HomeMy WebLinkAbout17-63 - Resolutions - Approving Design Review DRC2015-00991, RESOLUTION NO. 17-63 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW DRC2015-00991, FOR THE DEVELOPMENT OF A 10,912 SQUARE FOOT MEDICAL OFFICE BUILDING ON 1.13 ACRES OF LAND IN THE GENERAL COMMERCIAL (GC) DISTRICT, ON THE EAST SIDE OF GROVE AVENUE, APPROXIMATELY 500 FEET SOUTH OF ARROW ROUTE, LOCATED AT 8591 GROVE AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 1089-031-36. A. Recitals. 1. Wecare Dialysis Center filed an application for the approval of Design Review DRC2015- 00991, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Design Review request is referred to as "the application." 2. On the 24th day of May 2017, the Planning Commission of the City of Rancho Cucamonga opened the public hearing on the application, but continued the public hearing until June 14, 2017, due to insufficient noticing of the public meeting. 3. On the 14th day of June 2017, the Planning Commission of the City of Rancho Cucamonga conducted a noticed public hearing on the application and concluded said hearing on that date. 4. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on June 14, 2017, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a property located on the east side of Grove Avenue, approximately 500 feet south of Arrow Route, located at 8591 Grove Avenue in the General Commercial (GC) District; and b. The project site is generally of a rectangular shape of about 322 feet (east-west) by 180 feet (north-south). The site is vacant and vegetation consists of short grass and weeds; there are no trees on-site. The subject property is generally level with an elevation at the north and south sides of about 1,210 feet and 1,208 feet, respectively; and c. The project is for the development of a 10,912 square foot medical office, including an 8,505 square foot dialysis center and a 2,407 square foot sub-tenant on 1.13 acres of land. PLANNING COMMISSION RESOLUTION NO. 17-63 DESIGN REVIEW DRC2015-00991 WECARE DIALYSIS CENTER June 14, 2017 Page 2 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed project is consistent with the objectives of the General Plan; and b. The proposed use is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and c. The proposed use is in compliance with each of the applicable provisions of the Development Code; and d. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. The Planning Department Staff has determined that the project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA Guidelines. The project qualifies under the Class 32 exemption under State CEQA Guidelines Section 15332 — In-Fill Development Projects, because the project is a proposed development occurring within city limits on a project site less than 5 acres in size and substantially surrounded by urban uses. The project is a 10,912 square foot medical office building on 1.13 acres of land within the General Commercial (GC) District. The medical office use is consistent with the intent of the General Commercial designation in the General Plan and the project meets all applicable development standards and zoning regulations of the Development Code. In addition, there is no substantial evidence that the project may have a significant effect on the environment. The Planning Commission has reviewed the Planning Department's determination of exemption, and based on its own independent judgment, concurs in the staff's determination of exemption. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the Design Review application subject to each and every condition set forth in the attached standard conditions incorporated herein by this reference. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF JUNE 2017. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Francisco Oaxaca, Chairman ATTEST: ti&,,A7t24_ Candyce urnett, Secretary PLANNING COMMISSION RESOLUTION NO. 17-63 DESIGN REVIEW DRC2015-00991 WECARE DIALYSIS CENTER June 14, 2017 Page 3 I, Candyce Burnett, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of June 2017, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MUNOZ, OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MACIAS ABSTAIN: COMMISSIONERS: NONE Conditions of Approval -44 R NC110 CtCAMONGt Community Development Department Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions 1. Approval is for Design Review DRC2015-00991, for the development of a 10,912 square foot medical office building on 1.13 acres in the General Commercial (GC) District, on the east side of Grove Avenue, approximately 500 feet south of Arrow Route, located at 8591 Grove Avenue; APN: 0207-222-27. 2. Revise the design of the trellis on the south elevation to include the following: a. Redesign the wood trellis to include a more durable material consistent with the project architecture. b. Increase the size of the trellis support posts from a 4x4 to a larger size. c. Increase the size of the trellis base and incorporate the buildings brick finish into its design. d. Shift the trellis post location away from the adjacent parking space Standard Conditions of Approval 3. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 4. Copies of the signed Planning Commission Resolution and Conditions of Approval shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 5. The applicant shall be required to pay California Department of Fish and Wildlife Notice of Exemption fee in the amount of $50.00. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing or within 5 days of the date of project approval. 6. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. www.CityofRC.us Printed:6/7/2017 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 7. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Department. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 8. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a time extension has been granted. 9. For non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 10. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Department review and approval prior to the issuance of Building Permits for the development. 11. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 12. A minimum of 30 percent of trees planted within commercial and office projects shall be specimen size trees- 24-inch box or larger. 13. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 14. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 15. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department. 16. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82. 17. All parking lot landscape islands shall have a minimum outside dimension of 6 feet. 18. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 19. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. www.CityofRC.us Printed:6/7/2017 Page 2 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 20. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect buildings with open spaces/plazas/parking areas/and recreational uses. 21. Any signs indicated on the submitted plans are conceptual only and not a part of this approval. All signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. 22. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in effect at the time of Building Permit issuance. 23. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, and Development Code regulations. 24. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Department. 25. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 26. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owners at least 30 days prior to the removal of any existing walls/fences along the project perimeter. 27. Revised Site Plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Department review and approval prior to the issuance of Building Permits. 28. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Department review and approval prior to the issuance of Building Permits. Engineering Services Department Please be advised of the following Special Conditions www.CityofRC.us Printed:6/7/2017 Page 3 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Please be advised of the following Special Conditions 1. Grove Avenue frontage improvements shall be in accordance with City "Secondary Arterial" standards as required and including: a. Remove existing a.c. berm and provide curb and gutter, a.c. pavement, property line adjacent sidewalk, drive approach and street trees per City standards. b. Provide one (1) 5300 Lumen LED street light on the south property line. The street light shall be owned by the City. Developer shall be responsible to coordinate and pay all costs to provide SCE power on City owned street lights. Coordinate with City staff for design and installation requirements. c. Provide signing and striping as required. d. The drive approach shall have a minimum width of 35 feet, per City Std. 101, Type C. e. Widen Grove Avenue measuring 32 feet from the centerline of Grove Avenue to curb face and a 12-foot parkway with a 4-foot wide property line adjacent sidewalk. f. Pavement reconstruction and overlays will be determined during plan check. g. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. h. Transitions to existing a.c. berms on the north and south project boundaries shall be to the satisfaction of the City Engineer. 2. A total of 44 feet on Grove Avenue, measured from the street centerline, shall be dedicated to the City. Standard Conditions of Approval 3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the Engineering Services Department prior to issuance of Building Permits. Formation costs shall be borne by the developer. 4. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to Building Permit issuance. www.CityofRC.us Printed:6/7/2017 Page 4 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 5. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Permits issued on or after June 2, 2014, must complete the reimbursement process through the City's Accelerate online portal within 60 days following the completion of the construction and/or demolition project or the deposit will be forfeited. Permits issued before June 2, 2014, require the following when applying for a deposit reimbursement: a completed CD-2 form, a copy of the cashier's receipt showing the deposit amount, and all weight tickets. Instructions and forms are available at the City's web site, www.CityofRC.us, under City Hall; Engineering; Environmental Programs. 6. Add the following note to any private landscape plans that show street trees: "All improvements within the public right-of-way, including street trees, shall be installed per the public improvement plans." If there is a discrepancy between the public and private plans, the street improvement plans will govern. 7. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy, fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. www.CityofRC.us Printed:6/7/2017 Page 5 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 8. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on Sheet (typically Sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. Street Name Grove Avenue Botanical Name Chionanthus Retusus Common Name Chinese Fringe Tree Spacing 30' OC Size 24" box Construction Notes for Street Trees: 1)All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. Street trees are to be planted per public improvement plans only. 9. Provide utility services including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 10. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. Fire Prevention / New Construction Unit Standard Conditions of Approval 1. If the State considers this facility to be an OSHPD Occupancy, it must comply to all the OSHPD & general requirements of the current CFC & CBC, local ordinances and reference standards such as NFPA.RCFPD and B&S may required the review to be performed by the State. Building and Safety Services Department Please be advised of the following Special Conditions www.CityofRC.us Printed:6/7/2017 Page 6 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Building and Safety Services Department Please be advised of the following Special Conditions 1. When Design Review is approved submit complete construction drawings including structural and building energy calculations to building and safety for plan review in accordance with the current edition of the CA Building and Fire Codes. The applicant must clarify in the plan check application and the in the plans that the project is regulated by OSHPD. The north elevation is limited on the amount of openings permitted due to the proximity to the property line; reducing or protecting the openings may be required. the building is required to be fully sprinklered and equipped with a fire alarm system 2. When the Entitlement Review is approved submit complete construction drawings including structural calculations, energy calculations and soils report to Building and Safety for plan review in accordance with the current edition of the CA Building and Fire Codes including all local ordinances and standards. The new structures are required to be equipped with automatic fire sprinklers as required by the CBC and Current RCFPD Ordinance. Disabled access for the site and building must be in accordance to the State of CA and ADA regulations. Grading Section Standard Conditions of Approval 1. The preliminary water quality management plan shows a flow directional manhole prior to the storm water entering the Chambermaxx system prior to infiltration into the soil. The project is conditioned to install an appropriate pre-treatment system upstream of the Chambermaxx system. 2. Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 3. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 4. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and submitted at the time of application for Grading and Drainage Plan review. 5. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 6. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit. 7. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. All dust control sign(s) shall be located outside of the public right of way. www.CityofRC.us Printed:6/7/2017 Page 7 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 8. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review, the rough grading plan shall be a separate plan submittal and permit from Precise Grading and Drainage Plan/Permit. 9. Prior to the issuance of a grading permit the applicant shall obtain written permission from the adjacent property owner(s) to construct wall(s) on property line(s) or provide a detail(s) showing the perimeter wall(s)to be constructed offset from the property line. 10. Prior to issuance of a grading permit the Final Grading and Drainage Plan shall show the accessibility path from the public right of way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code. All accessibility ramps shall show sufficient detail including gradients, elevations, and dimensions and comply with the current adopted California Building Code. 11. The Grading and Drainage Plan shall implement City Standards for on-site construction where possible, and shall provide details for all work not covered by City Standard Drawings. 12. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall be a minimum 2-foot offset from the public right of way, permitted line, or the adjacent private property. All slope offsets shall meet the requirements of the current adopted California Building Code. 13. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum parking stall gradient at 5 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code. 14. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond project boundary. 15. This project shall comply with the accessibility requirements of the current adopted California Building Code. 16. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit". 17. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over-excavation; ii) Completion of Rough Grading, prior to issuance of the building permit; iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. www.CityofRC.us Printed:6/7/2017 Page 8 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 18. All roof drainage flowing to the public right of way (Grove Avenue) must drain under the sidewalk through a parkway culvert approved by the Engineering Department. This shall be shown on both the grading and drainage plan and Engineering Services Department required plans. 19. Prior to issuance of a wall permit, on engineered combination garden/retaining walls along the property boundary the structural calculations for the wall shall assume a level toe/heel at the adjacent off-site property (i.e. a manufactured slope is not present). This shall be shown in the typical sections of the grading and drainage plan. 20. Prior to issuance of a grading or building permit, the permitted grading plan (or architectural site plan) set shall show in each of the typical sections and the plan view show how the separations between the building exterior and exterior ground surface meet the requirements of Sections CBC1804.3/CRC R401.3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2.1 of the current adopted California Building Code/Residential Code. 21. Prior to issuance of a grading permit, the applicant shall obtain a signed and notarized letter from the adjacent property owner(s) for ALL work proposed on the adjacent property. The letter shall be scanned and pasted onto the permitted grading plan set. The letter shall show on either the title sheet or a detail sheet of the grading and drainage plan set. 22. Prior to approval of the project-specific storm water quality management plan, the applicant shall submit to the Building Official, or his designee, a precise grading plan showing the location and elevations of existing topographical features, and showing the location and proposed elevations of proposed structures and drainage of the site. 23. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 24. The conceptual grading and drainage plan shows an area within the parking lot and fire lane where storm water will be ponding. Prior to the issuance of a grading permit the civil engineer of record shall submit a set of grading plans to the City of Rancho Cucamonga Building and Safety Department Fire Construction Services to review the plans and provide a maximum ponding depth of the storm water retention. 25. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a grading permit. The report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. Note: of specific concern is the proper sizing of the sump catch basin and storm drain pipe discharging the storm water flows to the underground infiltration chambers. 26. Roof water is not permitted to flow over the public parkway and shall be directed to an under parkway culvert per City of Rancho Cucamonga requirements prior to issuance of a grading permit. www.CityofRC.us Printed:6/7/2017 Page 9 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 27. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) storm water treatment devices and best management practices (BMP). 28. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 29. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy of the project Conditions of Approval. 30. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan document. 31. The applicant shall provide a copy of a completed EPA Form 7520-16 (Inventory of Injection Wells) for each underground infiltration device, with the Facility ID Number assigned, to the Building and Safety Services Department Official prior to issuance of the Grading Permit and/or approval of the project-specific Water Quality Management Plan. A copy of EPA Form 7520-16 shall be scanned and pasted onto the permitted grading plan set, and a copy of said form shall be included in the project-specific Water Quality Management Plan. 32. The land owner shall provide an inspection report by a qualified person/company on a biennial basis for the Class V Injection Wells/underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all best management practices (BMP"s) as described in the Storm Water Quality Management Plan (WQMP) prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 33. The land owner shall provide an inspection report on a biennial basis for the structural storm water treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 34. The land/property owner shall follow the inspection and maintenance requirements of the approved project specific Water Quality Management Plan and shall provide a copy of the inspection reports on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager. 35. A final project-specific Storm Water Quality Management Plan (WQMP) shall be approved by the Building and Safety Director, or his designee, and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit or any building permit. 36. Prior to the start of landscaping operations, the landscape architect and the landscape contractor shall provide a sample of the weed fabric barrier to the Project Planner, City of Rancho Cucamonga Planning Department. The weed barrier shall be permeable. www.CityofRC.us Printed:6/7/2017 Page 10 of 11 Project#: DRC2015-00991 Project Name: DR///Wecare Dialysis Center Location: - 020722227-0000 Project Type: Design Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 37. The final project-specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. 38. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project-specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the "Inspection and Maintenance Responsibility for Post Construction BMP" section of the final project-specific water quality management plan. 39. Prior to issuance of a grading permit the Final Project-Specific Water Quality Management Plan shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet" located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table VII.3: Suitability Assessment Related Considerations for Infiltration Facility Safety Factors". 40. Prior to approval of the final project-specific water quality management plan the applicant shall have a soils engineer prepare a project-specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". 41. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm Water Treatment Devices As-Built Certificate with the Environmental Programs Coordinator, City of Rancho Cucamonga Engineering Services Department. 42. As the use of drywells are proposed for the structural storm water treatment device, to meet the infiltration requirements of the current Municipal Separate Storm Sewers Systems (MS4) Permit, adequate source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration shall be evaluated prior to infiltration and discussed in the final project-specific Water Quality Management Plan document. www.CityofRC.us Printed:6/7/2017 Page 11 of 11