Loading...
HomeMy WebLinkAbout17-84 - Resolutions - A Request For Site Plan And Architectural Review RESOLUTION NO.17-84 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW DRC2016-00695, A REQUEST FOR SITE PLAN AND ARCHITECTURAL REVIEW OF TWO INDUSTRIAL BUILDINGS TOTALING 150,003 SQUARE FEET ON TWO SEPARATE PARCELS TOTALING 7.52 ACRES OF LAND IN THE GENERAL INDUSTRIAL (GI) DISTRICT, LOCATED NORTH OF 8TH STREET AND WEST OF INDUSTRIAL LANE; AND MAKING FINDINGS IN SUPPORT THEREOF -APN: 0209-032-28, 0209- 032-29. A. Recitals. 1. The applicant, Rancho Cucamonga Properties, LLC, filed an application for Design Review DRC2016-00695, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Design Review is referred to as "the application." 2. On April 12, 2017, the Planning Commission of the City of Rancho Cucamonga conducted a noticed public hearing on the application. 3. On April 12, 2017, City staff requested a continuance for the project to a date unspecific in order to resolve issues raised during the CEQA public comment period. 4. On September 27, 2017, the Planning Commission of the City of Rancho Cucamonga conducted a noticed public hearing on the application and concluded said hearing on that date. 5. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to the Planning Commission during the above-referenced public hearing on September 27, 2017, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: b. The application applies to property located within the City; and c. The application applies to two separate parcels of land, approximately 3.12 and 4.40 acres in size, located north of 8th Street and west of Industrial Lane, on opposite sides of a future right-of-way extension for Feron Boulevard, and are currently designated General Industrial; and d. The property to the north, east and west contains industrial warehouse buildings in the General Industrial (GI) District, and the site is bounded by the Metrolink Rail Line to the south; and PLANNING COMMISSION RESOLUTION NO.17-84 DESIGN REVIEW DRC2016-00695 - CITY OF RANCHO CUCAMONGA September 27, 2017 Page 2 e. The property contains a 0.64 acre drainage basin at the southeast corner of the site and an easement extending from the future right-of-way extension for Feron Boulevard to an existing Sprint monopalm wireless communications facility along the east property line; and f. The proposed onsite improvements consist of two industrial warehouse buildings, totaling 64,509 and 85,494 square feet, of which 5,000 square feet is dedicated to office space in each building, parking and landscape improvements; and g. The proposed project meets or exceeds all Development Code standards. As conditioned, the industrial buildings will meet all applicable General Industrial (GI) District Development Code standards for industrial development. 3. Based upon the substantial evidence presented to this Commission during the above referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed project is consistent with the objectives of the General Plan. The site is located within land designated as General Industrial. The General Industrial designation permits a wide range of industrial activities that include manufacturing, assembling, fabrication, wholesale supply, heavy commercial, green technology, and office uses. The project consists of two industrial warehouse buildings on two separate parcels of land on opposite sides of a future right- of-way extension for Feron Boulevard. Parcel 1 is 3.12 acres and consists of a 64,509 square foot industrial warehouse building, including 5,000 square foot dedicated to office space. Parcel 2 is 4.40 acres and consists of an 85,494 square foot industrial warehouse building, also including 5,000 square feet dedicated to office space. Both buildings are designed for wholesale warehousing with ancillary office uses. All site improvements, including parking and landscaped areas, are designed to be consistent with the warehousing use and are consistent with the General Industrial land use as designated in the General Plan. b. The proposed use is in accord with the objectiveS of the Development Code and the purposes of the district in which the site is located. The Development Code designates the project site as a General Industrial (GI) District. The potential industrial and warehousing land uses that would be associated with this project are consistent with the General Industrial (GI) District. The zoning of the adjacent sites to the property are also in the General Industrial (GI) District and consist of industrial warehouse buildings. The design of the project site and building is similar in scale and intensity to neighboring lots. Parcel 1 has a Floor Area Ratio (FAR) of 0.52 and Parcel 2 has an FAR of 0.45. Both buildings are below the maximum 0.60 FAR allowed in the General Industrial (GI) District. c. The proposed use is in compliance with each of the applicable provisions of the Development Code. The buildings are designed for industrial warehouse operations with ancillary office space to support the main warehousing use. The buildings meet all setbacks, floor area and height requirements. The buildings have been designed to meet the City's architectural standards. Both parcels meet the minimum parking, access and landscaping requirements. Therefore, the project meets all applicable provisions of the Development Code. d. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. The site is surrounded by industrial facilities of a similar scale and PLANNING COMMISSION RESOLUTION NO.17-84 DESIGN REVIEW DRC2016-00695 - CITY OF RANCHO CUCAMONGA September 27, 2017 Page 3 intensity and bounded to the south by the Metrolink Rail Line. Operations on the site are expected to meet all Development Code standards regarding noise and odor. The project site is located within '/4 mile of potentially sensitive receptors, including a residential condominium complex, two single-family homes and a Montessori school. However, mitigation measures have been applied to the project to reduce air quality and noise impacts to a less-than-significant threshold. Therefore, the proposed use is not expected to be detrimental to public health, safety, welfare, and/or materially injurious to properties or improvements. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that, with the imposition of mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. During the public comment period, City staff received comments from the Department of Toxic Substances, Southern California Air Quality Management District, Native American Heritage Commission, San Manuel Band of Mission Indians, and the Southern California Regional Rail Authority. Staff consulted with each agency to resolve concerns of potential impacts regarding hazardous materials, air quality, Native American cultural resources and site access to the Metrolink right-of-way. The applicant provided new and revised studies to both the Department of Toxic Substances and the Southern California Air Quality Management District. Staff received approval from the Department of Toxic Substances to conduct a review of the new studies and determine whether the studies addressed the concerns raised. Staff reviewed the two reports provided by the applicant and determined that they fully addressed all concerns raised. Staff also received approval from the Southern California Air Quality Management District for the updated Air Quality Assessment (dated July 7, 2017). The applicant provided plans showing how the Metrolink right-of-way access will be restricted to the satisfaction of the Southern California Regional Rail Authority and no additional concerns were raised. Staff resolved concerns from the Native American Heritage Commission and the San Manuel Band of Mission Indians by incorporating mitigation measures and conditions of approvals to address issues raised. c. Following approval from all agencies, the applicant proposed removal of mitigation measures 3 & 4 from the Biological Resources section in the proposed Mitigated Negative Declaration. The proposed mitigation measures required the applicant to consult with the Army Corps of Engineers and the California Department of Fish and Wildlife (CDFW) to determine whether modification of onsite conveyance ditches and basin would require a permit from either agency. The applicant provided staff with a Preliminary Delineation Determination report (dated April 19, 2017) that stated that the Army Corps of Engineer and CDFW had no jurisdiction over the site's conveyance ditches and basin. The report concluded that no permits PLANNING COMMISSION RESOLUTION NO.17-84 DESIGN REVIEW DRC2016-00695 - CITY OF RANCHO CUCAMONGA September 27, 2017 Page 4 would be required. Staff removed the two mitigation measures and recirculated the Mitigated Negative Declaration pursuant to CEQA Guidelines Section 15073.5 on August 14, 2017. d. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. e. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. f. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth in the Conditions of Approval, attached hereto and incorporated herein by this reference. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 27TH DAY OF SEPTEMBER 2017. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: TU,X Francisco Oaxaca, Chairman ATTEST: Cande Burnett, Secretary PLANNING COMMISSION RESOLUTION NO.17-84 DESIGN REVIEW DRC2016-00695 - CITY OF RANCHO CUCAMONGA September 27, 2017 Page 5 I, Candyce Burnett, Secretary of the Planning Commission for the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 27th day of September 2017, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, MUNOZ NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: OAXACA, WIMBERLY ABSTAIN: COMMISSIONERS: NONE Conditions of Approval KA S110 ON ��UCr1�1GNli1 Community Development Department Project#: DRC2016-00695 CEQA2016-00020 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions 1. The proposed site is located within the boundary of the Ontario Airport Land Use Compatibility Plan (OALUCP). The OALUCP requires the preparation of a Real Estate Disclosure to notify future buyers that the building is located within potential overflight areas prior to building permits. 2. All walls, including retaining walls, exposed to public view shall be constructed of decorative masonry blocks, i.e., slump stone, split-face, or have a decorative finish such as stucco texture to match a concrete tilt up wall. 3. All wrought iron fences and sliding gates shall be painted black or similarly dark color. 4. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or proposed shall be installed at locations that are not within direct view or line-of-sight of the main entrance. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services/Fire Department. All Double Detector Checks (DDC) and Fire Department Connections (FDC) shall be screened behind a 4-foot high block wall. These walls shall be constructed of similar material used on-site to match the building. 5. The employee break area shall have an overhead trellis with cross members spaced no more than 18 inches on center with minimum dimensions of 4 inches by 12 inches. Each support column shall have a decorative base that incorporates the architectural design and finishes/trim used on the building. The trellis shall be painted to match the building. Tables, chairs/benches, and waste receptacles shall be provided. 6. In the event that human remains or funerary objects are encountered during any activities associated with the project, work in the immediate vicinity (within a 100-foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the project. 7. In the event that Native American cultural resources are discovered during project activities, all work in the immediate vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist meeting Secretary of Interior standards shall be hired to assess the find. Work on the other portions of the project outside of the buffered area may continue during this assessment period. Additionally, San Manuel Band of Mission Indians will be contacted if any such find occurs and be provided information and permitted/invited to perform a site visit when the archaeologist makes his/her assessment, so as to provide Tribal input. www.CityofRC.us Printed:9/25/2017 Project#: DRC2016-00695 CEQA2016-00020 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD- 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions 8. In the event that significant Native American historical resources, as defined by CEQA (as amended, 2015), are discovered and avoidance cannot be ensured, an SOI-qualified archaeologist shall be retained to develop an cultural resources Treatment Plan, as well as a Discovery and Monitoring Plan, the drafts of which shall be provided to San Manuel Band of Mission Indians for review and comment. •All in-field investigations, assessments, and/or data recovery enacted pursuant to the finalized Treatment Plan shall be monitored by a San Manuel Band of Mission Indians Tribal Participant(s). • The Lead Agency and/or applicant shall, in good faith, consult with San Manuel Band of Mission Indians on the disposition and treatment of any artifacts or other cultural materials encountered during the project. Standard Conditions of Approval 9. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in effect at the time of Building Permit issuance. 10. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 11. Copies of the signed Planning Commission Resolution of Approval, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 12. The applicant shall be required to pay California Department of Fish and Wildlife Mitigated Negative Declaration fee in the amount of $2,266.25. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing or within 5 days of the date of project approval. 13. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a time extension has been granted. 14. All clearing, grading, earth-moving, or excavation activities shall cease when winds exceed 25 mph per SCAQMD guidelines in order to limit fugitive dust emissions. 15. The contractor shall ensure that all disturbed unpaved roads and disturbed areas within the Project are watered at least three (3) times daily during dry weather. Watering, with complete coverage of disturbed areas, shall occur at least three times a day, preferably in the midmorning, afternoon, and after work is done for the day. Printed:9/25/2017 www.CityofRC.us Page 2 of 23 Project#: DRC2016-00695 CEQA2016-00020 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 16. The contractor shall ensure that traffic speeds on unpaved roads and Project site areas are reduced to 15 miles per hour or less. 17. All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. 18. Prior to the issuance of any grading permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. 19. The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 20. The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 21. All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 22. All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 23. All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds (i.e., wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24 inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 24. The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board (RWQCB)) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. www.CityofRC.us Printed:9/25/2017 Page 3 of 23 i I uject if: o-00 30 L;EC A2O1 6-00020 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 25. Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 26. Provide adequate ingress and egress at all entrances to public facilities to minimize vehicle idling at curbsides. 27. Provide preferential parking to high occupancy vehicles and shuttle services. 28. Schedule truck deliveries and pickups during off-peak hours. 29. Improve thermal integrity of the buildings and reduce thermal load with automated time clocks or occupant sensors. 30. Landscape with native and/or drought-resistant species to reduce water consumption and to provide passive solar benefits. 31. Provide lighter color roofing and road materials and tree planting programs to comply with the AQMP Miscellaneous Sources MSC-01 measure. 32. Comply with the AQMP Miscellaneous Sources PRC-03, and Stationary Sources Operations Enhanced Inspection and Maintenance and ADV-MISC to reduce emissions of restaurant operations. 33. All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). 34. All industrial and commercial facilities shall designate preferential parking for vanpools. 35. All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. 36. All industrial and commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. 37. 24)All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 38. All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. 39. All new development in the City of Rancho Cucamonga shall comply with South Coast Air Quality Management District's Rule 445, Wood Burning Devices. Rule 445 was adopted in March 2008 to reduce emissions of PM2.5 and precludes the installation of indoor or outdoor wood burning devices (i.e. fireplaces/hearths) in new development on or after March 9, 2009. www.CityofRC.us Printed:9/25/2017 Page 4 of 23 ''i ojeci u CC ii i 6-C uo9u o-U3U20 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 40. Three days prior to the removal of vegetation or ground-disturbing activities, a breeding bird survey that is in conformance with the Migratory Bird Act shall be required to determine whether nesting is occurring. Occupied nests shall not be disturbed unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying or incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival. If the biologist is unable to verify one of the above conditions, then no disturbance shall occur within 300 feet of non-raptor nests, and within 500 feet of raptor nests, during the breeding season to avoid abandonment of the young. If nests are discovered, they shall be avoided through the establishment of an appropriate buffer setback, as determined by a qualified wildlife biologist. The temporary "no construction" area shall be maintained until the nest has completed its cycle, as determined by a qualified wildlife biologist. Once the nest cycle is complete and all nestlings have fledged and have left the nest, construction in the area may resume. www.CityofRC.us Printed:9/25/2017 Page 5 of 23 i ;J)..i:. rr-. tJ;iL Lj 1 O-UJOdO 'vi=.;c LU i u-000LU Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 41. Perform a Burrowing Owl Survey that is in conformance with the Department of Fish and Wildlife Staff Report on Burrowing Owl Mitigation and submit the written report outlining the findings to the California Department of Fish and Wildlife (CDFW) and the Planning Department within 30 days of groundbreaking activity. The survey shall include a habitat assessment, survey and impact analysis. The Burrowing Owl Survey shall follow the following protocol: • Burrowing Owl Survey methodology shall be based on Appendix D (Breeding and Non-breeding Season Surveys and Reports) of the CDFW Staff Report. Results of the pre-construction survey shall be provided to CDFW and the City. If the pre- construction survey does not identify burrowing owls on the project site, then no further mitigation is required. If burrowing owls are found to be utilizing the project site during the pre-construction survey, measures shall be developed by the qualified biologist in coordination with CDFW to avoid Impacting occupied burrows during the nesting period. These measures shall be based on the most current CDFW protocols and will at minimum include establishment of buffer setbacks from occupied burrows and owl monitoring. If ground-disturbing activities are delayed or suspended for more than 30 days after the pre-construction survey, the site shall be resurveyed for owls. • During the non-breeding season from September 1 through January 31, if burrows are occupied by migratory or non- migratory resident burrowing owls during a pre- construction survey, burrow exclusion and/or closure may be used to exclude owls from those burrows. Burrow exclusion and/or closure should only be conducted by a qualified wildlife biologist in coordination with CDFW using the most current CDFW guidelines. • During the avian nesting season from February 1 through August 31, if nests are discovered, they shall be avoided through establishment of an appropriate buffer setback, as determined by a qualified wildlife biologist. The temporary "no construction"area would have to be maintained until the nest has completed its cycle, as determined by a qualified wildlife biologist. Once the nest cycle is complete and all nestlings have fledged and have left the nest, construction in the area may resume. www.CityofRC.us Printed 9/25/2017 Page 6 of 23 .-i-LT6.L L.,L�!!o uvJJ J vim 1Ll v UULU Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 42. If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Prepare a mitigation plan consistent with Section 21083.2 Archaeological resources of CEQA to eliminate adverse project effects on significant, important, and unique prehistoric resources, including but not limited to, avoiding archaeological sites, capping or covering sites with soil, planning the site as a park or green space or paying an in-kind mitigation fee. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 43. If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth- disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Archaeological Information Center for permanent archiving. www.CityofRC.us Printed:9/25/2017 Page 7 of 23 ‘LLU i o-JJ'ULU Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 44. The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 45. Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 46. Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 47. Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 48. The project must comply with all rules that assist in reducing short- term air pollutant emission in compliance with SCAQMD Rule 403 regarding fugitive dust including treating the site with water or other soil-stabilizing agent twice daily or replanting disturbed areas as quickly as possible. 49. The construction contractor shall select construction equipment based on low-emission factors and high energy efficiency and submit a statement on the grading plan that ensures all construction equipment will be tuned and maintained in accordance with the manufactures' specification. 50. Trucks shall not idle continuously for more than 5 minutes. 51. Alternative fuel powered equipment shall be utilized in lieu of gasoline- or diesel-powered engines where feasible. 52. Construction should be timed so as not to interfere with peak-hour traffic. 53. Ridesharing and transit incentives shall be supported and encouraged for the construction crew. 54. Construction and Building materials shall be produced and/or manufactured locally. Use "Green Building Materials" such as materials that are resource efficient, recycled and manufactured in an environmentally friendly way including low-volatile-organic-compound (VOC) materials. 55. Design all buildings to exceed California Building Code Title 24 energy standard including but not limited to any combination of; • Increased insulation. • Limit air leakage through the structure. • Incorporate Energy Star or better rated windows, space heating and cooling equipment, light fixtures, and appliances. • Landscape and develop site utilizing shade, prevailing winds and landscaping. • Install efficient lighting and lighting control systems. • Install light colored "cool" roofs and cool pavements. • Install solar or light emitting diodes (LED's) for outdoor lighting. Printed:9/25/2017 www.CityofRC.us Page 8 of 23 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 56. Prepare a comprehensive water conservation strategy appropriate for the project and include the following; • Install water efficient landscapes and irrigation systems and devices in compliance with the City of Rancho Cucamonga Water Efficient Landscape Ordinance. • Use reclaimed water for landscaping within the project if available and/or install the infrastructure to deliver and use reclaimed water. • Design building to be water efficient by installing water efficient fixtures and appliances including low flow faucets, dual flush toilets and waterless urinals/water heaters. • Design irrigation to control runoff and to remove water to non-vegetated surfaces. 57. Reuse and recycle construction and demolition waste. Provide interior and exterior storage areas for recyclables and green waste in public areas. Educate employees about reducing waste and about recycling. 58. Prior to issuance of grading permits, the permit applicant shall submit to the Building Official for approval, a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 59. An Erosion Control Plan shall be prepared, included in the Grading Plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in Southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 60. During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 61. During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 62. Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. www.CityofRC.us Printed'9/25/2017 Page 9 of 23 f"t lid Gi77. `\uL.0 I v—UJJ:./� VCL,C .ZU 1 tr-JUUGt) Project Name: 64,510 &85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 63. Prior to issuance of building permits, the applicant shall submit to the City Building Official for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 64. Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 65. The developer shall implement the BMPs identified in the Preliminary Water Quality Management Plan (Madole & Associates, February 2016) to reduce construction pollutants from entering the storm drain system to the maximum extent practical. 66. Prior to the issuance of any grading plans a construction-related noise mitigation plan shall be submitted to the City for review and approval. The Plan shall depict the location of the construction equipment and how the noise from this equipment would be mitigated during construction. 67. All future on-site activities shall adhere to the City's noise standards. Noise levels shall not exceed 80 dBA anywhere on the lot. 68. Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 69. Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.66.110, as measured at the property line. Developers shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.66.050. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 70. Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes and include appropriate noise mitigation measures. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 71. Idling equipment shall be turned off when not in use. 72. The project contractor shall place all stationary construction equipment so that emitted noise is directed away from sensitive receptors nearest the project site. www.CityofRC.us Printed:9/25/2017 Page 10 of 23 p.;L,i +. U wLU a uu 11 U io UUUL 1 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 73. The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise sources and noise-sensitive receptors nearest the project site during all project construction. 74. The construction contractor shall change the timing and/or sequence of the noisiest construction operations to avoid sensitive times of the day. 75. During all project site excavation and grading, the project contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers consistent with the manufacturers' standards. 76. Equipment shall be maintained so that vehicles and their loads are secured from rattling and banging. 77. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. 78. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 79. For multi-family residential and non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 80. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department. 81. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, and the Development Code regulations. 82. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. www.CityofRC.us Printed:9/25/2017 Page 11 of 23 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 83. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 84. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of Building Permits. 85. If soil contamination is suspected or observed in the project area, or the project proposes to import/export soil that is suspected or observed to be contaminated, the applicant shall provide a report evaluating status of the soil to determine if it has been contaminated by oil and gasoline. The potential solutions for addressing any contamination and a timeline for implementing the chosen solution shall be included in the report. If the soil is contaminated, it shall be disposed of properly in accordance with all applicable and relevant laws and regulations. 86. If human remains or funerary objects are encountered during any activities associated with the project, work in the immediate vicinity (within a 100-foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the project. 87. In the event that Native American cultural resources are discovered during project activities, all work in the immediate vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist meeting Secretary of Interior standards shall be hired to assess the find. Work on the other portions of the project outside of the buffered area may continue during this assessment period. Additionally, all Native American tribes previously contacted during the Tribal Consultation process will be re-contacted if any such find occurs and be provided information and permitted/invited to perform a site visit when the archaeologist makes his/her assessment, so as to provide Tribal input. 88. If significant Native American historical resources, as defined by CEQA (as amended, 2016), are discovered and avoidance cannot be ensured, an SOI-qualified archaeologist shall be retained to develop an cultural resources Treatment Plan, as well as a Discovery and Monitoring Plan, the drafts of which shall be provided to San Manuel Band of Mission Indians for review and comment. • All in-field investigations, assessments, and/or data recovery enacted pursuant to the finalized Treatment Plan shall be monitored by a representative of a Native American tribe previously contacted during the Tribal Consultation process. • Prior to disposition and treatment of any artifacts or other cultural materials encountered during the project, all Native American tribes previously contacted during the Tribal Consultation process will be consulted. 89. The developer shall provide all buyers with a real estate transaction disclosure identifying the ONT Airport in the City of Ontario and possible exposure to impacts associated with aircraft operations (e.g., aircraft noise). This disclosure shall be recorded against the property for future transactions. www.CityofRC.us Printed:9/25/2017 Page 12 of 23 ..i . ... . . .�, ...., , .. ..�...._ �._... ..mot. i.� _... �... Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Please be advised of the following Special Conditions 1. Submit proposed lot line adjustment between parcel 1 and parcel 5 of PM 4511 to planning for planning and engineering approval. Engineering fees apply. 2. Provide a legal description of the "Unrecorded Private Sewer Easement" for approval. Private sewer easement in favor of parcel 1 of PM 4511 shall then be recorded with the county. Engineering plan check fees apply. 3. Because parcel 5 and parcel 6 are two legal lots, ownership may change in the future. Provide a private storm drainage easement over parcel 6 in favor of parcel 5 for the private storm drain located on parcel 6. Also an access easement shall be dedicated to the city for access to the basin but shall not encompass the basin. 4. The existing basin on Parcel 6 is proposed was constructed in-lieu of constructing the Master Plan Storm Drain in 8th street to Hellman Avenue. A Maintenance agreement exists between the City and the owner for maintenance of the basin. The agreement shall be updated to City requirements. It will be the owners responsibility to continue maintenance of the basin until all downstream storm drain facilities are completed. The proposed drainage easement will not be accepted by the City for the basin. 5. The street lights shall be owned by the City. Developer shall be responsible to coordinate and pay all costs of street lights and to provide power to City owned street lights. 6. Development impact fees per the Engineering Fee Schedule will be collected prior to issuance of the building permit. Note: Fees are subject to change annually 7. Feron Boulevard frontage improvements to be in accordance with City "Collector Industrial" standards as required and including: A. Provide curb & gutter, sidewalk, street lights, and signing and striping as required. B. Driveways shall be in accordance with the City Driveway Policy including aligning driveways on opposite side of street. Standard Conditions of Approval 8. Easements for public sidewalks placed outside the public right-of-way shall be dedicated to the City. 9. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of Building Permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. www.CityofRC.us Printed:9/25/2017 Page 13 of 23 rrojG[ -: L.M ,LU i d-UudJ5 (U1-\2G"i 6-0002u Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 10. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Permits issued on or after June 2, 2014, must complete the reimbursement process through the City's Accelerate online portal within 60 days following the completion of the construction and/or demolition project or the deposit will be forfeited. Permits issued before June 2, 2014, require the following when applying for a deposit reimbursement: a completed CD-2 form, a copy of the cashier's receipt showing the deposit amount, and all weight tickets. Instructions and forms are available at the City's web site, www.CityofRC.us, under City Hall; Engineering; Environmental Programs. 11. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to Building Permit issuance if no map is involved. 12. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the Engineering Services Department prior to final map approval or issuance of Building Permits whichever occurs first. Formation costs shall be borne by the developer. 13. Add the following note to any private landscape plans that show street trees: "All improvements within the public right-of-way, including street trees, shall be installed per the public improvement plans." If there is a discrepancy between the public and private plans, the street improvement plans will govern. 14. Construct the following street improvements including, but not limited to: Curb & Gutter A.C. Pvmt Side-walk Drive Appr. Street Lights Street Trees Comm Trail Median Island Bike Trail Other Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. www.CityofRC.us Printed:9/25/2017 Page 14 of 23 • vt:,. Vl\�/L\.l I V'JVVvv ULl..tiflLv I U'IIUJ43 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 15. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy, fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. 16. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of Building Permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer. Notes: 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Access ramps for the disabled shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single-family residential lots. h. Street names shall be approved by the Planning Manager prior to submittal for first plan check. www.CityofRC.us Printed:9/25/2017 Page 15 of 23 1 U JUVGU Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 17. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on Sheet _ (typically Sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. Street Name Botanical Name Common Name Min. Grow Space Spacing Size Qty. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. Street trees are to be planted per public improvement plans only. 18. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. 19. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement, drive approaches, sidewalks, street lights, and street trees. 20. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 21. The developer shall be responsible for the relocation of existing utilities as necessary. 22. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. www.CityofRC.us Printed:9/25/2017 Page 16 of 23 rrojeui 4: (.;cu 20 i o-JuJ20 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 23. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 24. Process dedication of the one foot"non-access" strip lot "A" as shown on PM 4511. Building and Safety Services Department Please be advised of the following Special Conditions 1. When the Entitlement Review is approved submit complete construction drawings including structural calculations, energy calculations and soils report to Building and Safety for plan review in accordance with the current edition of the CA Building and Fire Codes including all local ordinances and standards. The new structures are required to be equipped with automatic fire sprinklers as required by the CBC and Current RCFPD Ordinance. Disabled access for the site and building must be in accordance to the State of CA and ADA regulations. Bollards must be installed behind the trailer spaces to allow for FD access and egress path of travel clearances to the staircase of Building 1 Grading Section Standard Conditions of Approval 1. Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 2. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 3. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and submitted at the time of application for Grading and Drainage Plan review. 4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit. www.CityofRC.us Printed:9/25/2017 Page 17 of 23 v �•til U JcUJ _ c U+J J Ll� Project Name: 64,510 &85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. All dust control sign(s) shall be located outside of the public right of way. 7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review, the rough grading plan shall be a separate plan submittal and permit from Precise Grading and Drainage Plan/Permit. 8. Prior to the issuance of a grading permit the applicant shall obtain written permission from the adjacent property owner(s) to construct wall(s) on property line(s) or provide a detail(s) showing the perimeter wall(s) to be constructed offset from the property line. 9. Prior to issuance of a grading permit the Final Grading and Drainage Plan shall show the accessibility path from the public right of way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code. All accessibility ramps shall show sufficient detail including gradients, elevations, and dimensions and comply with the current adopted California Building Code. 10. The Grading and Drainage Plan shall implement City Standards for on-site construction where possible, and shall provide details for all work not covered by City Standard Drawings. 11. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall be a minimum 2-foot offset from the public right of way, permitted line, or the adjacent private property. All slope offsets shall meet the requirements of the current adopted California Building Code. 12. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum parking stall gradient at 5 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code. 13. The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Building and Safety Official. 14. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond project boundary. 15. This project shall comply with the accessibility requirements of the current adopted California Building Code. 16. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout "Information for Grading Plans and Permit". www.CityofRC.us Printed:9/25/2017 Page 18 of 23 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 17. Grading inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over-excavation; ii) Completion of Rough Grading, prior to issuance of the building permit; iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. 18. All roof drainage flowing to the public right of way (Feron Boulevard) must drain under the sidewalk through a parkway culvert approved by the Engineering Department. This shall be shown on both the grading and drainage plan and Engineering Services Department required plans. 19. Prior to issuance of a grading or building permit, the permitted grading plan (or architectural site plan) set shall show in each of the typical sections and the plan view show how the separations between the building exterior and exterior ground surface meet the requirements of Sections CBC1804.3/CRC R401.3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2.1 of the current adopted California Building Code/Residential Code. 20. Prior to issuance of a grading permit, the applicant shall obtain a signed and notarized letter from the adjacent property owner(s) for ALL work proposed on the adjacent property. The letter shall be scanned and pasted onto the permitted grading plan set. The letter shall show on either the title sheet or a detail sheet of the grading and drainage plan set. 21. Prior to approval of the project-specific storm water quality management plan, the applicant shall submit to the Building Official, or his designee, a precise grading plan showing the location and elevations of existing topographical features, and showing the location and proposed elevations of proposed structures and drainage of the site. 22. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a grading permit. The report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. www.CityofRC.us Printed:9/25/2017 Page 19 of 23 i vj ...i ,r: lJlwLU+v-Jv0✓J l�Ll,[i-LJ I Ci-v UiiLll Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 23. A review of the conceptual grading and drainage plan and the preliminary water quality management plan shows that it is the intent of the engineer of record to drain the surface storm water flows to a retention basin. The basin shall be designed to accept multiple storm events (100-year storm event and Antecedent Moisture Condition 3) using the methodology outlined in the current adopted San Bernardino County Hydrology Manual. 24. Prior to issuance of a grading permit the applicant shall demonstrate that the storm water run-off will not adversely affect the downstream properties and that the water may legally discharge to the downstream properties. The engineer of record shall show on the final permitted grading and drainage plan one (1) or more of the following items are met: a) There is sufficient downstream capacity to accept the proposed storm water flows and that the downstream property owner have provided permission to accept the upstream storm water flows; b) a legal document/entity exists allowing developed storm water flows to be discharged to the property lower in elevation; c) a storm drain system to safely convey the storm water flows to a public storm drain system without causing flooding to adjacent property(ies). 25. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 26. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) storm water treatment devices and best management practices (BMP). 27. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy of the project Conditions of Approval. 28. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural/treatment devices and best management practices (BMP) as provided for in the project's Storm Water Quality Management Plan, shall be provided for by CC&R's or deeds and shall be recorded prior to the approval of the Water Quality Management Plan. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan. 29. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 30. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan document. www.CityofRC.us Printed:9/25/2017 Page 20 of 23 • -j s.;41 rr. ����_.dV IV- f Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD -020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 31. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural/treatment best management practices (BMP) devices, as provided for in the project's Storm Water Quality Management Plan, shall be provided for by CC&R's or deeds and shall be recorded prior to the issuance a grading permit. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan. 32. The land owner shall provide an inspection report on a biennial basis for the structural storm water treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 33. The land/property owner shall follow the inspection and maintenance requirements of the approved project specific Water Quality Management Plan and shall provide a copy of the inspection reports on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager. 34. Prior to the issuance of a building permit or Engineering Services Department issued right of way permit, the applicant shall submit to the Building Official, or his designee, a final project specific water quality management plan for review and approval, and shall have said document recorded with the San Bernardino County Recorder's Office. 35. Prior to the start of landscaping operations, the landscape architect and the landscape contractor shall provide a sample of the weed fabric barrier to the Project Planner, City of Rancho Cucamonga Planning Department. The weed barrier shall be permeable. 36. The final project-specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. 37. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project-specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the "Inspection and Maintenance Responsibility for Post Construction BMP" section of the final project-specific water quality management plan. www.CityofRC.us Printed:9/25/2017 Page 21 of 23 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 38. Prior to issuance of a grading permit the Final Project-Specific Water Quality Management Plan shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet" located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table VII.3: Suitability Assessment Related Considerations for Infiltration Facility Safety Factors". 39. Prior to approval of the final project-specific water quality management plan the applicant shall have a soils engineer prepare a project-specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". 40. The subject project, shall accept all existing off-site storm water drainage flows and safely convey those flows through or around the project site. If existing off-site storm water drainage flows mix with any on-site storm water drainage flows, then the off-site storm water drainage flows shall be treated with the on-site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 41. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm Water Treatment Devices As-Built Certificate with the Environmental Programs Coordinator, City of Rancho Cucamonga Engineering Services Department. www.CityofRC.us Printed:9/25/2017 Page 22 of 23 Project Name: 64,510 & 85,661 sq ft industrial buildings Location: 9500 FERON BLVD - 020903228-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 42. GROUND WATER PROTECTION: Prior to approval of the final project specific water quality management plan (WQMP), the WQMP document shall meet the requirements of the State Water Resources Control Board Order No. R8-2010-0036 (NPDES No. CAS 618036), the San Bernardino County Municipal Separate Storm Sewers Separation (MS4) Permit reads: Section XI.D(Water Quality Management Plan Requirements).8(Groundwater Protection): Treatment Control BMPs utilizing infiltration [exclusive of incidental infiltration and BMPs not designed to primarily function as infiltration devices (such as grassy swales, detention basins, vegetated buffer strips, constructed wetlands, etc.)] must comply with the following minimum requirements to protect groundwater: a. Use of structural infiltration treatment BMPs shall not cause or contribute to an exceedance of ground water quality objectives. b. Source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration should be evaluated prior to infiltration. c. Adequate pretreatment of runoff prior to infiltration shall be required in gas stations and large commercial parking lots. (NOTE: The State Water Quality Control Board defines a large commercial parking lot as '100,000 sq. ft. or more of commercial development to include parking lot (with 100 or more vehicle traffics), OR, by means of 5,000sqft or more of allowable space designated for parking purposes'). d. Unless adequate pre-treatment of runoff is provided prior to infiltration structural infiltration treatment BMPs must not be used for areas of industrial or light industrial activity{77}, areas subject to high vehicular traffic (25,000 or more daily traffic); car washes; fleet storage areas; nurseries; or any other high threat to water quality land uses or activities. i. Structural infiltration treatment BMPs shall not cause a nuisance or pollution as defined in Water Code Section 13050. www.CityofRC.us Printed:9/25/2017 Page 23 of 23