HomeMy WebLinkAbout17-03 - Resolutions - Site Plan And Architecture Review RESOLUTION NO. 17-03
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW
DRC2016-00268, A REQUEST FOR SITE PLAN AND ARCHITECTURAL
REVIEW OF A THREE (3) BUILDING INDUSTRIAL COMPLEX ON 5.26
ACRES OF LAND IN THE GENERAL INDUSTRIAL (GI) DISTRICT,
LOCATED AT THE NORTHEAST CORNER OF 6TH STREET AND
CENTER AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF -
APN: 0209-262-25.
A. Recitals.
1. The applicant, Bruce Karish, filed an application for the approval of Design Review
DRC2016-00268, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Design Review request is referred to as "the application."
2. On the 25th day of January, 2017, the Planning Commission of the City of Rancho
Cucamonga conducted noticed public hearing on the application and concluded said hearing on
that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above- referenced meeting on January 25, 2017, including written and oral staff reports, this
Commission hereby specifically finds as follows:
a. The application applies to approximately 5.26 acres of land, basically a
rectangular configuration, located at the northeast corner of 6th Street and Hermosa Avenue and
is currently designated General Industrial; and
b. The project site is a rectangular parcel of about 474 feet(north-south) by 558 feet
(east-west) and is vacant; and
c. The property to the north contains a warehouse building in the General Industrial
(GI) District, and the property to the east and south contain warehouse buildings in the Industrial
Park (IP) District, and the property to the west contains multi-tenant industrial buildings in the
General Industrial (GI) District; and
d. The project includes a related subdivision (Tentative Parcel Map
SUBTPM19683), a proposal to subdivide the 5.26 acre site into three (3) parcels; Parcel 1 is 3.35
acres and will contain Building 1, a four tenant multi-tenant industrial building, Parcel is 0.92 acres
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268— BRUCE KARISH
January 25, 2017
Page 2
and will contain Building 2, a single tenant building, and Parcel 3 is 0.89 acres and will contain
Building 3, a single tenant building; and
e. The proposed project meets or exceeds all Development Code standards. As
conditioned, the multi-tenant industrial complex will meet all applicable General Industrial (GI)
District Development Code standards for industrial development.
3. Based upon the substantial evidence presented to this Commission during the
above- referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the objectives of the General Plan, the
objectives of the Development Code, and the purposes of the district in which the site is located.
The proposal is to develop a three (3) building industrial complex on 5.26 acres of land in the
General Plan General Industrial land use designation; and
b. The proposed development is compatible with the existing and proposed land
uses in the surrounding area. The potential land uses that would be associated with this project
are consistent with the existing land uses in the vicinity where the project is located and the
expectations of the community. The zoning of the property to the north and west is General
Industrial (GI) District and the zoning of the property to the south and east is Industrial Park (IP)
District; and
c. The proposed development complies with each of the applicable provisions of
the Development Code. The proposed development complies with all development standards
outlined in the Development Code including building and parking setbacks, landscaping depth,
parking, landscape coverage, site planning, and architecture; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity. The potential land uses that would be associated with this project
are consistent with the land uses within the vicinity where it is located and the expectations of the
community.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment
for the application, the Planning Commission finds that there is no substantial evidence that the
project will have a significant effect upon the environment and adopts a Mitigated Negative
Declaration and Monitoring Program attached hereto, and incorporated herein by this reference,
based upon the findings as follows:
a. Pursuant to the California Environmental Quality Act (CEQA) and the City's local
CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of
the project. Based on the findings contained in that Initial Study, City staff determined that, with
the imposition of mitigation measures, there would be no substantial evidence that the project
would have a significant effect on the environment. Based on that determination, a Mitigated
Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public
comment period and of the intent to adopt the Mitigated Negative Declaration; and
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268— BRUCE KARISH
January 25, 2017
Page 3
b. The Planning Commission has reviewed the Mitigated Negative Declaration and
all comments received regarding the Mitigated Negative Declaration and, based on the whole
record before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with
CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial
evidence that the project will have a significant effect on the environment. The Planning
Commission further finds that the Mitigated Negative Declaration reflects the independent
judgment and analysis of the Planning Commission. Based on these findings, the Planning
Commission hereby adopts the Mitigated Negative Declaration; and
c. The Planning Commission has also reviewed and considered the Mitigation
Monitoring Program for the project that has been prepared pursuant to the requirements of Public
Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance
with the mitigation measures during project implementation. The Planning Commission therefore
adopts the Mitigation Monitoring Program for the project; and
d. The custodian of records for the Initial Study, Mitigated Negative Declaration,
Mitigation Monitoring Program and all other materials which constitute the record of proceedings
upon which the Planning Commission's decision is based is the Planning Director of the City of
Rancho Cucamonga. Those documents are available for public review in the Planning
Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho
Cucamonga, California 91730, telephone (909) 477-2750.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Conditions of Approval, attached hereto and incorporated herein by this
reference.
Environmental Mitigation
Air Quality
Short Term (Construction) Emissions
1) All clearing, grading, earth-moving, or excavation activities shall
cease when winds exceed 25 mph per SCAQMD guidelines in order
to limit fugitive dust emissions.
2) The contractor shall ensure that all disturbed unpaved roads and
disturbed areas within the Project are watered at least three (3)times
daily during dry weather. Watering, with complete coverage of
disturbed areas, shall occur at least three times a day, preferably in
the midmorning, afternoon, and after work is done for the day.
3) The contractor shall ensure that traffic speeds on unpaved roads and
Project site areas are reduced to 15 miles per hour or less.
4) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268— BRUCE KARISH
January 25, 2017
Page 4
maintained as per manufacturers' specifications. Maintenance
records shall be available at the construction site for City verification.
5) Prior to the issuance of any grading permits, the developer shall
submit construction plans to the City denoting the proposed schedule
and projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible
for the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management
District (SCAQMD) as well as City Planning Staff.
6) The construction contractor shall utilize electric or clean alternative
fuel powered equipment where feasible.
7) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment
when not in use.
8) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
9) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
10) All construction equipment shall comply with SCAQMD Rules 402
and 403. Additionally, contractors shall include the following
provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City
if silt is carried over to adjacent public thoroughfares or occurs
as a result of hauling. Timing may vary depending upon the
time of year of construction.
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268— BRUCE KARISH
January 25, 2017
Page 5
• Suspend grading operations during high winds (i.e., wind
speeds exceeding 25 mph) in accordance with Rule 403
requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
11) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
(RWQCB)) daily to reduce PM,() emissions, in accordance with
SCAQMD Rule 403.
12) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM,o emissions.
Long Term Proiect Operational Impacts
13) Provide adequate ingress and egress at all entrances to public
facilities to minimize vehicle idling at curbsides.
14) Provide preferential parking to high occupancy vehicles and shuttle
services.
15) Schedule truck deliveries and pickups during off-peak hours.
16) Improve thermal integrity of the buildings and reduce thermal load
with automated time clocks or occupant sensors.
17) Landscape with native and/or drought-resistant species to reduce
water consumption and to provide passive solar benefits.
18) Provide lighter color roofing and road materials and tree planting
programs to comply with the AQMP Miscellaneous Sources MSC-01
measure.
19) Comply with the AQMP Miscellaneous Sources PRC-03, and
Stationary Sources Operations Enhanced Inspection and
Maintenance and ADV-MISC to reduce emissions of restaurant
operations.
20) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of
10 minutes).
21) All industrial and commercial facilities shall designate preferential
parking for vanpools.
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268 — BRUCE KARISH
January 25, 2017
Page 6
22) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
23) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
24) All new development in the City of Rancho Cucamonga shall comply
with South Coast Air Quality Management District's Rule 445, Wood
Burning Devices. Rule 445 was adopted in March 2008 to reduce
emissions of PM2.5 and precludes the installation of indoor or outdoor
wood burning devices (i.e. fireplaces/hearths) in new development
on or after March 9, 2009.
Biological Resources
1) Three days prior to the removal of vegetation or ground-disturbing
activities, a breeding bird survey that is in conformance with the
Migratory Bird Act shall be required to determine whether nesting is
occurring. Occupied nests shall not be disturbed unless a qualified
biologist verifies through non-invasive methods that either (a) the
adult birds have not begun egg-laying or incubation; or (b) the
juveniles from the occupied nests are foraging independently and are
capable of independent survival. If the biologist is unable to verify
one of the above conditions, then no disturbance shall occur within
300 feet of non-raptor nests, and within 5,000 feet of raptor nests,
during the breeding season to avoid abandonment of the young.
If nests are discovered, they shall be avoided through the
establishment of an appropriate buffer setback, as determined by a
qualified wildlife biologist. The temporary"no construction" area shall
be maintained until the nest has completed its cycle, as determined
by a qualified wildlife biologist. Once the nest cycle is complete and
all nestlings have fledged and have left the nest, construction in the
area may resume.
2) Perform a Burrowing Owl Survey that is in conformance with the
Department of Fish and Wildlife Staff Report on Burrowing Owl
Mitigation and submit the written report outlining the findings to the
California Department of Fish and Wildlife (CDFW) and the Planning
Department within 30 days of groundbreaking activity. The survey
shall include a habitat assessment, survey and impact analysis. The
Burrowing Owl Survey shall follow the following protocol:
• Burrowing Owl Survey methodology shall be based on
Appendix D (Breeding and Non-breeding Season Surveys and
Reports) of the CDFW Staff Report. Results of the
pre- construction survey shall be provided to CDFW and the
City. If the pre-construction survey does not identify burrowing
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268 — BRUCE KARISH
January 25, 2017
Page 7
owls on the project site, then no further mitigation is required. If
burrowing owls are found to be utilizing the project site during
the pre-construction survey, measures shall be developed by
the qualified biologist in coordination with CDFW to avoid
Impacting occupied burrows during the nesting period. These
measures shall be based on the most current CDFW protocols
and will at minimum include establishment of buffer setbacks
from occupied burrows and owl monitoring. If ground-disturbing
activities are delayed or suspended for more than 30 days after
the pre-construction survey, the site shall be resurveyed for
owls.
• During the non-breeding season from September 1 through
January 31, if burrows are occupied by migratory or
non- migratory resident burrowing owls during a pre-
construction survey, burrow exclusion and/or closure may be
used to exclude owls from those burrows. Burrow exclusion
and/or closure should only be conducted by a qualified wildlife
biologist in coordination with CDFW using the most current
CDFW guidelines.
• During the avian nesting season from February 1 through
August 31, if nests are discovered, they shall be avoided
through establishment of an appropriate buffer setback, as
determined by a qualified wildlife biologist. The temporary "no
construction" area would have to be maintained until the nest
has completed its cycle, as determined by a qualified wildlife
biologist. Once the nest cycle is complete and all nestlings have
fledged and have left the nest, construction in the area may
resume.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to
protect or preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their
special qualities as a theme or focal point.
• Pursue educating the public about the archaeological heritage
of the area.
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268— BRUCE KARISH
January 25, 2017
Page 8
• Prepare a mitigation plan consistent with Section 21083.2
Archaeological resources of CEQA to eliminate adverse project
effects on significant, important, and unique prehistoric
resources, including but not limited to, avoiding archaeological
sites, capping or covering sites with soil, planning the site as a
park or green space or paying an in-kind mitigation fee.
• Prepare a technical resources management report,
documenting the inventory, evaluation, and proposed mitigation
of resources within the project area. Submit one copy of the
completed report with original illustrations, to the San
Bernardino County Archaeological Information Center for
permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be appropriate. Where
mitigation monitoring is appropriate, the program must include, but
not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
• Submit summary report to City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to San
Bernardino County Archaeological Information Center for
permanent archiving.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce PM10
emissions, in accordance with SCAQMD Rule 403 or re-planted with
drought resistant landscaping as soon as possible.
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268 — BRUCE KARISH
January 25, 2017
Page 9
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM,() emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM,o emissions.
Greenhouse Gas Emissions
Cumulative Short Term (Construction) GHG Emissions
1) The project must comply with all rules that assist in reducing
short- term air pollutant emission in compliance with SCAQMD Rule
403 regarding fugitive dust including treating the site with water or
other soil-stabilizing agent twice daily or replanting disturbed areas
as quickly as possible.
2) The construction contractor shall select construction equipment
based on low-emission factors and high energy efficiency and submit
a statement on the grading plan that ensures all construction
equipment will be tuned and maintained in accordance with the
manufactures' specification.
3) Trucks shall not idle continuously for More than 5 minutes.
4) Alternative fuel powered equipment shall be utilized in lieu of
gasoline- or diesel-powered engines where feasible.
5) Construction should be timed so as not to interfere with peak-hour
traffic.
6) Ridesharing and transit incentives shall be supported and
encouraged for the construction crew.
Cumulative Long Term (Operational) GHG Emissions
7) Construction and Building materials shall be produced and/or
manufactured locally. Use "Green Building Materials" such as
materials that are resource efficient, recycled and manufactured in an
environmentally friendly way including low-volatile-organic-
compound (VOC) materials.
8) Design all buildings to exceed California Building Code Title 24
energy standard including but not limited to any combination of;
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268 — BRUCE KARISH
January 25, 2017
Page 10
• Increased insulation.
• Limit air leakage through the structure.
• Incorporate Energy Star or better rated windows, space heating
and cooling equipment, light fixtures, and appliances.
• Landscape and develop site utilizing shade, prevailing winds and
landscaping.
• Install efficient lighting and lighting control systems.
• Install light colored "cool" roofs and cool pavements.
• Install solar or light emitting diodes (LED's) for outdoor lighting.
9) Prepare a comprehensive water conservation strategy appropriate
for the project and include the following;
• Install water efficient landscapes and irrigation systems and
devices in compliance with the City of Rancho Cucamonga Water
Efficient Landscape Ordinance.
• Use reclaimed water for landscaping within the project if available
and/or install the infrastructure to deliver and use reclaimed water.
• Design building to be water efficient by installing water efficient
fixtures and appliances including low flow faucets, dual flush
toilets and waterless urinals/water heaters.
• Design irrigation to control runoff and to remove water to
non- vegetated surfaces.
10) Reuse and recycle construction and demolition waste. Provide
interior and exterior storage areas for recyclables and green waste in
public areas. Educate employees about reducing waste and about
recycling.
Hydrology and Water Quality
Construction Activities
1) Prior to issuance of grading permits, the permit applicant shall submit
to the Building Official for approval, a Storm Water Pollution
Prevention Plan (SWPPP) specifically identifying Best Management
Practices (BMPs) that shall be used on-site to reduce pollutants
during construction activities entering the storm drain system to the
maximum extent practical.
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268— BRUCE KARISH
January 25, 2017
Page 11
2) An Erosion Control Plan shall be prepared, included in the Grading
Plan, and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
Erosion Control Plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in Southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site
or off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from
the site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
5) Prior to issuance of grading or paving permits, the applicant shall
obtain a Notice of Intent (NOI) to comply with obtaining coverage
under the National Pollutant Discharge Elimination System (NPDES)
General Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been obtained (i.e.,
a copy of the Waste Discharger's Identification Number) shall be
submitted to the City Building Official for coverage under the NPDES
General Construction Permit.
Post-Construction Operational
6) Prior to issuance of building permits, the applicant shall submit to the
City Building Official for approval of a Water Quality Management
Plan (WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-
structural measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of Rancho
Cucamonga in June 2004.
7) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
grading permits.
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268— BRUCE KARISH
January 25, 2017
Page 12
8) Prior to issuance of building permits, the applicant shall submit to the
City Building Official for approval of a Water Quality Management
Plan (WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and
non- structural measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of Rancho
Cucamonga in June 2004.
9) Prior to issuance of grading or paving permits, the applicant shall
obtain a Notice of Intent (NOI) to comply with obtaining coverage
under the National Pollutant Discharge Elimination System (NPDES)
General Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been obtained (i.e.,
a copy of the Waste Discharger's Identification Number) shall be
submitted to the City Building Official for coverage under the NPDES
General Construction Permit.
10) The developer shall implement the BMPs identified in the Preliminary
Water Quality Management Plan (Madole & Associates,
February 2016) to reduce construction pollutants from entering the
storm drain system to the maximum extent practical.
Noise
Exterior
1) Prior to the issuance of any grading plans a construction-related
noise mitigation plan shall be submitted to the City for review and
approval. The Plan shall depict the location of the construction
equipment and how the noise from this equipment would be mitigated
during construction.
2) Business operations shall maintain a noise level at 60dB or less
during the hours of 10 p.m. until 7 p.m. No loading and unloading
activities including opening, closing, or other handling of boxes,
crates, containers, building materials, garbage cans, or other similar
objects between the hours of 10 p.m. and 7 p.m. in a manner which
would cause a noise disturbance to residential areas.
3) During all project site excavation and grading, the project contractors
shall equip all construction equipment, fixed or mobile, with properly
operating and maintained mufflers consistent with the manufacturers'
standards.
4) The project contractor shall place all stationary construction
equipment so that emitted noise is directed away from sensitive
receptors nearest the project site.
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268 — BRUCE KARISH
January 25, 2017
Page 13
5) The construction contractor shall locate equipment staging in areas
that will create the greatest distance between construction-related
noise sources and noise-sensitive receptors nearest the project site
during all project construction.
6) The construction contractor shall change the timing and/or sequence
of the noisiest construction operations to avoid sensitive times of the
day.
7) During construction, the contractor shall ensure all construction
equipment is equipped with appropriate noise attenuating devices.
8) Idling equipment shall be turned off when not in use.
9) Equipment shall be maintained so that vehicles and their loads are
secured from rattling and banging.
10) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
11) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.66.050, as measured at
the property line. Developers shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.66.050. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
12) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks
used for hauling would exceed 100 daily trips (counting both to and
from the construction site), then the developer shall prepare a noise
mitigation plan denoting any construction traffic haul routes and
include appropriate noise mitigation measures. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 25TH DAY OF JANUARY 2017.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
PLANNING COMMISSION RESOLUTION NO. 17-03
DESIGN REVIEW DRC2016-00268 — BRUCE KARISH
January 25, 2017
Page 14
BY:
Francisco Oaxaca, Chairman
ATTEST: ?
Candyc ' rnett, Secretary
I, Candyce Burnett, Secretary of the Planning Commission of the City of Rancho Cucamonga, do
hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted
by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 25th day of January 2017, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, MACIAS, MUNOZ, OAXACA
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: WIMBERLY
ABSTAIN: COMMISSIONERS: NONE
100
City of Rancho Cucamonga
NO
NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Design Review DRC2016-00268 and Tentative Parcel Map SUBTPM19863
Public Review Period Closes: January 25, 2016
Project Name: Project Applicant: Bruce Karish
Karish Architects
3613 Glendon Avenue, #301
Los Angeles, CA 90034
Project Location (also see attached map): Located at the northeast corner of 6th Street and
Center Avenue—APN: 0209-262-25
Project Description: The subdivision of a 5.26 acre site into 3 parcels and the development of 3
industrial buildings located at the northeast corner of 6th Street and Center Avenue within the
General Industrial District.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax
(909) 477-2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
January 25, 2017
Date of Determination Ad•• ed By
Conditions of Approval
1
RINr110 Community Development Department
CICAMONGA
Project#: DRC2016-00268 (Related file: SUBTPM19683)
Project Name: DR///6th and Center Industrial Center
Location: ---020926225-0000
Project Type: Design Review and Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Planning Department
Please be advised of the following Special Conditions
1. Approval is for a site plan and architectural review of a three (3) building industrial complex on 5.26
acres of land in the General Industrial (GI) District, located at the northeast corner of 6th Street and
Center Avenue; APN: 209-262-25.
Standard Conditions of Approval
2. For commercial and industrial projects, paint roll-up doors and service doors to match main building
colors.
3. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections shall be screened from all sides and the sound shall be buffered from adjacent
properties and streets as required by the Planning Department. Such screening shall be
architecturally integrated with the building design and constructed to the satisfaction of the City
Planner. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more
than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed
enclosure which exhibits a permanent nature with the building design and is detailed consistent with
the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less
than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of
the building. Details shall be included in building plans.
4. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any
signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
5. A Uniform Sign Program for this development shall be submitted for Planning Department review
and approval prior to issuance of Building Permits.
6. All parking lot landscape islands shall have a minimum outside dimension of 6 feet.
7. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a
curb stop).
8. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and
exits shall be striped per City standards.
9. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect buildings with open space and plaza locations.
10. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
www.cityofRc.us
Printed:1/12/2017
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: ---020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Planning Department
Standard Conditions of Approval
11. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in
the required landscape plans and shall be subject to Planning Department review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Services Department.
12. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree
per 30 linear feet of building.
13. All walls shall be provided with decorative treatment. If located in public maintenance areas, the
design shall be coordinated with the Engineering Services Department.
14. Landscaping and irrigation shall be designed to conserve water through the principles of water
efficient landscaping per Development Code Chapter 17.82.
15. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of
mailboxes. The final location of the mailboxes and the design of any overhead structure shall be
subject to Planning Department review and approval prior to the issuance of Building Permits.
16. Approval of this request shall not waive compliance with all sections of the Development Code, all
other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in
effect at the time of Building Permit issuance.
17. All building numbers and individual units shall be identified in a clear and concise manner, including
proper illumination and in conformance with Building and Safety Services Department standards,
the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards.
18. The developer shall submit a construction access plan and schedule for the development of all lots
for Planning Department and Engineering Services Department approval; including, but not limited
to, public notice requirements, special street posting, phone listing for community concerns, hours of
construction activity, dust control measures, and security fencing.
19. The site shall be developed and maintained in accordance with the approved plans which include
Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and
grading on file in the Planning Department, the conditions contained herein, and Development Code
regulations.
20. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete or
masonry walls, berming, and/or landscaping to the satisfaction of the Planning Department.
21. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,
homeowners' association, or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Department and Engineering Services Department
review and approved prior to the issuance of Building Permits.
22. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by
the Planning Department and Police Department (909-477-2800) prior to the issuance of Building
Permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as
not to adversely affect adjacent properties.
www.CityofRC.us
Printed:1/12/2017 Page 2 of 9
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: --- 020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Planning Department
Standard Conditions of Approval
23. Occupancy of the facilities shall not commence until such time as all California Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services
Department to show compliance. The buildings shall be inspected for compliance and final
acceptance granted prior to occupancy.
24. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building,
etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has
commenced, whichever comes first.
25. Prior to any use of the project site or business activity being commenced thereon, all Conditions of
Approval shall be completed to the satisfaction of the Planning Department.
26. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the
number of trash receptacles shall be subject to Planning Department review and approval prior to
the issuance of Building Permits.
27. If no centralized trash receptacles are provided, all trash pick-up shall be for individual units with all
receptacles shielded from public view.
28. Bicycle storage spaces shall be provided at a rate equivalent to 5 percent of all required motorized
vehicle parking, with a minimum of one rack with a capacity for two bicycles.
29. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to post
cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of
$767 prior to the issuance of Building Permits, guaranteeing satisfactory performance and
completion of all mitigation measures. These funds may be used by the City to retain consultants
and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete
all actions required by the approved environmental documents shall be considered grounds for
forfeit.
30. In those instances requiring long term monitoring (i.e. beyond final certificate of occupancy), the
applicant shall provide a written monitoring and reporting program to the City Planner prior to
issuance of Building Permits. Said program shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented.
31. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers, or employees, because of the issuance of such approval, or in the alternative, to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees,
for any Court costs and attorney's fees which the City, its agents, officers, or employees may be
required by a court to pay as a result of such action. The City may, at its sole discretion, participate
at its own expense in the defense of any such action but such participation shall not relieve
applicant of his obligations under this condition.
www.CityofRC.us
Printed:1/12/2017 Page 3 of 9
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: --- 020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Planning Department
Standard Conditions of Approval
32. Copies of the signed Planning Commission Resolution of Approval, Conditions of Approval, and all
environmental mitigations shall be included on the plans (full size). The sheet(s) are for information
only to all parties involved in the construction/grading activities and are not required to be wet
sealed/stamped by a licensed Engineer/Architect.
33. The applicant shall be required to pay California Department of Fish and Wildlife Notice of
Exemption and Mitigated Negative Declaration fee in the amount of $2,266.25. All checks are to be
made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission
Secretary prior to public hearing.
34. Any approval shall expire if Building Permits are not issued or approved use has not commenced
within 5 years from the date of approval or a time extension has been granted.
35. For non-residential development, property owners are responsible for the continual maintenance of
all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All
landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving
condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead,
diseased, or decaying plant material shall be replaced within 30 days from the date of damage.
36. A detailed landscape and irrigation plan shall be prepared by a licensed landscape architect and
submitted for Planning Department review and approval prior to the issuance of Building Permits.
37. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
38. A minimum of 20 percent of trees planted within industrial projects shall be specimen size trees -
24-inch box or larger.
Building and Safety Services Department
Please be advised of the following Special Conditions
1. When the Design Review is approved submit complete construction drawings including structural
and energy calculations to Building and Safety for plan review in accordance with the current edition
of the CA Building and Fire Codes. The new structure is required to be equipped with automatic fire
sprinklers. A soils report is required for new structures. A recent fire flow letter from CVWD is
required Disabled access must comply to current regulations. the site and buildings shall also be
design in accordance with the current B&S and RCFPD Ordinances and standards.
Grading Section
Standard Conditions of Approval
1. Prior to issuance of a grading permit the Final Project-Specific Water Quality Management Plan
shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet"
located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety
Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water
Quality Management Plans.
www.CityofRC.us
Printed:1/12/2017 Page 4 of 9
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: --- 020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
2. Grading of the subject property shall be in accordance with current adopted California Building
Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s)
shall be in substantial conformance with the approved conceptual Grading and Drainage Plan.
3. Prior to issuance of a wall permit, on engineered combination garden/retaining walls along the
property boundary the structural calculations for the wall shall assume a level toe/heel at the
adjacent off-site property (i.e. a manufactured slope is not present). This shall be shown in the
typical sections of the grading and drainage plan.
4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be
completed, submitted, and approved by the Building and Safety Official prior to the issuance of
building permits.
5. A separate Grading and Drainage Plan check submittal is required for all new construction projects
and for existing buildings where improvements being proposed will generate 50 cubic yards or more
of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet
signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit.
6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a
dust control sign on the project site prior to the issuance of a grading permit.
7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for
review, the rough grading plan shall be a separate plan submittal and permit from Precise Grading
and Drainage Plan/Permit.
8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be
prepared and submitted to the Building and Safety Official for review and approval for on-site storm
water drainage prior to issuance of a grading permit. The report shall contain water surface profile
gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be
wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study
shall provide inlet calculations showing the proper sizing of the water quality management plan
storm water flows into the proposed structural storm water treatment devices.
9. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil
engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm
Water Treatment Devices As-Built Certificate with the Environmental Programs Coordinator, City of
Rancho Cucamonga Engineering Services Department.
10. As the use of drywells are proposed for the structural storm water treatment device, to meet the
infiltration requirements of the current Municipal Separate Storm Sewers Systems (MS4) Permit,
adequate source control and pollution prevention control BMPs shall be implemented to protect
groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration shall be
evaluated prior to infiltration and discussed in the final project-specific Water Quality Management
Plan document.
www.CityofRC.us
Printed:1/12/2017 Page 5 of 9
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: --- 020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
11. The final project-specific water quality management plan (WQMP) shall include executed
maintenance agreements along with the maintenance guidelines for all proprietary structural storm
water treatment devices (BMP's). In the event the applicant cannot get the proprietary device
maintenance agreements executed prior to issuance of a grading permit, the applicant is required to
submit a letter to be included within the WQMP document, and scanned and pasted onto the Site
and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant
shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the
proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the
residential lot, the developer shall include maintenance agreement(s) as part of the sale of the
residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the
property shall be included within the WQMP document.
12. The Preliminary Water Quality Management Plan (WQMP) has been deemed "Acceptable". Prior to
the issuance of a grading permit a final project-specific Water Quality Management Plan shall be
submitted for review and approval by the Building Official.
13. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of
Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval
by the Building Official and recorded with the County Recorder's Office.
14. Prior to the start of landscaping operations, the landscape architect and the landscape contractor
shall provide a sample of the weed fabric barrier to the Project Planner, City of Rancho Cucamonga
Planning Department. The weed barrier shall be permeable.
15. Prior to the issuance of a grading permit the applicant shall obtain written permission from the
adjacent property owner(s) to construct wall(s) on property line(s) or provide a detail(s) showing the
perimeter wall(s) to be constructed offset from the property line.
16. .Prior to issuance of a grading permit the Final Grading and Drainage Plan shall show the
accessibility path from the public right of way and the accessibility parking stalls to the building
doors in conformance with the current adopted California Building Code. All accessibility ramps
shall show sufficient detail including gradients, elevations, and dimensions and comply with the
current adopted California Building Code.
17. The Grading and Drainage Plan shall implement City Standards for on-site construction where
possible, and shall provide details for all work not covered by City Standard Drawings.
18. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall
be a minimum 2-foot offset from the public right of way, permitted line, or the adjacent private
property. All slope offsets shall meet the requirements of the current adopted California Building
Code.
19. Private sewer, water, and storm drain improvements will be designed per the, latest adopted
California Plumbing Code. Private storm drain improvements shall be shown on the grading and
drainage plan.
20. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum
parking stall gradient at 5 percent. Accessibility parking stall grades shall be constructed per the,
current adopted California Building Code.
www.CityofRC.us
Printed:1/12/2017 Page 6 of 9
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: ---020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
21. Roof storm water is not permitted to flow over the public parkway and shall be directed to an under
parkway culvert per City of Rancho Cucamonga requirements prior to issuance of a grading permit.
22. The final grading and drainage plan shall show existing topography a minimum of 50-feet beyond
project boundary, including the north boundary where improvements are proposed on the adjacent
private property.
23. The applicant shall provide a grading agreement and grading bond for all cut and fill combined
exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and
bond shall be approved by the Building and Safety Official.
24. This project shall comply with the accessibility requirements of the current adopted California
Building Code.
25. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format
provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit".
26. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor
shall request a pre-grading meeting. The meeting shall be attended by the project
owner/representative, the grading contractor and the Building Inspector to discuss about grading
requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours
from the start of grading operations, the grading permit may be subject to suspension by the
Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building
and Safety Department at least 1 working day in advance to request the following grading
inspections prior to continuing grading operations: i) The bottom of the over-excavation; ii)
Completion of Rough Grading, prior to issuance of the building permit; iii) At the completion of
Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building
and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and
properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough
grading certificates and the compaction reports will be reviewed by the Associate Engineer or a
designated person and approved prior to the issuance of a building permit.
27. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the
engineer of record shall certify the functionality of the storm water quality management plan
(WQMP) storm water treatment devices and best management practices (BMP).
28. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy
of the project Conditions of Approval.
29. Reciprocal access easements for all parcels and maintenance agreements ensuring joint
maintenance of all storm water quality structural/treatment devices and best management practices
(BMP) as provided for in the project's Storm Water Quality Management Plan, shall be provided for
by CC&R's or deeds and shall be recorded prior to the approval of the Water Quality Management
Plan. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality
Management Plan (WQMP) document prior to approval of the WQMP document and recording of
the Memorandum of Agreement of Storm Water Quality Management Plan.
www.CityofRC.us
Printed:1/12/2017 Page 7 of 9
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: --- 020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
30. Prior to issuance of a grading permit and approval of the project specific water quality management
plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of
concern as addressed in the in the final project-specific water quality management plan (WQMP). At
a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert
filters shall be maintained on a regular basis as described in the "Inspection and Maintenance
Responsibility for Post Construction BMP" section of the final project-specific water quality
management plan.
31. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification
Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan
document.
32. All roof drainage flowing to the public right of way (Center Avenue and Sixth Street) must drain
under the sidewalk through a parkway culvert approved by the Engineering Department. This shall
be shown on both the grading and drainage plan and Engineering Services Department required
plans.
33. The applicant shall provide a copy of a completed EPA Form 7520-16 (Inventory of Injection Wells)
for each underground infiltration device, with the Facility ID Number assigned, to the Building and
Safety Services Department Official prior to issuance of the Grading Permit and/or approval of the
project-specific Water Quality Management Plan. A copy of EPA Form 7520-16 shall be scanned
and pasted onto the permitted grading plan set, and a copy of said form shall be included in the
project-specific Water Quality Management Plan.
34. The land owner shall provide an inspection report by a qualified person/company on a biennial basis
for the Class V Injection Wells/underground infiltration chambers to the City of Rancho Cucamonga
Environmental Program Manager. The land owner shall maintain on a regular basis all best
management practices (BMP"s) as described in the Storm Water Quality Management Plan
(WQMP) prepared for the subject project. All costs associated with the underground infiltration
chamber are the responsibility of the land owner.
35. Reciprocal access easements for all parcels and maintenance agreements ensuring joint
maintenance of all storm water quality structural/treatment best management practices (BMP)
devices, as provided for in the project's Storm Water Quality Management Plan, shall be provided
for by CC&R's or deeds and shall be recorded prior to the issuance a grading permit. Said CC&R's
and/or deeds shall be included in the project site specific Storm Water Quality Management Plan
(WQMP) document prior to approval of the WQMP document and recording of the Memorandum of
Agreement of Storm Water Quality Management Plan.
36. Prior to approval of the final project-specific water quality management plan the applicant shall have
a soils engineer prepare a project-specific infiltration study for the project for the purposes of storm
water quality treatment. The infiltration study and recommendations shall follow the guidelines in the
current adopted "San Bernardino County Technical Guidance Document for Water Quality
Management Plans".
www.CityofRC.us
Printed:1/12/2017 Page 8 of 9
Project#: DRC2016-00268 SUBTPM19683
Project Name: DR///6th and Center Industrial Center
Location: --- 020926225-0000
Project Type: Design Review Tentative Parcel Map
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
37. Prior to issuance of a grading or building permit, the permitted grading plan (or architectural site
plan) set shall show in each of the typical sections and the plan view show how the separations
between the building exterior and exterior ground surface meet the requirements of Sections
CBC1804.3/CRC R401.3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2.1 of
the current adopted California Building Code/Residential Code.Here
38. Prior to issuance of a grading permit, the applicant shall obtain a signed and notarized letter from
the adjacent property owner(s) for ALL work proposed on the adjacent property. The letter shall be
scanned and pasted onto the permitted grading plan set. The letter shall show on either the title
sheet or a detail sheet of the grading and drainage plan set.
39. Prior to approval of the project-specific storm water quality management plan, the applicant shall
submit to the Building Official, or his designee, a precise grading plan showing the location and
elevations of existing topographical features, and showing the location and proposed elevations of
proposed structures and drainage of the site.
40. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform
such work. Two copies will be provided at grading and drainage plan submittal for review. Plans
shall implement design recommendations per said report.