HomeMy WebLinkAbout1993/04/28 - Workshop Minutes - PC-HPCCITY OF RANCHO CUCAMONGA
PLANNING COMMISSION MINUTES
Adjourned Meeting
April 28, 1993
Chairman McNiel called the Adjourned Meeting of the City of Rancho Cucamonga
Planning Commission to order at 9=00 p.m. The meeting was held in the Rains
Room at Rancho Cucamonga Civic Center, 10500 Civic Center Drive, Rancho
Cucamonga, California-
ROLL CALL
COMMISSIONERS:
PRESENT:
Suzanne Chitlea, Larry McNiel, John
Melcher, Peter Tolstoy, Wendy Vallette
ABSENT: None
STAFF PRESENT=
Brad Bullet, City Planner~ Dan Coleman,
Planner~ Dan James, Senior Civil Engineer
Principal
, , , ,
pRE-AFPLICATION REVIEW 93-02 -YEH - The review of a proposed 3-story, 20,700
square foot medical building on 1.3 acres of land in the Office Professional
District, located on the south side of Base Line Road at Amethyst Street -
AFN: 208-432-17 and 18.
Brad Buller, City Planner, gave a brief explanation of the Pre-Application
review process.
Chien Yeh, applicant, presented the site plan and elevations to the
Commissioners. He also showed the Commissioners a new elevation indicating a
two-story building, 25 feet high.
Dan Coleman, Principal Planner, explained staff's concerns with the project.
He noted that the project is inconsistent with the General Plan and zoning
designations of Low Residential on the southern third of the project site. He
pointed out that the neighborhood is entirely one-story structures. He noted
the following major issues: the lack of a focal point plaza in the master
plan, the inappropriateness of a three-story design, and the confusing and
poorly conceived architectural design.
Mr. Bullet added that the project does not take into consideration
preservation of existing mature trees on site.
Commissioner Tolstoy commented on the primarily single family residential
character of the neighborhood. He stated that a three-story building would be
out of scale with the surrounding area.
Commissioner Chitiea stated that a three-story building was inappropriate for
this location. She indicated that the design should consider natural grade
and be sensitive to the in-fill nature of the site. She also concurred with
staff's comments.
Commissioner Vallette agreed with staff's comments. She felt that the
architecture should blend better, in terms of scale, with the neighborhood.
Commissioner Melcher commented that the project architect, Mr. Yeh, had
designed a rather ingenious solution if considered on its own merits. He
noted that taken in the context of the surrounding neighborhood, the site is
inadequate in area. He felt the design is not compatible with the
neighborhood. He thought the appropriate approach would be for someone to
assemble all of the Office Professional land at the intersection and design
and develop it as a unified project.
Chairman McNiel agreed that a three-story building is inappropriate. He
thought a two-story building would be more appropriate. He stated that
allowing this site to be developed on its own would be undesirable "piecemeal"
developsent. He felt the architecture needs refinement and the site plan
should include a plaza element.
Commissioner Melcher suggested the City may want to consider changing the land
use designation for the entire master plan area to single family residential
and connect Ruby Court with Amethyst Street.
Mr. Buller indicated that during the initial discussions regarding the Old
Alta Loma Neighborhood Plan, this master plan site was viewed as a critical
design component to creating an entry statement to the old downtown area on
Amethyst Street.
, * , ,
ADJOURNMENT
The meeting adjourAed at 9=30 p.m.
Respectfully submitted,
Brad Buller
Secretary
P C Workshop Minutes -2- April 28, 1993