Loading...
HomeMy WebLinkAbout19-11 - ResolutionRESOLUTION NO. 19-11 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT DRC2018-00393, A REQUEST TO OPERATE A 5,825 SQUARE FOOT FULL-SERVICE SIT-DOWN RESTAURANT WITH A 675 SQUARE FOOT OUTDOOR EATING AREA THAT INCLUDES THE SALE OF DISTILLED SPIRITS (TYPE 47/ON-SALE GENERAL ABC LICENSE) ON A 71,063 SQUARE FOOT PARCEL OF LAND IN THE REGIONALLY RELATED OFFICE/COMMERCIAL (RRO/C) DISTRICT OF THE VICTORIA COMMUNITY PLAN AT THE SOUTHEAST CORNER OF FOOTHILL BOULEVARD AND DAY CREEK BOULEVARD AT 12327 FOOTHILL BOULEVARD; AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0229-021-76 A. Recitals 1. CDS Development on behalf of Longhorn Steakhouse, filed an application for the approval of Conditional Use Permit DRC2018-00393 as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional Use Permit request is referred to as "the application." 2. On the 23rd day of January 2019, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred B. Resolution, NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above -referenced public hearing on January 23, 2019, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a property located at the southeast corner of Foothill Boulevard and Day Creek Boulevard; and b. The subject parcel of land is currently developed with a 5,641 square foot sit down restaurant along with a 2,185 square foot outdoor patio. The generally rectangular shaped project site is approximately 200 feet (east to west) by 350 feet (north to south), with an area of approximately 71,063 square feet (1.63 acres); and C. The project site is within the 312,906 square foot Foothill Crossings commercial center and is bounded by freestanding commercial pad buildings to the north (across Foothill Boulevard), south, east, and west. The project site and the properties to the east, west, and south are within the Regionally Related Office/Commercial (RRO/C) District of the Victoria Community PLANNING COMMISSION RESOLUTION NO. 19-11 CONDITIONAL USE PERMIT DRC2018-00393 - CDS DEVELOPMENT FOR LONGHORN STEAKHOUSE January 23, 2019 Page 2 Plan. The property to the north is within the Mixed Use Commercial' Regional Related (MU/CRR) District of the Victoria Arbors Master Plan and within the Victoria Gardens Master Plan; and d. The applicant proposes constructing a freestanding, sit-down restaurantwith a floor area of 5,825 square feet and a 675 square foot outdoor patio; and e. The restaurant will include a full-service liquor license (Type 47/On-Sale General— Eating Place). Alcoholic beverages will be available both within the restaurant and the outdoor gated patio area. The restaurant will not provide any type of entertainment; and f. The hours of operation will be Sunday thru Thursday from 11:00 a.m. to 10:00 p.m. and Friday and Saturday from 11:00 a.m. to 11:00 p.m. There will be 30 to 35 staff members on the largest shifts; and g. The parking requirement for the. proposed 5,825 square foot restaurant with a 675 square foot outdoor eating area is 33 parking spaces. The project site is located in a commercial center with 1,705 parking spaces, 137 parking spaces over the minimum requirement including the proposed restaurant; and 3. Based upon the substantial evidence presented to this Commission during the above -referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed use is allowed within the applicable zoning district and complies with all other applicable provisions of this Zoning Code, Municipal Code, General Plan, and any .applicable Specific Plans or City regulations/ standards. The project site is within the Regionally Related Office/Commercial (RRO/C) which permit restaurants with a full-service liquor license (Type 47/On-Sale General — Eating ,Place) subject to the approval of a Conditional Use Permit. The proposed restaurant is designed in accordance with all applicable development standards of the Development Code such as building setbacks, building height, and parking and will comply with all applicable performance standards. b. The site is physically suited forthe type, density, and intensity of the proposed use including access, utilities, and the absence of physical constraints and can be conditioned to meet all related performance criteria and development standards. The proposed restaurant replaces an existing restaurant on the same parcel which also included a full-service liquor license (Type 47/On- Sale General — Eating Place). The project site is located within the 312,906 square foot Foothill Crossings commercial center (which includes the square footage of the proposed restaurant), which includes multiple sit-down restaurants with full-service liquor licenses along with retail and office tenants. The project site is located on Foothill Boulevard, which is a major thoroughfare in the city and was designed to accommodate large commercial centers that include full-service restaurants. The project site provides parking in excess of the minimum requirement and multiple access points. C. Granting these permits would not be detrimental to the public interest, health, safety, convenience, or welfare, or materially injurious to persons, property, or improvements in the vicinity in which the project is located. The project site and the surrounding area is developed with large commercial centers that include similar full-service restaurants. The proposed restaurant will not negatively impact the surrounding land uses in that the sale of alcoholic beverages will be monitored by the restaurant staff and will not be available to be consumed off premises. PLANNING COMMISSION RESOLUTION NO. 19-11 CONDITIONAL USE PERMIT DRC2018-00393 - CDS DEVELOPMENT FOR LONGHORN STEAKHOUSE January 23, 2019 Page 3 4. The Planning Department staff has determined that the project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA Guidelines. The project qualifies under a Class 32 exemption under State CEQA Guidelines Section 15303 — New Construction or Conversion of Small Structures up to 10,000 square feet area in an urbanized area. The proposed restaurant building is 5,825 square feet in area and replaces an existing restaurant building of a similar size. The Planning Commission has reviewed the Planning Department determination of exemption, and based on its own independent judgment, concurs in the staffs determination of exemption. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the attached standard conditions incorporated herein by this reference. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 23rd DAY OF JANUARY 2019. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Tony Guglielmo, Chairman ATTEST: Candyc Burnett, Secretary I, Candyce Burnett, Secretary of the Planning Commission for the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 23rd day of January 2019, by the following vote -to -wit: AYES: COMMISSIONERS: DOPP, GUGLIELMO, MUNOZ, OAXACA. WIMBERLY NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Conditions of Approval Community Development Department Project M DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.- Planning ROJECT: Planning Department Please be advised of the following Special Conditions 1. Approval is granted for a 5,825 square foot full service restaurant with a Type 47 "On -sale General - Eating Place" liquor license that includes a 675 square foot outdoor eating area that is located in the Regionally Related Office/Commercial (RROIC) District of the Victoria Community Plan at the southeast corner of Foothill Boulevard and Day Creek Boulevard at 12327 Foothill Boulevard; APN: 0229-021-76. 2. The approved hours of operation are Sunday lhru Thursday from 11:00 a.m. to 10:00 p.m. and Friday and Saturday from 11:00 a.m. to 11:00 p.m. 3. The on-site manager shall actively monitor area under their control in an effort to prevent the loitering of persons in and around the subject business and take reasonable steps to correct objectionable conditions that constitute a nuisance. 4. Any graffiti painted or marked upon the premises or any adjacent area under the control of the subject business shall be removed or painted over within 72 hours of being detected. 5. Any modifications or intensification of the approved use, including any increase in square footage, changes in operating hours and/or other modifications/intensification beyond what is specifically approved by Conditional Use Permit shall required the review and approval of the City Planner. 6. All temporary events shall be reviewed by the Planning Department and approved by the City Planner prior to submittal of documents for construction, commencement of the activity or event, and/or issuance of a business license, in compliance with Chapter 17.04 (Temporary Uses) of the Development Code. 7. All signs shall be in conformance with Uniform Sign Program #153. Temporary signs require the approval of a Temporary Sign Permit. 8. If the operation of the business causes any adverse effects upon adjacent residences, businesses, or their normal operation including, but not limited to, noise, loitering, parking, or disturbances, or if any of the Conditions of Approval are not fulfilled properly, the Conditional Use permit shall be brought before the City Planner for considoratlon and possible suspension, modification or revocation. 9. No entertainment as described In Chapter 17.20.020 (Entertainment Permit) of the Development Code Is permitted without prior approval of an Entertainment Permit. 10. Approval of this request shall not waive compliance with any sections of the Municipal Code, Slate Fire Marshal's rogulntlons, Uniform Building Code, or any other City Ordinances, p,.d.d i1ir,1nw � Cityu014C u* Project M DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Planning Department Please be advised of the following Special Conditions 11. The project is subject to the public art requirement and will be required to provide public art on the project site with a minimum value of $5,825 or pay an in -lieu fee the City's public art fund, equal to the minimum value of art that would otherwise be included in the development project. A condition has been included pursuant to the Development Code that requires the public art requirement to be met prior to occupancy. Standard Conditions of Approval 12. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 13. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheel(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 14. The applicant shall be required to pay California Department of Fish and Wildlife Notice of Exemption fee in the amount of $50.00. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing or within 5 days of the date of project approval. 15. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a limo extension has been granted. 16. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Mastor Plans in effect at the time of Building Permit issuance. 17. The signs indicated on the submitted plans aro conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. 18. Existing frees required to be preserved In place shall be protected with a construction barrier In accordance with the Development Code Section 17.80.050, and so noted on Iho grading plans. The location of those trees to bo preserved In place and now locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the nrborlsl's recommendations regarding preservation, transplanting, and trimming melhods. 19. Landscaping and Irrigation sysloms required to be installed within the public rlghl-of-way on the porimoler of this project area shall be continuously maintained by Vie developer, ia1,n�a uLlquio www CgyulltC11% r�uo � of iu Project M DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse' Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Planning Department Standard Conditions of Approval 20. The final design of the perimeter parkways, walls, landscaping, the required landscape plans and shall be subject to Planning coordinated for consistency with any parkway landscaping plan Engineering Services Department. Engineering Services Department Please be advised of the following Special Conditions and sidewalks shall be included in Director review and approval and which may be required by the 1. The existing ramp located at southeast corner of Foothill Boulevard/Day Creek Boulevard and shall be evaluated for conformance to current ADA regulations. If the ramp does not meet ADA regulations then the developer shall be responsible for providing design and reconstruction of the ramp for compliance. Design shall be completed and improvements secured for prior to issuance of Building permit or approval of final subdivision map whichever occurs first. The reconstruction along with all public improvements shall be completed prior to occupancy. 2. Prior to the issuance of a building permit, the applicant shall submit street plans,. or revise existing street plans, showing the removal or replacement of existing Route 66 visual improvements within the parkway area of Foothill Boulevard to the satisfaction of the City Engineer. Standard Conditions of Approval 3, " CD Information Required Prior to Sign -Off for Building Permit Prior to the issuance of building permits, if valuation Is greater or equal to $100,000, a Diversion Deposit and a related administrative fee shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 65% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Applicant must identify if they are self -hauling or utilizing Burrtec prior to Issuance of a building permit. Proof of diversion must be submitted to the Environmental Engineering Division within 60 days following the completion of the construction and / or demolition project. Contact Susan Shaker, Environmental Engineering, at (909) 774-4062 for more information. Instructions and forms are available at the City's wobsllo, www.cllyofrc,us, under City Hall I Engineering / Environmental Programs / Construction & Demolition Diversion Program. Buildlna and Safety Sorvices Department Planso be ndvlsod of the following Spoclnl Conditions 14uVn,1 11110019 www CayolliC ua roan I nl w Project #: DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Building and Safety Services Department Please be advised of the following Special Conditions 1. When the Entitlement Review is approved submit complete construction drawings including structural calculations, energy calculations and soils report to Building and Safety for plan review in accordance with the current edition of the CA Building and Fire Codes including all local ordinances and standards which are effective at the time of Plan Check Submittal. The new structures are required to be equipped with automatic fire sprinklers per the CBC and Current RCFPD Ordinance. Disabled access for the site and building must be in accordance to the State of CA and ADA regulations. Grading Section Standard Conditions of Approval 1. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the formal provided in the City of Rancho Cucamonga handout "Information for Grading Plans and Permit". 2. Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 3, A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cul and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer prior to the Issuance of a grading or building permit. 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. All dust control sign (s) shall be located outside of Ilia public right of way. 7. If a Rough Grading and Drainage Plan/Pormil aro submitted to Ilia Building and Safely Official for review, Ilio rough grading plan shall be a soparalo plan submittal and Pormil from Precise Grading and Drainage Plan/Pormil, 8. Prior to the Issuance of a grading permit the applicant shall obtain written permission from the adjacent properly ownor(s) to construct wall(s) on properly linos) or provide a dolall(s) showing Ilia perimeter wall(s) to be constructed offset from Ilia properly line. 9. Prior to Issuance of a grading permit Ilio Final Grading and Drainage Plan shall show Ilia accessibility path from Ilia public right of way and Iho accessibility parking stalls to Ilia building doors In conformance with the current adopted California Building Code. All accessibility ramps Shall show sufficient dolall Including gradients, elevations, and dimensions and comply with Iho current adopted California Building Code. r mn uvuuiu www CdyollCn% Project #: DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Grading Section Standard Conditions of Approval 10. The Grading and Drainage Plan shall implement City Standards for on-site construction where possible, and shall provide details for all work not covered by City Standard Drawings. 11. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall be a minimum 2 -foot offset from the public right of way, permitted line, or the adjacent private property. All slope offsets shall meet the requirements of the current adopted California Building Code. 12. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum parking stall gradient at 7 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code. 13. The final grading and drainage plan shall show existing topography a minimum of 100 -feet beyond project boundary. 14, This project shall comply with the accessibility requirements of the current adopted California Building Code. 15. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre -grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre -grading meeting is riot had within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over -excavation; ii) Completion of Rough Grading, prior to issuance of the building permit; til) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safely Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wol signed and sealed by the Civil Engineer and Soils Engineer of Record; Iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated parson and approved prior to Ilia Issuance of a building permit. 16. Prior to issuance of a grading or building pormil, the permitted grading plan (or architectural silo plan) sol shall show in each of Ilia typical sections and ([to plan view show how the separations between the building exterior and exterior ground surface moot Ilio requirements of Sections CBC1804,3/CRC R401,3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2,1 of Ilio current adopted California Building Codo/Rosidontlal Code. 17. Prior to approval of the projocl-spocific storm water qunldy mnnagomant plan, Iho npplicnnl shall submit to Ilia Building Official, or his closlgnoo, a precise grading plan showing the location and olovallons of existing topographical features, and showing Ilia location and proposed elevations of proposed structures and drainage of Ilia silo. www lalyolHC u� 1111.110.1 NINONI'nUn M1nl 111 Project #: DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Grading Section Standard Conditions of Approval 18. Private sewer, 'water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 19. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) storm water treatment devices and best management practices (BMP). 20. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy of the project Conditions of Approval. 21. The Preliminary Water Quality Management Plan (PWQMP) has been deemed "Acceptable". Prior to the issuance of a grading permit a final project -specific Water Quality Management Plan shall be submitted for review and approval by the Building Official. 22. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 23. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan document. 24. The applicant shall provide a copy of a completed EPA Form 7520-16 (Inventory of Injection Wells) for each underground infiltration device, with the Facility ID Number assigned, to the Building and Safely Services Department Official prior to issuance of the Grading Permit and/or approval of the project -specific Water Quality Management Plan. A copy of EPA Form 7520-16 shall be scanned and pasted onto the permitted grading plan set, and a copy of said form shall be Included in the project -specific Water Quality Management Plan. 25. The land owner shall provide an inspection report by a qualified person/company on a blonnial basis for the Class V Injection Wells/underground Infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all best management practices (BMP"s) as described In the Storm Water Quality Management Plan (WQMP) prepared for the subject project. All costs associated with the underground infiltration chamber aro the responsibility of the land owner. 26. The land owner shall provide an inspoclion report on a bionnial basis for the structural storm water treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basls-ns described In the Storm Water Quality Management Plan prepared for the subject project. All costs associated wllh the undorground Infiltrallon chamber aro the rosponslblllly of Iho land owner. 27. The land/proporly owner shall follow the inspoclion and mainlonanco requirements of the approved project specific Water Quality Managomont Plan and shall provide it copy of the Inspection reports on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager. pmtlnd III h7n IU µ'ms 1:'IynINC u% No. 6 of III Project #: DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Grading Section Standard Conditions of Approval 28. A final project -specific Storm Water Quality Management Plan (WQMP) shall be approved by the Building and Safety Director, or his designee, and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit or any building permit. 29. The Site and Drainage Plan in the final project -specific Water Quality Management Plan shall show the locations of all roof downspout drains. if required for storm water quality purposes, the downspouts shall include filters. 30. The final project -specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which stales that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. 31. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert fillers to capture those pollutants of concern as addressed in the in the final project -specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert fillers shall be maintained on a regular basis as described in the "Inspection and Maintenance Responsibility for Post Construction BMP" section of the final project -specific water quality management plan. 32. Prior to Issuance of a grading permit the Final Projocl-Specific Water Quality Management Plan shall Include a completed copy of "Workshoel H: Factor of Safely and Design Infiltration Workshool" located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The Infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table VI1.3: Suitability Assessment Related Considerations for Infiltration Facility Safely Factors". 33, Prior to approval of the final project -specific water quality management plan the applicant shall have it soils engineer prepare a projocl-spoclfic Infiltration study for the project for the purposes of storm water quality treatment. The Infillralion study and recommendations shall follow the guidolinos In Ilio current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". 34. Prior to the Issuance of it certificate of occupancy by the Building Official, or his designee, the civil onginoor of record shall filo a Walor Quality Management Plan (WQMP) Post Construction Storm Water Treatment Dovicas As-Bulll Certificate with the Environmental Programs Coordinator, City or Rancho Cucamonga Englnooring Sorvlcos Dopnrtmonl. rum.n 111111119 www GlynMC ur I'nUn I'd III Project #: DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.- Grading ROJECT: Grading Section Standard Conditions of Approval 35. As the use of drywells are proposed for the structural storm water treatment device, to meet the infiltration requirements of the current Municipal Separate Storm Sewers Systems (MS4) Permit, adequate source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration shall be evaluated prior to infiltration and discussed in the final project -specific Water Quality Management Plan document. 36. Section 1.5.1, Table 1-1 Priority Projects, Category No. 1, of the San Bernardino County Technical Guidance Document for Water Quality Management Plans reads "All significant re -development projects — defined as the addition or replacement of 5,000 or more square feet (sq. ft.) of impervious surface on an already developed site subject to discretionary approval of the permitting jurisdiction. In addition: Where re -development results in an increase of 50% or more of the impervious surfaces of a previously existing developed site, the numeric sizing criteria discussed in Section 4 applies to the entire development. The project is showing 56,906 square feet of existing 53,736 square feet of proposed and/or removal and proposed/removal/replacement impervious area equals or area, the project is conditioned, prior to the issuance project -specific water quality management plan to treat development's impervious area. impervious area. The project is showing replacement of impervious area. The exceeds 50% of the existing impervious of a grading permit, to prepare a final the storm water runoff of the entire www cdyonu: u. V, Ind Ill I11111V I'nVn M nl Ill Project #: DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 37. GROUND WATER PROTECTION: Prior to approval of the final project specific water quality management plan (WQMP), the WQMP document shall meet the requirements of the State Water Resources Control Board Order No. R8-2010-0036 (NPDES No. CAS 618036), the San Bernardino County Municipal Separate Storm Sewers Separation (MS4) Permit reads: Section XI.D(Water Quality Management Plan Requirements).8(Groundwater Protection): Treatment Control BMPs utilizing infiltration (exclusive of incidental infiltration and BMPs not designed to primarily function as infiltration devices (such as grassy swales, detention basins, vegetated buffer strips, constructed wetlands, etc.)] must comply with the following minimum requirements to protect groundwater: a. Use of structural infiltration treatment BMPs shall not cause or contribute to an exceedance of ground water quality objectives. b. Source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration should be evaluated prior to infiltration. c. Adequate pretreatment of runoff prior to infiltration shall be required in gas stations and large commercial parking lots. (NOTE: The Slate Water Quality Control Board defines a large commercial parking lot as '100,000 sq. ft, or more of commercial development to include parking lot (with 100 or more vehicle traffics), OR, by means of 5,000sgft or more of allowable space designated for parking purposes'). d. Unless adequate pre-treatment of runoff is provided prior to infiltration structural infiltration treatment BMPs must riot be used for areas of industrial or light industrial activity(77), areas subject to high vehicular traffic (25,000 or more dally traffic); car washes; fleet storage areas; nurseries; or any other high threat to water quality land uses or activities. e. Class V injection wells or dry wells must not be placed in areas subject to vehicular(78) repair or maintenance activllies(79), such as an auto body repair shop, automotive repair shop, new and used car dealership, specially repair shop (e.g., transmission and muffler repair shop) or any facility that does any vehicular repair work. I. Structural infiltration BMP treatment shall not be used at sites that are known to have soil and groundwater contamination. g. Structural infiltration treatment BMPs shall be located at least 100 fool horizontally from any water supply wells. h. The vortical distance from the bottom of any Infiltration structural treatment BMP to Iho historic high groundwater mark shall be at least 10 -fool. Where the groundwater basins do riot support beneficial uses, this vortical distance criteria may be reduced, provided groundwater quality Is nutlntnlnod. i. Structural infiltration treatment BMPs shall not cause a nuisance or pollution as defined In Water Code Section 13050. 1'11,11011 III lNOIV WWw CdyoNC lip I'nUn U nl 10 Project #: DRC2018-00392 DRC2018-00393 Project Name: EDR - Longhorn Steakhouse Location: 12327 FOOTHILL BLVD - 022902176-0000 Project Type: Design Review Conditional Use Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.- Grading ROJECT. Grading Section Standard Conditions of Approval 38. Prior to approval of the final project -specific water quality management plan the applicant shall have a soils engineer prepare a project -specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". Note: This project exceeds 5 -acres, the use of the Custom Soil Resource Report for San Bernardino County Southwestern Part by the United States Department of Agriculture, Natural Resource Conservation Service for natural soils is not acceptable for soil groundwater infiltration rates. 39. Prior to issuance of a grading permit for non-residential projects the applicant shall show on the electrical plans and the permitted grading plan set the location for a future installation of an Electric Vehicle (EV) charging station/parking area per the current adopted California Green Building Standards Code, section 5.106.5.3. 40. Prior to issuance of a grading permit the applicant shall show on the site plan and the permitted grading plan set for non-residential projects the designated parking for clean air vehicles per the current adopted California Green Building Standards Code, section 5.106.5.2. www cny.duc 114 IhbtlnO III N/IIIV I'n�a Ill nl Ill