Loading...
HomeMy WebLinkAbout18-03 - Resolution - Approval of Time Extension for One Year for SUBTT18823 RESOLUTION NO. 18-03 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA,APPROVING TIME EXTENSION DRC2017-00922, A REQUEST TO ALLOW FOR A ONE (1) YEAR TIME EXTENSION OF A PREVIOUSLY APPROVED TENTATIVE TRACT MAP (SUBTT18823) TO SUBDIVIDE 3 PARCELS OF LAND TOTALING 12.93 ACRES INTO 19 LOTS FOR THE FUTURE DEVELOPMENT OF SINGLE- FAMILY RESIDENCES IN THE VERY LOW (VL) DISTRICT OF THE ETIWANDA NORTH SPECIFIC PLAN (.1 TO 2 DWELLING UNITS PER ACRE) LOCATED ON THE WEST SIDE OF WARDMAN BULLOCK ROAD, SOUTH AND EAST OF BLUE SKY COURT; AND MAKING FINDINGS IN SUPPORT THEREOF -APN: 0226-081-15, 16 AND 17 A. Recitals. 1. Youlita and Kiryakos, LLC. filed an application for the extension of the approval of Tentative Tract Map SUBTT18823, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map Time Extension request is referred to as "the application." 2. On January 23, 2013, this Commission adopted Resolution No. 13-07, thereby approving the application subject to specific conditions and time limits. 3. The State approved a time extension of approved tentative maps (AB 116) that extended the approval period by 2-years to January 23, 2018; 4. On February 14, 2018, the Planning Commission of the City of Rancho Cucamonga conducted a noticed public hearing on the application and concluded said hearing on that date. 5. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon substantial evidence presented to this Commission during the above- referenced public hearing on February 14, 2018, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The project site consists of two rectangular shaped parcels and one puzzle- shaped parcel totaling 12.93 acres of land in the Very Low (VL) District of the Etiwanda North Specific Plan. The parcels are vacant except for two unfinished residences on Lots #12 and #15; and b. To the north of the project site is vacant land owned by the San Bernardino County Flood Control District along with three single-family residences within the Very Low (VL) District PLANNING COMMISSION RESOLUTION NO. 18-03 TIME EXTENSION DRC2017-00922 —YOULITA AND KIRYAKOS, LLC February 14, 2018 Page 2 (.1 to 2 dwelling unit per acre) of the Etiwanda North Specific Plan (ENSP). To the south are single-family residences within the Very Low (VL) District (.1 to 2 dwelling units per acre) of the Etiwanda North Specific Plan (ENSP). To the east (across Wardman Bullock Road) are single- family residences within the Low (L) District (2 to 4 dwelling units per acre) of the Etiwanda Highlands Specific Plan (EHSP). To the west is a flood control basin operated by the San Bernardino County Flood Control District within the Flood Control (FC) District; and c. The subdivision of the project site conforms to all applicable development standards of the Etiwanda North Specific Plan (ENSP) for the Very Low (VL) District except for the need for a Variance (DRC2012-00135) to reduce the required lot depth from 150 feet to 124 feet on Lot #9, due to site constraints, and Minor Exception (DRC2012-00513) to allow for perimeter walls up to 8 feet in height on Lots#1, #9 and #10; and d. This application is a request to extend the approval period of Tentative Tract Map SUBTT18823 for one (1) additional year. The time extension is necessary to provide time to resolve outstanding engineering issues. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The previously approved tentative tract map is consistent with the City's current General Plan, specific plans, Ordinances, plans, codes, and policies. The proposed project is for the subdivision of 12.93 acres of land for the future development of 19 single-family residences. The project is consistent with the related City requirements with the previous Planning Commission approval on January 23, 2013, consisting of Variance (DRC2012-00135) to reduce the required lot depth from 150 feet to 124 feet on Lot #9, and a Minor Exception (DRC2012- 00513) to allow for perimeter walls up to 8 feet in height on Lots#1, #9 and #10; and b. The site is physically suitable for the type and density of the proposed subdivision. The project site is well suited for the proposed project as there is similar residential development to the east, north and south of the project site and a flood control retention basin to the west; and c. The proposed subdivision, together with the conditions applicable thereto, will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. An initial study was prepared for the original project that was approved by the Planning Commission on January 23, 2013, along with a Mitigated Negative Declaration, which reviewed potential environmental impacts created by the subdivision of the project site into 19 residential lots. Mitigation measures were included in the original approval reducing any potential impact to less than significant; and d. The proposed subdivision complies with each of the applicable provisions of the Development Code. The proposed subdivision complies all development standards outlined in the Development Code and the Etiwanda North Specific Plan for the development of single-family residences within the Vary Low (VL) District with the previous approval of a Variance for lot width and a Minor Exception for wall height; and e. The extension is within the time limits established by State law and local ordinance. State law allows for one (1) year time extension. PLANNING COMMISSION RESOLUTION NO. 18-03 TIME EXTENSION DRC2017-00922 —YOULITA AND KIRYAKOS, LLC February 14, 2018 Page 3 4. Based upon the facts and information contained in the application, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that no subsequent or supplemental environmental document is required pursuant to the California Environmental Quality Act (CEQA) in connection with the review and approval of this application based upon the following findings and determinations: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, the City adopted a Mitigated Negative Declaration on January 23, 2013, in connection with the City's approval of Tentative Tract Map SUBTT18823, Variance DRC2012- 00135 and Minor Exception DRC2012-00513. Pursuant to CEQA Guidelines Section 15162, no subsequent or supplemental EIR or Negative Declaration is required in connection with subsequent discretionary approvals of the same project unless: (i) substantial changes are proposed to the project that indicate new or more severe impacts on the environment; (ii) substantial changes have occurred in the circumstances under which the project was previously reviewed that indicate new or more severe environmental impacts; or (iii) new important information shows the project will have new or more severe impacts than previously considered; or (iv) additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. b. The Planning Commission finds, in connection with Tentative Tract Map SUBTT18823, Variance DRC2012-00135 and Minor Exception DRC2012-00513 that substantial changes to the project or the circumstances surrounding the project have not occurred which would create new or more severe impacts than those evaluated in the previous Mitigated Negative Declaration. The application is for a one (1)year time extension of a previously approved tentative tract map with no proposed changes to the scope of the original approval. Staff further finds that the project will not have one or more significant effects not discussed in the previous Mitigated Negative Declaration, not have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less than significant. c. Based on these findings and all evidence in the record,the Planning Commission concurs with the staff determination that no additional environmental review is required pursuant to CEQA in connection with the City's consideration of Tentative Tract Map SUBTT18823, Variance DRC2012-00135 and Minor Exception DRC2012-00513. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3 and 4 above, this Commission hereby grants a time extension. The new expiration date for Tentative Tract Map SUBTT8823 is January 23, 2019. 6. All applicable Conditions of Approval in Resolution No. 13-07 and incorporated Standard Conditions in Resolution 13-07 for SUBTT18823 and the attached Standard Conditions incorporated herein by this reference shall apply to Time Extension DRC2017-00922. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF FEBRUARY 2018. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA PLANNING COMMISSION RESOLUTION NO. 18-03 TIME EXTENSION DRC2017-00922 —YOULITA AND KIRYAKOS, LLC February 14, 2018 Page 4 BY: rancisco Oaxaca, Chairman ATTEST: a.. Candy Burne , Secretary • I, Candyce Burnett, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of February 2018, by the following vote-to-wit: AYES: COMMISSIONERS: GUGLIELMO, MACIAS, OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MUNOZ ABSTAIN: COMMISSIONERS: NONE Conditions of Approval 4-4* RANCHO Community Development Department CUCAMONGA Project#: DRC2017-00922 DRC2017-00951, DRC2017-00952 Project Name: Time Extension for SUBTT18823 Location: -- -022608116-0000 Project Type: Time Extension Time Extension, Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Please be advised of the following Special Conditions 1. Comply with all existing conditions of approval per SUBTT18823. 2. New street lights shall be owned by the City. The developer shall be responsible to coordinate and pay all costs of street lights and to provide power to City owned street lights. Street lights for local and collector streets are now 3600 lumen LED. Street light plans must be submitted to Engineering for approval. Standard Conditions of Approval 3. An improvement security per section 66499 of the Subdivision Map Act shall be required prior to final map recordation, accompanied by an agreement executed by the Developer and the City. Grading Section Standard Conditions of Approval www.CityofRC.us Printed:211 412 0 1 8 D3 — � Project#: DRC2017-00922 DRC2017-00951, DRC2017-00952 Project Name: Time Extension for SUBTT18823 Location: ---022608116-0000 Project Type: Time Extension Time Extension, Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 1. GROUND WATER PROTECTION: Prior to approval of the final project specific water quality management plan (WQMP), the WQMP document shall meet the requirements of the State Water Resources Control Board Order No. R8-2010-0036 (NPDES No. CAS 618036), the San Bernardino County Municipal Separate Storm Sewers Separation (MS4) Permit reads: Section XI.D(Water Quality Management Plan Requirements).8(Groundwater Protection): Treatment Control BMPs utilizing infiltration [exclusive of incidental infiltration and BMPs not designed to primarily function as infiltration devices (such as grassy swales, detention basins, vegetated buffer strips, constructed wetlands, etc.)] must comply with the following minimum requirements to protect groundwater: a. Use of structural infiltration treatment BMPs shall not cause or contribute to an exceedance of ground water quality objectives. b. Source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration should be evaluated prior to infiltration. c. Adequate pretreatment of runoff prior to infiltration shall be required in gas stations and large commercial parking lots. (NOTE: The State Water Quality Control Board defines a large commercial parking lot as '100,000 sq. ft. or more of commercial development to include parking lot (with 100 or more vehicle traffics), OR, by means of 5,000sqft or more of allowable space designated for parking purposes'). d. Unless adequate pre-treatment of runoff is provided prior to infiltration structural infiltration treatment BMPs must not be used for areas of industrial or light industrial activity{77}, areas subject to high vehicular traffic (25,000 or more daily traffic); car washes; fleet storage areas; nurseries; or any other high threat to water quality land uses or activities. e. Class V injection wells or dry wells must not be placed in areas subject to vehicular{78} repair or maintenance activities{79}, such as an auto body repair shop, automotive repair shop, new and used car dealership, specialty repair shop (e.g., transmission and muffler repair shop) or any facility that does any vehicular repair work. f. Structural infiltration BMP treatment shall not be used at sites that are known to have soil and groundwater contamination. g. Structural infiltration treatment BMPs shall be located at least 100 feet horizontally from any water supply wells. h. The vertical distance from the bottom of any infiltration structural treatment BMP to the historic high groundwater mark shall be at least 10-feet. Where the groundwater basins do not support beneficial uses, this vertical distance criteria may be reduced, provided groundwater quality is maintained. i. Structural infiltration treatment BMPs shall not cause a nuisance or pollution as defined in Water Code Section 13050. 2. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit". www.CityofRC.us Printed:2/14;2018 Page 2 of 7 Project#: DRC2017-00922 DRC2017-00951, DRC2017-00952 Project Name: Time Extension for SUBTT18823 Location: -- -022608116-0000 Project Type: Time Extension Time Extension, Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 3. Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 4. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 5. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 6. A separate Grading and Drainage Plan cheek submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit. 7. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. All dust control sign(s) shall be located outside of the public right of way. 8. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review, the rough grading plan shall be a separate plan submittal and permit from Precise Grading and Drainage Plan/Permit. 9. Prior to the issuance of a grading permit the applicant shall obtain written permission from the adjacent property owner(s) to construct wall(s) on property line(s) or provide a detail(s) showing the perimeter wall(s)to be constructed offset from the property line. 10. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall be a minimum 2-foot offset from the public right of way, permitted line, or the adjacent private property. All slope offsets shall meet the requirements of the current adopted California Building Code. 11. The applicant shall provide a grading agreement and grading bond for ail cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Building and Safety Official. 12. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond project boundary. 13. This project shall comply with the accessibility requirements of the current adopted California Building Code. WW'N.CityofRC.uS Printed:2.(14/2018 Page 3 of 7 Project#: DRC2017-00922 DRC2017-00951, DRC2017-00952 Project Name: Time Extension for SUBTT18823 Location: ---022608116-0000 Project Type: Time Extension Time Extension, Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 14. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over-excavation; ii) Completion of Rough Grading, prior to issuance of the building permit; iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. 15. Prior to issuance of a grading or building permit, the permitted grading plan (or architectural site plan) set shall show in each of the typical sections and the plan view show how the separations between the building exterior and exterior ground surface meet the requirements of Sections CBC1804.3/CRC R401.3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2.1 of the current adopted California Building Code/Residential Code. 16. Prior to issuance of a grading permit, the applicant shall obtain a signed and notarized letter from the adjacent property owner(s) for ALL work proposed on the adjacent property. The letter shall be scanned and pasted onto the permitted grading plan set. The letter shall show on either the title sheet or a detail sheet of the grading and drainage plan set. 17. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a grading permit. The report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. 18. It shall be the responsibility of the applicant to acquire any required off-site drainage easements prior to the issuance of a grading permit. 19. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. This shall be shown on the grading and drainage plan prior to issuance of a grading permit. Wv'N.CityofRC.us Printed:2'14/2018 Page 4 of 7 Project#: DRC2017-00922 DRC2017-00951, DRC2017-00952 Project Name: Time Extension for SUBTT18823 Location: ---022608116-0000 Project Type: Time Extension Time Extension, Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 20. Prior to issuance of a grading permit and in accordance with Planning Commission Resolution 92-17, if a lot may not directly drain off-site directly to the street or other acceptable drainage device (such as a drainage ditch adjacent to an equestrian trail), then: a) drainage may flow from only one lot onto only one other lot; b) a drainage easement shall be provided over the lot accepting the drainage; c) the drainage shall be contained within either a concrete/rock lined swale/channel or a reinforced concrete pipe; and d) the drainage shall be designed with excess capacity to account for the probable lack of necessary maintenance, therefore, it shall be designed to convey two (2) times the runoff from a 100-year storm event with the minimum diameter of the pipe being 12-inches. 21. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 22. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the engineer of record shall certify the functionality of the storm water quality management plan (WQMP)storm water treatment devices and best management practices (BMP). 23. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy of the project Conditions of Approval. 24. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural/treatment devices and best management practices (BMP) as provided for in the project's Storm Water Quality Management Plan, shall be provided for by CC&R's or deeds and shall be recorded prior to the approval of the Water Quality Management Plan. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan. 25. The City of Rancho Cucamonga does not allow on-site storm water quality treatment BMP devices within the individual single-family lots which will be required to be inspected and maintained by each individual homeowner. As a condition of approval for this single-family residential project (including tentative tract maps and parcel maps, and final tract maps and parcel maps of 2 lots/parcels or more) a common storm water treatment system(s) will be required which shall be maintained by a homeowners' association prior to the approval of a water quality management plan and issuance of a grading permit. 26. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 27. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan document. w ww.CityofRC.us Printed:2;14'2018 Page 5 of 7 Project#: DRC2017-00922 DRC2017-00951, DRC2017-00952 Project Name: Time Extension for SUBTT18823 Location: ---022608116-0000 Project Type: Time Extension Time Extension, Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 28. The applicant shall provide a copy of a completed EPA Form 7520-16 (Inventory of Injection Wells) for each underground infiltration device, with the Facility ID Number assigned, to the Building and Safety Services Department Official prior to issuance of the Grading Permit and/or approval of the project-specific Water Quality Management Plan. A copy of EPA Form 7520-16 shall be scanned and pasted onto the permitted grading plan set, and a copy of said form shall be included in the project-specific Water Quality Management Plan. 29. The land owner shall provide an inspection report by a qualified person/company on a biennial basis for the Class V Injection Wells/underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all best management practices (BMP"s) as described in the Storm Water Quality Management Plan (WQMP) prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 30. The land owner shall provide an inspection report on a biennial basis for the structural storm water treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 31. The land/property owner shall follow the inspection and maintenance requirements of the approved project specific Water Quality Management Plan and shall provide a copy of the inspection reports on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager. 32. A final project-specific Storm Water Quality Management Plan (WQMP) shall be approved by the Building and Safety Director, or his designee, and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit or any building permit. 33. Prior to the start of landscaping operations, the landscape architect and the landscape contractor shall provide a sample of the weed fabric barrier to the Project Planner, City of Rancho Cucamonga Planning Department. The weed barrier shall be permeable. 34. The final project-specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. w Ww.CityofRC.us Printed:2114;2018 Page 6 of 7 Project#: DRC2017-00922 DRC2017-00951, DRC2017-00952 Project Name: Time Extension for SUBTT18823 Location: ---022608116-0000 Project Type: Time Extension Time Extension, Time Extension ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 35. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project-specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the "Inspection and Maintenance Responsibility for Post Construction BMP" section of the final project-specific water quality management plan. 36. Prior to issuance of a grading permit the Final Project-Specific Water Quality Management Plan shall include a completed copy of "Worksheet. H: Factor of Safety and Design Infiltration Worksheets located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table Vll.3: Suitability Assessment Related Considerations for Infiltration Facility Safety Factors". 37. Prior to approval of the final project-specific water quality management plan the applicant shall have a soils engineer prepare a project-specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". 38. The subject project, shall accept all existing off-site storm water drainage flows and safely convey those flows through or around the project site. If existing off-site storm water drainage flows mix with any on-site storm water drainage flows, then the off-site storm water drainage flows shall be treated with the on-site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 39. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm Water Treatment Devices As-Built Certificate with the Environmental Programs Coordinator, City of Rancho Cucamonga Engineering Services Department. 40. As the use of drywells are proposed for the structural storm water treatment device, to meet the infiltration requirements of the current Municipal Separate Storm Sewers Systems (MS4) Permit, adequate source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration shall be evaluated prior to infiltration and discussed in the final project-specific Water Quality Management Plan document. 41. Prior to the issuance of a grading permit, or recording of the final map, the applicant shall prepare a storm water quality management plan (WQMP) meeting the requirements of the current adopted Municipal Separate Storm Sewer Systems (MS4) permit. The WQMP shall be approved by the City Engineer, or his designee, and recorded prior to the issuance of a grading permit and/or recordation of the final map. wvw.CityofRC.us Printed:2,'1412018 Page 7 of 7