These walls shall be constructed of decorative masonry block such as slumpstone or stackstone or
poured in-place concrete with design elements incorporated to match the building.
43. The output surface (face) of all lamp heads on wall-mounted light fixtures and the light standards
shall be parallel to the ground in order to eliminate glare and minimize lighting on adjacent properties.
The maximum height of light standards, including the base, measured from the finished surface is 25
feet.
44. Approval of this application is contingent on the approval of General Plan Amendment
DRC2014-00877 and Development Code Amendment DRC2014-00879.
45. All ground-mounted equipment, including utility boxes, transformers, and back-flow devices, shall
be surrounded by a minimum of two rows of shrubs spaced a minimum of 18 inches on-center. All
ground-mounted equipment shall be painted dark green except as directed otherwise by the Fire
Department.
46. All wrought iron fences and sliding gates shall be painted bfack or similarly dark color.
47. Decorative paving shall be provided at each vehicle entrance to the site, behind the public
right-of-way. These decoratively paved areas shall extend from the front property line to the setback
line and have a width equal to that of the driveway.
Printed.3/24/2015 www CityofRC u5
Page 5 of 11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: -022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
B. Ennineerin4 Services Department
1. Easements for public sidewalks placed outside the public right-of-way shall be dedicated to the
City.
2. Pittsburgh Avenue frontage improvements to be in accordance with City "Industrial Collector"
standards as required and including:
a. Protect or provide curb and gutter, sidewalk and street lights, as required.
b. Proposed driveway approach shall conform to Std. Dwg. 101, Type C.
c. Provide curbside drain outlet per City Standards.
d. Protect existing R26(s) signs along Pittsburgh Avenue
e. Provide traffic signing and striping, as required.
3. The sidewalk shall wrap at the back of the proposed drive approach and shall cross the drive
approach at the zero curb face.
4. Street improvement plans, prepared by a registered Civil Engineer, shall be submitted to and
approved by the City Engineer. Alternatively, revisions can be made to existing street improvement
plans Drawing Numbers 769 and 1337 respectively, to the satisfaction of the City Engineer.
5. Site is located within Assessment District 82-1 and therefore exempt from payment of drainage
fees.
6. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source
of energy, fuel or power to any building or structure which is regulated by technical codes and for
which a permit is required unless, in addition to any and all other codes, regulations and ordinances,
all improvements required by these conditions of development approval have been completed and
accepted by the City Council, except: that in developments containing more than one building,
structure or unit, the development may have energy connections made in equal proportion to the
percentage of completion of all improvements required by these conditions of development approval,
as determined by the City Engineer, provided that reasonable, safe and maintainable access to the
property exists. In no case shall more than 95 percent of the buildings, structures or units be
connected to energy sources prior to completion and acceptance of all improvements required by
these conditions of development approval.
7. Construct the following perimeter street improvements including, but not limited to:
Pittsburgh Avenue
Sidewalk
Drive Approach
www.CityofRC.us
Printed:3/24/2675 Page 6 or 11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: - 022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
B. Engineering Services Department
8. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, and intersection safety lights on
future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall
be submitted to and approved by the City Engineer. Security shall be posted and an agreement
executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the
public and/or private street improvements, prior to final map approval or the issuance of Building
Permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction
permit shall be obtained from the Engineering Services Department in addition to any other permits
required.
c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project
along major or secondary streets and at intersections for future traffic signals and interconnect wiring.
Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other
locations approved by the City Engineer.
Notes:
1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart,
unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Access ramps for the disabled shall be installed on all corners of intersections per City Standards
or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with adequate
detours during construction. Street or lane closure permits are required. A cash deposit shall be
provided to cover the cost of grading and paving, which shall be refunded upon completion of the
construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to
City Standards, except for single-family residential lots.
h. Street names shall be approved by the Planning Manager prior to submittal for first plan check.
9. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the Engineering Services Department prior to final map approval or
issuance of Building Permits whichever occurs first. Formation costs shall be borne by the
developer.
10. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
11. Provide separate utility services to each parcel including sanitary sewerage system, water, gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards.
Easements shall be provided as required.
12. The developer shall be responsible for the relocation of existing utilities as necessary.
Pnnted 3/24/2015 P4"/w CltyofRC 115
Page 7 0(11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: -022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.-
B.
ROJECT.B. Engineering Services Department
13. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from the
CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such
letter must have been issued by the water district within 90 days prior to final map approval in the
case of subdivision or prior to the issuance of permits in the case of all other residential projects.
14. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from them.
15. Prior to the issuance of Building Permits, a Diversion Deposit and related administrative fees
shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable
if at least 50 percent of all wastes generated during construction and demolition are diverted from
landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the
Engineering Services Department when the first Building Permit application is submitted to the
Building and Safety Services Department. Form CD-2 shall be submitted to the Engineering Services
Department within 60 days following the completion of the construction and/or demolition project.
E. Grading Section
1. Grading of the subject property shall be in accordance with current adopted California Building
Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s)
shall be in substantial conformance with the approved conceptual Grading and Drainage Plan.
2. A soils report shall be prepared by a qualified Engineer licensed by the State of California to
perform such work. Two copies will be provided at grading and drainage plan submittal for review.
Plans shall implement design recommendations per said report.
3. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and
submitted at the time of application for Grading and Drainage Plan review.
4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be
completed, submitted, and approved by the Building and Safety Official prior to the issuance of
building permits.
5. A separate Grading and Drainage Plan check submittal is required for all new construction projects
and for existing buildings where improvements being proposed will generate 50 cubic yards or more
of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet
signed by a California licensed Civil Engineer.
6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place
a dust control sign on the project site prior to the issuance of a grading permit.
7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for
review, that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit.
www CityofRC.us
Printed 3/24/2015 Page 8 of 11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: -022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
E. Grading Section
8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be
prepared and submitted to the Building and Safety Official for review and approval for on-site storm
water drainage prior to issuance of a grading permit. All reports shall be wet signed and sealed by
the Engineer of Record.
9. It shall be the responsibility of the applicant to acquire any required off-site drainage easements
prior to the issuance of a grading permit.
10. It shall be the responsibility of the applicant to obtain written permission from the adjacent
property owner(s) to construct wall on property line or provide a detail(s) showing the perimeter
wall(s) to be constructed offset from the property line.
11. The Final Grading and Drainage Plan shall show the accessibility path from the public right of
way and the accessibility parking stalls to the building doors in conformance with the current adopted
California Building Code. All accessibility ramps shall show sufficient detail including gradients,
elevations, and dimensions and comply with the current adopted California Building Code.
12. The Grading and Drainage Plan shall implement City Standards for on-site construction where
possible, and provide details for all work not covered by City Standard Drawings.
13. All slopes shall be a minimum 2-foot offset from the public right of way or adjacent private
property.
14. Private sewer, water, and storm drain improvements will be designed per the, latest adopted
California Plumbing Code.
15. The maximum parking stall gradient is 5 percent. Accessibility parking stall grades shall be
constructed per the, current adopted California Building Code.
16. Roof storm water is not permitted to flow over the public parkway and shall be directed to an
under parkway culvert per City of Rancho Cucamonga requirements prior to issuance of a grading
permit.
17. This project shall comply with the accessibility requirements of the current adopted California
Building Code.
18. The precise grading and drainage plan shall follow the format provided in the City of Rancho
Cucamonga handout"Information for Grading Plans and Permit".
Pnnted 3/24/2015 V .CityotRC.u4
Page 9 of 11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL///W/S PITTSBURGH + MISSION VISTA
Location: -022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
E. Grading Section
19. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor
shall request a pre-grading meeting. The meeting shall be attended by the project
owner/representative, the grading contractor and the Building Inspector to discuss about grading
requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from
the start of grading operations, the grading permit may be subject to suspension by the Building
Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and
Safety Department at least 1 working day in advance to request the following grading inspections
prior to continuing grading operations: i) The bottom of the over-excavation; ii) Completion of Rough
Grading, prior to issuance of the building permit; iii) At the completion of Rough Grading, the grading
contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an
original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by
the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the
compaction reports will be reviewed by the Associate Engineer or a designated person and approved
prior to the issuance of a building permit.
20. Prior to the issuance of the Certificate of Occupancy the engineer of record shall certify the
functionality of the storm water quality management plan (WQMP) best management practices
(BMP) devices.
21. The Water Quality Management Plan (WQMP) shall include a copy of the project Conditions of
Approval.
22. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of
Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by
the Building Official and recorded with the County Recorder's Office.
23. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification
Number(WDID).
24. All roof drainage Flowing to the public right of way (Pittsburgh Avenue) must drain under the
sidewalk through a parkway culvert approved by the Engineering Department.
25. The applicant shall provide a copy of EPA Form 7520-16 (Inventory of Injection Wells) with the
Facility ID Number assigned to the Building and Safety Services Department Official prior to issuance
of the Grading Permit.
26. The land owner shall provide an inspection report by a qualified person/company on a biennial
basis for the underground infiltration chambers to the City of Rancho Cucamonga Environmental
Program Manager. The land owner shall maintain on a regular basis all best management practices
(BMP"s) as described in the Storm Water Quality Management Plan prepared for the subject project.
All costs associated with the underground infiltration chamber are the responsibility of the land
owner.
27. Prior to issuance of a wall permit, on engineered combination garden/retaining walls along the
property boundary the structural calculations for the wall shall assume a level toe/heel at the adjacent
off-site property (i.e. a manufactured slope is not present).
www.CityofRC.us
Pnnteo:7/24/2015 Page 10 of 11
Project#: DRC2014-00232 CEQA2014-00017, PMT2015-00619
Project Name: 105 ROOM HOTEL 1H W/S PITTSBURGH + MISSION VISTA
Location: -022934111-0000
Project Type: Design Review CEQA Review, Commercial New Construction
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
E. Grading Section
28. Prior to issuance of a wall permit, a copy of the Grading Special Conditions of Approval shall be
included within the engineered wall plans and calculations.
29. Prior to removing fences or walls along common lot lines and prior to constructing walls along
common lot lines the applicant shall provide a letter from the adjacent property owner(s) allowing
work on the adjacent property.
30. The land owner shall provide an inspection report on a biennial basis for the underground
infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land
owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan
prepared for the subject project. All costs associated with the underground infiltration chamber are
the responsibility of the land owner.