HomeMy WebLinkAbout16-56 - Resolutions - Design Review, Located On The East Side Of Rochester Ave RESOLUTION NO. 16-56 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW DRC2016-00170, A REQUEST FOR SITE PLAN AND ARCHITECTURAL REVIEW OF A 34,944 SQUARE FOOT GYMNASIUM ALONG WITH 20,536 SQUARE FEET OF OUTDOOR COVERED BASKETBALL COURTS ON 4.63 ACRES OF LAND (TOTAL SITE IS 9.5 ACRES) LOCATED ON THE EAST SIDE OF ROCHESTER AVENUE IN THE INDUSTRIAL PARK (IP) AND GENERAL INDUSTRIAL (GI) DISTRICTS; AND MAKING FINDINGS IN SUPPORT THEREOF — APN: 0229- 021-41 AND 44. A. Recitals. 1. The City of Rancho Cucamonga filed an application for the approval of Design Review DRC2016-00170, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Design Review request is referred to as "the application." 2. On the 9th day of November 2016, the Planning Commission of the City of Rancho Cucamonga conducted a noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearings of November 9, 2016, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The 4.63 acre project site is located on the east side of Rochester Avenue at Stadium Way; and b. The site is presently used as an overflow parking lot for the Quakes Stadium on the west side Rochester Avenue; and c. The project site is within the Industrial Park (IP) and the General Industrial (GI) Districts. To the north is an office complex within the Industrial Park (IP) District. To the south is a light industrial complex within the General Industrial (GI) District. To the west (across Rochester Avenue) is the Rancho Cucamonga Adult Sports Park (Quakes Stadium) within the General Industrial (GI) District. To the east is a utility corridor within the Open Space (OS) District; and d. The Development Code permits public sports facilities within the Industrial Park (IP) and General Industrial (GI) Districts under the Community Centers/Civic Uses category; and PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 — CITY OF RANCHO CUCAMONGA November 9, 2016 Page 2 e. The proposed Rancho Cucamonga Sports Center includes a single-story 34,994 square foot recreation facility with 3 indoor, high school regulation basketball courts. The facility also includes 3 outdoor basketball courts with a 20,536 square foot overhead open shade structure that is designed so that it can be enclosed in the future; and f. The project conforms to all related criteria of the Development Code for the Industrial Park (IP) District; and g. Required parking for fitness related uses is 1 parking space per 200 square feet of gross floor area. The project requires 278 parking spaces (55,480 square feet of gross floor area divided by 200 square feet). The project site includes 44 parking spaces in addition to the existing 431 parking spaces in the Quakes overflow parking lot, for a total of 475 parking spaces. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed project is consistent with the General Plan. The General Plan land use designation for the project site is Park (P). The General Plan states that parklands include traditional neighborhood-level and community-level parks, as well as multi-purpose recreational oriented lands such as the Epicenter and Central Park. The proposed facility is an extension of the adult sports park on the west side of Rochester Avenue and fulfills the General Plan's intent for the Park (P) land use designation; and b. The proposed use is in accord with the objective of the Development Code and the purposes of the district in which the site is located. The project site is within the Industrial Park (IP) and the General Industrial (GI) Districts. The Development Code permits public sports facilities within the Industrial Park (IP) and General Industrial (GI) Districts under the Community Centers/Civic Uses category; and c. The proposed use is in compliance with each of the applicable provisions of the Development Code. The project conforms to all related criteria of the Development Code for the Industrial Park (IP) District; and d. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. The Initial Study Part II outlines potential environmental impacts related to the project and identifies project specific mitigation measures that reduce these impacts to less-than-significant. 4. Based upon the facts and information contained in the application, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that no subsequent or supplemental environmental document is required pursuant to the California Environmental Quality Act (CEQA) in connection with the review and approval of this application based upon the following findings and determinations: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that, with the imposition of mitigation measures, there would be no substantial evidence that the project would have a PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 —CITY OF RANCHO CUCAMONGA November 9, 2016 Page 3 significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i) that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. c. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. d. The custodian of records for the Initial Study, Mitigated Negative Declaration and all other materials which constitute the record of proceedings upon which the Planning Commission's recommendation is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for Design Review DRC2016-00170, the site plan and architecture of a 34,944 square foot gymnasium along with 20,536 square feet of outdoor covered basketball courts on 4.63 acres of land (total site is 9.5 acres) located on the east side of Rochester Avenue in the Industrial Park (IP) and General Industrial (GI) Districts; APN: 0229-109-41 Environmental Mitigation Air Quality 1) All clearing, grading, earth-moving, or excavation activities shall cease when winds exceed 25mph per SCAQMD guidelines in order to limit fugitive dust emissions. 2) The contractor shall ensure that all disturbed unpaved roads and disturbed areas within the Project are watered at least three (3) times daily during dry weather. Watering, with complete coverage of disturbed areas, shall occur at PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 —CITY OF RANCHO CUCAMONGA November 9, 2016 Page 4 least three times a day, preferably in the midmorning, afternoon, and after work is done for the day. 3) The contractor shall ensure that traffic speeds on unpaved roads and Project site areas are reduced to 15 miles per hour or less. 4) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. 5) Prior to the issuance of any Grading Permits, the developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. 6) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 7) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 8) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 9) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 10) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170—CITY OF RANCHO CUCAMONGA November 9, 2016 Page 5 • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds (i.e., wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 11) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM,() emissions, in accordance with SCAQMD Rule 403. 12) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 13) Provide adequate ingress and egress at all entrances to public facilities to minimize vehicle idling at curbsides. 14) Provide preferential parking to high occupancy vehicles and shuttle services. 15) Schedule truck deliveries and pickups during off-peak hours. 16) Improve thermal integrity of the buildings and reduce thermal load with automated time clocks or occupant sensors. 17) Landscape with native and/or drought-resistant species to reduce water consumption and to provide passive solar benefits. 18) Provide lighter color roofing and road materials and tree planting programs to comply with the AQMP Miscellaneous Sources MSC-01 measure. 19) Comply with the AQMP Miscellaneous Sources PRC-03, and Stationary Sources Operations Enhanced Inspection and Maintenance and ADV-MISC to reduce emissions of restaurant operations. 20) All commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). 21) All commercial facilities shall designate preferential parking for vanpools. 22) All commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170— CITY OF RANCHO CUCAMONGA November 9, 2016 Page 6 23) All commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. 24) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 25) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. 26) All new development in the City of Rancho Cucamonga shall comply with South Coast Air Quality Management District's Rule 445, Wood Burning Devices. Rule 445 was adopted in March 2008 to reduce emissions of PM2.5 and precludes the installation of indoor or outdoor wood burning devices (i.e. fireplaces/hearths) in new development on or after March 9, 2009. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Prepare a mitigation plan consistent with Section 21083.2 Archaeological resources of CEQA to eliminate adverse project effects on significant, important, and unique prehistoric resources, including but not limited to, avoiding archaeological sites, capping or covering sites with soil, planning the site as a park or green space or paying a in-kind mitigation fee. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 —CITY OF RANCHO CUCAMONGA November 9, 2016 Page 7 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full- time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM,() emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM,o emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM,o emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Greenhouse Gasses 1) The project must comply with all rules that assist in reducing short-term air pollutant emission in compliance with SCAWMD Rule 403 regarding fugitive PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170— CITY OF RANCHO CUCAMONGA November 9, 2016 Page 8 dust including treating the site with water or other soil-stabilizing agent twice daily or replanting disturbed areas as quickly as possible. 2) The construction contactor shall select construction equipment based on low-emission factors and high energy efficiency and submit a statement on the grading plan that ensures all construction equipment will be tuned and maintained in accordance with the manufactures specification. 3) Trucks shall not idle continuously for more than 5 minutes. 4) Alternative fuel powered equipment shall be utilized in lieu of gasoline- or diesel-powered engines where feasible. 5) Construction should be timed so as not to interfere with peak-hour traffic. 6) Ridesharing and transit incentives shall be supported and encouraged for construction crew. 7) Construction and Building materials shall be produced and/or manufactured locally. Use "Green Building Materials" such as materials that are resource efficient, recycled and manufactured in an environmentally friendly way including low-volatile-organic-compound (VOC) materials. 8) Design all buildings to exceed California Building Code Title 24 energy standard including but not limited to any combination of: • Increased insulation. • Limit air leakage through the structure. • Incorporate Energy Star or better rated windows, space heating and cooling equipment, light fixtures, and appliances. • Landscape and developed site utilizing shade, prevailing winds and landscaping. • Install light colored "cool" roofs and cool pavement. • Install efficient lighting and lighting control systems. • Install solar or light emitting diodes (LED's) for outdoor lighting. 9) Prepare a comprehensive water conservation strategy appropriate for the project and include the following: PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 —CITY OF RANCHO CUCAMONGA November 9, 2016 Page 9 • Install water efficient landscapes and irrigation systems and devices in compliance with the City of Rancho Cucamonga Water Efficient Landscape Ordinance. • Use reclaimed water for landscaping within the project if available and/or install the infrastructure to deliver and use reclaimed water. • Design building to be water efficient by installing water efficient fixtures and appliances including low flow faucets, dual flush toilets and waterless urinals/water heaters. • Design irrigation to control runoff and to remove water to non-vegetated surfaces. 10) Reuse and recycle construction and demolition waste. Provide interior and exterior storage areas for recyclables and green waste in public areas. Educated employees about reducing waste and about recycling. Hydrology and Water Quality 1) Prior to issuance of Grading Permits, the permit applicant shall submit to the Building Official for approval, a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in the Grading Plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in Southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) Prior to issuance of Building Permits, the applicant shall submit to the City Building Official for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 —CITY OF RANCHO CUCAMONGA November 9, 2016 Page 10 (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 6) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 8) The developer shall implement the BMPs identified in the Water Quality Management Plan prepared by MCE (June 10, 2016) to reduce construction pollutants from entering the storm drain system to the maximum extent practical. Noise 1) Prior to the issuance of any grading plans a construction-related noise mitigation plan shall be submitted to the City for review and approval. The Plan shall depict the location of the construction equipment and how the noise from this equipment would be mitigated during construction. 2) Business operations shall maintain a noise level at 60dB or less during the hours of 10:00 p.m. until 7:00 p.m. No loading and unloading activities including opening, closing, or other handling of boxes, crates, containers, building materials, garbage cans, or other similar objects between the hours of 10:00 p.m. and 7:00 p.m. in a manner which would cause a noise disturbance to residential areas. 3) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 4) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.66.050, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.66.050. Monitoring PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 — CITY OF RANCHO CUCAMONGA November 9, 2016 Page 11 at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted during all project site excavation and grading on the site. The project contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers consistent with manufacturer's standards. 5) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Traffic 1) The following improvements shall be completed at the Foothill Boulevard/Rochester Avenue intersection: Signing and striping revisions to improve the northbound approach from 2 left turn lanes, 1 through lane, and 1 through/right turn lane to have 1 left turn lane, 2 through lanes, and 1 right turn lane. 2) The following improvements shall be completed at the Rochester Avenue/Arrow Route intersection: Signing and striping revisions to add a second eastbound left turn lane. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 9TH DAY OF NOVEMBER 2016. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Francisco Oaxaca, Chairman ATTEST: Candyce urnett, Secretary PLANNING COMMISSION RESOLUTION NO. 16-56 DRC2016-00170 —CITY OF RANCHO CUCAMONGA November 9, 2016 Page 12 I, Candyce Burnett, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 9th day of November 2016, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, OAXACA, MACIAS NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MUNOZ, WIMBERLY ABSTAIN: COMMISSIONERS: NONE .ii-,':::' -• ,- City of Rancho Cucamonga MITIGATED NEGATIVE DECLARATION The following Mitigated Negative Declaration is being circulated for public review in accordance with the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code. Project File No.: Design Review DRC2016-00170 Public Review Period Closes: November 9, 2016 Project Name: Gym and Basketball Courts Project Applicant: City of Rancho Cucamonga 10500 Civic Center Drive Rancho Cucamonga,CA 91730 Project Location (also see attached map): Located on the east side of Rochester Avenue in the Industrial Park (IP) and General Industrial (GI) Districts—APN: 0229-021-41 and 44 Project Description: Site Plan and architectural review of a 34,944 square foot gymnasium with a 20,536 square feet of outdoor covered basketball courts of 4.63 acres of land (total parcel area is 9.5 acres) FINDING This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an Initial Study to determine if the project may have a significant effect on the environment and is proposing this Mitigated Negative Declaration based upon the following finding: The Initial Study identified potentially significant effects but: (1) Revisions in the project plans or proposals made or agreed to by the applicant before this proposed Mitigated Negative Declaration was released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur, and (2) There is no substantial evidence before the agency that the project, as revised, may have a significant effect on the environment. If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not be required. The factual and analytical basis for this finding is included in the attached Initial Study. The project file and all related documents are available for review at the City of Rancho Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909) 477-2847. NOTICE The public is invited to comment on the proposed Mitigated Negative Declaration during the review period. November 9, 2016 Date of Determination Ad •ted By / /T/� c+cv 4 UDR' <2 Conditions of Approval ANC110 Community Development Department CUCAMONGA Project#: DRC2016-00170 DRC2016-00653 Project Name: Rancho Cucamonga Sports Center Location: 8273 ROCHESTER AVE - 022902141-0000 Project Type: Design Review Sign Permit Notice of Filing ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay California Department of Fish and Wildlife Notice of Exemption and Mitigated Negative Declaration fee in the amount of $2,260.25. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing. 4. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a time extension has been granted. 5. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in effect at the time of Building Permit issuance. Engineering Services Department Please be advised of the following Special Conditions 1. Prior to issuance of a building permit, the following impact fees shall be collected: 1. Police: $549.00 per 1,000 sf Note: fees subject to change annually 2. A Lot Line Adjustment shall be submitted to the Planning department for approval. Building and Safety Services Department Please be advised of the following Special Conditions www.CityofRC.us Printed:10/4/2016 Project#: DRC2016-00170 DRC2016-00653 Project Name: Rancho Cucamonga Sports Center Location: 8273 ROCHESTER AVE -022902141-0000 Project Type: Design Review Sign Permit Notice of Filing ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Building and Safety Services Department Please be advised of the following Special Conditions 1. Submit the code modification request for approval before plan check submittal (CBC 104.10/104.11). When the Entitlement Review is approved submit complete construction drawings including structural calculations energy calculations and soils report to Building and Safety for plan review in accordance with the current edition of the CA Building and Fire Codes as well as local Ordinances and Standards. The new structures are required to be equipped with automatic fire sprinklers as required by the CBC and Current RCFPD Ordinance. Disabled access for the site and building must be made to the in accordance to the State of CA and ADA regulations. Grading Section Standard Conditions of Approval 1. Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 2. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. The project specific soils report shall specifically address the proposed structural storm water treatment basins (i.e. bio-retention area without underdrain) adjacent to the building footings and the effect of the standing water in relation to the soil recommendations for footing. 3. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and submitted at the time of application for Grading and Drainage Plan review. 4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit. 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. All dust control sign(s) shall be located outside of the public right of way. 7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review, that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit. www.CityofRC.us Printed:10/4/2016 Page 2 of 6 Project#: DRC2016-00170 DRC2016-00653 Project Name: Rancho Cucamonga Sports Center Location: 8273 ROCHESTER AVE -022902141-0000 Project Type: Design Review Sign Permit Notice of Filing ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a grading permit. The report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. 9. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project-specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the "Inspection and Maintenance Responsibility for Post Construction BMP" section of the final project-specific water quality management plan. 10. Prior to issuance of a grading permit the Final Grading and Drainage Plan shall show the accessibility path from the public right of way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code. All accessibility ramps shall show sufficient detail including gradients, elevations, and dimensions and comply with the current adopted California Building Code. 11. The Grading and Drainage Plan shall implement City Standards for on-site construction where possible, and shall provide details for all work not covered by City Standard Drawings. 12. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall be a minimum 2-foot offset from the public right of way, permitted line, or the adjacent private property. All slope offsets shall meet the requirements of the current adopted California Building Code. 13. Private sewer, water, and storm drain improvements will be designed per the, latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 14. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum parking stall gradient at 5 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code. 15. Roof storm water is not permitted to flow over the public parkway and shall be directed to an under parkway culvert per City of Rancho Cucamonga requirements prior to issuance of a grading permit. 16. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond project boundary. 17. This project shall comply with the accessibility requirements of the current adopted California Building Code. 18. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit". www.CityofRC.us Printed:10/4/2016 Page 3 of 6 Project#: DRC2016-00170 DRC2016-00653 Project Name: Rancho Cucamonga Sports Center Location: 8273 ROCHESTER AVE -022902141-0000 Project Type: Design Review Sign Permit Notice of Filing ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 19. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over-excavation; ii) Completion of Rough Grading, prior to issuance of the building permit; iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. 20. Prior to the issuance of the Certificate of Occupancy the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) storm water treatment devices and best management practices (BMP). 21. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy of the project Conditions of Approval. 22. The land owner shall follow the inspection and maintenance requirements of the approved project specific Water Quality Management Plan and shall provide a copy of the inspection reports on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager. 23. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 24. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan document. 25. Prior to the start of landscaping operations, the landscape architect and the landscape contractor shall provide a sample of the weed fabric barrier to the Project Planner, City of Rancho Cucamonga Planning Department. The weed barrier shall be permeable. 26. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. This shall be shown on the grading and drainage plan prior to issuance of a grading permit. www.CityofRC.us Printed:10/4/2016 Page 4 of 6 Project#: DRC2016-00170 DRC2016-00653 Project Name: Rancho Cucamonga Sports Center Location: 8273 ROCHESTER AVE -022902141-0000 Project Type: Design Review Sign Permit Notice of Filing ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 27. Prior to issuance of a grading permit the Final Project-Specific Water Quality Management Plan shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet" located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table Vll.3: Suitability Assessment Related Considerations for Infiltration Facility Safety Factors". 28. Prior to approval of the final project-specific water quality management plan the applicant shall have a soils engineer prepare a project-specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". The infiltration study shall include the recommended infiltration rates for the compacted soil adjacent to the building footings. 29. Prior to issuance of a grading or building permit, the permitted grading plan (or architectural site plan) set shall show in each of the typical sections and the plan view show how the separations between the building exterior and exterior ground surface meet the requirements of Sections CBC1804.3/CRC R401.3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2.1 of the current adopted California Building Code/Residential Code. 30. Prior to approval of the project-specific storm water quality management plan, the applicant shall submit to the Building Official, or his designee, a precise grading plan showing the location and elevations of existing topographical features, and showing the location and proposed elevations of proposed structures and drainage of the site. 31. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm Water Treatment Devices As-Built Certificate with the Environmental Programs Coordinator, City of Rancho Cucamonga Engineering Services Department. 32. The applicant shall provide a copy of a completed EPA Form 7520-16 (Inventory of Injection Wells) for each underground infiltration device, with the Facility ID Number assigned, to the Building and Safety Services Department Official prior to issuance of the Grading Permit and/or approval of the project-specific Water Quality Management Plan. A copy of EPA Form 7520-16 shall be scanned and pasted onto the permitted grading plan set, and a copy of said form shall be included in the project-specific Water Quality Management Plan. 33. The land owner shall provide an inspection report by a qualified person/company on a biennial basis for the Class V Injection Wells/underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all best management practices (BMP"s) as described in the Storm Water Quality Management Plan (WQMP) prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. www.CityofRC.us Printed:10/4/2016 Page 5 of 6 Project#: DRC2016-00170 DRC2016-00653 Project Name: Rancho Cucamonga Sports Center Location: 8273 ROCHESTER AVE -022902141-0000 Project Type: Design Review Sign Permit Notice of Filing ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 34. The land owner shall provide an inspection report on a biennial basis for the structural storm water treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 35. A final project-specific Storm Water Quality Management Plan (WQMP) shall be approved by the Building and Safety Director, or his designee, and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit or any building permit. 36. The final project-specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. 37. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm Water Treatment Devices As-Built Certificate with the Environmental Programs Coordinator, City of Rancho Cucamonga Engineering Services Department. 38. As the use of drywells are proposed for the structural storm water treatment device, to meet the infiltration requirements of the current Municipal Separate Storm Sewers Systems (MS4) Permit, adequate source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration shall be evaluated prior to infiltration and discussed in the final project-specific Water Quality Management Plan document. www.CityofRC.us Printed:10/4/2016 Page 6 of 6