Loading...
HomeMy WebLinkAbout18-24 - Resolution - Approval of Time Extension for One Year for SUBTT16072, Located in the Low (L) Residental District RESOLUTION NO 18-24 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA,APPROVING A REQUEST FOR A FIFTH 1-YEAR TIME EXTENSION(DRC2018-00319) FORA PREVIOUSLY APPROVED TENTATIVE TRACT MAP (SUBTT16072) TO SUBDIVIDE 150.79 ACRES INTO 358 LOTS IN THE LOW(2-4 DWELLING UNITS PER ACRE) RESIDENTIAL DISTRICT, WITH AN AVERAGE DENSITY OF 2.3 DWELLING UNITS PER ACRE FOR THE ENTIRE PROJECT, IN THE UPPER ETIWANDA NEIGHBORHOOD OF THE ETIWANDA NORTH SPECIFIC PLAN, LOCATED AT THE NORTHEAST CORNER OF WILSON AVENUE AND ETIWANDA AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF -APNs: 1087-081-12, 19 THROUGH 24. A. Recitals. 1. Golden Meadowland, LLC. and Ranch Haven, LLC.filed an application for the extension of the approval of Tentative Tract Map SUBTT16072, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map Time Extension request is referred to as "the application." 2. On June 16, 2004, the City Council adopted its Resolution No. 04-206, thereby, approving Tentative Tract Map SUBTT16072 subject to specific conditions and time limits. 3. On June 13, 2007,the Planning Commission adopted its Resolution No.07-26,thereby, approving the application for a 1-year time extension subject to specific conditions and time limits. 4. On May 28, 2008, the Planning Commission adopted its Resolution No. 08-25,thereby, approving the application for a 1-year time extension subject to specific conditions and time limits. 5. From July 2008 to July 2013, Senate Bill 1185,Assembly Bill 333,Assembly Bill 208 and Assembly Bill 116 were approved by the Governor allowing for a total of 7 years of automatic extensions for this Tentative Tract Map SUBTT16072. 6. On June 22, 2016,the Planning Commission adopted its Resolution No. 16-42,thereby, approving the application for a 1-year time extension subject to specific conditions and time limits 7. On June 14, 2017,the Planning Commission adopted its Resolution No. 17-64,thereby, approving the application for a 1-year time extension subject to specific conditions and time limits 8. On June 13, 2018, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application for a fifth 1-year time extension to SUBTT16072 and concluded said hearing on that date. 9. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: PLANNING COMMISSION RESOLUTION NO.18-24 TIME EXTENSION DRC2018-00319 - GOLDEN MEADOWLAND, LLC. AND RANCH HAVEN, LLC. June 13, 2018 Page 2 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon substantial evidence presented to this Commission during the above- referenced public hearing on June 13, 2018, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to 7 parcels of approximately 150.79 acres located at the northeast corner of Etiwanda Avenue and Wilson Avenue; and b. The project is adjacent to the south and west by single-family residences and is adjacent to the north and east by vacant undeveloped land; and c. The zoning of the subject property is Very-Low Residential District and Low Residential District. The zoning of the properties to the north and west are within the Low Residential District. The Zoning of the property to the east is within the Very-Low Residential District. The Zoning of the properties to the south are within the Very-Low Residential District. The subject property and properties to the north, east and west are within the North Etiwanda Specific Plan. The properties to the south are within the Etiwanda Specific Plan; and d. The previously approved Tentative Tract Map SUBTT16072 complies with the density requirements specified within the Etiwanda North Specific Plan (ENSP). The ENSP requires the density within any residential district to be determined through the residential land development/design review process and public hearings as described in the Development Code in order to ensure compatibility with adjacent residential developments; existing or proposed. The Tentative Tract Map includes 358 lots for single-family residential development and is consistent with the existing residential development to the west and northwest as well as the previously approved subdivisions to the north and southeast. The northern portion of SUBTT16072 includes 167 lots on 56.61 acres with a density of 2.95 dwelling units per acre. The southern portion of the project includes 191 lots on 65.71 acres at a density of 2.92 dwelling units per acre. The combined net density of the project is 2.93 dwelling units per acre.The gross density of the project is 2.38 dwelling units per acre; and e. The previously approved Tentative Tract Map SUBTT16072 is consistent with the density provisions of the General Plan Land Use Designations of Low Residential (2-4 dwelling units per acre) and Very Low Residential (1-2 dwelling units per acre) as averaged across the project site (as described in subsection e. above). Furthermore, development across the entire project results in less development than what would otherwise be allowed under the General Plan based on the permitted densities; and f. The extension of the Tentative Tract Map SUBTT16072 approval will not cause significant inconsistencies with the current General Plan, specific plans, ordinances, plans, codes, and policies; and g. The extension of the Tentative Tract Map SUBTT16072 approval is not likely to cause public health and safety problems; and h. The extension is within the time limits established by State law and local ordinance. This application involves the fifth 1-year time extension. Section 16.16.170.0 of the Municipal Code, PLANNING COMMISSION RESOLUTION NO.18-24 TIME EXTENSION DRC2018-00319 - GOLDEN MEADOWLAND, LLC. AND RANCH HAVEN, LLC. June 13, 2018 Page 3 Time Limit of Extension, allows for up to five time-extensions to be granted in 12-month increments. This will be the final extension of time that can be granted for the subject tentative tract map. 3. Based upon the facts and information contained in the application, together with all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that no subsequent or supplemental environmental document is required pursuant to the California Environmental Quality Act (CEQA) in connection with the review and approval of this application based upon the following findings and determinations: a. Pursuant to the California Environmental Quality Act("CEQA")and the City's local CEQA Guidelines, the City certified an Environmental Impact Report (EIR) on June 16, 2004 in connection with the City's approval of Tentative Tract Map SUBTT16072. Pursuant to CEQA Guidelines Section 15162, no subsequent or supplemental EIR or Negative Declaration is required in connection with subsequent discretionary approvals of the same project unless: (i) substantial changes are proposed to the project that indicate new or more severe impacts on the environment; (ii)substantial changes have occurred in the circumstances under which the project was previously reviewed that indicates new or more severe environmental impacts;or(iii) new important information shows the project will have new or more severe impacts than previously considered; or (iv) additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. b. The Planning Commission finds, in connection with the time extension request,that substantial changes to the project or the circumstances surrounding the project have not occurred which would create new or more severe impacts than those evaluated in the previously certified EIR. The proposal only involves a request to extend the approval period of a previously approved Tentative Tract Map. The proposal does not involve any changes or modifications to the design of the previously approved subdivision. Staff further finds that the project will not have one or more significant effects not discussed in the previously certified EIR, not have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less than significant. A memorandum was submitted by the applicant's biologist, on June 5, 2017, stating the site conditions remain consistent with previous site assessments. The letter also concludes, based on observations made in our recent site visit, no substantial changes have occurred in the circumstances under which the project was previously reviewed that indicates new or more severe environmental impacts and no new important information shows the project will have new or more severe impacts than previously considered,and that, no additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. c. Based on these findings and all evidence in the record,the Planning Commission concurs with the staff determination that no additional environmental review is required pursuant to CEQA in connection with the City's consideration of the time extension. PLANNING COMMISSION RESOLUTION NO.18-24 TIME EXTENSION DRC2018-00319 - GOLDEN MEADOWLAND, LLC. AND RANCH HAVEN, LLC. June 13, 2018 Page 4 4. Based upon the findings and conclusions set forth in Paragraphs 1, 2, and 3 above,this Commission hereby grants a time extension for: Tentative Tract Applicant Expiration SUBTT16072 GOLDEN MEADOWLAND, LLC. June 16, 2019 AND RANCH HAVEN, LLC. 5. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 13TH DAY OF JUNE 2018. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Francisco Oaxaca, Chairman ATTEST: L" Candyce rnett, Secretary I, Candyce Burnett, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed,and adopted by the Planning Commission of the City of Rancho Cucamonga,at a regular meeting of the Planning Commission held on the 13th day of June 2018, by the following vote-to-wit: AYES: COMMISSIONERS: GUGLIELMO, MACIA, MUNOZ, OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE ABSTAIN: COMMISSIONERS: NONE Conditions of Approval j �nc10 CommunityDepartment CUCAMONGA Development P Project#: DRC2018-00319 Project Name: EDR- Richland (Tract 16072)Time Extension Location: 5300 ETIWANDAAVE - 108708112-0000 Project Type: Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Please be advised of the following Special Conditions 1. This project shall meet all of the conditions of approval for Tentative Tract Map 16072. Grading Section Standard Conditions of Approval 1. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit". 2. Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 3. The City of Rancho Cucamonga does not allow on-site storm water quality treatment BMP devices within the individual single-family lots which will be required to be inspected and maintained by each individual homeowner. As a condition of approval for this single-family residential project (including tentative tract maps and parcel maps, and final tract maps and parcel maps of 2 parcels or more) a common storm water treatment system will be required which shall be maintained by a homeowners' association prior to the approval of a water quality management plan and issuance of a grading permit. 4. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the engineer of record shall certify the functionality of the storm water quality management plan (WQMP)storm water treatment devices and best management practices (BMP). 5. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy of the project Conditions of Approval. 6. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 7. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan document. 8. The applicant shall provide a copy of a completed EPA Form 7520-16 (Inventory of Injection Wells) for each underground infiltration device, with the Facility ID Number assigned, to the Building and Safety Services Department Official prior to issuance of the Grading Permit and/or approval of the project-specific Water Quality Management Plan. A copy of EPA Form 7520-16 shall be scanned and pasted onto the permitted grading plan set, and a copy of said form shall be included in the project-specific Water Quality Management Plan. www.CityofRC.us Printed:6/14/2018 Project#: DRC2018-00319 Project Name: EDR- Richland (Tract 16072) Time Extension Location: 5300 ETIWANDA AVE - 108708112-0000 Project Type: Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 9. The land owner shall provide an inspection report by a qualified person/company on a biennial basis for the Class V Injection Wells/underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all best management practices (BMP"s) as described in the Storm Water Quality Management Plan (WQMP) prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 10. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural/treatment best management practices (BMP) devices, as provided for in the project's Storm Water Quality Management Plan, shall be provided for by CC&R's or deeds and shall be recorded prior to the issuance a grading permit. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan. 11. The land owner shall provide an inspection report on a biennial basis for the structural storm water treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 12. The land/property owner shall follow the inspection and maintenance requirements of the approved project specific Water Quality Management Plan and shall provide a copy of the inspection reports on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager. 13. A final project-specific Storm Water Quality Management Plan (WQMP) shall be approved by the Building and Safety Director, or his designee, and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit or any building permit. 14. The final project-specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. www.CityofRC.us Printed:6/14/2018 Page 2 of 3 Project#: DRC2018-00319 Project Name: EDR- Richland (Tract 16072) Time Extension Location: 5300 ETIWANDA AVE - 108708112-0000 Project Type: Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 15. Prior to issuance of a grading permit the Final Project-Specific Water Quality Management Plan shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet" located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table VI1.3: Suitability Assessment Related Considerations for Infiltration Facility Safety Factors". 16. Prior to approval of the final project-specific water quality management plan the applicant shall have a soils engineer prepare a project-specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". 17. The subject project, shall accept all existing off-site storm water drainage flows and safely convey those flows through or around the project site. If existing off-site storm water drainage flows mix with any on-site storm water drainage flows, then the off-site storm water drainage flows shall be treated with the on-site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 18. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm Water Treatment Devices As-Built Certificate with the Environmental Programs Coordinator, City of Rancho Cucamonga Engineering Services Department. www.CityofRC.us Printed:6/14/2018 Page 3 of 3